{"title":"Production \u0026 Industry – Templates","description":"\u003csection lang=\"en\" class=\"mb-production-choice\" data-mb-review=\"mb-production-20261122\"\u003e\n\u003cp\u003e\u003cstrong\u003eWhich manufacturing or industrial template do you need? Choose by the actual task: production orders, material demand, OEE, measurement quality, failure investigation, maintenance, PLC\/HMI changes or regulatory compliance. Documents support decisions, but do not provide CE approval or replace testing, workplace safety or official reporting.\u003c\/strong\u003e\u003c\/p\u003e\n\u003ch2\u003eChoose by your production task\u003c\/h2\u003e\n\u003ch3\u003eOrders, capacity, materials and costing\u003c\/h3\u003e\u003cp\u003ePlan production orders and capacity, calculate MRP material needs, compare costing and orders, and distinguish a supplier agreement from a goods receipt. Plan is not actual delivery.\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/produktionsplanering-kapacitetskalkyl-excel-2026-2027\"\u003e\u003cspan lang=\"sv\"\u003eProduktionsplanering \u0026amp; Kapacitetskalkyl 2026\/2027 – Produktionsorder, Veckoplan \u0026amp; Excel\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/materialbehovsplanering-mrp-inkopsplan-excel-2026-2027\"\u003e\u003cspan lang=\"sv\"\u003eMaterialbehovsplanering \u0026amp; Inköpsplanering MRP Light 2026\/2027 – Excel, Word \u0026amp; PDF\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/produktionskostnad-maskintimkostnad-artikelkalkyl-excel-2026-2027\"\u003e\u003cspan lang=\"sv\"\u003eProduktionskostnad \u0026amp; Maskintimkostnad 2026\/2027 – Artikelkalkyl, Pris \u0026amp; Excel\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/inkopsorder-leveransbevakning-excel-2026-2027\"\u003e\u003cspan lang=\"sv\"\u003eInköpsorder \u0026amp; Leveransbevakning 2026\/2027 – Beställningsorder, Restorder \u0026amp; Excel\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/leveransavtal-b2b-leveransplan-order-excel-2027\"\u003e\u003cspan lang=\"sv\"\u003eLeveransavtal \u0026amp; Leveransplan B2B 2026\/2027 – Order, Leveranskvittens \u0026amp; Excel\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/godsmottagningsprotokoll-leveranskontroll-2026-2027-excel-word-pdf\"\u003e\u003cspan lang=\"sv\"\u003eGodsmottagningsprotokoll \u0026amp; Leveranskontroll 2026\/2027 – Excel, Word \u0026amp; PDF\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eShift handover, OEE, setup time and material flow\u003c\/h3\u003e\u003cp\u003eMeasure real OEE performance, report shift issues, study SMED changeover and 5S, use Kanban for replenishment and a spare-parts register for machine-linked critical stock.\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/oee-tak-maskineffektivitet-excel-mall-2026-2027\"\u003e\u003cspan lang=\"sv\"\u003eOEE \u0026amp; TAK – Maskineffektivitet 2026\/2027\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/skiftoverlamning-produktionsdagbok-excel-2027\"\u003e\u003cspan lang=\"sv\"\u003eSkiftöverlämning \u0026amp; Produktionsdagbok 2026\/2027 – Skiftrapport, Risker, Åtgärder \u0026amp; Excel\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/smed-stalltidsanalys-excel-stallinstruktion-2027\"\u003e\u003cspan lang=\"sv\"\u003eSMED \u0026amp; Ställtidsanalys 2026\/2027 – Intern\/extern ställtid, ställinstruktion \u0026amp; Excel\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/5s-revision-arbetsplatsstandard-checklista-excel-2027\"\u003e\u003cspan lang=\"sv\"\u003e5S-revision \u0026amp; Arbetsplatsstandard 2026\/2027 – Checklista, Poängkort \u0026amp; Åtgärdsregister\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/kanban-tvabinge-lagerpafyllnad-excel-2027\"\u003e\u003cspan lang=\"sv\"\u003eKanban \u0026amp; Tvåbingesystem 2026\/2027 – Påfyllnadskort, Lagerflöde \u0026amp; Excel\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/cnc-verktygsregister-verktygslivslangd-2027\"\u003e\u003cspan lang=\"sv\"\u003eCNC Verktygsregister \u0026amp; Verktygslivslängd 2026\/2027 – Skärverktyg, Bytejournal \u0026amp; Kostnader\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/reservdelsregister-kritiska-reservdelar-lager-excel-2027\"\u003e\u003cspan lang=\"sv\"\u003eReservdelsregister \u0026amp; Kritiska Reservdelar 2026\/2027 – Lagerstyrning, Min\/Max \u0026amp; Inköpsförslag\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eMeasurement systems and product-quality release\u003c\/h3\u003e\u003cp\u003eCalibration checks the instrument; MSA examines the measurement process, FAI checks an initial product, and SPC examines process variation. Weight and AI-vision testing require real evidence and manual release decisions.\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/kalibreringsregister-matdonskontroll-excel-2026-2027\"\u003e\u003cspan lang=\"sv\"\u003eKalibreringsregister \u0026amp; Mätdonskontroll 2026\/2027 – Excel, Word \u0026amp; PDF\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/msa-gage-rr-matsystemanalys-excel-2027\"\u003e\u003cspan lang=\"sv\"\u003eMätsystemanalys MSA \u0026amp; Gage R\u0026amp;R 2026\/2027 – 60 mätningar, upprepbarhet \u0026amp; reproducerbarhet\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/forstastyckskontroll-fai-mattprotokoll-2027\"\u003e\u003cspan lang=\"sv\"\u003eFörstastyckskontroll \u0026amp; FAI 2026\/2027 – Måttprotokoll, Ritningskrav \u0026amp; Frisläppningsregister\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/spc-processduglighet-styrdiagram-cp-cpk-2027\"\u003e\u003cspan lang=\"sv\"\u003eSPC \u0026amp; Processduglighet 2026\/2027 – Styrdiagram I–MR, Cp\/Cpk \u0026amp; Åtgärdsregister\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/kontrollvagning-produktionscell-tolerans-avvikelse\"\u003e\u003cspan lang=\"sv\"\u003eKontrollvägning i produktionscell – mätprotokoll, toleransavvikelse och frisläppningsunderlag\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/ai-visionsystem-felaktig-ok-partisparr-aterstart\"\u003e\u003cspan lang=\"sv\"\u003eAI-visionsystem – felaktig OK-sortering, partispärr och säker återstart\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/ai-visionsystem-produktionscell-modellbyte-provserie-frislappning\"\u003e\u003cspan lang=\"sv\"\u003eAI-visionsystem i produktionscell – modellbyte, provserie och frisläppningsbeslut\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003e8D, FMEA, root cause and unplanned machine stops\u003c\/h3\u003e\u003cp\u003eUse 8D for identified defects, FMEA for possible failures, and downtime reports for actual machine stoppages. An RPN number is not a safety certification.\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/8d-rapport-rotorsaksanalys-5-varfor-mall-2026-2027\"\u003e\u003cspan lang=\"sv\"\u003e8D-rapport \u0026amp; Rotorsaksanalys 2026\/2027 – 5 Varför, Åtgärdsregister \u0026amp; Excel\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/fmea-feleffektanalys-mall-excel-2026-2027\"\u003e\u003cspan lang=\"sv\"\u003eFMEA – Feleffektanalys 2026\/2027\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/driftstoppsrapport-maskinhaveri-riskkontroll-atgardslogg-excel\"\u003e\u003cspan lang=\"sv\"\u003eDriftstoppsrapport \u0026amp; Maskinhaveri 2026\/2027 – Riskkontroll, åtgärdslogg och Excel\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003ePreventive maintenance and equipment records\u003c\/h3\u003e\u003cp\u003eKeep machine maintenance distinct from warranties, vehicles, lift tables, fire equipment and ventilation. A log does not replace any legally required inspection.\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/maskinregister-forebyggande-underhall-excel-2026-2027\"\u003e\u003cspan lang=\"sv\"\u003eMaskinregister \u0026amp; Förebyggande Underhåll 2026\/2027 – Excel, Word \u0026amp; PDF\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/garantiregister-garantibevakning-2026-2027-excel-word-pdf\"\u003e\u003cspan lang=\"sv\"\u003eGarantiregister \u0026amp; Garantibevakning 2026\/2027 – Excel, Word \u0026amp; PDF\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/fordonsregister-serviceplanering-2026-2027-excel-word-pdf\"\u003e\u003cspan lang=\"sv\"\u003eFordonsregister \u0026amp; Serviceplanering 2026\/2027 – Excel, Word \u0026amp; PDF\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/lyftbord-saxlyftbord-kontrolljournal-service-atgardsregister\"\u003e\u003cspan lang=\"sv\"\u003eLyftbord \u0026amp; Saxlyftbord – Kontrolljournal, Service \u0026amp; Åtgärdsregister\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/inomhusbrandpost-slangvinda-kontrolljournal-service\"\u003e\u003cspan lang=\"sv\"\u003eInomhusbrandpost \u0026amp; Slangvinda – Kontrolljournal, Service \u0026amp; Åtgärdsregister\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/ventilation-inomhusklimat-driftjournal-ovk-2026-2027\"\u003e\u003cspan lang=\"sv\"\u003eVentilation \u0026amp; Inomhusklimat 2026\/2027 – Driftjournal, Mätprotokoll \u0026amp; OVK-bevakning\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eAutomation, PLC\/HMI, machine safety and FAT\/SAT\u003c\/h3\u003e\u003cp\u003eA scale-to-PLC\/HMI test, new button panel, backup, firmware change, Safety PLC, integrated line and FAT\/SAT are different tasks. Creating an integrated machine may create manufacturer and CE responsibilities.\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/vagsystem-plc-hmi-integrationsprov-viktprov-excel-2026\"\u003e\u003cspan lang=\"sv\"\u003eIntegrationsprov för vågsystem mot PLC\/HMI – signalmatris, viktprov \u0026amp; Excel\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/manoverpanel-tryckknappsstation-produktionscell-funktionsprov\"\u003e\u003cspan lang=\"sv\"\u003eManöverpanel i produktionscell – tryckknappsstation, funktionsprov och säkerhetsgränsdragning\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/plc-hmi-backup-aterlasningsprov-aterstartsbeslut\"\u003e\u003cspan lang=\"sv\"\u003ePLC\/HMI – backup, återläsningsprov och återstartsbeslut\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/maskin-ota-firmware-release-rollback-andringsbeslut-2027\"\u003e\u003cspan lang=\"sv\"\u003eMaskinens OTA-uppdatering 2027 – säkerhetsfirmware, återställningsprov och ändringsbeslut\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/sakerhets-plc-2027-programandring-versionsbevis-aterstartsprov\"\u003e\u003cspan lang=\"sv\"\u003eSäkerhets-PLC 2027 – programändring, versionsbevis och återstartsprov\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/sammansatt-produktionscell-2027-maskinintegrator-ce-granssnitt\"\u003e\u003cspan lang=\"sv\"\u003eSammansatt produktionscell 2027 – integratörens gränssnitt, CE-underlag \u0026amp; säkerhetsprovning\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/fat-sat-testprotokoll-2026-2027-acceptansprovning-avvikelser-och-excel-word-pdf\"\u003e\u003cspan lang=\"sv\"\u003eFAT \u0026amp; SAT Testprotokoll 2026\/2027 – Acceptansprovning, avvikelser och Excel\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/3d-printade-reservdelar-2027-cad-provning-produktansvar\"\u003e\u003cspan lang=\"sv\"\u003e3D-printade reservdelar 2027 – CAD-fil, säkerhetsprovning och produktansvar\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/maskinimportor-distributor-ce-dokumentkontroll-2027\"\u003e\u003cspan lang=\"sv\"\u003eMaskinförordningen 2027 – importör \u0026amp; distributör: CE- och dokumentkontroll\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eOccupational health, exposure and environmental records\u003c\/h3\u003e\u003cp\u003eForklift operators require documented knowledge and written permission. Diesel exhaust needs actual exposure controls; environmental and hazardous-waste records must reflect reality. Authority submissions are separate.\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/trucktillstand-riskbedomning-trucktrafik-2027\"\u003e\u003cspan lang=\"sv\"\u003eTrucktillstånd \u0026amp; Riskbedömning Trucktrafik 2026\/2027 – Lager, Trafikplan \u0026amp; Excel\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/dieselavgaser-arbetsplats-riskbedomning-utsug-exponering-2026\"\u003e\u003cspan lang=\"sv\"\u003eDieselavgaser i verkstad \u0026amp; depå 2026\/2027 – Riskbedömning, utsug \u0026amp; exponeringsregister\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/tradamm-snickeri-2026-riskbedomning-utsug-cmr-register\"\u003e\u003cspan lang=\"sv\"\u003eTrädamm i snickeri 2026\/2027 – Riskbedömning, utsug, mätunderlag \u0026amp; CMR-register\u003c\/span\u003e\u003c\/a\u003e – Woodworking: record real wood-dust risks, extraction measures, exposure evidence and applicable CMR duties; templates cannot replace actual controls.\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/miljoaspektregister-miljoriskbedomning-2026-2027-excel-word-pdf\"\u003e\u003cspan lang=\"sv\"\u003eMiljöaspektregister \u0026amp; Miljöriskbedömning 2026\/2027 – Excel, Word \u0026amp; PDF\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/farligt-avfall-avfallsjournal-transportdokument-2026-2027\"\u003e\u003cspan lang=\"sv\"\u003eFarligt avfall – Avfallsjournal \u0026amp; Transportdokument 2026\/2027\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eIndustry regulations, raw materials, energy and permits\u003c\/h3\u003e\u003cp\u003eIED and CRMA apply only to particular operators. Check when cross-border waste provisions apply and whether new Swedish EED implementing rules are in force. A permit register does not issue a permit.\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/ied2-miljoledningssystem-artikel14a-bat-revision\"\u003e\u003cspan lang=\"sv\"\u003eIED 2.0 miljöledningssystem 2027 – artikel 14a, BAT-mål, kemikalieinventering och revisionsbevis\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/strategiska-ravaror-crma-artikel24-riskberedskap\"\u003e\u003cspan lang=\"sv\"\u003eStrategiska råmaterial 2026\/2027 – leverantörskartläggning, försörjningsrisk och åtgärdsplan\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/avfall-bortskaffande-artikel11-pic-bevis\"\u003e\u003cspan lang=\"sv\"\u003eAvfall för bortskaffande 2026\/2027 – artikel 11, återvinningsprövning och PIC-bevis\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/energikartlaggning-10-85-tj-2027-handlingsplan\"\u003e\u003cspan lang=\"sv\"\u003eEED 2027 – energikartläggning 10\/85 TJ, treårsberäkning och handlingsplan\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/products\/tillstandsregister-myndighetsbevakning-2026-2027-excel-word-pdf\"\u003e\u003cspan lang=\"sv\"\u003eTillståndsregister \u0026amp; Myndighetsbevakning 2026\/2027 – Excel, Word \u0026amp; PDF\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2\u003eLegal scope and future rules\u003c\/h2\u003e\u003cp\u003eEU Machinery Regulation 2023\/1230 applies from 20 January 2027. Swedish machinery and workplace-risk responsibilities already exist. The proposed Swedish energy-audit law remained under consultation with a response deadline of 15 January 2027. Hazardous-waste reports must be submitted separately to the Swedish Environmental Protection Agency.\u003c\/p\u003e\n\u003ch2\u003eFAQ\u003c\/h2\u003e\n\u003ch3\u003eDoes OEE show machine safety?\u003c\/h3\u003e\u003cp\u003eNo. It measures operational performance, not protective functions.\u003c\/p\u003e\n\u003ch3\u003eAre MRP, FMEA and 8D the same?\u003c\/h3\u003e\u003cp\u003eNo. They plan materials, anticipate failure modes and investigate actual problems.\u003c\/p\u003e\n\u003ch3\u003eDoes a PLC backup authorise restart?\u003c\/h3\u003e\u003cp\u003eNo. Testing and safety approval are separate.\u003c\/p\u003e\n\u003ch3\u003eDoes vision AI for product inspection control machine safety?\u003c\/h3\u003e\u003cp\u003eNo. These products address quality inspection.\u003c\/p\u003e\n\u003ch3\u003eIs the proposed EED 2027 law already enacted in Sweden?\u003c\/h3\u003e\u003cp\u003eNot merely because an EU directive exists. Verify national implementation.\u003c\/p\u003e\n\u003ch3\u003eAre downloaded files automatically in the storefront language?\u003c\/h3\u003e\u003cp\u003eNo. Check each product's actual file language and format.\u003c\/p\u003e\n\u003ch2\u003eOfficial sources and further reading\u003c\/h2\u003e\u003cul\u003e\n\u003cli\u003e\u003ca href=\"https:\/\/www.av.se\/produktion-industri-och-logistik\/anvandning-av-arbetsutrustning\/\"\u003eArbetsmiljöverket – arbetsutrustning\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/inspektioner-utredningar-och-kontroller\/produktregler-och-marknadskontroll\/produktregler\/krav-pa-maskiner\/den-nya-maskinforordningen\/\"\u003eArbetsmiljöverket – maskinförordningen\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"https:\/\/www.energimyndigheten.se\/effektiv-energianvandning\/foretag\/lagar-och-krav-for-energieffektivisering-i-foretag\/energikartlaggning\/ny-lag-om-energiledningssystem-och-energikartlaggningar-i-foretag\/\"\u003eEnergimyndigheten – EED\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"https:\/\/www.naturvardsverket.se\/vagledning-och-stod\/avfall-farligt-avfall\/avfallsregistret\/\"\u003eNaturvårdsverket – avfallsregister\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"https:\/\/www.av.se\/produktion-industri-och-logistik\/fordon\/kunskaper-och-tillstand-for-saker-truckanvandning\/\"\u003eArbetsmiljöverket – trucktillstånd\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"https:\/\/mallbutiken.se\/blogs\/foretag\/produktion-kvalitetsledning-guide-mrp-oee-fmea-8d\"\u003e\u003cspan lang=\"sv\"\u003eGuide MRP, OEE, FMEA, 8D (svenska)\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/collections\/lager-inventering-mallar\"\u003e\u003cspan lang=\"sv\"\u003eLager \u0026amp; inventering\u003c\/span\u003e\u003c\/a\u003e\u003c\/li\u003e\n\u003cli\u003e\u003ca href=\"\/en\/pages\/dokumentmallar-kategorier\"\u003eAll categories\u003c\/a\u003e\u003c\/li\u003e\n\u003c\/ul\u003e\u003c\/section\u003e","products":[{"product_id":"kalibreringsregister-matdonskontroll-excel-2026-2027","title":"Calibration Register \u0026 Gauge Control 2026\/2027 – Excel, Word \u0026 PDF | Swedish + English","description":"\u003cdiv class=\"mb-product-description\"\u003e\n\n\u003cp\u003e\u003cstrong\u003eCalibration Register \u0026amp; Measuring Equipment Control 2026\/2027\u003c\/strong\u003e is an editable package for companies that need to keep track of measuring equipment, equipment record cards, control history, calibration certificates, planned intervals, and deviations. Here, you get a practical Excel tool combined with clear Word and PDF documents – with no subscription required.\u003c\/p\u003e\n\n\u003cp\u003eSuitable for workshops, manufacturing companies, quality departments, service organizations, and others who need traceable documentation of their instruments. All controls must be adapted to the actual risks, requirements, and scope of the measurements.\u003c\/p\u003e\n\n\u003cnav aria-label=\"About the document template\"\u003e\u003cstrong\u003eAbout the document template:\u003c\/strong\u003e \u003ca href=\"#kal-paket\"\u003eWhat's included\u003c\/a\u003e · \u003ca href=\"#kal-excel\"\u003eExcel\u003c\/a\u003e · \u003ca href=\"#kal-steg\"\u003eStep by step\u003c\/a\u003e · \u003ca href=\"#kal-krav\"\u003eRequirements and ISO 9001\u003c\/a\u003e · \u003ca href=\"#kal-faq\"\u003eFAQ\u003c\/a\u003e · \u003ca href=\"#kal-leverans\"\u003eDelivery\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv style=\"background:#e8f4ee;border-left:4px solid #278451;padding:15px 18px;margin:20px 0\"\u003e\n\n\u003cstrong\u003eLegally and technically reviewed: October 7, 2026\u003c\/strong\u003e\u003cp\u003eVersion 1.0. The product is based on an overview of public guidance from Swedac and SIS, as well as current relevant Swedish\/EU conditions. SIS lists the new ISO 9001:2026 as published. A template is not a calibration certificate and does not imply that an organization meets ISO 9001 or accreditation requirements.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2 id=\"kal-paket\"\u003eWhat's included in the package\u003c\/h2\u003e\n\n\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth\u003eDocument\u003c\/th\u003e\n\n\u003cth\u003eContent\u003c\/th\u003e\n\n\u003cth\u003eFile format\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eCalibration procedure and measuring equipment control\u003c\/td\u003e\n\n\u003ctd\u003eReady-to-use Swedish control document for responsibilities, risk-based intervals, control methods, traceability, review, and handling of incorrect equipment.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eEquipment record cards and control logs\u003c\/td\u003e\n\n\u003ctd\u003ePrintable fields for instrument ID, serial number, usage, measurement range, calibration certificate, results, measurement uncertainty, decisions, and deviations.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eDetailed user guide\u003c\/td\u003e\n\n\u003ctd\u003eA walkthrough of every file, step-by-step instructions for filling them out, common mistakes, workflow, archiving, and technical limitations.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eMeasuring Equipment Control (English)\u003c\/td\u003e\n\n\u003ctd\u003eSupplementary English work documentation for international personnel in Swedish operations; not a full translation of all Swedish documents.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eCalibration register and measuring equipment control\u003c\/td\u003e\n\n\u003ctd\u003eExcel workbook with overview, instrument register, calibration log, intermediate checks, deviations, and instructions.\u003c\/td\u003e\n\n\u003ctd\u003eExcel (XLSX)\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003cp\u003e\u003cstrong\u003eTotal of 9 files:\u003c\/strong\u003e 4 DOCX, 4 searchable A4 PDFs, and 1 XLSX. Swedish is the primary language, with supplementary English-language work documentation.\u003c\/p\u003e\n\n\u003ch2 id=\"kal-excel\"\u003eA practical calibration register in Excel\u003c\/h2\u003e\n\n\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth\u003eWorksheet\u003c\/th\u003e\n\n\u003cth\u003eWhat you get\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eOverview\u003c\/td\u003e\n\n\u003ctd\u003eKPI dashboard with the number of registered measuring instruments, overdue and upcoming checks, locked instruments, missing dates, and open deviations.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eInstrument register\u003c\/td\u003e\n\n\u003ctd\u003e200 rows for unique ID, manufacturer, model, serial number, person responsible, measurement range, accuracy requirements, operating status, and certificate reference. The next planned date and status are calculated based on your last approved date and chosen interval.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eCalibration log\u003c\/td\u003e\n\n\u003ctd\u003e200 entries for type of control, performer\/laboratory, method, certificate, traceability documentation, measurement points, observed deviation, tolerances, measurement uncertainty, and decisions.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eIntermediate checks\u003c\/td\u003e\n\n\u003ctd\u003e200 entries for risk-based function and stability checks between regular calibrations.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eDeviations\u003c\/td\u003e\n\n\u003ctd\u003e150 entries for locking, root cause investigation, assessment of previous measurement results, actions taken, and release.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eInstructions\u003c\/td\u003e\n\n\u003ctd\u003eStep-by-step guide to the workbook's logic, risk-based usage, and public sources.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003cp\u003eThe workbook features data validation, formula-based dates, and status indicators. \u003cstrong\u003eThere are no automatic email reminders and no default universal calibration intervals.\u003c\/strong\u003e The status is an administrative planning signal, not a decision on the actual suitability of the measuring instrument.\u003c\/p\u003e\n\n\u003ch2\u003eWho benefits from the calibration template?\u003c\/h2\u003e\n\n\u003cp\u003eIt is particularly useful for companies with multiple calipers, micrometers, torque wrenches, thermometers, pressure gauges, testing instruments, and other measurement resources where measurement results affect quality. The product's broad structure can be adapted to industry, workshops, quality departments, facility management, or service, but may need to be supplemented for accredited laboratories and regulated measuring instruments.\u003c\/p\u003e\n\n\u003ch2 id=\"kal-steg\"\u003eHow to use the package – 7 steps\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eInventory:\u003c\/strong\u003e Assign each relevant measuring instrument its own ID and document the measurement range, resolution, usage, and responsibility.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDetermine needs:\u003c\/strong\u003e Assess whether the instrument should be calibrated, verified, or function-tested for its actual use.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDetermine intervals:\u003c\/strong\u003e Document an appropriate time and frequency based on operation, history, risk, the manufacturer, and any external requirements. Do not just blindly set 12 months.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eGather evidence:\u003c\/strong\u003e Register calibration reports, identification, results, measurement uncertainty, and traceability where relevant.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eReview acceptance:\u003c\/strong\u003e A qualified person assesses whether the instrument meets the criteria applicable to its use. A calibration certificate does not automatically imply approval.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003ePlan and follow up:\u003c\/strong\u003e Enter the last \u003cem\u003eapproved\u003c\/em\u003e check and the decided interval in Excel; register intermediate checks and monitor deadlines.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eManage deviations:\u003c\/strong\u003e Lock suspect equipment, assess the impact on previous measurements, and archive decisions and actions before resuming use.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2 id=\"kal-krav\"\u003eISO 9001, Swedac, and calibration requirements – what applies?\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eISO 9001 is a management system standard, not a law that generally requires all companies to calibrate every instrument.\u003c\/strong\u003e Organizations that have implemented or agreed to a quality management system must assess the requirements relevant to their own operations and the edition of the standard being used. SIS lists \u003cstrong\u003eSS-EN ISO 9001:2026\u003c\/strong\u003e as published. Purchase and review the standard itself for actual application or certification.\u003c\/p\u003e\n\n\u003cp\u003eSwedac explains that calibration is based on comparisons with traceable standards and that the measurement uncertainty of the result is an important part of calibration reporting. Calibration, adjustment, verification, and simpler function checks are not the same thing. There is no common mandatory annual interval that automatically applies to all measuring equipment.\u003c\/p\u003e\n\n\u003cp\u003eFor certain instruments, testing areas, and accredited operations, additional legislation, regulations, or technical standards may apply. This template does not replace the assessment of measurement uncertainty, traceability, tolerances, or technical competence.\u003c\/p\u003e\n\n\u003cdiv style=\"background:#fff4da;border-left:4px solid #D3A640;padding:15px 17px;margin:18px 0\"\u003e\n\n\u003cstrong\u003eImportant:\u003c\/strong\u003e Just because an instrument has the status \"PLANNED\" or \"OK\" in a register does not mean it is approved for use. Always check original certificates, error margins, measurement uncertainty, area of use, and current deviations. When in doubt, the instrument should be assessed by a competent person.\u003c\/div\u003e\n\n\u003ch2\u003eCommon pitfalls in measuring equipment control\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003eFailing to distinguish between traceable calibration and simple function checks.\u003c\/li\u003e\n\n\u003cli\u003eChoosing the same control interval for all instruments without technical risk assessment.\u003c\/li\u003e\n\n\u003cli\u003eAssuming the calibration laboratory has automatically approved the equipment for the company's tolerances.\u003c\/li\u003e\n\n\u003cli\u003eOmitting serial numbers, traceability information, or references to original certificates.\u003c\/li\u003e\n\n\u003cli\u003eFailing to assess previous control results when an instrument is found to be faulty.\u003c\/li\u003e\n\n\u003cli\u003eRelying solely on Excel status without actual technical review.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2 id=\"kal-faq\"\u003eCommon questions and answers\u003c\/h2\u003e\n\n\u003ch3\u003eIs ISO 9001:2026 mandatory for all companies?\u003c\/h3\u003e\n\n\u003cp\u003eNo. ISO 9001 is fundamentally voluntary, but it may be a customer requirement, a procurement condition, or part of a certification. Any legal or industry requirements must be assessed separately.\u003c\/p\u003e\n\n\u003ch3\u003eCan I use Excel for all my measuring instruments?\u003c\/h3\u003e\n\n\u003cp\u003eThe tool has space for 200 instruments and 200 entries each in the log and intermediate checks. Adjust control types, intervals, and acceptance requirements to suit your instruments.\u003c\/p\u003e\n\n\u003ch3\u003eIs the next calibration date calculated automatically?\u003c\/h3\u003e\n\n\u003cp\u003eYes. Once the instrument has an ID, a last approved date, and a decided interval in months, the register sheet shows the next planned date and calendar-based plan status.\u003c\/p\u003e\n\n\u003ch3\u003eDo I get a calibration certificate?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The protocols help you document performed checks and refer to certificates; they are not accredited calibration certificates.\u003c\/p\u003e\n\n\u003ch3\u003eDo all instruments need to be calibrated annually?\u003c\/h3\u003e\n\n\u003cp\u003eNo, a general 12-month interval does not automatically apply to all equipment. Needs and intervals depend on usage, risk, history, applicable requirements, and professional assessment.\u003c\/p\u003e\n\n\u003ch3\u003eIs there an English version?\u003c\/h3\u003e\n\n\u003cp\u003eYes, a separate English staff document adapted for Swedish operational conditions is included. Main templates and the user guide are in Swedish.\u003c\/p\u003e\n\n\u003ch2 id=\"kal-leverans\"\u003eFormat, price, and delivery\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003e79 SEK.\u003c\/strong\u003e ZIP file with 9 final files in Word (DOCX), PDF, and Excel (XLSX). Entirely digital product with no physical shipping. For automatic delivery after purchase, the download file must be linked to Shopify Digital Products.\u003c\/p\u003e\n\n\u003ch2\u003eOfficial sources and further reading\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.sis.se\/iso9001\/\"\u003eSIS – ISO 9001 and current standard edition\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.sis.se\/iso9001\/tolkningsgruppfriso9001\/tolkningaraviso9001\/fraga-7\/\"\u003eSIS – Resources for monitoring and measurement\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.swedac.se\/amnesomraden\/kalibrering\/\"\u003eSwedac – Calibration and measurement uncertainty\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/regelverk.swedac.se\/policy\/swedac-doc-05-6_sv.html\"\u003eSwedac – Technical assessment and equipment control\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/regelverk.swedac.se\/policy\/swedac-doc-12-7_sv.html\"\u003eSwedac – Calibration, verification, and control\u003c\/a\u003e\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003e\u003csmall\u003eDisclaimer: The product is an editable document aid, not a calibration laboratory, a technical validation service, an accreditation certificate, or a guarantee of ISO compliance. Consult an expert for advanced tolerances, measurement uncertainty, metrological decisions, or industry requirements.\u003c\/small\u003e\u003c\/p\u003e\n\n\n\u003c\/div\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55644377088342,"sku":"KALIBRERINGSREGISTER-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/01_kalibreringsregister_mallpaket_2027_a3454e4f-2ffa-4432-a2e1-d1266d7adaee.png?v=1791425904"},{"product_id":"fmea-feleffektanalys-mall-excel-2026-2027","title":"FMEA – Failure Mode and Effects Analysis 2026\/2027 | Risk Analysis, RPN \u0026 Action Register – Word\/PDF\/Excel","description":"\u003cdiv class=\"mb-product-description\" lang=\"en\"\u003e\n\n\u003cp\u003e\u003cstrong\u003eFMEA – Failure Mode and Effects Analysis 2026\/2027\u003c\/strong\u003e is an editable template package for companies that need to identify failure modes, analyze effects and causes, and plan and follow up on improvement measures. The package is adaptable for \u003cstrong\u003eProcess FMEA (PFMEA)\u003c\/strong\u003e, \u003cstrong\u003eDesign FMEA (DFMEA)\u003c\/strong\u003e, service processes, and other business analyses. It combines Word and PDF documents with an Excel register that calculates conventional RPN and shows responsibilities, control history, and revision status.\u003c\/p\u003e\n\n\u003cp\u003eYou get a practical starting point for cross-functional analysis meetings, clear decision protocols, and traceable action follow-ups – without having to build the entire structure yourself.\u003c\/p\u003e\n\n\u003cnav aria-label=\"About the document template\"\u003e\u003cstrong\u003eAbout the document template:\u003c\/strong\u003e \u003ca href=\"#fmea-inne\"\u003eWhat's included\u003c\/a\u003e · \u003ca href=\"#fmea-excel\"\u003eThe Excel tool\u003c\/a\u003e · \u003ca href=\"#fmea-steg\"\u003eHow to do it\u003c\/a\u003e · \u003ca href=\"#fmea-regler\"\u003eStandard and method\u003c\/a\u003e · \u003ca href=\"#fmea-faq\"\u003eFAQ\u003c\/a\u003e · \u003ca href=\"#fmea-leverans\"\u003eFormat\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv style=\"background:#e9f5ee;border-left:4px solid #278250;padding:16px;margin:18px 0\"\u003e\n\n\u003cstrong\u003eTechnically and legally reviewed: October 7, 2026\u003c\/strong\u003e\u003cp\u003eVersion 1.0 • 2026\/2027. The methodology basis has been compared with IEC 60812:2018 and public information from SIS\/SEK. The templates are \u003cstrong\u003eproprietary working documents\u003c\/strong\u003e, not a copy of the IEC standard, licensed AIAG-VDA tables, certification material that automatically demonstrates compliance, or a safety assessment of an actual system.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2 id=\"fmea-inne\"\u003eIncluded in the FMEA package\u003c\/h2\u003e\n\n\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth\u003eDocument\u003c\/th\u003e\n\n\u003cth\u003eContent\u003c\/th\u003e\n\n\u003cth\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eFMEA – working method and analysis plan\u003c\/td\u003e\n\n\u003ctd\u003eRoles, scope, functions, failure modes, effects analysis, causes, preventive controls, S\/O\/D assessment, and decision process.\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eAnalysis and decision protocols\u003c\/td\u003e\n\n\u003ctd\u003eMeeting tasks, risk selection, action decisions, verification references, and approval of residual risk.\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eDetailed user guide\u003c\/td\u003e\n\n\u003ctd\u003eWalkthrough of the workflow, calculation examples, Excel instructions, pitfalls, control points, and sources.\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eFMEA – Working Sheet (English)\u003c\/td\u003e\n\n\u003ctd\u003eEnglish working document for international project teams in Swedish operations. Not a complete translation of all Swedish documents.\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eFMEA risk register and actions\u003c\/td\u003e\n\n\u003ctd\u003eProfessional Excel workbook with six sheets, calculated RPN, status, dashboard, and follow-up.\u003c\/td\u003e\n\n\u003ctd\u003eXLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003cp\u003e\u003cstrong\u003eTotal of nine files:\u003c\/strong\u003e four Word (DOCX), four searchable PDF, and one Excel (XLSX), gathered in a ZIP. Swedish is the primary language; a practical English working document is included.\u003c\/p\u003e\n\n\u003ch2\u003eWho is this FMEA template suitable for?\u003c\/h2\u003e\n\n\u003cp\u003eThe templates are suitable for manufacturing companies, workshops, engineering departments, quality managers, production engineers, and process owners who need to analyze failure risks and document decisions. FMEA is useful when introducing a new product or production process, process changes, recurring deviations, supplier changes, or preventive improvement work.\u003c\/p\u003e\n\n\u003ch2 id=\"fmea-excel\"\u003eExcel – six sheets with real functionality\u003c\/h2\u003e\n\n\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth\u003eSheet\u003c\/th\u003e\n\n\u003cth\u003eFunction\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eOverview\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eDisplays the number of registered failure modes, highlighted high severity, open and overdue actions, and registered revisions.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eFMEA Register\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e120 prepared rows for function, failure mode, effect, cause, controls, S\/O\/D, RPN, proposed actions, and residual risk.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eActions\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e100 entries for responsibility, due date, actual verification evidence, status, and approval.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eAssessment Scales\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eIllustrative explanations for S\/O\/D 1–10; to be replaced by the organization's decided method.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eRevision Log\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e50 rows for document changes, reason, decision, and next review.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eInstructions\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eStep-by-step completion guide, limitations, and links to sources.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003cp\u003eExcel automatically calculates conventional \u003cstrong\u003eRPN = S × O × D\u003c\/strong\u003e and corresponding scores after actions when you enter values 1–10. Here, S stands for Severity, O for Occurrence, and D for Detectability (higher D is worse detection). An example with S=8, O=4, and D=6 gives RPN 192; if a verified action leads to a new assessment of S=8, O=2, D=3, the RPN becomes 48. These figures are decision support, not approvals.\u003c\/p\u003e\n\n\u003cdiv style=\"background:#fff5d9;border-left:4px solid #d1a235;padding:16px;margin:17px 0\"\u003e\n\n\u003cstrong\u003eImportant regarding RPN and AIAG-VDA:\u003c\/strong\u003e Risks should never be automatically approved just because an RPN is low. Safety-critical effects must be assessed separately. The customer-specific \u003cem\u003eAIAG-VDA Action Priority (AP)\u003c\/em\u003e method is not included and is not calculated by the template. Use licensed methodology material in case of specific industry or customer requirements.\u003c\/div\u003e\n\n\u003ch2 id=\"fmea-steg\"\u003eHow to create a traceable Failure Mode and Effects Analysis\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDescribe the analysis object:\u003c\/strong\u003e specify product, process, functions, scope, and version designation.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eGather the right expertise:\u003c\/strong\u003e involve e.g., engineering, production, quality, and maintenance based on the actual risk.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eIdentify failure modes:\u003c\/strong\u003e analyze how a step can fail, what effects the failure has, and possible underlying causes.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDocument existing controls:\u003c\/strong\u003e differentiate between preventive measures and controls that detect the failure.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eAssess S\/O\/D:\u003c\/strong\u003e use common criteria and document assumptions. RPN is generated automatically.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eChoose risk actions:\u003c\/strong\u003e always prioritize serious effects and potential safety and customer requirements, not just high RPN.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eVerify the effect:\u003c\/strong\u003e record evidence, responsible person, date, and new assessment only after the action has shown results.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDecide and archive:\u003c\/strong\u003e document residual risk, authorized approver, and when the analysis should be re-evaluated.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2 id=\"fmea-regler\"\u003eFMEA, IEC 60812 and Swedish requirements\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eIEC 60812:2018\u003c\/strong\u003e describes how FMEA and FMECA can be planned, performed, documented, and maintained. The standard is general and covers hardware, software, and processes, among other things. FMEA is not an independent general legal requirement for all Swedish companies. However, mandatory requirements may follow from applicable legislation and agreements for a specific product, industry, or business.\u003c\/p\u003e\n\n\u003cp\u003eFor medical devices, automotive suppliers, safety-critical systems, and machinery, specialized standards, customer requirements, or safety analyses may be required. This package does not provide automatic compliance with IEC, ISO, AIAG-VDA, or IATF 16949 and cannot replace professional safety assessment. The actual IEC standard text is not included in the purchase.\u003c\/p\u003e\n\n\u003ch2\u003eCommon mistakes to avoid\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003eMixing failure mode, effect, and root cause in a single unclear field.\u003c\/li\u003e\n\n\u003cli\u003eEquating two different risks because their RPN happens to be the same.\u003c\/li\u003e\n\n\u003cli\u003eIgnoring very serious effects that have a low probability value.\u003c\/li\u003e\n\n\u003cli\u003eChanging risk scores after a planned action without actual verification.\u003c\/li\u003e\n\n\u003cli\u003eClaiming that standard RPN categories correspond to AIAG-VDA Action Priority.\u003c\/li\u003e\n\n\u003cli\u003eLeaving decisions on residual risk without a named responsible person.\u003c\/li\u003e\n\n\u003cli\u003eNot updating the FMEA after changing design, process, or new deviations.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2 id=\"fmea-faq\"\u003eFrequently asked questions about FMEA\u003c\/h2\u003e\n\n\u003ch3\u003eWhat is an FMEA?\u003c\/h3\u003e\n\n\u003cp\u003eFMEA, Failure Mode and Effects Analysis, is a structured method for identifying how a product or process can fail, assessing consequences, and prioritizing preventive improvements.\u003c\/p\u003e\n\n\u003ch3\u003eWhat is the difference between PFMEA and DFMEA?\u003c\/h3\u003e\n\n\u003cp\u003ePFMEA analyzes potential failures in the execution of the process. DFMEA analyzes failures linked to the function of a product or design. Both need to be adapted to their real requirements.\u003c\/p\u003e\n\n\u003ch3\u003eIs FMEA mandatory according to ISO 9001?\u003c\/h3\u003e\n\n\u003cp\u003eThere is no general requirement for all organizations to use this specific spreadsheet or FMEA method to work in a risk-based manner. Check your applicable standard edition and customer requirements.\u003c\/p\u003e\n\n\u003ch3\u003eHow is RPN calculated?\u003c\/h3\u003e\n\n\u003cp\u003eExcel multiplies severity S, occurrence O, and detectability D, using ratings 1–10. This gives a number between 1 and 1000 when all values are present.\u003c\/p\u003e\n\n\u003ch3\u003eCan Excel automatically approve a risk?\u003c\/h3\u003e\n\n\u003cp\u003eNo. A low RPN is not equivalent to low actual risk. A competent person must take a stance on serious effects and applicable requirements.\u003c\/p\u003e\n\n\u003ch3\u003eIs AIAG-VDA Action Priority included?\u003c\/h3\u003e\n\n\u003cp\u003eNo. No licensed AP table or automatic AP calculation is included. A customer-adapted FMEA approach may require other materials.\u003c\/p\u003e\n\n\u003ch3\u003eIs there an English version?\u003c\/h3\u003e\n\n\u003cp\u003eYes, a separate English working sheet is included for international teams. The primary Swedish templates and user guide are not included as complete English translations.\u003c\/p\u003e\n\n\u003ch2 id=\"fmea-leverans\"\u003eFormat, price, and digital delivery\u003c\/h2\u003e\n\n\u003cp\u003eDelivered as a ZIP file with \u003cstrong\u003e4 DOCX, 4 PDF, and 1 XLSX\u003c\/strong\u003e. Standard price 79 SEK. No physical shipping. For automatic digital delivery after purchase, the ZIP file must be linked to the correct variant in Shopify's Digital Products.\u003c\/p\u003e\n\n\u003ch2\u003eOfficial sources\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/webstore.iec.ch\/en\/publication\/26359\"\u003eIEC – IEC 60812:2018, Failure modes and effects analysis\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.sis.se\/produkter\/mekaniska-system-och-komponenter\/egenskaper-och-utformning-av-maskiner-apparater-och-utrustningar\/ss-en-iec-60812\/\"\u003eSIS – SS-EN IEC 60812, Reliability – Failure modes and effects analysis\u003c\/a\u003e\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003e\u003csmall\u003eDisclaimer: An FMEA template does not replace licensed standards, customer-specific regulations, technical testing, CE assessment, or specialist expertise where required. The method and scales must be adapted and documented by the person responsible for the business.\u003c\/small\u003e\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\u003csection class=\"mallbutiken-related-guide\" aria-label=\"Related guide\"\u003e\u003ch2\u003eDeepen your knowledge with our guides\u003c\/h2\u003e\n\n\u003cp\u003eLearn how to identify failure modes and plan preventive actions.\u003c\/p\u003e\n\n\u003cp\u003e\u003ca href=\"\/en\/blogs\/foretag\/fmea-feleffektanalys-steg-for-steg\"\u003eFMEA – Failure Mode and Effects Analysis step by step\u003c\/a\u003e\u003c\/p\u003e\n\n\u003cp\u003e\u003ca href=\"\/en\/blogs\/foretag\/produktion-kvalitetsledning-guide-mrp-oee-fmea-8d\"\u003eOverview: production management and quality management\u003c\/a\u003e\u003c\/p\u003e\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55644674097494,"sku":"FMEA-RISKANALYS-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/01_fmea_hero_2026_2027_de439c3f-0f04-4cb4-b7b5-1faf043f96db.png?v=1791427722"},{"product_id":"maskinregister-forebyggande-underhall-excel-2026-2027","title":"Machine Register \u0026 Preventive Maintenance 2026\/2027 – Excel, Word \u0026 PDF | Swedish + English","description":"\u003cdiv class=\"mb-product-description\" lang=\"en\"\u003e\n\n\u003cp\u003e\u003cstrong\u003eMachine Register \u0026amp; Preventive Maintenance 2026\/2027\u003c\/strong\u003e is a complete, editable document package for workshops, production companies, service organizations, and facility management that require a clear overview of machinery, maintenance plans, completed inspections, and deviations. You receive Word templates, searchable PDF versions, a separate user guide, an English working document, and an Excel workbook with six interconnected sheets.\u003c\/p\u003e\n\n\u003cp\u003eCreate a machine list with unique machine IDs, plan maintenance based on your own risk-assessed intervals, register completed service, and follow up on deviations. The product is an administrative tool and \u003cstrong\u003enot a machine safety approval or a substitute for statutory inspections.\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003cnav aria-label=\"About the document template\"\u003e\u003cstrong\u003eAbout the document template:\u003c\/strong\u003e \u003ca href=\"#maskin-inne\"\u003eWhat's included\u003c\/a\u003e · \u003ca href=\"#maskin-excel\"\u003eThe Excel tool\u003c\/a\u003e · \u003ca href=\"#maskin-steg\"\u003eHow to use\u003c\/a\u003e · \u003ca href=\"#maskin-juridik\"\u003eRules \u0026amp; safety\u003c\/a\u003e · \u003ca href=\"#maskin-faq\"\u003eFAQ\u003c\/a\u003e · \u003ca href=\"#maskin-format\"\u003eDelivery\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv style=\"background:#e9f5ee;border-left:4px solid #24845b;padding:15px 18px;margin:20px 0\"\u003e\n\n\u003cstrong\u003eRegulation and technical review: October 9, 2026\u003c\/strong\u003e\u003cp\u003eVersion 1.0 with relevance for 2026\/2027. The template package has been editorially checked against the Swedish Work Environment Authority's AFS 2023:11 and relevant EU information regarding the Machinery Regulation (EU) 2023\/1230. It has not been reviewed by authorities, certified, or individually safety-assessed.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2 id=\"maskin-inne\"\u003eWhat's included in the package\u003c\/h2\u003e\n\n\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth\u003eDocument\u003c\/th\u003e\n\n\u003cth\u003eContent\u003c\/th\u003e\n\n\u003cth\u003eFile format\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eMaintenance program \u0026amp; machine control\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eResponsibility, inventory, risk-based maintenance strategy, safe working methods, special checks, restart, and document control.\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eMachine card \u0026amp; service log\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eUnique machine details, identification, completed checks, measured results, deviations, lockout, and verified restart.\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eDetailed user guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003ePractical review of every document and Excel sheet, application, common mistakes, safety, and archiving.\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eMachine Maintenance – Working Sheets\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eSupplementary English working sheets for Swedish operations; not a complete translation of the entire Swedish package.\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eMachine register \u0026amp; maintenance plan\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eExcel workbook with register, scheduling, service history, deviations, KPI overview, and instructions.\u003c\/td\u003e\n\n\u003ctd\u003eXLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003cp\u003e\u003cstrong\u003eTotal of nine final delivery files:\u003c\/strong\u003e four Word files, four A4 PDF files, and one Excel workbook. Swedish is the primary language, supplemented by an English working document.\u003c\/p\u003e\n\n\u003ch2\u003eWho are the machine maintenance templates for?\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eWorkshops and manufacturing companies\u003c\/strong\u003e can consolidate production machines, service activities, and operational disruptions into one register. \u003cstrong\u003eMaintenance technicians and production managers\u003c\/strong\u003e can plan, document, and follow up on work with traceability to technical manuals. \u003cstrong\u003eFacility caretakers and service contractors\u003c\/strong\u003e can use the same work structure for relevant equipment but must determine for themselves which types of controls and regulations apply.\u003c\/p\u003e\n\n\u003cp\u003eThe machine register is not the same as an accounting asset register, and the package is not a full-scale CMMS with connected operational monitoring or automatic notifications.\u003c\/p\u003e\n\n\u003ch2 id=\"maskin-excel\"\u003eThe Excel tool – six practical worksheets\u003c\/h2\u003e\n\n\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth\u003eWorksheet\u003c\/th\u003e\n\n\u003cth\u003eFunctions\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eOverview\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eAutomatic summary of registered machines, planned inspection tasks, overdue items, upcoming checks within 30 days, open deviations, service interventions, and costs.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eMachine Register\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e120 rows for machine ID, description, location, manufacturer, serial number, responsibility, risk reference, operating status, manual, and inspection documents.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eMaintenance Plan\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e120 plan rows for machine ID, check type, instructions, responsibility, last performed, interval in days, and estimated next planned date. Separate manually determined operating status.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eService Journal\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e120 rows with actual service date, work tasks, performer, hours, cost, results, and reference to protocol.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eDeviations\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e120 rows for faults, risk priority, lockout, responsibility, deadline, verification, and restart decision.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eInstructions\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eMethod of use, limitations, and official sources.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003cp\u003eExcel calculates calendar-based next check occasions when an actual completed date and your own approved interval are entered; for the first check without history, an initial due date can be set. Plan status can be displayed as \u003cem\u003eoverdue\u003c\/em\u003e, \u003cem\u003ewithin 30 days\u003c\/em\u003e, \u003cem\u003eplanned\u003c\/em\u003e, or \u003cem\u003edate missing\u003c\/em\u003e. The system does not send email reminders. Operating status and technical approval are never automatically determined by the spreadsheet.\u003c\/p\u003e\n\n\u003cdiv style=\"background:#fff4d7;border-left:4px solid #D5A337;padding:15px 18px;margin:18px 0\"\u003e\n\n\u003cstrong\u003eImportant regarding intervals and safety:\u003c\/strong\u003e No universal monthly or yearly intervals are pre-filled as regulatory requirements. Manufacturer instructions, actual risks, usage, operating hours, and any special regulations govern this. The spreadsheet formulas handle calendar dates, not automatic operating-hour-based control or statutory inspections. The machine's technical usability must always be assessed separately.\u003c\/div\u003e\n\n\u003ch2 id=\"maskin-steg\"\u003eHow to work with the package – step by step\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eInventory:\u003c\/strong\u003e gather machine ID, model, serial number, location, user manual, and relevant inspection documents.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDetermine responsibility:\u003c\/strong\u003e specify the maintenance manager, authorized performers, and who is permitted to decide on shutdown and restart.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eAssess needs:\u003c\/strong\u003e base this on relevant risk assessments and manufacturer instructions. Distinguish between daily supervision, preventive service, extra checks, and prescribed inspections.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003ePlan maintenance:\u003c\/strong\u003e create one row per machine and activity in Excel. Enter method, performer, document reference, actual check history, and risk-based interval.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003ePerform safely:\u003c\/strong\u003e handle energy isolation, protection, and access according to the organization's safety procedures. Perform only tasks you are competent and authorized to carry out.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDocument the result:\u003c\/strong\u003e note the intervention and actual observations in the service protocol and service journal. Update the \"last performed\" date only when the work is actually completed.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eManage defects:\u003c\/strong\u003e lockout suspected hazardous equipment, register deviations, and verify necessary measures before restart.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eUpdate:\u003c\/strong\u003e check open items, changes in the machine fleet, and new instructions. Archive previous versions and original certificates.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2 id=\"maskin-juridik\"\u003eThe Swedish Work Environment Authority's rules on maintenance and control\u003c\/h2\u003e\n\n\u003cp\u003eIn \u003cstrong\u003eAFS 2023:11\u003c\/strong\u003e, there is a requirement that employers ensure that work equipment is maintained during use. When a maintenance journal exists, it must be kept up to date (Chapter 2, Section 15). The same chapter regulates, among other things, checks for certain installations and relocations, regular checks for impacts that may cause risks, and extra checks after specific events. Relevant results must be documented in the specified cases. \u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/afs-202311\/\"\u003eRead AFS 2023:11 at the Swedish Work Environment Authority\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003cp\u003eCertain machines and devices may have more specific requirements for continuous supervision, record-keeping, inspection, inspection bodies, or permits. The \u003cstrong\u003eEU Machinery Regulation (EU) 2023\/1230\u003c\/strong\u003e largely concerns product requirements and market access for machines, with provisions having different application dates. It should not be confused with the user's overall work environment responsibility for existing equipment. \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2023\/1230\/oj\"\u003eRead the Machinery Regulation on EUR-Lex\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003cp\u003eThe document template does not replace risk assessment, technical control, CE documentation, manufacturer service instructions, inspections by an authorized inspection body, or specialist support when needed.\u003c\/p\u003e\n\n\u003ch2\u003eCommon mistakes and pitfalls\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003eApplying a general interval to all machine equipment without risk assessment.\u003c\/li\u003e\n\n\u003cli\u003eEntering planned service as if it were already completed.\u003c\/li\u003e\n\n\u003cli\u003eLacking unique machine IDs, thereby mixing the history of different machines.\u003c\/li\u003e\n\n\u003cli\u003eConfusing your own service checklist with a formal inspection certificate.\u003c\/li\u003e\n\n\u003cli\u003eMarking “in operation” in Excel despite technical uncertainty or open safety-critical defects.\u003c\/li\u003e\n\n\u003cli\u003eNot performing extra checks after rebuilding, accidents, or other risk-relevant events.\u003c\/li\u003e\n\n\u003cli\u003eNot documenting restart decisions, original reports, and responsibilities.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2 id=\"maskin-faq\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\n\u003ch3\u003eIs a machine register mandatory?\u003c\/h3\u003e\n\n\u003cp\u003eThere is no general requirement for this specific Excel template. However, AFS 2023:11 sets requirements for safe maintenance and certain checks, including documentation in relevant cases. Other equipment types may have specific documentation and inspection requirements.\u003c\/p\u003e\n\n\u003ch3\u003eCan Excel plan upcoming service?\u003c\/h3\u003e\n\n\u003cp\u003eYes. The next calendar date and plan status are calculated when the correct information is entered. The intervals must be determined by the business, and no automated technical safety assessment is performed.\u003c\/p\u003e\n\n\u003ch3\u003eCan I register machines that need service based on operating hours?\u003c\/h3\u003e\n\n\u003cp\u003eThe machine's hour-meter reading can be noted in the protocols, but the calculation in Excel only supports calendar days. Maintenance based on operating hours requires separate planning or further customization.\u003c\/p\u003e\n\n\u003ch3\u003eIs it a complete CMMS system?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It is an offline-based register and document package, without automatic notifications, integrations, or mobile work order flows.\u003c\/p\u003e\n\n\u003ch3\u003eDoes the service protocol suffice as an inspection certificate?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Equipment with requirements for special inspections or checks must be handled in the manner prescribed by current rules.\u003c\/p\u003e\n\n\u003ch3\u003eIs an English version included?\u003c\/h3\u003e\n\n\u003cp\u003eYes, a supplementary English working document based on Swedish conditions. The main Swedish documents and the guide are not fully translated.\u003c\/p\u003e\n\n\u003ch2 id=\"maskin-format\"\u003eFile format and digital delivery\u003c\/h2\u003e\n\n\u003cp\u003eOne-time price \u003cstrong\u003e79 SEK\u003c\/strong\u003e. ZIP with four DOCX, four PDF, and one XLSX. Word and Excel can be edited in compatible software; the PDF files are searchable and can be printed. The product is entirely digital without physical shipping. Automatic download after purchase requires that the ZIP file is linked to the correct Shopify variant in Digital Products.\u003c\/p\u003e\n\n\u003ch2\u003eOfficial sources\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/afs-202311\/\"\u003eSwedish Work Environment Authority – AFS 2023:11, Work equipment and personal protective equipment\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2023\/1230\/oj\"\u003eEUR-Lex – Regulation (EU) 2023\/1230 on machinery\u003c\/a\u003e\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003e\u003csmall\u003eDisclaimer: Editable document templates and administrative Excel tool. No on-site inspection, certification, guarantee of regulatory compliance, or individual technical\/legal advice is included. Adapt the documents to the business's actual equipment, risks, and current regulations.\u003c\/small\u003e\u003c\/p\u003e\n\n\n\u003c\/div\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55654990184790,"sku":"MASKINREGISTER-UNDERHALL-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/01_Maskinregister_underhall_2027_hero_0c83235a-debd-4e41-8fc5-8e3fc5ee0b60.png?v=1791497422"},{"product_id":"8d-rapport-rotorsaksanalys-5-varfor-mall-2026-2027","title":"8D Report \u0026 Root Cause Analysis 2026\/2027 – 5 Whys, Action Log \u0026 Excel | Word\/PDF","description":"\u003csection class=\"mb-product-description\" lang=\"en\"\u003e\n\u003cp\u003e\u003cstrong\u003e8D Report \u0026amp; Root Cause Analysis 2026\/2027\u003c\/strong\u003e is a professional, editable template package for companies that need to investigate quality issues, supplier deviations, and customer complaints using a systematic method. The package includes a complete report template in Swedish for D0–D8, a separate 5 Whys and root cause analysis, a detailed user guide, an English working document, and an Excel register for cases, actions, and verified effectiveness.\u003c\/p\u003e\n\n\u003cp\u003eFrom the first deviation to formal closure: identify the scope, protect the customer, test root causes, implement permanent actions, and document whether they actually worked. \u003cstrong\u003eStandard price: 79 SEK, one-time purchase.\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003cnav aria-label=\"About the document template\"\u003e\u003cstrong\u003eAbout the document template:\u003c\/strong\u003e \u003ca href=\"#8d-inne\"\u003ePackage contents\u003c\/a\u003e · \u003ca href=\"#8d-excel\"\u003eExcel\u003c\/a\u003e · \u003ca href=\"#8d-metod\"\u003eStep by step\u003c\/a\u003e · \u003ca href=\"#8d-regler\"\u003eRequirements and limitations\u003c\/a\u003e · \u003ca href=\"#8d-faq\"\u003eFAQ\u003c\/a\u003e · \u003ca href=\"#8d-format\"\u003eDelivery\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv style=\"background:#eaf6ee;border-left:4px solid #25865c;padding:15px 18px;margin:18px 0;\"\u003e\n\n\u003cstrong\u003eProfessionally peer-reviewed: October 9, 2026\u003c\/strong\u003e\u003cp\u003eDocument version 1.0, relevant for 2026\/2027. The main steps of the method have been compared with publicly available information from Siemens and WEDEAQ (licensed VDA QMC partner). The package is independently developed, does not contain protected VDA\/OEM original forms, and is not a certification or a promise of compliance with customer-specific standards.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2 id=\"8d-inne\"\u003eWhat is included in the 8D package\u003c\/h2\u003e\n\n\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth\u003eDocument\u003c\/th\u003e\n\n\u003cth\u003eWhat is it used for?\u003c\/th\u003e\n\n\u003cth\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003e8D Report (Swedish)\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eD0 initial protection, D1 team, D2 problem definition, D3 temporary containment actions, D4 root cause, D5 permanent action selection, D6 effectiveness verification, D7 prevention, and D8 formal closure.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eRoot Cause Analysis and 5 Whys\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eAnalysis form for five whys, alternative hypotheses, cause of non-detection, verification evidence, and decision on the next action.\u003c\/td\u003e\n\u003c!--nl --\u003e\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eDetailed Swedish user guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eMethod description, step-by-step, document control, examples, Excel instructions, common mistakes, and sources.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003e8D Problem-Solving Sheet (English)\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eEnglish working document for D0–D8 and action decisions in Swedish operations. A supplement, not a full translation of all Swedish files.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003e8D – Case and Action Register\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eExcel workbook with overview, cases, actions, 5 Whys, effectiveness control, and instructions.\u003c\/td\u003e\n\n\u003ctd\u003eExcel (XLSX)\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003cp\u003e\u003cstrong\u003eTotal of nine files in a ZIP package:\u003c\/strong\u003e 4 DOCX + 4 searchable A4 PDFs + 1 XLSX. Swedish is the primary language; English working document included.\u003c\/p\u003e\n\n\u003ch2\u003eWho is the 8D report useful for?\u003c\/h2\u003e\n\n\u003cp\u003eThe templates are suitable for quality managers, production engineers, process owners, supplier quality, purchasing departments, workshops, industrial companies, and technical service organizations. Typical cases include recurring product failures, delivery complaints, process disturbances, lacking control points, or quality problems where a simple one-off correction is insufficient.\u003c\/p\u003e\n\n\u003cp\u003eThe method can also be used in other industries but should be adapted to the scope of the problem. For small isolated flaws, a simpler action log may be more proportionate; safety-critical incidents often require additional special investigation.\u003c\/p\u003e\n\n\u003ch2 id=\"8d-excel\"\u003eThe Excel tool – six tabs for traceable follow-up\u003c\/h2\u003e\n\n\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth\u003eWorksheet\u003c\/th\u003e\n\n\u003cth\u003eFunction\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eOverview\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eAutomatic indicators for registered 8D cases, open\/ongoing cases, delayed cases, overdue actions, completed actions, and effectiveness checks marked as fulfilled.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003e8D Cases\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e100 prepared rows for customer\/process, item, problem description, priority, current discipline D0–D8, person responsible, date, customer communication, and case status.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eActions\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e150 rows for temporary containment, permanent correction, or preventive system changes with responsibility, deadline, execution, effectiveness status, and evidence reference.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003e5 Whys\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e100 rows for analytical causal chains, confirmed root cause, non-detection, method, and evidence.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eEffectiveness Control\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e100 rows for comparison before\/after action, sampling, control period, acceptance criteria, reviewer, and actual outcome.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eInstructions\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eWorkflow, safety limitations, status definitions, and sources.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003cp\u003eThe workbook contains data validation, filterable and structured register fields, calendar-based delay indicators, and automatic summaries. \u003cstrong\u003eNeither Excel nor the Word template automatically approves a risk.\u003c\/strong\u003e The status \"completed\" is not the same as verified effectiveness, and \"delayed\" only means that a registered target date has passed.\u003c\/p\u003e\n\n\u003ch2 id=\"8d-metod\"\u003eHow to use 8D – step by step\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eD0 – Prepare if necessary:\u003c\/strong\u003e assess urgent safety and customer risk, save evidence, and allocate resources. Document any immediate blocking.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eD1 – Team:\u003c\/strong\u003e assemble people with relevant process, quality, and technical expertise as well as authority.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eD2 – Define the problem:\u003c\/strong\u003e specify requirements vs. actual outcome, product\/batch, scope, and the important \"is\/is not\" limitation.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eD3 – Temporary containment actions:\u003c\/strong\u003e stop or sort suspicious material, protect the customer, and show with data that the containment actions are working.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eD4 – Root cause:\u003c\/strong\u003e analyze with 5 Whys, fishbone categories, and testing. Investigate separately why the error could occur and why it was not detected.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eD5 – Select permanent action:\u003c\/strong\u003e choose a solution to the cause and plan in advance how the action will be verified.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eD6 – Implement and verify:\u003c\/strong\u003e document the implementation, test the effectiveness over a relevant period, and compare with established acceptance criteria.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eD7 – Prevent recurrence:\u003c\/strong\u003e check other lines, products, FMEA, control plans, work instructions, and suppliers.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eD8 – Formal closure:\u003c\/strong\u003e document lessons learned, customer communication, approval by the person responsible, and outstanding issues. Archive the documents.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eThe difference between 8D, CAPA, and FMEA\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003e8D\u003c\/strong\u003e is a structured workflow to solve an identified problem and document the actual root cause. \u003cstrong\u003eCAPA\u003c\/strong\u003e is often used more broadly for corrective and preventive actions. \u003cstrong\u003eFMEA\u003c\/strong\u003e is a forward-looking method for analyzing potential failure modes and their effects. The methods can complement each other but should not be confused.\u003c\/p\u003e\n\n\u003ch2 id=\"8d-regler\"\u003e8D, ISO 9001, and industry requirements – what applies?\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eThe 8D method is not a general legal requirement for all Swedish companies.\u003c\/strong\u003e ISO 9001:2026 is a standard for quality management and improvement, but it does not mean that a specific downloadable 8D form must be used by all organizations. In the automotive industry, for example, customer requirements, IATF 16949, and VDA methodology may set specific requirements for report format, response times, problem definition, verification, and customer communication.\u003c\/p\u003e\n\n\u003cp\u003eThis template is a \u003cstrong\u003egeneral self-produced support\u003c\/strong\u003e for the 8D workflow, not a licensed VDA 8D report. Always check current customer manuals and actually applicable industry or product safety legislation. In the case of dangerous products or safety-critical faults, specific obligations to stop deliveries, investigate, and notify competent authorities may be required.\u003c\/p\u003e\n\n\u003cdiv style=\"background:#fff5d9;border-left:4px solid #D5A63E;padding:14px 18px;margin:17px 0;\"\u003e\n\n\u003cstrong\u003eImportant before use:\u003c\/strong\u003e Stating a root cause does not mean it is confirmed. That a temporary sorting works does not mean that a permanent corrective action has been implemented. Report only real checks, measured values, accepted criteria, and authorized decisions.\u003c\/div\u003e\n\n\u003ch2\u003eCommon pitfalls\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003eWriting an 8D report afterwards without a documented investigation.\u003c\/li\u003e\n\n\u003cli\u003eMixing hypotheses, symptoms, and verified root causes.\u003c\/li\u003e\n\n\u003cli\u003eForgetting why existing controls did not detect the error.\u003c\/li\u003e\n\n\u003cli\u003eClosing a case without an independent assessment of the action's effectiveness.\u003c\/li\u003e\n\n\u003cli\u003eConfusing customer approval with internal quality assessment.\u003c\/li\u003e\n\n\u003cli\u003eFailing to update FMEA, control plans, instructions, or other affected processes.\u003c\/li\u003e\n\n\u003cli\u003eUsing a general report where the customer requires a specific format.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2 id=\"8d-faq\"\u003eFrequently asked questions about 8D reports\u003c\/h2\u003e\n\n\u003ch3\u003eWhat is an 8D report?\u003c\/h3\u003e\n\n\u003cp\u003eA documented investigation that step-by-step describes the problem, immediate customer protection, fact-based root cause analysis, permanent actions, verification, and feedback of experience.\u003c\/p\u003e\n\n\u003ch3\u003eMust you always go through all eight steps?\u003c\/h3\u003e\n\n\u003cp\u003eIt depends on customer requirements, operations, and the scope of the problem. For serious quality deviations, a complete 8D flow is often used. For simpler flaws, another proportionate method may be better.\u003c\/p\u003e\n\n\u003ch3\u003eAre 5 Whys and Ishikawa included?\u003c\/h3\u003e\n\n\u003cp\u003eYes, a separate 5 Whys template and a table with generic cause families to support fishbone analysis. The templates do not test hypotheses automatically.\u003c\/p\u003e\n\n\u003ch3\u003eCan Excel be used for multiple cases?\u003c\/h3\u003e\n\n\u003cp\u003eYes. 100 case rows and several separate registers for actions, analyses, and effectiveness checks are included.\u003c\/p\u003e\n\n\u003ch3\u003eIs this the same thing as a VDA 8D template?\u003c\/h3\u003e\n\n\u003cp\u003eNo. No protected or licensed original forms are included. Check your customer's or industry's specific method and document requirements.\u003c\/p\u003e\n\n\u003ch3\u003eIs there an English version?\u003c\/h3\u003e\n\n\u003cp\u003eA supplementary English 8D working document is included. The main report, root cause analysis, and detailed guide are in Swedish.\u003c\/p\u003e\n\n\u003ch3\u003eIs the report proof of ISO certification?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It is a work aid and does not replace a functioning quality system or audit by an authorized certification body.\u003c\/p\u003e\n\n\u003ch2 id=\"8d-format\"\u003eFormat and digital delivery\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003ePrice 79 SEK.\u003c\/strong\u003e ZIP with four Word documents (DOCX), four searchable A4 PDF files, and one Excel workbook (XLSX). No physical shipping. Word and Excel can be edited in compatible software. Automatic digital delivery after purchase assumes that the ZIP file is attached to Shopify Digital Products.\u003c\/p\u003e\n\n\u003ch2\u003eProfessional sources and further reading\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.siemens.com\/sv-se\/technology\/8d-report\/\"\u003eSiemens – 8D report and structured problem solving\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.wedeaq.se\/8d-problemlosning\/\"\u003eWEDEAQ – The 8D method, Swedish descriptions, and VDA QMC methodology\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.iso.org\/9001-2026\"\u003eISO – Quality Management ISO 9001:2026\u003c\/a\u003e\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2\u003eRelated templates\u003c\/h2\u003e\n\n\u003cp\u003eFor forward-looking risk analysis: \u003ca href=\"\/en\/products\/fmea-feleffektanalys-mall-excel-2026-2027\"\u003eFMEA – Failure Mode and Effects Analysis 2026\/2027\u003c\/a\u003e. For audit planning and verification of the quality system: \u003ca href=\"\/en\/products\/internrevision-iso-9001-revisionsprogram-checklista-2026-2027\"\u003eInternal Audit ISO 9001 2026\/2027\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003cp\u003e\u003csmall\u003eDisclaimer: The template package does not replace product safety investigation, legal advice, applicable customer- and industry-specific rules, licensed VDA methodology, or a specialist's safety assessment.\u003c\/small\u003e\u003c\/p\u003e\n\n\u003c\/section\u003e\n\u003csection class=\"mallbutiken-related-guide\" aria-label=\"Related guide\"\u003e\u003ch2\u003eDeepen your knowledge with our guides\u003c\/h2\u003e\n\n\u003cp\u003eRead about the eight steps of the 8D method and how to use 5 whys.\u003c\/p\u003e\n\n\u003cp\u003e\u003ca href=\"\/en\/blogs\/foretag\/8d-rapport-rotorsaksanalys-5-varfor-guide\"\u003e8D report and root cause analysis\u003c\/a\u003e\u003c\/p\u003e\n\n\u003cp\u003e\u003ca href=\"\/en\/blogs\/foretag\/produktion-kvalitetsledning-guide-mrp-oee-fmea-8d\"\u003eOverview: production control and quality management\u003c\/a\u003e\u003c\/p\u003e\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55655077282134,"sku":"8D-ROTORSAKSANALYS-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/01_8D_rapport_hero_2027_b8413aeb-4ac4-4873-a289-95a09c8eb4b9.png?v=1791499838"},{"product_id":"produktionsplanering-kapacitetskalkyl-excel-2026-2027","title":"Production Planning \u0026 Capacity Calculation 2026\/2027 – Production Order, Weekly Plan \u0026 Excel | Word\/PDF","description":"\u003cdiv class=\"mb-product-description\" lang=\"en\"\u003e\n\n\u003cp\u003e\u003cstrong\u003eProduction Planning \u0026amp; Capacity Calculation 2026\/2027\u003c\/strong\u003e is an editable template package for workshops, manufacturing companies, production managers, and small industrial businesses that need to consolidate production orders, resources, and capacity assessments. The package combines Word and PDF templates with an Excel workbook for planned order hours, weekly capacity, resource utilization, and deviations.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003e79 SEK – one-time purchase.\u003c\/strong\u003e No subscription. With a common structure for order IDs, resource IDs, and week codes, you can assess whether a planned week is overloaded and document decisions regarding rescheduling. It is a practical offline tool, not an ERP system, MES, or automated sequence optimizer.\u003c\/p\u003e\n\n\u003cnav aria-label=\"About the document template\"\u003e\u003cstrong\u003eAbout the document template:\u003c\/strong\u003e \u003ca href=\"#prod-innehall\"\u003eWhat is included\u003c\/a\u003e · \u003ca href=\"#prod-excel\"\u003eExcel\u003c\/a\u003e · \u003ca href=\"#prod-guide\"\u003eHow to use the package\u003c\/a\u003e · \u003ca href=\"#prod-regler\"\u003eRules\u003c\/a\u003e · \u003ca href=\"#prod-faq\"\u003eFAQ\u003c\/a\u003e · \u003ca href=\"#prod-format\"\u003eFormat\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv style=\"background:#e8f5ed;border-left:4px solid #238657;padding:16px 19px;margin:18px 0\"\u003e\n\n\u003cstrong\u003eProfessionally and regulation-checked: October 9, 2026\u003c\/strong\u003e\u003cp\u003eVersion 1.0 relevant for 2026\/2027. The templates have been compared with current public guidance on employer planning and risk assessment responsibilities, including the Swedish Work Environment Authority's AFS 2023:1 and 2023:2. No official certification, formal specialist review of your specific production, or guarantee of delivery results is included.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2 id=\"prod-innehall\"\u003eWhat is included in the document package\u003c\/h2\u003e\n\n\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth\u003eDocument\u003c\/th\u003e\n\n\u003cth\u003ePractical content\u003c\/th\u003e\n\n\u003cth\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eProduction Planning \u0026amp; Capacity Control – Routine\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eGovernance document with purpose, roles, weekly process, capacity calculations, pre-decision checks, deviation management, and decision log.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eProduction Order \u0026amp; Capacity Decision\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eForm for order details, standard time, resource, material, safety requirements, capacity assessment, decision, and follow-up.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eSeparate user guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eReview of each Excel sheet, real calculation examples, step-by-step instructions, common errors, limitations, and archiving.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eProduction Planning Working Sheet (English)\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eSupplementary English working document for Swedish operations; not a full translation of the main templates.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eProduction Planning \u0026amp; Capacity in Excel\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eSix sheets with order register, resource details, weekly capacity, overload warnings, deviations, and overview.\u003c\/td\u003e\n\n\u003ctd\u003eExcel XLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003cp\u003e\u003cstrong\u003eA total of 9 files\u003c\/strong\u003e in one combined ZIP package: four editable Word documents (DOCX), four searchable PDF documents in A4, and one Excel workbook (XLSX). Main language: Swedish, with a supplementary English working form.\u003c\/p\u003e\n\n\u003ch2\u003eWho is this template for?\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eProduction managers\u003c\/strong\u003e who want to view planned hours per week and resource; \u003cstrong\u003eworkshops and smaller manufacturing companies\u003c\/strong\u003e planning based on standard times; \u003cstrong\u003eprocess owners and supervisors\u003c\/strong\u003e who document bottlenecks, decisions, and rescheduling; as well as \u003cstrong\u003emaintenance and quality functions\u003c\/strong\u003e that need a common order ID for follow-up.\u003c\/p\u003e\n\n\u003ch2 id=\"prod-excel\"\u003eExcel – six tabs with functional calculations\u003c\/h2\u003e\n\n\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth\u003eWorksheet\u003c\/th\u003e\n\n\u003cth\u003eFunction\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eOverview\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eAutomatic counts of orders, active orders, remaining order hours, weekly plan rows, overloads, and open deviations.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eResources\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e40 pre-prepared rows for resource ID, type, person responsible, gross hours per week, availability in percent, and net hours.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eProduction Orders\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e80 pre-prepared order rows with quantity, standard time in minutes per unit, total\/remaining hours, week code, resource ID, status, and delivery date.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eWeekly Capacity\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e100 planning rows per combination of week and resource. Net capacity, remaining order load, utilization, and capacity margin are calculated automatically.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eDeviations\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e80 rows for obstacles, cause, consequence, responsibility, priority, action, date, status, and verification.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eInstructions\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eDefinitions, unit management, calculation examples, usage limits, and sources.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003cp\u003eFormulas use \u003cstrong\u003eremaining quantity × standard time ÷ 60\u003c\/strong\u003e for order hours and \u003cstrong\u003egross hours × availability\u003c\/strong\u003e for net capacity. The weekly resource load is summed only when the order's week code and resource ID match the capacity plan's code. Capacity rows display \u003cem\u003eOVERLOADED\u003c\/em\u003e when demand in calculated hours exceeds available net hours.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eIllustrative example:\u003c\/strong\u003e An order of 80 items with a standard time of 15 minutes equals 20 total order hours. When 20 items have been produced, 15 hours remain. A resource with 32 gross hours and 75% availability has 24 net hours. In this example, that results in 62.5% utilization if no other orders are assigned to the same week and resource. The delivery file contains no fabricated real orders.\u003c\/p\u003e\n\n\u003cdiv style=\"background:#fff3d7;border-left:4px solid #d6a33a;padding:15px 19px;margin:18px 0\"\u003e\n\n\u003cstrong\u003eImportant limitation:\u003c\/strong\u003e Planned capacity does not guarantee delivery. The workbook does not automatically monitor material shortages, setup times, staff competence and working time regulations, dependencies between operations, real suitability of different machines, work environment risks, or product quality requirements. Approval of the production plan is done manually.\u003c\/div\u003e\n\n\u003ch2 id=\"prod-guide\"\u003eHow to use the production planning package\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCollect facts.\u003c\/strong\u003e Identify production lines, machines, relevant standard times, and already decided delivery dates.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCreate resource IDs.\u003c\/strong\u003e Enter realistic weekly gross capacity and estimated availability percentage.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRegister production orders.\u003c\/strong\u003e Use a unique order ID, quantity, and standard time in \u003cem\u003eminutes per unit\u003c\/em\u003e. Enter the planned week in the format YYYY-WWW, for example, 2026-W042.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCreate a weekly plan.\u003c\/strong\u003e Add a row for the same week code and resource ID in the Weekly Capacity sheet, as well as the decided gross time and availability.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eReview calculations.\u003c\/strong\u003e Check net capacity, remaining planned hours, utilization, and any overload warnings.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDecide on actions.\u003c\/strong\u003e In case of capacity conflicts: assess redistribution, new delivery dates, material, competence, safety, and actually possible extra capacity. Document decisions and customer communication.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eUpdate actual outcome.\u003c\/strong\u003e Report actual completed quantities and record deviations. Take versioned copies of approved plans.\u003c\/li\u003e\n\n\u003cli\u003e\n\u003c\/li\u003e\n\u003c\/ol\u003e\n\n\u003ch2\u003eCommon mistakes\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003eUsing different week codes or resource IDs in the order and capacity sheets – this prevents the load from matching correctly.\u003c\/li\u003e\n\n\u003cli\u003eEntering the standard time in hours even though the input field refers to minutes.\u003c\/li\u003e\n\n\u003cli\u003eConfusing gross working time with actual available production time.\u003c\/li\u003e\n\n\u003cli\u003eForgetting setup time, maintenance, purchasing, personnel, and inspections that affect capacity.\u003c\/li\u003e\n\n\u003cli\u003eMarking an order as finished without simultaneously updating the actual quantity produced.\u003c\/li\u003e\n\n\u003cli\u003eViewing a green utilization indicator as proof that the production's work environment and product requirements are fulfilled.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2 id=\"prod-regler\"\u003eProduction planning, work environment, and rules\u003c\/h2\u003e\n\n\u003cp\u003eThere is no general Swedish legal requirement to use a specific Excel template for production planning. However, employers are responsible for planning and organizing work safely. \u003cstrong\u003eAFS 2023:1\u003c\/strong\u003e includes obligations to regularly examine and assess work environment risks, including before making changes. \u003cstrong\u003eAFS 2023:2, Ch. 2 § 6\u003c\/strong\u003e deals with the prevention of unhealthy work pressure and ensuring that resources are adapted to the requirements of the work.\u003c\/p\u003e\n\n\u003cp\u003ePlanned utilization is merely a production administrative metric. It cannot replace risk assessment, working time monitoring, individual competence assessment, or actual safety measures. Furthermore, the employer must comply with applicable collective agreements, working time regulations, product-specific requirements, and safe routines during operation and changes.\u003c\/p\u003e\n\n\u003ch2 id=\"prod-faq\"\u003eFrequently asked questions\u003c\/h2\u003e\n\n\u003ch3\u003eCan Excel automatically calculate production capacity?\u003c\/h3\u003e\n\n\u003cp\u003eYes, net capacity and weekly utilization are calculated when you enter gross hours, availability, and matching resource and week codes for orders. The real-world accuracy of the capacity is your responsibility.\u003c\/p\u003e\n\n\u003ch3\u003eDo I get a Gantt chart or automatic production sequencing?\u003c\/h3\u003e\n\n\u003cp\u003eNo. This is not an optimization engine and does not contain automatic machine sequences or a Gantt system. The focus is on realistic weekly and resource capacity.\u003c\/p\u003e\n\n\u003ch3\u003eCan I handle multiple production lines?\u003c\/h3\u003e\n\n\u003cp\u003eYes. Each line or resource is given a unique resource ID; a separate weekly capacity row is used for each relevant combination of week and resource.\u003c\/p\u003e\n\n\u003ch3\u003eIs cost and inventory planning included?\u003c\/h3\u003e\n\n\u003cp\u003eNo, this package prioritizes capacity and case traceability. Full material requirements planning (MRP), inventory, and cost accounting are not included.\u003c\/p\u003e\n\n\u003ch3\u003eHow many orders can I register?\u003c\/h3\u003e\n\n\u003cp\u003eThe workbook has 80 prepared order rows, 40 resources, 100 weekly planning rows, and 80 deviation entries.\u003c\/p\u003e\n\n\u003ch3\u003eIs there an English version?\u003c\/h3\u003e\n\n\u003cp\u003eYes, a supplementary English-language Production Planning Working Sheet is included. The main Swedish documents and the detailed guide are not fully translated.\u003c\/p\u003e\n\n\u003ch3\u003eDoes the product work in Microsoft Excel?\u003c\/h3\u003e\n\n\u003cp\u003eYes, XLSX is intended for modern Excel or compatible software. For the best results, a spreadsheet program with support for standard formulas and data validation is recommended.\u003c\/p\u003e\n\n\u003ch2 id=\"prod-format\"\u003eFormat, price, and digital delivery\u003c\/h2\u003e\n\n\u003cp\u003eOne-time price \u003cstrong\u003e79 SEK\u003c\/strong\u003e. Delivered as a ZIP file with four Word files (DOCX), four searchable A4 PDFs, and an Excel workbook (XLSX). No physical shipping. Automatic digital customer delivery requires the ZIP file to be linked to the product variant in Shopify's Digital Products.\u003c\/p\u003e\n\n\u003ch2\u003eOfficial sources\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/afs-20231\/\"\u003eSwedish Work Environment Authority – AFS 2023:1, Systematic Work Environment Management\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/afs-20232\/\"\u003eSwedish Work Environment Authority – AFS 2023:2, Planning, organizing and workload\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/verksamt.se\/\"\u003eVerksamt.se – Practical support for business\u003c\/a\u003e\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2\u003eRelated products\u003c\/h2\u003e\n\n\u003cp\u003eComplement your planning with \u003ca href=\"\/en\/products\/maskinregister-forebyggande-underhall-excel-2026-2027\"\u003eMachine Register \u0026amp; Preventive Maintenance\u003c\/a\u003e for service and operational reliability, or \u003ca href=\"\/en\/products\/fmea-feleffektanalys-mall-excel-2026-2027\"\u003eFMEA – Failure Mode and Effects Analysis\u003c\/a\u003e for preventive risk analysis of processes.\u003c\/p\u003e\n\n\u003cp\u003e\u003csmall\u003eDisclaimer: The product provides general planning support and does not constitute a legal, technical, or organization-specific specialist assessment. The results should always be verified against real resources, agreements, and applicable safety requirements.\u003c\/small\u003e\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\u003csection class=\"mallbutiken-related-guide\" aria-label=\"Related guide\"\u003e\u003ch2\u003eDeepen your knowledge with our guides\u003c\/h2\u003e\n\n\u003cp\u003eOverview of planning, material requirements, follow-up, and improvement.\u003c\/p\u003e\n\n\u003cp\u003e\u003ca href=\"\/en\/blogs\/foretag\/produktion-kvalitetsledning-guide-mrp-oee-fmea-8d\"\u003eGuide to production management and quality management\u003c\/a\u003e\u003c\/p\u003e\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55655096189270,"sku":"PRODUKTIONSPLANERING-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/01_Produktionsplanering_Kapacitet_Hero_2027_d9f09ce3-ed1c-46a5-a3a1-a2731c9e0d03.png?v=1791501258"},{"product_id":"oee-tak-maskineffektivitet-excel-mall-2026-2027","title":"OEE \u0026 TAK – Machine Efficiency 2026\/2027 | Excel, Shift Logs \u0026 Downtime Word\/PDF","description":"\u003csection class=\"mb-product-description\" lang=\"sv\"\u003e\n\u003cp\u003e\u003cstrong\u003eOEE \u0026amp; TAK – Machine Efficiency 2026\/2027\u003c\/strong\u003e is a practical document package for production managers, manufacturing companies, machine operators, and quality managers who want to analyze how planned production time is used. You receive a professional OEE calculator in Excel with a shift register, downtime log, machine register, action follow-up, and a clear dashboard. In addition, editable Word templates and printable PDFs are included for shift reports, measurement routines, and user instructions.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eSEK 79, one-time purchase.\u003c\/strong\u003e No recurring fees. The tool works offline in compatible software but is not machine-integrated, an MES system, or an automatic alarm and safety system.\u003c\/p\u003e\n\n\u003cnav aria-label=\"About the document template\"\u003e\u003cstrong\u003eAbout the document template:\u003c\/strong\u003e \u003ca href=\"#oee-inne\"\u003eWhat's included\u003c\/a\u003e · \u003ca href=\"#oee-formel\"\u003eOEE formula\u003c\/a\u003e · \u003ca href=\"#oee-excel\"\u003eExcel\u003c\/a\u003e · \u003ca href=\"#oee-guide\"\u003eHow to use\u003c\/a\u003e · \u003ca href=\"#oee-faq\"\u003eFAQ\u003c\/a\u003e · \u003ca href=\"#oee-kallor\"\u003eSources\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv style=\"background:#e7f4eb;border-left:4px solid #2A865C;padding:15px 18px;margin:18px 0;\"\u003e\n\n\u003cstrong\u003eProfessionally reviewed: October 9, 2026\u003c\/strong\u003e\u003cp\u003eVersion 1.0 – for 2026\/2027. The calculation principles have been verified against public OEE guides and the Swedish explanation of the TAK method. The templates are general work tools, not a certified measurement solution or an assessment of machine safety. ISO standard texts or claimed ISO certification are not included.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2 id=\"oee-inne\"\u003eWhat is included in the package\u003c\/h2\u003e\n\n\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth\u003eDocument or tool\u003c\/th\u003e\n\n\u003cth\u003eContent\u003c\/th\u003e\n\n\u003cth\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eOEE\/TAK – measurement routine\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eDefinitions, scope, responsibilities, measurement method, control points, and version control.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eShift log \u0026amp; downtime\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eShift ID, time data, production volumes, causes of stoppages, calculation verification, and decided improvements.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eSeparate user guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eStep-by-step instructions for all Excel sheets, a realistic calculation example, data quality, pitfalls, checklist, and sources.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eOEE – Shift Working Sheet (English)\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eSupplementary English shift worksheet for staff in Swedish operations – not a complete translation of all documents.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eOEE \u0026amp; TAK in Excel\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eSix sheets for machines, shift data, downtime, actions, instructions, and a dashboard with calculated KPIs.\u003c\/td\u003e\n\n\u003ctd\u003eExcel (XLSX)\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003cp\u003e\u003cstrong\u003eTotal of nine files:\u003c\/strong\u003e four Word (DOCX), four searchable A4-PDFs, and one Excel (XLSX), gathered in a ZIP file. Swedish is the primary language with an English working template as a supplement.\u003c\/p\u003e\n\n\u003ch2\u003eWho is the OEE template for?\u003c\/h2\u003e\n\n\u003cp\u003eThe template is particularly useful for small and medium-sized \u003cstrong\u003eindustrial companies, CNC workshops, manufacturing operations, production managers, and quality teams\u003c\/strong\u003e who need to track recurring stoppages, pace deficiencies, and scrap rates across different shifts. It can be used both for the initial implementation of a simpler TAK workflow and as an additional analysis base for existing production follow-up.\u003c\/p\u003e\n\n\u003ch2 id=\"oee-formel\"\u003eHow do you calculate OEE\/TAK?\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eOEE = Availability × Performance × Quality.\u003c\/strong\u003e The three factors must be calculated from the same machine and time period:\u003c\/p\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eAvailability (A)\u003c\/strong\u003e = (planned production time − downtime) \/ planned production time.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003ePerformance (P)\u003c\/strong\u003e = (verified ideal time in seconds\/unit × total produced quantity) \/ (operating time in minutes × 60).\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eQuality (Q)\u003c\/strong\u003e = (total produced quantity − scrapped units) \/ total produced quantity.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003e\u003cstrong\u003eCalculation example:\u003c\/strong\u003e Planned production time 420 minutes, downtime 42 minutes, ideal time 30 seconds per unit, and 680 units produced, of which 20 are scrapped. Availability becomes 90.0%, performance approximately 89.95%, quality approximately 97.06%, and \u003cstrong\u003eOEE approximately 78.57%\u003c\/strong\u003e. In Excel, the calculation is performed automatically once the necessary information has been entered and the downtime follow-up has been approved.\u003c\/p\u003e\n\n\u003cdiv style=\"background:#fff4d6;border-left:4px solid #d9a13a;padding:15px 18px;margin:17px 0;\"\u003e\n\n\u003cstrong\u003eImportant:\u003c\/strong\u003e Performance exceeding 100 percent is usually a reason to check the ideal time, time units, stop definition, or production volume. In this case, the calculator will show a data warning instead of using a misleading OEE value. A universal “world-class limit” is not a legal requirement or an appropriate goal for all machines.\u003c\/div\u003e\n\n\u003ch2 id=\"oee-excel\"\u003eThe Excel tool – six interconnected worksheets\u003c\/h2\u003e\n\n\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth\u003eSheet\u003c\/th\u003e\n\n\u003cth\u003ePractical function\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eOverview\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eNumber of shifts, reviewed shifts, average OEE and its sub-factors, summed downtime minutes, data warnings, and open actions.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eMachines\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e50 rows for machine ID, name, process, responsible person, and reference to ideal time.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eShift data\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e120 rows with planned time, ideal time, volumes, scrap, and automatic OEE formula, plus data status check.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eDowntime\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e180 rows for stop ID, shift ID, machine, cause, stop time, and performed action. Stop time is automatically summed to the matching shift.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eActions\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e100 improvement issues with loss category, responsible person, target date, status, effect check, and evidence reference.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eInstructions\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eDefinitions, correct time units, step-by-step usage, method limitations, and source references.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003cp\u003eExcel uses a unique \u003cstrong\u003eShift ID\u003c\/strong\u003e to link shifts and downtime together. For example, you register a shift with ID \u003cem\u003eSK-2026-0001\u003c\/em\u003e and use the same ID for all stoppages within that shift. Once you have checked the downtime log, mark it as reviewed. Calculations only begin when there is sufficiently reliable data.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003ePlease note:\u003c\/strong\u003e The dashboard average consists of simple averages over shifts with approved data status, not a separately weighted total OEE for an entire factory. An incomplete shift will not receive a final OEE value. For comparisons, you must use a consistent definition of downtime, ideal time, and approved output.\u003c\/p\u003e\n\n\u003ch2 id=\"oee-guide\"\u003eHow to get started – step by step\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDetermine the method:\u003c\/strong\u003e select the relevant machine, product, reporting period, and a consistent definition of planned production time.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eVerify ideal time:\u003c\/strong\u003e use a realistic and documented cycle time in seconds per unit for the correct process.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCreate machine and shift IDs:\u003c\/strong\u003e use the same designation in all registers.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eEnter real shift data:\u003c\/strong\u003e minutes, total production, and scrap.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRegister downtime:\u003c\/strong\u003e enter stop causes and stop time in the separate log with the correct Shift ID.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eReview data:\u003c\/strong\u003e confirm the downtime log and check the data status before drawing conclusions.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eIdentify main loss:\u003c\/strong\u003e compare availability, performance, and quality with previous, comparable periods.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eFollow up on improvements:\u003c\/strong\u003e document the action, responsibility, deadline, and actual measured effect.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eCommon pitfalls\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003eMixing minutes and seconds in the pace and time data.\u003c\/li\u003e\n\n\u003cli\u003eExcluding changeover time in some shifts but including it in others.\u003c\/li\u003e\n\n\u003cli\u003eRegistering the same downtime multiple times.\u003c\/li\u003e\n\n\u003cli\u003eCounting reworked units as approved without a documented and consistent definition.\u003c\/li\u003e\n\n\u003cli\u003eTreating high OEE as proof of safe operation, sufficient staffing, or high economic profitability.\u003c\/li\u003e\n\n\u003cli\u003eStating an improvement as verified without new measurement data.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2\u003eOEE and legal or technical requirements\u003c\/h2\u003e\n\n\u003cp\u003eOEE\/TAK is a method for production follow-up – \u003cstrong\u003enot a general statutory KPI\u003c\/strong\u003e for all Swedish companies. The ISO 22400 series can provide support for terminology and KPIs in production, but protected standard text is not included here. The calculator does not replace work environment risk assessments, machine safety requirements, product control, certification, or industry-specific obligations.\u003c\/p\u003e\n\n\u003ch2 id=\"oee-faq\"\u003eFrequently asked questions\u003c\/h2\u003e\n\n\u003ch3\u003eWhat are OEE and TAK?\u003c\/h3\u003e\n\n\u003cp\u003eOverall Equipment Effectiveness, often called TAK in Swedish operations, is a combined measure of availability, performance, and quality during defined production time.\u003c\/p\u003e\n\n\u003ch3\u003eIs an OEE calculator in Excel better than a full MES system?\u003c\/h3\u003e\n\n\u003cp\u003eThey are different solutions. This product is affordable and stand-alone for manual follow-up, but it does not automatically collect data from machines and does not include real-time monitoring or advanced production control.\u003c\/p\u003e\n\n\u003ch3\u003eWhat do I do if my OEE is displayed as empty?\u003c\/h3\u003e\n\n\u003cp\u003eCheck if the Shift ID, planned time, ideal time, volumes, scrap, and downtime log are complete, and if the downtime log is marked as reviewed. Also, check if an incorrect cycle time value has been flagged.\u003c\/p\u003e\n\n\u003ch3\u003eIs downtime analysis included?\u003c\/h3\u003e\n\n\u003cp\u003eYes. A separate log can register multiple stops per shift and compile stop time into the shift calculation. Cause and action can be documented separately.\u003c\/p\u003e\n\n\u003ch3\u003eCan the tool be used for different machines?\u003c\/h3\u003e\n\n\u003cp\u003eYes. The machine register has space for 50 machines and the shift register for 120 shifts. The exact same measurement definitions should be used when comparing results.\u003c\/p\u003e\n\n\u003ch3\u003eAre there English files available?\u003c\/h3\u003e\n\n\u003cp\u003eYes, an English shift worksheet is included as a supplement for Swedish operations. The main documents and the user guide are in Swedish.\u003c\/p\u003e\n\n\u003ch3\u003eAre the PDF files editable forms?\u003c\/h3\u003e\n\n\u003cp\u003eThe Word documents are editable. The PDF files are searchable and printable but are not supplied as interactive, fillable AcroForm forms.\u003c\/p\u003e\n\n\u003ch2\u003eFormat and digital delivery\u003c\/h2\u003e\n\n\u003cp\u003ePrice \u003cstrong\u003eSEK 79\u003c\/strong\u003e. Digital ZIP with \u003cstrong\u003e4 DOCX, 4 PDF, and 1 XLSX\u003c\/strong\u003e. No physical shipping. Automated customer delivery in Shopify assumes that the ZIP file has been correctly linked to the product variant in Digital Products.\u003c\/p\u003e\n\n\u003ch2 id=\"oee-kallor\"\u003eMethod sources\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.oee.com\/calculating-oee\/\"\u003eOEE.com – Calculate OEE\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.oee.com\/oee-factors\/\"\u003eOEE.com – Availability, Performance, Quality\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/goodsolutions.se\/artiklar\/vad-%C3%A4r-oee-och-hur-ber%C3%A4knas-det\"\u003eGood Solutions – Vad är OEE och hur beräknas det?\u003c\/a\u003e\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2\u003eRelated documents\u003c\/h2\u003e\n\n\u003cp\u003eFor forward-looking capacity planning: \u003ca href=\"\/en\/products\/produktionsplanering-kapacitetskalkyl-excel-2026-2027\"\u003eProduction Planning \u0026amp; Capacity Calculator\u003c\/a\u003e. For scheduled machine maintenance: \u003ca href=\"\/en\/products\/maskinregister-forebyggande-underhall-excel-2026-2027\"\u003eMachine Register \u0026amp; Preventive Maintenance\u003c\/a\u003e. For preventive process risks: \u003ca href=\"\/en\/products\/fmea-feleffektanalys-mall-excel-2026-2027\"\u003eFMEA – Failure Mode and Effects Analysis\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003cp\u003e\u003csmall\u003eDisclaimer: This is a general documentation and calculation tool, not a safety certification, site inspection, or guarantee of production, work environment, or quality requirements. Adapt the measurement method and usage to your operation's actual conditions.\u003c\/small\u003e\u003c\/p\u003e\n\n\u003c\/section\u003e\n\u003csection class=\"mallbutiken-related-guide\" aria-label=\"Related guide\"\u003e\u003ch2\u003eDeepen your knowledge with our guides\u003c\/h2\u003e\n\n\u003cp\u003eGet formulas and examples for availability, performance, and quality.\u003c\/p\u003e\n\n\u003cp\u003e\u003ca href=\"\/en\/blogs\/foretag\/oee-tak-berakna-maskineffektivitet\"\u003eHow to calculate OEE and TAK\u003c\/a\u003e\u003c\/p\u003e\n\n\u003cp\u003e\u003ca href=\"\/en\/blogs\/foretag\/produktion-kvalitetsledning-guide-mrp-oee-fmea-8d\"\u003eOverview: production control and quality management\u003c\/a\u003e\u003c\/p\u003e\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55655149994326,"sku":"OEE-TAK-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/01_OEE_TAK_Huvudbild_2027_51289ab4-d8b8-4688-985b-e30944f7dc3c.png?v=1791503038"},{"product_id":"materialbehovsplanering-mrp-inkopsplan-excel-2026-2027","title":"Material Requirements Planning \u0026 Purchasing Planning MRP Light 2026\/2027 – Excel, Word \u0026 PDF","description":"\u003csection class=\"mb-product-description\" lang=\"en\"\u003e\n\u003cp\u003e\u003cstrong\u003eMaterial Requirements Planning \u0026amp; Purchasing Planning – MRP Light 2026\/2027\u003c\/strong\u003e is an editable toolkit for smaller manufacturers, workshops, production managers, and purchasing agents who need to plan components before production begins. It combines a professional Excel sheet with document templates for material planning routines, purchasing decisions, a detailed user guide, and an English working template.\u003c\/p\u003e\n\n\u003cp\u003eUsing a \u003cstrong\u003esingle-level Bill of Materials (BOM)\u003c\/strong\u003e and planned finished product orders, the gross requirements for purchased components are calculated. Excel then accounts for stock balances, safety stock, confirmed incoming deliveries, and ordering terms to suggest what needs to be purchased. This means less manual calculation and clearer documentation for responsible purchasing decisions.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003ePrice 79 SEK as a one-time purchase\u003c\/strong\u003e – no subscription. This product is a limited and transparent \u003cem\u003eMRP Light\u003c\/em\u003e tool, not an ERP system, advanced multi-level MRP, or automatic inventory bookkeeping system.\u003c\/p\u003e\n\n\u003cnav aria-label=\"About the document template\"\u003e\u003cstrong\u003eAbout the document template:\u003c\/strong\u003e \u003ca href=\"#mrp-paket\"\u003eIncluded\u003c\/a\u003e · \u003ca href=\"#mrp-excel\"\u003eExcel Tool\u003c\/a\u003e · \u003ca href=\"#mrp-berakning\"\u003eCalculation Example\u003c\/a\u003e · \u003ca href=\"#mrp-steg\"\u003eHow it works\u003c\/a\u003e · \u003ca href=\"#mrp-risker\"\u003eLimitations\u003c\/a\u003e · \u003ca href=\"#mrp-faq\"\u003eFAQ\u003c\/a\u003e · \u003ca href=\"#mrp-kallor\"\u003eSources\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv style=\"background:#E8F5EE;border-left:4px solid #348456;padding:15px 18px;margin:18px 0\"\u003e\n\n\u003cstrong\u003eLegally and\/or technically reviewed: October 7, 2026\u003c\/strong\u003e\u003cp\u003eVersion 1.0, intended for 2026\/2027. Formulas and control values have been tested, and the method description has been source-checked against public information regarding material requirements planning. The marking refers to an internal editorial\/technical review, not external certification, site audit, or an individual legal opinion.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2 id=\"mrp-paket\"\u003eWhat is included in the MRP package\u003c\/h2\u003e\n\n\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth\u003eDocument\u003c\/th\u003e\n\n\u003cth\u003eContent\u003c\/th\u003e\n\n\u003cth\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eMaterial Planning Routine\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eResponsibilities, data sources, work methodology, BOM control, decisions, deviation handling, and archiving.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eMaterial \u0026amp; Purchasing Decisions\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003ePrintable control and decision protocol for purchasing quantities, supplier data, deviations, and approval.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eDetailed Swedish User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eReview of all seven tabs, preparations, step-by-step instructions, calculation examples, common errors, and division of responsibilities.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eMaterial Planning – Working Sheet (English)\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eSupplementary English working sheet for personnel in Swedish companies. Not a complete translation of every Swedish document.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eMaterial Requirements \u0026amp; MRP Light\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eExcel workbook with integrated registers, BOMs, material requirements, purchase suggestions, control tab, and dashboard.\u003c\/td\u003e\n\n\u003ctd\u003eExcel (XLSX)\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003cp\u003e\u003cstrong\u003e9 delivery files in one ZIP:\u003c\/strong\u003e 4 DOCX, 4 searchable A4-PDFs, and 1 XLSX. Swedish is the primary language; an English working sheet is included.\u003c\/p\u003e\n\n\u003ch2\u003eWhich businesses is the tool suitable for?\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eSmall industrial companies\u003c\/strong\u003e with recurring finished products and clear component BOMs, \u003cstrong\u003eworkshops and assemblers\u003c\/strong\u003e that need to order material for specific jobs, \u003cstrong\u003eproduction planners\u003c\/strong\u003e who want to derive material needs from product orders, and \u003cstrong\u003epurchasing agents\u003c\/strong\u003e who want to consolidate component data, purchase terms, and individual decisions.\u003c\/p\u003e\n\n\u003cp\u003eMRP Light is best suited for a straightforward product structure where a finished product consumes purchased components at \u003cstrong\u003ea single BOM level\u003c\/strong\u003e. For intermediate products with their own underlying BOMs and multiple levels, you should use a more advanced MRP method.\u003c\/p\u003e\n\n\u003ch2 id=\"mrp-excel\"\u003eExcel – seven worksheets with calculation functions\u003c\/h2\u003e\n\n\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth\u003eWorksheet\u003c\/th\u003e\n\n\u003cth\u003eWhat can you do?\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eOverview\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eDashboard with registered components, BOM lines, orders, components requiring purchase, calculated purchase value, and data warnings.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eItems\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e80 component lines for component ID, unit, balance, safety stock, confirmed incoming quantity, lead time, minimum order size, order multiple, unit price, and date. Gross, net, purchase suggestions, and value are calculated.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eBOM\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e120 lines for finished product, component, quantity per finished unit, and scrap percentage. Summarizes input order volumes per product and calculates gross requirements per line.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eOrder Requirements\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e100 order lines with ID, finished product ID, volume, due date, customer\/project, and verification of whether the product's BOM exists.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003ePurchasing Plan\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e80 lines to retrieve suggested quantities and calculated value via component ID, along with actual ordered quantity, order number, confirmed delivery, and receipt.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eControl\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eCompilation of orders without a BOM, components missing from the item register, items with requirements, missing due dates, and potential item ID duplicates.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eInstructions\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eTab-by-tab guide, defined limitations, and methodology sources.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003cp\u003eThe workbook has clear headings, frozen top rows, input fields, data validation for certain status fields, and an automatic overview. It is designed for manual use offline in Microsoft Excel or compatible software.\u003c\/p\u003e\n\n\u003ch2 id=\"mrp-berakning\"\u003eHow the MRP calculation works – a concrete example\u003c\/h2\u003e\n\n\u003cp\u003eAssume you are going to manufacture \u003cstrong\u003e40 finished products\u003c\/strong\u003e. Each product requires \u003cstrong\u003e3 components\u003c\/strong\u003e and you have accounted for \u003cstrong\u003e5% scrap\u003c\/strong\u003e. The gross requirement for the component will be 40 × 3 × 1.05 = \u003cstrong\u003e126 units\u003c\/strong\u003e after rounding up.\u003c\/p\u003e\n\n\u003cp\u003eAt the same time, you have 40 units in stock, require 10 units in safety stock, and have 20 units in actual confirmed incoming deliveries. The net requirement therefore becomes \u003cstrong\u003e126 + 10 − 40 − 20 = 76 units\u003c\/strong\u003e. If the minimum order quantity is 50 units and the order multiple is 10 units, Excel suggests a purchase of \u003cstrong\u003e80 units\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cp\u003eWith a unit price of 15 SEK, this corresponds to a \u003cstrong\u003ecalculated purchase value of 1,200 SEK excluding any VAT\u003c\/strong\u003e. The calculation determines this value but does not purchase material and does not automatically determine correct VAT or delivery time.\u003c\/p\u003e\n\n\u003cdiv style=\"background:#FFF3D6;border-left:4px solid #D6A23A;padding:15px 18px;margin:18px 0\"\u003e\n\n\u003cstrong\u003eImportant limitation:\u003c\/strong\u003e This is an \u003cem\u003eaggregate material requirements calculation\u003c\/em\u003e, not a fully time-phased MRP. Orders from the input data are aggregated over the entire planning horizon. No components are automatically reserved for individual orders, no multi-level BOM is exploded, and balances are not updated when a purchase order is placed or when material is used.\u003c\/div\u003e\n\n\u003ch2 id=\"mrp-steg\"\u003eHow to use material requirements planning\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eSelect planning horizon and order selection.\u003c\/strong\u003e Collect only the production and customer orders that are actually to be calculated. Remove canceled orders from the selection before calculating.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRegister purchased components.\u003c\/strong\u003e Give each component a unique ID, enter unit, actual stock, safety stock, and confirmed incoming deliveries.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCreate single-level BOMs.\u003c\/strong\u003e List which components are needed per finished product, how many, and if a verified scrap allowance is needed.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eEnter planned finished product orders.\u003c\/strong\u003e Use a product ID that matches the BOM and enter the requested quantity.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCheck automatic gross calculation and net requirements.\u003c\/strong\u003e Verify that no component or BOM is missing and that units are comparable.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eAssess lead time and dates.\u003c\/strong\u003e State when the component is needed at the latest. The calculated order date subtracts calendar days and needs to be reviewed against holidays, transport times, and the supplier's actual order handling.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eMake actual purchasing decisions.\u003c\/strong\u003e Check MOQ, order multiple, agreements, price, and supplier confirmation. Document decisions in the separate protocol.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eKeep balances current.\u003c\/strong\u003e Register purchase orders, deliveries, and actual stock events in correct systems or your own controlled routines. Then update the calculation.\u003c\/li\u003e\n\n\n\n\u003c\/ol\u003e\n\n\u003ch2 id=\"mrp-risker\"\u003eImportant error sources and when you need more than Excel\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eBOM version:\u003c\/strong\u003e Incorrect component consumption results in incorrect material requirements even if the formula is mathematically correct.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eStock and reservations:\u003c\/strong\u003e Available balance may be lower than physical balance if material is reserved for other orders.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eComponents in multiple products:\u003c\/strong\u003e Excel sums component requirements across matching BOM lines, provided codes are unique and consistent.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eLead time:\u003c\/strong\u003e Calculated order dates use calendar days, not a separate supplier calendar or working day model.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eUnits:\u003c\/strong\u003e Never mix meters, kilograms, or pieces without a documented unit conversion.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eConfirmed incoming:\u003c\/strong\u003e Confused or double-counted incoming deliveries can create misleading purchase suggestions.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eComplex business:\u003c\/strong\u003e Multi-level BOM, multiple warehouses, traceability requirements, batch control, dynamic weekly plans, and automatic transactions require special systems or customized controls.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2\u003eWhat applies according to Swedish regulations?\u003c\/h2\u003e\n\n\u003cp\u003eThere is \u003cstrong\u003eno general Swedish legal requirement that all companies must use a specific MRP template\u003c\/strong\u003e. Material requirements planning is an administrative method. However, actual purchasing, documentation, inventory management, accounting, and products may be covered by separate contractual, accounting, work environment, or product safety requirements. A purchasing plan is not a binding supplier contract, a goods receipt check, an accounting voucher, or proof of product safety.\u003c\/p\u003e\n\n\u003ch2 id=\"mrp-faq\"\u003eFrequently asked questions and answers\u003c\/h2\u003e\n\n\u003ch3\u003eWhat is the difference between production planning and material requirements planning?\u003c\/h3\u003e\n\n\u003cp\u003eProduction planning assesses when and with what resources something should be manufactured. Material requirements planning calculates which components are needed for the planned production and what purchasing requirements remain after stock and planned deliveries.\u003c\/p\u003e\n\n\u003ch3\u003eCan the template calculate net requirements and purchase suggestions?\u003c\/h3\u003e\n\n\u003cp\u003eYes. With complete registered component, BOM, and order data, Excel calculates total gross\/net requirements and suggestions using MOQ and order multiple. Calculation results should be reviewed before ordering.\u003c\/p\u003e\n\n\u003ch3\u003eAre multi-level BOMs or MRP per calendar week supported?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The product is explicitly limited to single-level BOMs and aggregated requirements for a specified selection. It is an MRP Light model without automatic time-phased planning.\u003c\/p\u003e\n\n\u003ch3\u003eIs the stock balance updated automatically when an order is manufactured or a purchase is received?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Inventory is manually entered and must be kept accurate by the company. Actual purchase orders in the purchasing plan are separate registration items.\u003c\/p\u003e\n\n\u003ch3\u003eIs a user guide and English version included?\u003c\/h3\u003e\n\n\u003cp\u003eYes. A detailed guide in Swedish and a separate supplementary working sheet in English are included. The main Swedish documents are not fully translated.\u003c\/p\u003e\n\n\u003ch3\u003eCan I use the Excel tool as a purchase contract or invoice?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It is a calculation and decision support tool. For commercial agreements, invoicing, and accounting, correct documents and routines are needed.\u003c\/p\u003e\n\n\u003ch3\u003eCan I use the template for many items and customers?\u003c\/h3\u003e\n\n\u003cp\u003eThe workbook has prepared rows for 80 purchased components, 120 BOM lines, 100 finished product orders, and 80 purchasing plan lines. For larger volumes, a more advanced business system is recommended.\u003c\/p\u003e\n\n\u003ch2\u003eFormat, price, and digital delivery\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003e79 SEK\u003c\/strong\u003e, one-time purchase. Delivered as a ZIP with four Word files (DOCX), four searchable A4-PDFs, and one Excel workbook (XLSX). The files can be used offline in compatible software. The product is digital and requires no physical shipping. Automatic download after purchase assumes the ZIP file is linked to the correct Shopify variant in Digital Products.\u003c\/p\u003e\n\n\u003ch2 id=\"mrp-kallor\"\u003eMethodological sources and further reading\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.mallar.biz\/mall\/material-inkopsplanering\"\u003eMallar.biz – Material and Purchasing Planning (MRP)\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/usersolutions.com\/excel-templates\/mrp\"\u003eUser Solutions – Material Requirements Planning, Excel\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/stocksmith.io\/mrp-excel\"\u003eStocksmith – MRP, BOMs, and inventory requirements\u003c\/a\u003e\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2\u003eRelated products on Mallbutiken.se\u003c\/h2\u003e\n\n\u003cp\u003eSupplement with \u003ca href=\"\/en\/products\/produktionsplanering-kapacitetskalkyl-excel-2026-2027\"\u003eProduction Planning \u0026amp; Capacity Calculation\u003c\/a\u003e when you also need resources and machine hours, or \u003ca href=\"\/en\/products\/leverantorsbedomning-leverantorsuppfoljning-excel-2026-2027\"\u003eSupplier Assessment \u0026amp; Supplier Follow-up\u003c\/a\u003e for quality and supplier assessment. The \u003ca href=\"\/en\/products\/maskinregister-forebyggande-underhall-excel-2026-2027\"\u003eMachine Register \u0026amp; Preventive Maintenance\u003c\/a\u003e is also relevant within the same production cluster.\u003c\/p\u003e\n\n\u003cp\u003e\u003csmall\u003eDisclaimer: The documents are general planning aids and cannot guarantee actual balances, error-free BOMs, correct prices, or agreed delivery times. They do not replace technical, legal, or accounting specialist assessment when required.\u003c\/small\u003e\u003c\/p\u003e\n\n\u003c\/section\u003e\n\u003csection class=\"mallbutiken-related-guide\" aria-label=\"Related guide\"\u003e\u003ch2\u003eDeepen your knowledge with our guides\u003c\/h2\u003e\n\n\u003cp\u003eSee how you use BOMs, inventory, and lead times to plan purchases.\u003c\/p\u003e\n\n\u003cp\u003e\u003ca href=\"\/en\/blogs\/foretag\/materialbehovsplanering-mrp-stycklista-inkop\"\u003eMaterial Requirements Planning with MRP – step by step\u003c\/a\u003e\u003c\/p\u003e\n\n\u003cp\u003e\u003ca href=\"\/en\/blogs\/foretag\/produktion-kvalitetsledning-guide-mrp-oee-fmea-8d\"\u003eOverview: production management and quality management\u003c\/a\u003e\u003c\/p\u003e\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55655157236054,"sku":"MRP-LIGHT-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/01_materialbehov_mrp_light_hero_2027_7131c305-6c93-4e60-83be-04092d2da263.png?v=1791503764"},{"product_id":"inkopsorder-leveransbevakning-excel-2026-2027","title":"Purchase Order \u0026 Delivery Monitoring 2026\/2027 – Purchase Order, Backorder \u0026 Excel | Word\/PDF","description":"\u003csection class=\"mb-product-description\" lang=\"en\"\u003e\n\u003cp\u003e\u003cstrong\u003ePurchase Order \u0026amp; Delivery Tracking 2026\/2027\u003c\/strong\u003e is a professional template package for purchasers, small businesses, and manufacturing companies that want to order goods clearly and track orders, partial deliveries, backorders, and delivery discrepancies. The package includes an editable purchase order, a goods receipt protocol, a comprehensive Swedish user guide, a supplementary English worksheet, and a functional Excel register with six tabs.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003ePrice: 79 SEK – one-time purchase.\u003c\/strong\u003e No subscription required. The documents are used manually in compatible Word, PDF, and Excel software. Excel does not send orders, automatically retrieve supplier data, or update stock balances in separate ERP systems.\u003c\/p\u003e\n\n\u003cnav aria-label=\"About the document template\"\u003e\u003cstrong\u003eAbout the document template:\u003c\/strong\u003e \u003ca href=\"#inkop-paket\"\u003eWhat's included\u003c\/a\u003e · \u003ca href=\"#inkop-excel\"\u003eExcel tools\u003c\/a\u003e · \u003ca href=\"#inkop-steg\"\u003eWorkflow\u003c\/a\u003e · \u003ca href=\"#inkop-ratt\"\u003eLegal information\u003c\/a\u003e · \u003ca href=\"#inkop-faq\"\u003eFAQ\u003c\/a\u003e · \u003ca href=\"#inkop-leverans\"\u003eFormat and delivery\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv style=\"background:#e8f5ed;border-left:4px solid #278552;padding:15px 18px;margin:18px 0\"\u003e\n\n\u003cstrong\u003eLegally and technically reviewed: October 9, 2026\u003c\/strong\u003e\u003cp\u003eVersion 1.0, intended for 2026\/2027. Legal limitations have been checked against the current Sale of Goods Act (Köplagen), Verksamt’s guidance on tenders and acceptance, and the Swedish Tax Agency's invoicing rules. The labeling refers to editorial review, not government approval or individual legal specialist assessment.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2 id=\"inkop-paket\"\u003eWhat is included in the document package\u003c\/h2\u003e\n\n\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth\u003eFile\u003c\/th\u003e\n\n\u003cth\u003eContent\u003c\/th\u003e\n\n\u003cth\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003ePurchase Order \/ Order Form\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eBuyer, supplier, PO ID, order date, delivery address, line items, quantity, unit price, contract reference, delivery and payment terms, and confirmation requirements.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eDelivery Receipt \u0026amp; Discrepancy\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eReceipt protocol with ordered, approved, and rejected quantities, backorders, documentation reference, and action decisions.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eDetailed Swedish User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eEight steps from order to receipt, practical input rules, legalities, confidentiality, common errors, and official sources.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003ePurchase Order \u0026amp; Delivery Tracking\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eEnglish worksheet for purchase and delivery references in Swedish operations. Not a complete translation of all Swedish files.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eOrder Register \u0026amp; Delivery Tracking\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eExcel with six worksheets, formulas for order values, actual delivery, remaining quantity, and follow-up alerts.\u003c\/td\u003e\n\n\u003ctd\u003eExcel (XLSX)\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003cp\u003e\u003cstrong\u003eTotal of 9 delivery files:\u003c\/strong\u003e 4 editable Word documents, 4 searchable A4 PDFs, and 1 Excel workbook. Swedish is the primary language with a supplementary English worksheet. All files are delivered in a ZIP.\u003c\/p\u003e\n\n\u003ch2\u003eWho is this purchase template for?\u003c\/h2\u003e\n\n\u003cp\u003eThe product is suitable for \u003cstrong\u003epurchasing managers\u003c\/strong\u003e who order from multiple suppliers, \u003cstrong\u003eworkshops and manufacturing companies\u003c\/strong\u003e that need traceability between material orders and deliveries, \u003cstrong\u003ee-commerce and trading companies\u003c\/strong\u003e with recurring purchases, and \u003cstrong\u003esmall businesses\u003c\/strong\u003e that do not use a comprehensive ERP system. It can be used independently of material requirements planning, but naturally serves as the next manual step after an MRP report.\u003c\/p\u003e\n\n\u003ch2 id=\"inkop-excel\"\u003eExcel – six sheets with real-world formulas\u003c\/h2\u003e\n\n\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth\u003eWorksheet\u003c\/th\u003e\n\n\u003cth\u003eFunction\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eOverview\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eAutomatic summary of registered purchase orders, ordered and received value, open residual value, tracking alerts, over-deliveries, and open discrepancies.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eOrder Register\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e80 rows with PO ID, supplier, ordered and confirmed delivery date, manual order status, currency, automatic value, and tracking alert.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eOrder Lines\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e120 rows with item, line number, ordered quantity, unit, price, received quantity from delivery log, remaining quantity, and warnings for over-delivery or duplicate line numbers.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eDeliveries\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e160 registrations of actual approved and rejected received quantity, delivery note, date, and receipt officer. PO ID and line number connect the receipt to the order line.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eDiscrepancies\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e80 entries for shortages, delays, damages, documentation errors, or price issues with responsibility, internal target date, and verified closure.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eInstructions\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eDescription of input logic and linked official guidance.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003cp\u003e\u003cstrong\u003eCalculation example:\u003c\/strong\u003e 10 ordered items × 200 SEK excluding VAT gives an order of 2,000 SEK. Two approved partial deliveries of 4 and 3 items respectively give 7 received, 3 remaining, and an open residual value of 600 SEK. Excel calculates these values automatically when the correct PO ID and line number are used.\u003c\/p\u003e\n\n\u003cdiv style=\"background:#FFF4D9;border-left:4px solid #D6A53B;padding:15px 18px;margin:18px 0\"\u003e\n\n\u003cstrong\u003eImportant limitations:\u003c\/strong\u003e Excel is not a purchase contract, invoice, inventory accounting, or an automatic order and payment system. Formulas calculate amounts excluding VAT and do not convert currencies. Do not sum order amounts in different currencies as if they were the same currency. An internal delay alert does not automatically mean the supplier is in legal default.\u003c\/div\u003e\n\n\u003ch2 id=\"inkop-steg\"\u003eHow to use the package – eight steps\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRegister the order.\u003c\/strong\u003e Create a unique PO ID and note the buyer, supplier, date, and relevant quote\/framework agreement.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRegister order lines.\u003c\/strong\u003e Enter item, line number, ordered quantity, unit, and agreed unit price excluding VAT.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eReview before sending.\u003c\/strong\u003e Check delivery address, delivery terms, authority to order, and which documents or specifications should be included.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eSave supplier confirmation.\u003c\/strong\u003e Register the actual confirmation and confirmed delivery date. The customer's or buyer's original request is not the same as the agreed date.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eReceive delivery.\u003c\/strong\u003e Check quantity and condition. Register the approved received quantity to the correct PO ID and line number. Rejected quantity is documented separately.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eTrack backorders.\u003c\/strong\u003e Review remaining quantity and order value, and follow up on missing dates or passed internal follow-up dates.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDocument discrepancies.\u003c\/strong\u003e Describe the difference from the contract and make any claims according to applicable law and contractual terms.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eClose in a controlled manner.\u003c\/strong\u003e Do not close manually until delivery, backorders, discrepancies, and invoice documentation have been reconciled.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2 id=\"inkop-ratt\"\u003ePurchase orders, contracts, and the Sale of Goods Act – what applies?\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eA purchase order is not automatically a completed contract.\u003c\/strong\u003e Whether a binding contract arises depends on factors such as offers, acceptance, previous negotiations, and agreed terms. Verksamt explains the importance of clear terms and order confirmation. A supplier's confirmation with changes must be reviewed separately.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eThe Sale of Goods Act (1990:931)\u003c\/strong\u003e may be applicable to the purchase of movable property between businesses. According to Section 3, agreements, commercial usage, or practices take precedence over many of the Act's provisions. Legal consequences for delays or defects must therefore be assessed based on the specific transaction, and a delayed Excel date never determines the issue alone.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eA purchase order is not an invoice.\u003c\/strong\u003e Invoice content is regulated by, among others, the VAT Act and is guided by the Swedish Tax Agency. The package's order amounts and registered deliveries do not automatically become accounting vouchers or tax documents. Verify the supplier's invoice, correct VAT, currency, and other accounting requirements separately.\u003c\/p\u003e\n\n\u003cp\u003eFor international purchases, public procurement, transport terms, and goods with special security or import requirements, other rules and agreements may be relevant. Seek help from a purchasing or legal specialist when the risks or value of the business justify it.\u003c\/p\u003e\n\n\u003ch2\u003eCommon pitfalls\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003eConfusing the requested delivery date with the supplier's actually confirmed date.\u003c\/li\u003e\n\n\u003cli\u003eUsing different PO IDs or line numbers on order lines and delivery registrations.\u003c\/li\u003e\n\n\u003cli\u003eCounting damaged or rejected goods as approved received.\u003c\/li\u003e\n\n\u003cli\u003eEntering the same delivery twice, thus creating over-delivery in the register.\u003c\/li\u003e\n\n\u003cli\u003eConfusing an open residual value with a booked debt.\u003c\/li\u003e\n\n\u003cli\u003eUsing order status \"Delivered\" despite remaining backorders without examining the situation.\u003c\/li\u003e\n\n\u003cli\u003eAssuming an order automatically implies a contract or that a delivery registration is a formal claim.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2 id=\"inkop-faq\"\u003eCommon questions and answers\u003c\/h2\u003e\n\n\u003ch3\u003eWhat is a purchase order?\u003c\/h3\u003e\n\n\u003cp\u003eAn ordering document with reference numbers, goods or services, quantity, price, and terms. It makes it easier to consolidate what has been sent to the supplier and what has subsequently been confirmed and delivered.\u003c\/p\u003e\n\n\u003ch3\u003eDoes Excel automatically calculate backorders?\u003c\/h3\u003e\n\n\u003cp\u003eYes. Approved received quantities are summed per combination of PO ID and order line. Remaining quantity and residual value are then shown automatically based on the registered data.\u003c\/p\u003e\n\n\u003ch3\u003eCan the package be used after MRP Light?\u003c\/h3\u003e\n\n\u003cp\u003eYes. MRP Light helps you calculate material requirements and purchase proposals. This product then helps you document orders and track actual incoming deliveries. However, there is no automatic file integration.\u003c\/p\u003e\n\n\u003ch3\u003eCan I track multiple suppliers and different purchase orders?\u003c\/h3\u003e\n\n\u003cp\u003eYes. Excel contains prepared rows for 80 purchase orders, 120 order lines, and 160 partial deliveries. Each order requires its own PO ID.\u003c\/p\u003e\n\n\u003ch3\u003eDoes Excel support VAT and currency conversion?\u003c\/h3\u003e\n\n\u003cp\u003eAmounts are registered excluding VAT. No automatic VAT assessment or currency conversion is included. The overview's total amount should only be compared when all relevant orders use the same currency.\u003c\/p\u003e\n\n\u003ch3\u003eCan Excel send the order or notify about late deliveries?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The tool works offline and does not send orders, messages, or automatic email reminders.\u003c\/p\u003e\n\n\u003ch3\u003eIs an English version included?\u003c\/h3\u003e\n\n\u003cp\u003eYes, a supplementary English worksheet is included for companies operating in Sweden. The primary Swedish templates and the user guide are not fully translated.\u003c\/p\u003e\n\n\u003ch2 id=\"inkop-leverans\"\u003eFile formats, price, and digital delivery\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003e79 SEK\u003c\/strong\u003e, digital one-time purchase. ZIP with four DOCX files, four searchable A4 PDFs, and one XLSX file. No physical goods are sent. For automatic delivery after purchase, the ZIP file must be linked to the correct Shopify variant in Digital Products.\u003c\/p\u003e\n\n\u003ch2\u003eOfficial sources\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/verksamt.se\/avtal-fakturering\/offert-och-anbud\"\u003eVerksamt\/Swedish Agency for Economic and Regional Growth – Offer and tender\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.riksdagen.se\/sv\/dokument-och-lagar\/dokument\/svensk-forfattningssamling\/koplag-1990931_sfs-1990-931\/\"\u003eThe Riksdag – Sale of Goods Act (1990:931)\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.skatteverket.se\/foretagorganisationer\/moms\/saljavarorochtjanster\/fakturering.4.58d555751259e4d66168000403.html\"\u003eSwedish Tax Agency – Invoicing rules\u003c\/a\u003e\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2\u003eSupplementary products\u003c\/h2\u003e\n\n\u003cp\u003eTo calculate what needs to be ordered, you can combine the product with \u003ca href=\"\/en\/products\/materialbehovsplanering-mrp-inkopsplan-excel-2026-2027\"\u003eMaterial Requirements Planning – MRP Light\u003c\/a\u003e. For checking supplier performance, there is \u003ca href=\"\/en\/products\/leverantorsbedomning-leverantorsuppfoljning-excel-2026-2027\"\u003eSupplier Assessment \u0026amp; Supplier Follow-up\u003c\/a\u003e. For clear contracts, you can use \u003ca href=\"\/en\/products\/leverantorsavtal-supplier-agreement-2026-2027-word-pdf-english-svensk-ratt\"\u003eSupplier Agreement\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003cp\u003e\u003csmall\u003eDisclaimer: The documents are general administrative and contract-related work tools. They do not replace individually designed contracts, ERP systems, VAT accounting, special inspections, or legal advice.\u003c\/small\u003e\u003c\/p\u003e\n\n\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55655190102358,"sku":"INKOPSORDER-LEVERANS-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/01_inkopsorder_leveransbevakning_hero_2027_559da26d-34fb-4814-a55b-67e7258b8d01.png?v=1791505205"},{"product_id":"produktionskostnad-maskintimkostnad-artikelkalkyl-excel-2026-2027","title":"Production Cost \u0026 Machine Hour Rate 2026\/2027 – Item Costing, Price \u0026 Excel | Word\/PDF","description":"\u003csection class=\"mb-product-description\" lang=\"sv\"\u003e\n\u003cp\u003e\u003cstrong\u003eProduction Cost \u0026amp; Machine Hour Rate 2026\/2027\u003c\/strong\u003e is a complete, editable calculation package for manufacturing companies, CNC workshops, and small production businesses. Calculate the imputed machine hour rate, material consumption, direct labor time, setup time, external processing costs, and overhead markups. Obtain a basis for \u003cstrong\u003efull cost calculation per item, target price, and quote follow-up\u003c\/strong\u003e – with an Excel tool and document templates for review and pricing decisions.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003ePrice 79 SEK – one-time purchase.\u003c\/strong\u003e The package includes Swedish Word and PDF templates, a separate Swedish user guide, a supplementary English worksheet, and an Excel file with six interconnected tabs. No subscription or connection required.\u003c\/p\u003e\n\n\u003cnav aria-label=\"About the document template\"\u003e\u003cstrong\u003eJump to:\u003c\/strong\u003e \u003ca href=\"#pk-innehall\"\u003eWhat's included\u003c\/a\u003e · \u003ca href=\"#pk-excel\"\u003eExcel\u003c\/a\u003e · \u003ca href=\"#pk-exempel\"\u003eCalculation example\u003c\/a\u003e · \u003ca href=\"#pk-anvand\"\u003eWorkflow\u003c\/a\u003e · \u003ca href=\"#pk-redovisning\"\u003eAccounting\u003c\/a\u003e · \u003ca href=\"#pk-faq\"\u003eFAQ\u003c\/a\u003e · \u003ca href=\"#pk-leverans\"\u003eDelivery\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv style=\"background:#E9F6EF;border-left:4px solid #248359;padding:16px 19px;margin:20px 0\"\u003e\n\n\u003cstrong\u003eLegally and\/or technically reviewed: October 9, 2026\u003c\/strong\u003e\u003cp\u003eVersion 1.0, intended for 2026\/2027. The Excel calculations have been functionally tested for accurate costs, margins, and warnings for prices below cost. Accounting and tax limitations have been compared with guidance from the Swedish Tax Agency and the Accounting Standards Board. No external certification or company-specific accounting review is included.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2 id=\"pk-innehall\"\u003eWhat is included in the calculation package\u003c\/h2\u003e\n\n\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth\u003eDocument\u003c\/th\u003e\n\n\u003cth\u003eContent\u003c\/th\u003e\n\n\u003cth\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eProduction Cost – Calculation Routine\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eRoles, calculation policy, machine-related costs, productive hours, price calculation, control points, and limitations.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eItem Costing \u0026amp; Pricing Decision\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eProfessional form for item data, cost basis, reasonableness check, justification, approval, and follow-up.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eDetailed User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eStep-by-step instructions for all Excel sheets, cost examples, common error sources, and accounting source information.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eProduction Costing – Working Sheet\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eSupplementary English working document for staff in Swedish operations; not a complete translation of the main templates.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eProduction Cost \u0026amp; Machine Hour Rate\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eExcel tool with machine register, item register, item costing, quote follow-up, and overview.\u003c\/td\u003e\n\n\u003ctd\u003eExcel XLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003cp\u003e\u003cstrong\u003eTotal of nine files in ZIP:\u003c\/strong\u003e 4 DOCX, 4 searchable A4-PDFs, and 1 XLSX. The primary language is Swedish.\u003c\/p\u003e\n\n\u003ch2\u003eFor which companies is the production cost calculation suitable?\u003c\/h2\u003e\n\n\u003cp\u003eFor \u003cstrong\u003eCNC workshops and contract manufacturers\u003c\/strong\u003e calculating processing costs per part and machine hour, \u003cstrong\u003eproduction managers\u003c\/strong\u003e in need of a consistent calculation policy, \u003cstrong\u003ecost and quote managers\u003c\/strong\u003e comparing quoted prices against modeled costs, and \u003cstrong\u003esmall manufacturing companies\u003c\/strong\u003e wanting structure without a comprehensive ERP system.\u003c\/p\u003e\n\n\u003ch2 id=\"pk-excel\"\u003eExcel – six interconnected worksheets\u003c\/h2\u003e\n\n\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth\u003eWorksheet\u003c\/th\u003e\n\n\u003cth\u003eFunction\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eOverview\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eDisplays registered machines and items, completed costings, quotes below cost, as well as summarized quote values, modeled costs, and profit margins.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eMachines\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e60 rows for machine ID, imputed capital cost, maintenance, energy, premises, other annual costs, and productive hours. Automatic hourly rate.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eItems\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e80 rows with material\/pc, waste %, direct labor\/hr, cycle time, setup time, batch size, external costs, overhead %, machine ID, target margin, and planned price.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eItem Costing\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e80 interconnected calculation rows with material, labor, machine, setup cost, markups, full cost\/pc, target price, margin, and data status.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eQuote Follow-up\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e80 prepared quote rows with item ID, quantity, quoted price, estimated order cost, and margin, plus warning for price below full cost.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eInstructions\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eCalculation definitions, registration order, limitations, review, and relevant authority sources.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003cp\u003eThe formulas calculate once the required values are entered. Empty or incomplete items should not be used as a basis for decision-making. Status is shown for, among other things, missing machine ID, incomplete costing, missing planned price, and price below full cost. \u003cstrong\u003eExcel never makes a business decision automatically.\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003ch2 id=\"pk-exempel\"\u003eCalculation example – how machine hour rate and price work\u003c\/h2\u003e\n\n\u003cp\u003eAssume a machine has \u003cstrong\u003e450,000 SEK in budgeted annual costs\u003c\/strong\u003e and is used for \u003cstrong\u003e1,500 productive hours\u003c\/strong\u003e. The machine hour rate then becomes \u003cstrong\u003e300 SEK\/hour\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cp\u003eAn item has the following costing conditions: material 120 SEK\/pc, waste 5%, labor time 12 minutes\/pc at 240 SEK\/hour, machine time 12 minutes\/pc, setup time 30 minutes per batch of 50 pcs, external cost 10 SEK\/pc, and overhead markup 15% of the defined cost base.\u003c\/p\u003e\n\n\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth\u003eCost item\u003c\/th\u003e\n\n\u003cth\u003eCalculated SEK\/pc\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eMaterial including waste\u003c\/td\u003e\n\n\u003ctd\u003e126.00\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eDirect labor time\u003c\/td\u003e\n\n\u003ctd\u003e48.00\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eMachine time\u003c\/td\u003e\n\n\u003ctd\u003e60.00\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctd\u003eSetup time distributed per item\u003c\/td\u003e\n\n\u003ctd\u003e5.40\u003c\/td\u003e\n\n\n\u003ctr\u003e\n\n\u003ctd\u003eExternal processing\u003c\/td\u003e\n\n\u003ctd\u003e10.00\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eOverhead markup 15%\u003c\/td\u003e\n\n\u003ctd\u003e37.41\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eFull cost\/pc\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003e\u003cstrong\u003e286.81\u003c\/strong\u003e\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eTarget price at 20% target margin\u003c\/td\u003e\n\n\u003ctd\u003e\u003cstrong\u003e358.51\u003c\/strong\u003e\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003cp\u003eThe model calculates target price as \u003cstrong\u003ecost \/ (1 − desired target margin)\u003c\/strong\u003e, not as a simple 20% markup. All amounts should be stated in SEK excluding VAT and based on documented assumptions.\u003c\/p\u003e\n\n\u003cdiv style=\"background:#FFF4D8;border-left:4px solid #CFA238;padding:15px 18px;margin:18px 0\"\u003e\n\n\u003cstrong\u003eImportant:\u003c\/strong\u003e An internal machine hour rate is a \u003cem\u003ecalculation\u003c\/em\u003e, not automatically an accounting or tax-related cost. The product's simplified contribution margin is based on specific assumptions about which cost items are variable. Margin and target price are not the same as booked profit, gross margin in an annual report, or a guarantee of profitability.\u003c\/div\u003e\n\n\u003ch2 id=\"pk-anvand\"\u003eHow to use the package – step by step\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDetermine calculation period.\u003c\/strong\u003e Use SEK excluding VAT throughout and document who is responsible for the cost basis.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRegister machines.\u003c\/strong\u003e State annual imputed machine costs and realistic productive hours. Avoid double-counting premises, energy, and personnel.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRegister items.\u003c\/strong\u003e State cost per material\/pc, waste, labor cost\/hr, cycle time and setup time in minutes, normal batch size, and external processing.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eSelect the correct machine.\u003c\/strong\u003e Use the exact same unique machine ID as in the machine register so that the machine hour rate is retrieved correctly.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDetermine markups and target margin.\u003c\/strong\u003e Distinguish overhead distribution from margin and verify every percentage.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eReview item costing.\u003c\/strong\u003e Check full cost, target price, and any status warnings.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eTest quote price.\u003c\/strong\u003e Register quote volume, item ID, and quoted price in the Quote follow-up. Compare order value with modeled cost.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eMake and document decisions.\u003c\/strong\u003e Use the pricing decision form, save assumptions, and follow up against actual production costs.\u003c\/li\u003e\n\n\u003cli\u003e\n\u003c\/li\u003e\n\u003c\/ol\u003e\n\n\u003ch2\u003eCommon mistakes in cost accounting for production\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003eDividing annual costs by calendar or scheduled hours instead of productive hours.\u003c\/li\u003e\n\n\u003cli\u003eUsing wages excluding relevant cost components and thereby underestimating the true labor cost.\u003c\/li\u003e\n\n\u003cli\u003eDouble-counting capital, energy, premises, maintenance, or overheads in several items.\u003c\/li\u003e\n\n\u003cli\u003eForgetting setup time or using a batch size that does not correspond to normal production.\u003c\/li\u003e\n\n\u003cli\u003eMixing SEK with EUR or other currencies in the same calculation.\u003c\/li\u003e\n\n\u003cli\u003eViewing a suggested price as a market-ready, contractually or legally correct quoted price without separate assessment.\u003c\/li\u003e\n\n\u003cli\u003eCopying internal machine depreciation directly into the annual accounts.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2 id=\"pk-redovisning\"\u003eWhat applies to depreciation and accounting 2026\/2027?\u003c\/h2\u003e\n\n\u003cp\u003eThere is no general Swedish legal requirement to use a specific machine hour rate calculation. The \u003cstrong\u003eAccounting Standards Board (Bokföringsnämnden)\u003c\/strong\u003e provides rules and guidance on how machines and other assets should be valued and depreciated in the company's accounts depending on the applicable framework and fiscal year. Amendments to K2 and K3 have been decided, with different application dates that must be verified for the company in question. The \u003cstrong\u003eSwedish Tax Agency (Skatteverket)\u003c\/strong\u003e describes, among other things, the conditions for tax-related depreciation.\u003c\/p\u003e\n\n\u003cp\u003eThis product's field for \u003cstrong\u003eimputed capital cost\u003c\/strong\u003e, however, is an internal planning assumption for prices. It does not establish the correct depreciation method, tax-related value, inventory accounting, VAT, or taxable profit. Accounting must be assessed separately.\u003c\/p\u003e\n\n\u003ch2 id=\"pk-faq\"\u003eFrequently asked questions\u003c\/h2\u003e\n\n\u003ch3\u003eHow do I calculate machine hour rate?\u003c\/h3\u003e\n\n\u003cp\u003eSum up relevant budgeted annual machine costs and divide by realistic productive machine hours per year. Excel performs the calculation once the information is registered.\u003c\/p\u003e\n\n\u003ch3\u003eCan I calculate the cost for each manufactured item?\u003c\/h3\u003e\n\n\u003cp\u003eYes. You can enter material, labor, processing time, setup time, batch size, external costs, and overhead markups for up to 80 prepared item rows.\u003c\/p\u003e\n\n\u003ch3\u003eDoes Excel calculate cost and target price?\u003c\/h3\u003e\n\n\u003cp\u003eYes, as \u003cem\u003einternally modeled full cost\u003c\/em\u003e and a target price at a specified target margin. It is not a tax-related cost calculation or an automatically approved customer quote.\u003c\/p\u003e\n\n\u003ch3\u003eWhat is the difference between markup and margin?\u003c\/h3\u003e\n\n\u003cp\u003eMarkup is calculated in relation to cost. Margin is normally calculated as a share of the price. Therefore, a 20% target margin results in a different target price than a 20% markup.\u003c\/p\u003e\n\n\u003ch3\u003eCan several different processing operations be calculated separately?\u003c\/h3\u003e\n\n\u003cp\u003eThe workbook is limited to one selected machine\/main operation per item row. For multiple operations, the separate steps need to be calculated and consolidated through your own adjustments or a more advanced system.\u003c\/p\u003e\n\n\u003ch3\u003eIs this a ready-made accounting or tax return template?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It is a pricing and production calculation tool, not a general ledger system, tax report, inventory valuation, or annual closing template.\u003c\/p\u003e\n\n\u003ch3\u003eIs an English version included?\u003c\/h3\u003e\n\n\u003cp\u003eYes, a supplementary English worksheet is included. The main documents and the detailed user guide are in Swedish.\u003c\/p\u003e\n\n\u003ch2 id=\"pk-leverans\"\u003eFormat, digital delivery, and price\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003e79 SEK\u003c\/strong\u003e, digital one-time purchase. ZIP with four editable DOCX, four searchable A4-PDFs, and one Excel workbook (XLSX). No physical shipping. Automated delivery after purchase requires that the ZIP file be linked to the correct product variant in Digital Products.\u003c\/p\u003e\n\n\u003ch2\u003eOfficial sources\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.bfn.se\/redovisningsregler\/beslutade-redovisningsregler\/\"\u003eAccounting Standards Board – Decided accounting rules\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.bfn.se\/andringar-i-k2-k3-arsbokslut\/\"\u003eAccounting Standards Board – Changes in K2\/K3 and annual accounts\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www4.skatteverket.se\/rattsligvagledning\/edition\/2026.13\/339134.html\"\u003eSwedish Tax Agency – Tax-related depreciation\u003c\/a\u003e\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2\u003eRelated templates\u003c\/h2\u003e\n\n\u003cp\u003eComplement with \u003ca href=\"\/en\/products\/produktionsplanering-kapacitetskalkyl-excel-2026-2027\"\u003eProduction Planning \u0026amp; Capacity Calculation\u003c\/a\u003e for order and load planning, \u003ca href=\"\/en\/products\/oee-tak-maskineffektivitet-excel-mall-2026-2027\"\u003eOEE \u0026amp; TAK – Machine Efficiency\u003c\/a\u003e for actual operational follow-up, and \u003ca href=\"\/en\/products\/offertmall-offertkalkyl-excel-2026-2027\"\u003eQuote Template \u0026amp; Quote Calculation\u003c\/a\u003e for a separate quoting process.\u003c\/p\u003e\n\n\u003cp\u003e\u003csmall\u003eDisclaimer: General calculation and document templates. Calculations depend entirely on correctly entered input and do not replace market assessment, contracts, bookkeeping, audit review, or individual accounting or tax advice.\u003c\/small\u003e\u003c\/p\u003e\n\n\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55655220314454,"sku":"PRODUKTIONSKOSTNAD-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/01_Produktionskostnad_Maskintimme_Hero_2027_2ea61605-7132-41f2-86d9-441370564d5d.png?v=1791506430"},{"product_id":"godsmottagningsprotokoll-leveranskontroll-2026-2027-excel-word-pdf","title":"Goods Receipt Protocol \u0026 Delivery Inspection 2026\/2027 – Excel, Word \u0026 PDF","description":"\u003csection class=\"mb-product-content\" lang=\"en\"\u003e\n\u003cp\u003e\u003cstrong\u003eGoods Receipt Protocol \u0026amp; Delivery Inspection 2026\/2027\u003c\/strong\u003e is a complete template package for companies that need to document what has actually arrived from a supplier. Compare the delivery against the purchase order, register ordered and received quantities, document damages and quality deviations, and make a clear manual decision on whether the goods can be used or need to be quarantined. You receive \u003cstrong\u003ean Excel-based receipt register with a dashboard\u003c\/strong\u003e, goods receipt protocol, deviation report, inspection checklist, a detailed Swedish user guide, and an English work reference.\u003c\/p\u003e\n\n\u003cnav aria-label=\"About the document template\"\u003e\u003cp\u003e\u003cstrong\u003eAbout the document template:\u003c\/strong\u003e \u003ca href=\"#leverans-innehall\"\u003eWhat's included\u003c\/a\u003e · \u003ca href=\"#leverans-excel\"\u003eThe Excel tool\u003c\/a\u003e · \u003ca href=\"#leverans-guide\"\u003eHow to use the package\u003c\/a\u003e · \u003ca href=\"#leverans-juridik\"\u003eLegal basis\u003c\/a\u003e · \u003ca href=\"#leverans-faq\"\u003eFAQ\u003c\/a\u003e · \u003ca href=\"#leverans-kallor\"\u003eSources\u003c\/a\u003e\u003c\/p\u003e\u003c\/nav\u003e\n\u003caside style=\"background:#e7f3e9;border-left:4px solid #25764c;border-radius:7px;padding:16px\"\u003e\u003cstrong\u003eLegally and\/or technically reviewed: October 9, 2026.\u003c\/strong\u003e Version 1.0, developed for 2026\/2027. The template has been reviewed as general administrative material based on stated Swedish legal sources and checked technically. It does not constitute individual legal advice, certification, safety assessment, or government-approved quality control.\u003c\/aside\u003e\n\u003ch2 id=\"leverans-innehall\"\u003eWhat is included in the package\u003c\/h2\u003e\n\n\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth\u003eDocument\u003c\/th\u003e\n\n\u003cth\u003eFunction\u003c\/th\u003e\n\n\u003cth\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eGoods Receipt Register \u0026amp; Dashboard\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eSeven Excel sheets with overview, 200 receipts, 350 article rows, 150 deviations, inspection checklist, instructions, and dummy examples.\u003c\/td\u003e\n\n\u003ctd\u003eExcel (XLSX)\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eGoods Receipt Protocol\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eDelivery details, number of parcels, purchase order, waybill, labeling, condition, testing, article rows, and manual disposition.\u003c\/td\u003e\n\n\u003ctd\u003eWord (DOCX) + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eDeviation and Delivery Discrepancy Report\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eDocument incorrect article, discrepancy, damage, missing documents, quarantine, evidence, and external notification.\u003c\/td\u003e\n\n\u003ctd\u003eWord (DOCX) + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eGoods Receipt Checklist\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eInspection points before unloading, upon receipt, before release, and during follow-up.\u003c\/td\u003e\n\n\u003ctd\u003eWord (DOCX) + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eDetailed User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eStep-by-step instructions, legal limitations, common errors, quality procedures, and government sources.\u003c\/td\u003e\n\n\u003ctd\u003eWord (DOCX) + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e\u003cstrong\u003eGoods Receipt \u0026amp; Incoming Inspection\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd\u003eEnglish work reference and inspection protocol for use in Swedish operations.\u003c\/td\u003e\n\n\u003ctd\u003eWord (DOCX) + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003cp\u003e\u003cstrong\u003eTotal of 11 files:\u003c\/strong\u003e five editable DOCX, five searchable PDF files in A4 format, and one Excel workbook. All are delivered as a digital ZIP file.\u003c\/p\u003e\n\n\u003ch2 id=\"leverans-excel\"\u003eExcel template for goods receipt and delivery inspection\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eOverview:\u003c\/strong\u003e registered receipts, manual release decisions, quarantine\/investigation entries, article rows, and open deviations.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDeliveries:\u003c\/strong\u003e 200 prepared entries with receipt ID, order number, supplier, waybill, recipient, location, inspection status, and person responsible.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eArticle rows:\u003c\/strong\u003e 350 rows where ordered, received, and approved quantities are entered separately. Formulas calculate discrepancies and non-approved quantities, and flag deviant or unreasonable values.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDeviations:\u003c\/strong\u003e 150 entries with documented type, priority, responsible person, internal follow-up date, action, and case status.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eChecklist:\u003c\/strong\u003e 15 suggested inspection points and space for local control points.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eInstruction and examples:\u003c\/strong\u003e easy-to-read support within the workbook and a separate dummy example that does not affect the dashboard.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003eExcel has no macros and sends no automatic emails, SMS, or reminders. \u003cstrong\u003eA release status is based on the responsible user's manually documented decision\u003c\/strong\u003e; Excel does not automatically check all product requirements, whether the goods are safe, or whether the delivery is legally accepted.\u003c\/p\u003e\n\n\u003ch2 id=\"leverans-guide\"\u003eHow to use the goods receipt template\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003ePrepare for receipt:\u003c\/strong\u003e retrieve the current purchase order, specification, packing slip, and any supplier requirements.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCheck packaging:\u003c\/strong\u003e note the number of parcels, visible damage, shipment references, and any reservations on transport documents.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRegister articles:\u003c\/strong\u003e enter one row per article\/lot with ordered, received, and approved quantity, as well as any serial number, batch number, and evidence reference.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eAssess and quarantine:\u003c\/strong\u003e document deviations in a separate protocol and decide on quarantine, further inspection, or release with the authorized person in charge.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eClaim separately:\u003c\/strong\u003e in case of error or damage – investigate who the correct contracting party is and notify them without undue delay, according to applicable terms and law.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eFollow up:\u003c\/strong\u003e review open cases, confirm actions, and archive protocols, photos, communication, and decisions.\u003c\/li\u003e\n\n\u003cli\u003e\n\u003c\/li\u003e\n\u003c\/ol\u003e\n\n\u003ch2\u003eWho is this document package suitable for?\u003c\/h2\u003e\n\n\u003cp\u003eFor warehousing, e-commerce, wholesalers, manufacturing industry, workshops, spare parts operations, purchasing functions, service companies, property management companies, and other organizations that receive goods and need a more structured and traceable workflow.\u003c\/p\u003e\n\n\u003ch2 id=\"leverans-juridik\"\u003eThe Sale of Goods Act and delivery inspection: what applies?\u003c\/h2\u003e\n\n\u003cp\u003eFor applicable B2B purchases, the \u003cstrong\u003eSale of Goods Act (1990:931)\u003c\/strong\u003e is often the starting point. According to Section 31, the buyer shall examine the goods as soon as circumstances permit and in accordance with good business practice. According to Section 32, the buyer shall notify of defects within a reasonable time after the defect was or should have been discovered. The Act is largely dispositive; the parties' agreement, trade usage, or other applicable legal rules may influence the assessment.\u003c\/p\u003e\n\n\u003caside style=\"background:#fff3d7;border-left:4px solid #c5902a;border-radius:7px;padding:16px\"\u003e\u003cstrong\u003eImportant limitations:\u003c\/strong\u003e The goods receipt protocol is not in itself a formal claim to the seller or carrier. Excel does not calculate legal notification deadlines. A signed receipt does not automatically mean that all defects have been accepted. In international transport, consumer purchases, dangerous goods, food, pharmaceuticals, or specially regulated products, other requirements may apply.\u003c\/aside\u003e\n\u003cp\u003eThe package is not an ISO 9001 certificate, a mandatory self-inspection system according to any specific product legislation, or a system that replaces the company's warehouse\/ERP system. Use relevant quality or transport expertise for risk-based inspections.\u003c\/p\u003e\n\n\u003ch2 id=\"leverans-faq\"\u003eCommon questions about goods receipt\u003c\/h2\u003e\n\n\u003ch3\u003eWhat is the difference between a goods receipt protocol and a transport damage report?\u003c\/h3\u003e\n\n\u003cp\u003eThe goods receipt protocol documents the general inspection of what the company has received. A transport damage report is a specific document used when goods have been damaged or lost and an external claim may need to be made.\u003c\/p\u003e\n\n\u003ch3\u003eHow many deliveries can fit in Excel?\u003c\/h3\u003e\n\n\u003cp\u003e200 receipt rows, 350 article rows, and 150 deviation cases are prepared.\u003c\/p\u003e\n\n\u003ch3\u003eCan Excel automatically approve or release goods?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Release is documented as a manual decision. The template only provides administrative control signals.\u003c\/p\u003e\n\n\u003ch3\u003eAre quantity discrepancies calculated automatically?\u003c\/h3\u003e\n\n\u003cp\u003eYes. Formulas calculate received minus ordered and received minus approved, and can mark incorrect or incomplete entries.\u003c\/p\u003e\n\n\u003ch3\u003eDoes the template work with ISO 9001?\u003c\/h3\u003e\n\n\u003cp\u003eIt can contribute documentation to a management system but does not automatically fulfill any specific standard or certification requirement.\u003c\/p\u003e\n\n\u003ch3\u003eAre 2027 rules built in?\u003c\/h3\u003e\n\n\u003cp\u003eThe package uses general inspection routines and references to legal rules reviewed on October 9, 2026. Future rules and changed contractual terms need to be checked upon use.\u003c\/p\u003e\n\n\u003ch3\u003eIs an English version included?\u003c\/h3\u003e\n\n\u003cp\u003eYes, an English work reference with an inspection protocol for Swedish operations. The detailed Excel register and user guide have primary Swedish fields.\u003c\/p\u003e\n\n\u003ch2 id=\"leverans-kallor\"\u003eLegal basis and government sources\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003ca href=\"https:\/\/www.riksdagen.se\/sv\/dokument-och-lagar\/dokument\/svensk-forfattningssamling\/koplag-1990931_sfs-1990-931\/\"\u003eSwedish Parliament – Sale of Goods Act (1990:931), specifically Sections 3 and 31–33\u003c\/a\u003e.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003ca href=\"https:\/\/www.konsumentverket.se\/\"\u003eSwedish Consumer Agency – guidance on consumer purchases and complaints (different legal situation than B2B)\u003c\/a\u003e.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003eNatural supplementary products are \u003ca href=\"\/en\/products\/inkopsorder-leveransbevakning-excel-2026-2027\"\u003ePurchase Order \u0026amp; Delivery Monitoring\u003c\/a\u003e and \u003ca href=\"\/en\/products\/transportskadeanmalan-fraktreklamation-2026-2027-excel-word-pdf\"\u003eTransport Damage Report \u0026amp; Freight Claim\u003c\/a\u003e. See also \u003ca href=\"\/en\/collections\/inkop-leverantor-service-mallar\"\u003emore purchasing and supplier templates\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eDelivery:\u003c\/strong\u003e Immediate digital ZIP download provided that the file is linked in the store's delivery system. No physical product is sent.\u003c\/p\u003e\n\n\u003c\/section\u003e\u003csection class=\"mb-related-consignment-warehouse\" style=\"margin:20px 0\"\u003e\u003ch3\u003eRelated template: consignment warehouse and inventory accounting\u003c\/h3\u003e\n\n\u003cp\u003eWhen receiving goods that are not purchased but stored for commission sales, separate ownership and inventory tracking checks are required. See our consignment warehouse package with commission agreement, article appendix, and Excel. \u003ca href=\"\/en\/products\/konsignationslager-lagerredovisning-b2b-2027\"\u003eConsignment Warehouse \u0026amp; Inventory Accounting B2B 2027 – Word, PDF \u0026amp; Excel\u003c\/a\u003e.\u003c\/p\u003e\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55657432318294,"sku":"GODSMOTTAGNING-LEVERANSKONTROLL-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/godsmottagning-leveranskontroll-2027-hero.png?v=1791515058"},{"product_id":"farligt-avfall-avfallsjournal-transportdokument-2026-2027","title":"Hazardous waste – Waste record \u0026 Consignment note 2026\/2027 | Excel, Word \u0026 PDF","description":"\n\u003csection class=\"mb-product mb-waste\" style=\"color:#17324D;line-height:1.7\"\u003e\n\u003ch2\u003eHazardous waste – waste record, reporting control, and transport document 2026\/2027\u003c\/h2\u003e\n\n\u003cp\u003eDoes your company need to document hazardous waste before it is collected and subsequently keep track of reporting to the Swedish Environmental Protection Agency? This downloadable template package is designed for \u003cstrong\u003eSwedish waste producers\u003c\/strong\u003e who want to maintain a structured waste record, create notes, and have a separate transport document for domestic shipments.\u003c\/p\u003e\n\n\u003cp\u003eYou will receive a formula-driven \u003cstrong\u003ewaste record in Excel\u003c\/strong\u003e, two editable document templates, and a detailed guide, totaling \u003cstrong\u003e7 files in Word, PDF, and Excel\u003c\/strong\u003e. Swedish main versions with English reference sections. Adapted for Swedish conditions.\u003c\/p\u003e\n\n\u003cnav aria-label=\"About the document template\"\u003e\u003cstrong\u003eAbout the document template:\u003c\/strong\u003e \u003ca href=\"#ingar\"\u003eWhat's included\u003c\/a\u003e · \u003ca href=\"#excel\"\u003eThe Excel tool\u003c\/a\u003e · \u003ca href=\"#regler\"\u003eThe rules\u003c\/a\u003e · \u003ca href=\"#anvandning\"\u003eHow to do it\u003c\/a\u003e · \u003ca href=\"#fragor\"\u003eFAQ\u003c\/a\u003e · \u003ca href=\"#kallor\"\u003eSources\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv style=\"background:#EAF3ED;padding:15px;border-left:5px solid #40755B;margin:18px 0\"\u003e\n\n\u003cstrong\u003eLegally and technically verified: October 12, 2026.\u003c\/strong\u003e The material has been developed based on the Waste Ordinance (2020:614) and the Swedish Environmental Protection Agency's current guidance. The package is a documentation aid, not a government-approved e-service or a guarantee of regulatory compliance. Check for changes and internal operational requirements before use.\u003c\/div\u003e\n\n\u003ch2 id=\"ingar\"\u003eWhat is included in the template package\u003c\/h2\u003e\n\n\u003ctable style=\"border-collapse:collapse;width:100%\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#17324D;color:white\"\u003e\n\n\u003cth style=\"padding:9px;text-align:left\"\u003eDocument\u003c\/th\u003e\n\n\u003cth style=\"padding:9px;text-align:left\"\u003eFormat and usage\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DCE5EB\"\u003e\u003cstrong\u003eWaste record and reporting control\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DCE5EB\"\u003eExcel XLSX · 5 sheets and 150 record rows. Register waste, transport, recipient, and receipt. Status overview and preliminary follow-up dates.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DCE5EB\"\u003e\u003cstrong\u003eNotes – waste producer\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DCE5EB\"\u003eWord DOCX + PDF · waste code, weight, origin, carrier, recipient, and reporting details. Swedish and English reference.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DCE5EB\"\u003e\u003cstrong\u003eTransport document – hazardous waste\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DCE5EB\"\u003eWord DOCX + PDF · domestic transport, waste code, weight, transport date, locations, and carrier, consigner where applicable, and final recipient.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px\"\u003e\u003cstrong\u003eSeparate user guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px\"\u003eWord DOCX + PDF · workflow, legal checkpoints, reporting, archiving, risks, and English quick guide.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003ch2 id=\"excel\"\u003eWaste record in Excel – what can the tool do?\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003eCollect up to 150 records of waste quantities and six-digit waste codes.\u003c\/li\u003e\n\n\u003cli\u003eSave weight (kg), origin of the waste, date of transport, and relevant actor details.\u003c\/li\u003e\n\n\u003cli\u003eFollow up on reporting dates and note the Swedish Environmental Protection Agency's report\/waste ID.\u003c\/li\u003e\n\n\u003cli\u003eSee an \u003cstrong\u003eoverview of the number of records, reported, non-reported, and incomplete entries\u003c\/strong\u003e.\u003c\/li\u003e\n\n\u003cli\u003eMonitor a \u003cstrong\u003epreliminary\u003c\/strong\u003e reporting deadline with the ability to edit Swedish holidays.\u003c\/li\u003e\n\n\u003cli\u003eDocument operational details and CFAR numbers, as well as use a built-in guide.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cdiv style=\"background:#FFF3D6;padding:15px;border-left:5px solid #D6A343;margin:18px 0\"\u003e\n\n\u003cstrong\u003eNote:\u003c\/strong\u003e The Excel template calculates preliminary control deadlines. The user is responsible for ensuring the correct legal deadline and holidays are assessed. The Excel file does \u003cstrong\u003enot\u003c\/strong\u003e automatically report to the Waste Registry and does not replace the waste producer's own documentation and reporting obligations.\u003c\/div\u003e\n\n\u003ch2 id=\"regler\"\u003eWhat do the rules say about hazardous waste?\u003c\/h2\u003e\n\n\u003ch3\u003eObligation to keep records\u003c\/h3\u003e\n\n\u003cp\u003eAnyone who generates hazardous waste in their business and has it transported away must normally record the information \u003cstrong\u003ebefore transport begins\u003c\/strong\u003e. A note from a waste producer includes, among other things, a six-digit waste code, weight in kg, the location where the waste was produced, the date of transport, details of the carrier, mode of transport, as well as the recipient and the location where the waste is to be handled further. For electronic reporting as a waste producer, the business normally also needs a CFAR number.\u003c\/p\u003e\n\n\u003ch3\u003eReporting to the Swedish Environmental Protection Agency\u003c\/h3\u003e\n\n\u003cdiv\u003eReporting to the national waste registry is done via the Swedish Environmental Protection Agency's official e-service or an approved API. Normally, the information must be submitted no later than \u003cstrong\u003etwo working days from the date when the record should have been made\u003c\/strong\u003e. As a waste producer, you are generally required to keep records for at least three years. Late reporting may lead to an environmental sanction fee.\u003c\/div\u003e\n\n\u003ch3\u003eTransport document\u003c\/h3\u003e\n\n\u003cp\u003eA domestic transport of hazardous waste must generally be accompanied by a separate transport document. The document is not the same as the waste record or the electronic report. The package's transport form is intended for domestic Swedish transport and is not an ADR document or a template for cross-border waste shipments.\u003c\/p\u003e\n\n\u003ch2 id=\"anvandning\"\u003eHow to use the template package – step by step\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCheck your role:\u003c\/strong\u003e ensure you are acting as a waste producer. Carriers, collectors, and processors have partially different obligations.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eClassify the waste:\u003c\/strong\u003e establish the correct waste code. Do not choose a code based solely on the template's examples.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRecord before transport:\u003c\/strong\u003e fill in the notes and Excel record with the necessary information.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eFill in the transport document:\u003c\/strong\u003e let the document accompany the domestic transport.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eReport electronically:\u003c\/strong\u003e submit the information via the Swedish Environmental Protection Agency's e-service or API within the applicable deadline.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDocument the receipt:\u003c\/strong\u003e register the report date and report ID in Excel.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eFollow up and archive:\u003c\/strong\u003e check that the note and the authority report match and preserve the documents according to current rules.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eWhich businesses is the package suitable for?\u003c\/h2\u003e\n\n\u003cp\u003eWorkshops, construction and contracting companies, painting firms, property managers, small industrial companies, shops, beauty salons, and other businesses that generate hazardous waste. Non-profit organizations may also be covered depending on their activities. A private individual's own household waste is assessed differently according to special exemptions.\u003c\/p\u003e\n\n\u003ch2\u003eImportant pitfalls\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003eThinking that the Excel report is sent automatically to the authority.\u003c\/li\u003e\n\n\u003cli\u003eDocumenting too late or not recording separately for each relevant waste type and quantity.\u003c\/li\u003e\n\n\u003cli\u003eEntering the wrong waste code or using the wrong operational role.\u003c\/li\u003e\n\n\u003cli\u003eMixing up the notes, transport document, and electronic report.\u003c\/li\u003e\n\n\u003cli\u003eForgetting to check the carrier's and recipient's authorizations or permits where required.\u003c\/li\u003e\n\n\u003cli\u003eNot saving your own notes or documenting the reporting receipt.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2 id=\"fragor\"\u003eCommon questions about the waste record\u003c\/h2\u003e\n\n\u003ch3\u003eIs it a legal requirement to keep a waste record in Excel?\u003c\/h3\u003e\n\n\u003cp\u003eNo, Excel itself is not mandated by law. The requirement concerns, among other things, the information that must be recorded and, where applicable, reported electronically. How the notes are documented can vary.\u003c\/p\u003e\n\n\u003ch3\u003eIs the package the same as the Swedish Environmental Protection Agency's waste registry?\u003c\/h3\u003e\n\n\u003cp\u003eNo. This is an internal documentation aid. Reporting must be done separately in the Swedish Environmental Protection Agency's service or via API.\u003c\/p\u003e\n\n\u003ch3\u003eDoes it also apply to a very small company?\u003c\/h3\u003e\n\n\u003cp\u003eYes, the obligation to keep records and report for business hazardous waste is not generally limited to a certain minimum quantity.\u003c\/p\u003e\n\n\u003ch3\u003eCan all waste companies use the templates?\u003c\/h3\u003e\n\n\u003cp\u003eThey are limited to waste producers. If the business also acts as a collector, carrier, processor, or dealer\/broker, a separate assessment and additional procedures are required.\u003c\/p\u003e\n\n\u003ch3\u003eIs an English version included?\u003c\/h3\u003e\n\n\u003cp\u003eThe Word templates have Swedish main sections and English reference translations. The Excel workbook is in Swedish. Rules and references apply to Sweden.\u003c\/p\u003e\n\n\u003ch3\u003eIs the reporting deadline automatically legally secure?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Excel's calculated follow-up dates are only preliminary; check working days, dates, and applicable rules yourself.\u003c\/p\u003e\n\n\u003ch3\u003eCan I use the transport document abroad?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The attached template is for domestic Swedish transport. International waste shipments require separate control.\u003c\/p\u003e\n\n\u003ch2 id=\"kallor\"\u003eLegal basis and primary sources\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.riksdagen.se\/sv\/dokument-och-lagar\/dokument\/svensk-forfattningssamling\/avfallsforordning-2020614_sfs-2020-614\/\"\u003eWaste Ordinance (2020:614), Chapter 6 and Appendix 3 – The Swedish Parliament\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.naturvardsverket.se\/avfallsregister\"\u003eSwedish Environmental Protection Agency – Waste Registry\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.naturvardsverket.se\/verktyg-och-tjanster\/e-tjanster\/avfallsregistret\/\"\u003eSwedish Environmental Protection Agency – report hazardous waste\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.naturvardsverket.se\/vagledning-och-stod\/avfall\/avfallstransporter-inom-sverige\/\"\u003eSwedish Environmental Protection Agency – transport document for waste in Sweden\u003c\/a\u003e\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003e\u003cstrong\u003eFile format and delivery:\u003c\/strong\u003e ZIP with 3 DOCX, 3 searchable PDF, and 1 XLSX. Editable in compatible Office software. No physical product or shipping. See also \u003ca href=\"\/en\/collections\/produktion-industri-mallar\"\u003eproduction and industry\u003c\/a\u003e and \u003ca href=\"\/en\/collections\/kvalitetsledning-iso-mallar\"\u003equality management templates\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003cp\u003e\u003csmall\u003eMallbutiken.se · Version 1.0 · Verified October 12, 2026 · Waste producer \/ Swedish law.\u003c\/small\u003e\u003c\/p\u003e\n\n\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55711122686294,"sku":"AVFALLSJOURNAL-FARLIGT-AVFALL-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/farligt-avfall-avfallsjournal-2026-2027-hero.png?v=1791791740"},{"product_id":"fordonsregister-serviceplanering-2026-2027-excel-word-pdf","title":"Vehicle Registry \u0026 Service Planning 2026\/2027 – Excel, Word \u0026 PDF | Swedish + English","description":"\u003csection style=\"color:#17324D;line-height:1.75\"\u003e\n\u003ch2\u003eVehicle Register and Service Planning 2026\/2027 – Excel template for companies\u003c\/h2\u003e\n\n\u003cp\u003eConsolidate your company's vehicles, service intervals, inspection dates, costs, and internal vehicle checks into a professional, downloadable document package. \u003cstrong\u003eVehicle Register \u0026amp; Service Planning 2026\/2027\u003c\/strong\u003e is specifically developed for Swedish small businesses, property managers, associations, and organizations that want to manage vehicle administration locally without monthly subscriptions.\u003c\/p\u003e\n\n\u003cp\u003eThe package combines a formula-driven \u003cstrong\u003eExcel workbook with six worksheets\u003c\/strong\u003e, a vehicle card with handover inspection, a service log with follow-up tracking, and a separate comprehensive user guide. \u003cstrong\u003eSeven files: XLSX, three DOCX, and three PDF.\u003c\/strong\u003e The Word templates include a Swedish main version and an English reference translation.\u003c\/p\u003e\n\n\u003cnav aria-label=\"About the document template\"\u003e\u003cstrong\u003eAbout the document template:\u003c\/strong\u003e \u003ca href=\"#mb-ingar\"\u003ePackage contents\u003c\/a\u003e · \u003ca href=\"#mb-funktion\"\u003eExcel tool\u003c\/a\u003e · \u003ca href=\"#mb-guide\"\u003eHow to use it\u003c\/a\u003e · \u003ca href=\"#mb-regler\"\u003eInspection and regulations\u003c\/a\u003e · \u003ca href=\"#mb-faq\"\u003eFAQ\u003c\/a\u003e · \u003ca href=\"#mb-kallor\"\u003eSources\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv style=\"background:#e8f4ed;padding:15px;border-left:5px solid #337b5f;margin:20px 0\"\u003e\n\n\u003cstrong\u003eLegally and technically verified on October 12, 2026.\u003c\/strong\u003e The template is based on Swedish vehicle regulations and the Swedish Transport Agency's guidance. This is an administrative tool – not a government register, a certified vehicle inspection, or an automated monitoring service.\u003c\/div\u003e\n\n\u003ch2 id=\"mb-ingar\"\u003eIncluded in the product package\u003c\/h2\u003e\n\n\u003ctable style=\"width:100%;border-collapse:collapse\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#17324D;color:white\"\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eFile\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eFunction\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae4eb\"\u003e\u003cstrong\u003eVehicle Register \u0026amp; Service Planning.xlsx\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae4eb\"\u003e6 worksheets: Overview, Vehicles, Service Plan, Costs, Checklist, and Read me.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae4eb\"\u003e\u003cstrong\u003eVehicle Card \u0026amp; Handover Inspection\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae4eb\"\u003eWord + PDF; responsibility, inspection dates, odometer reading, condition, and internal sign-off. Swedish and English reference.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae4eb\"\u003e\u003cstrong\u003eService Log \u0026amp; Action Report\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae4eb\"\u003eWord + PDF; work performed, discrepancies, costs, and next steps. Swedish and English reference.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px\"\u003e\u003cstrong\u003eSeparate User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px\"\u003eWord + PDF; instructions, checks, scope, GDPR, primary sources, and English quick guide.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003ch2 id=\"mb-funktion\"\u003eFeatures in Excel – vehicle register and cost tracking\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eUp to 50 vehicles:\u003c\/strong\u003e registration number, vehicle type, model, area of responsibility, current odometer reading, status, and comments.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eInspection monitoring:\u003c\/strong\u003e highlighting for passed or upcoming due dates that the user has verified with the Swedish Transport Agency.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eService monitoring:\u003c\/strong\u003e calculation of services nearing or passed, based on both date and odometer reading.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e200 service tasks:\u003c\/strong\u003e planned work, date performed, workshop, follow-up status, and internal monitoring signal.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e300 cost items:\u003c\/strong\u003e repairs, service, insurance, tax\/fees, fuel\/charging, and other costs with annual and monthly overviews.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e150 check items:\u003c\/strong\u003e inspection points, discrepancies, actions, and next check.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDashboard:\u003c\/strong\u003e number of active vehicles, expiry warnings, costs per month, and open actions.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eAdjustable limits:\u003c\/strong\u003e set your own warning thresholds in days and kilometers. No macros or internet required for the planning itself.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cdiv style=\"background:#fff3d6;padding:15px;border-left:5px solid #d3a33f;margin:20px 0\"\u003e\n\n\u003cstrong\u003eImportant:\u003c\/strong\u003e The Excel template does not retrieve vehicle data from authorities and does not send any email or SMS reminders. It does not calculate the statutory date for the next periodic inspection; enter a current, individually verified date from the Swedish Transport Agency. Warning colors are for internal planning information and do not determine driving bans or insurance validity.\u003c\/div\u003e\n\n\u003ch2\u003eUsage example\u003c\/h2\u003e\n\n\u003cp\u003eA small construction company can register service vehicles and trailers, enter actual inspection dates, track service based on kilometers, document tire changes and costs, and see which actions need to be handled in the coming month. A property manager can use a similar structure for service vehicles and light trucks.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-guide\"\u003eHow to get started\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eSet up Overview:\u003c\/strong\u003e select reporting year (pre-set to 2027), warning threshold in days and kilometers.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCreate the vehicle register:\u003c\/strong\u003e give each vehicle a unique internal Vehicle ID and enter the registration number and responsible function.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eVerify inspection dates:\u003c\/strong\u003e check each registered vehicle with the Swedish Transport Agency and manually fill in the latest allowed date.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eEnter service intervals:\u003c\/strong\u003e from the workshop or manufacturer, as a date and\/or odometer reading.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRegister actions and costs:\u003c\/strong\u003e in Service Plan and Costs. Use the same Vehicle ID in all sheets.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eFollow up:\u003c\/strong\u003e document check items, process warnings, and update status after work is performed.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eSave and archive:\u003c\/strong\u003e store the data with appropriate access control and backups.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2 id=\"mb-regler\"\u003eInspection rules and legal check points\u003c\/h2\u003e\n\n\u003cp\u003eFor standard passenger cars and light trucks with a total weight not exceeding 3,500 kg, the Swedish Transport Agency states as a general rule that the first periodic inspection must take place no later than 36 months after the first month in traffic, the second no later than 24 months after the month of the first inspection, and thereafter no later than 14 months after the month of the previous inspection. Other types of vehicles may have different regulations. \u003cstrong\u003eThe template therefore does not derive the next inspection date from a general interval.\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003cp\u003eThe Swedish Transport Agency does not send general notices for periodic inspections; the vehicle owner is personally responsible for ensuring the vehicle is inspected on time. A late inspection date may result in a driving ban. Always check the actual vehicle status via the authority's e-services, especially before using vehicles with an uncertain status.\u003c\/p\u003e\n\n\u003cp\u003eService, warranty, and insurance agreements may have their own terms. The template contains only optional check reminders for contract renewal and cannot confirm if a vehicle is registered for traffic or insured. For heavy transport, ADR, special vehicles, or other regulated activities, additional procedures may be required.\u003c\/p\u003e\n\n\u003ch2\u003ePersonal data and internal routines\u003c\/h2\u003e\n\n\u003cp\u003eIf vehicle data is linked to identifiable employees, GDPR may be applicable. Primarily use internal vehicle IDs and responsible functions, restrict access, and avoid unnecessary personal identity numbers or detailed private driving history. Maintain separate arrangements for invoices, accounting, and other legally required archives.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-faq\"\u003eFrequently asked questions\u003c\/h2\u003e\n\n\u003ch3\u003eCan I use the Excel file for both 2026 and 2027?\u003c\/h3\u003e\n\n\u003cp\u003eYes. The overview's reporting year can be changed. The registers and formulas are based on your own data, not on a locked calendar.\u003c\/p\u003e\n\n\u003ch3\u003eDoes Excel calculate when the car must be inspected?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The date must be verified for each vehicle with the Swedish Transport Agency and manually entered. Excel then shows internal status before and after this date.\u003c\/p\u003e\n\n\u003ch3\u003eCan it send automatic reminders?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Warning status is shown in the workbook when opened\/recalculated. No email, SMS, or government connectivity is included.\u003c\/p\u003e\n\n\u003ch3\u003eIs service calculated in both kilometers and dates?\u003c\/h3\u003e\n\n\u003cp\u003eYes, once planned values and current odometer readings have been entered. This is for internal tracking based on your chosen service intervals.\u003c\/p\u003e\n\n\u003ch3\u003eAre English documents included?\u003c\/h3\u003e\n\n\u003cp\u003eYes, the Word templates contain English reference sections, and the user guide includes an English quick guide. The Excel file is in Swedish, and the content is based on Swedish conditions.\u003c\/p\u003e\n\n\u003ch3\u003eIs this an accounting program?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The amounts are used for cost tracking; calculation of VAT, taxes, and accounting entries is not included.\u003c\/p\u003e\n\n\u003ch3\u003eCan I use it for trucks and trailers?\u003c\/h3\u003e\n\n\u003cp\u003eYou can register the vehicles, but their actual inspection requirements, service intervals, and any professional traffic regulations must be determined separately.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-kallor\"\u003eSources and further information\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.transportstyrelsen.se\/fordonsbesiktning\"\u003eSwedish Transport Agency – vehicle inspection and driving bans\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.transportstyrelsen.se\/sv\/vagtrafik\/fordon\/fordons-agaruppgift\/sok-fordons-och-agaruppgifter\/\"\u003eSwedish Transport Agency – search vehicle and owner data\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.transportstyrelsen.se\/sv\/vagtrafik\/fordon\/aga-kopa-eller-salja-fordon\/fordonsbesiktning\/besiktningsregler\/personbil-och-lastbil-som-inte-overstiger-3500-kg-i-totalvikt\/\"\u003eSwedish Transport Agency – inspection intervals for passenger cars\/light trucks\u003c\/a\u003e\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003e\u003cstrong\u003eDelivery:\u003c\/strong\u003e Digital ZIP package, 7 files, editable Excel and Word as well as searchable PDF files. Also read our \u003ca href=\"\/en\/collections\/produktion-industri-mallar\"\u003etemplates for production and industry\u003c\/a\u003e and \u003ca href=\"\/en\/collections\/fordonsavtal-fordonskop-mallar\"\u003evehicle templates\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003cp\u003e\u003csmall\u003eMallbutiken.se | Version 1.0 | Legally and technically verified: October 12, 2026 | Swedish + English reference.\u003c\/small\u003e\u003c\/p\u003e\n\n\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55711369724246,"sku":"FORDONSREGISTER-SERVICEPLANERING-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/fordonsregister-serviceplanering-2027-hero.png?v=1791793137"},{"product_id":"miljoaspektregister-miljoriskbedomning-2026-2027-excel-word-pdf","title":"Environmental Aspect Register \u0026 Environmental Risk Assessment 2026\/2027 – Excel, Word \u0026 PDF | ISO 14001","description":"\n\u003csection style=\"color:#17324D;line-height:1.75\"\u003e\n\u003ch2\u003eEnvironmental Aspect Register \u0026amp; Environmental Risk Assessment 2026\/2027 – Excel, Word, and PDF\u003c\/h2\u003e\n\n\u003cp\u003eInventory environmental aspects, assess the environmental impact of your operations, and document those responsible, legal control points, and measures in a structured manner. This downloadable package is designed for Swedish companies, associations, industrial operations, and environmental managers who want to build or improve their systematic environmental work.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eISO 14001:2026 was published on April 15, 2026.\u003c\/strong\u003e The package takes into account the updated environmental management perspective, including environmental aspects of operations and relevant life cycle stages. However, it is not a transcript of the standard, not a certification guarantee, and not a complete environmental management manual.\u003c\/p\u003e\n\n\u003cnav aria-label=\"About the document template\"\u003e\u003cstrong\u003eAbout the document template:\u003c\/strong\u003e \u003ca href=\"#mb-ingar\"\u003eWhat's included\u003c\/a\u003e · \u003ca href=\"#mb-excel\"\u003eExcel and risk assessment\u003c\/a\u003e · \u003ca href=\"#mb-steg\"\u003eHow to use\u003c\/a\u003e · \u003ca href=\"#mb-regler\"\u003eRegulations and ISO\u003c\/a\u003e · \u003ca href=\"#mb-faq\"\u003eFAQ\u003c\/a\u003e · \u003ca href=\"#mb-kallor\"\u003eSources\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv style=\"background:#e7f3eb;border-left:5px solid #39865E;padding:16px;margin:18px 0\"\u003e\n\n\u003cstrong\u003eLegally and technically fact-checked: October 12, 2026.\u003c\/strong\u003e Based on the Swedish Environmental Code’s rules on consideration and internal control, the ordinance on operational internal control where applicable, and public information from ISO and SIS regarding 14001:2026. Must always be adapted to the actual environmental impact and permits of the operation.\u003c\/div\u003e\n\n\u003ch2 id=\"mb-ingar\"\u003eWhat is included in the document package\u003c\/h2\u003e\n\n\u003ctable style=\"width:100%;border-collapse:collapse\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#17324D;color:#fff\"\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eDelivery file\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eArea of use\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #D9E5EA\"\u003e\u003cstrong\u003eEnvironmental Aspect Register \u0026amp; Risk Assessment.xlsx\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #D9E5EA\"\u003eSix sheets with aspect inventory, internal scoring matrix, action register, requirement monitoring, settings, and overview.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #D9E5EA\"\u003e\u003cstrong\u003eEnvironmental Aspect Assessment \u0026amp; Decision Minutes\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #D9E5EA\"\u003eWord (DOCX) + PDF. Document aspect, impact, life cycle stage, assessment, legal requirements, decision, and signature.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #D9E5EA\"\u003e\u003cstrong\u003eAnnual Environmental Aspect Review\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #D9E5EA\"\u003eWord + PDF. Checklist for regular environmental reviews including deviations, responsibility, and follow-up.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px\"\u003e\u003cstrong\u003eSeparate User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px\"\u003eWord + PDF. Step-by-step instructions, legal delimitations, methodology explanation, pitfalls, sources, and English quick guide.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003cp\u003e\u003cstrong\u003eTotal: seven files in one ZIP\u003c\/strong\u003e (1 XLSX, 3 DOCX, and 3 searchable PDFs). Swedish main versions and English reference text in Word\/PDF. Excel is in Swedish.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-excel\"\u003eEnvironmental Aspect Register in Excel – features\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e100 environmental aspects:\u003c\/strong\u003e register process, activity, aspect, environmental impact, life cycle stage, and operating condition.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eThree assessment factors:\u003c\/strong\u003e probability, severity, and extent from 1 to 5, with automatic internal score 1–125.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRequirement monitoring with 50 items:\u003c\/strong\u003e collect applicable laws, permit conditions, injunctions, and contractual requirements that you have verified yourself.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e100 action rows:\u003c\/strong\u003e responsible party, priority, deadline, status, and documented effect.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDashboard:\u003c\/strong\u003e number of inventoried aspects, flagged assessments, open actions, and requirements that need to be investigated.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eAdjustable threshold:\u003c\/strong\u003e adapt the internal score limit to your operation's methodology and document the justification.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eControl or influence:\u003c\/strong\u003e distinguish your own activities from impact in, for example, the supplier and user chains.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cdiv style=\"background:#fff2d4;border-left:5px solid #D6A13B;padding:16px;margin:18px 0\"\u003e\n\n\u003cstrong\u003eImportant methodological delimitation:\u003c\/strong\u003e The score is a simplified, voluntary screening model designed for this template package. ISO 14001 does not prescribe this scoring model. A low score does not mean that the aspect lacks significance or that a legal requirement can be ignored. Final prioritization requires documented and competent assessment.\u003c\/div\u003e\n\n\u003ch2 id=\"mb-steg\"\u003eHow to use the document package\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eInventory environmental impact:\u003c\/strong\u003e go through purchasing, production, transport, energy use, water, waste, emissions, and relevant products and services.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eIdentify aspects:\u003c\/strong\u003e describe what causes the impact and what effect the activity may have on the environment.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eAssess unusual situations too:\u003c\/strong\u003e note normal operation, deviations, and any emergency situations.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eAllocate internal scores:\u003c\/strong\u003e fill in probability, severity, and extent, and document your assumptions.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eExamine actual obligations:\u003c\/strong\u003e investigate laws, permits, and other binding requirements regardless of the score.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eMake and document decisions:\u003c\/strong\u003e use the decision minutes for the final assessment of what should be prioritized.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eFollow up on actions:\u003c\/strong\u003e register responsible party, deadline, and verification of the actual effect.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eConduct recurring reviews:\u003c\/strong\u003e use the checklist during changes and as part of your planned annual review.\u003c\/li\u003e\n\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eWhich operations can use the template?\u003c\/h2\u003e\n\n\u003cp\u003eSmall manufacturing companies, workshops, construction and real estate companies, warehouse and logistics operations, offices, associations, and consulting organizations. The product is particularly suitable where a manager needs a clear process to identify and follow up on environmental aspects before investing in a more comprehensive management system.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-regler\"\u003eSwedish environmental law and ISO 14001:2026 – important to distinguish between requirements\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eCurrent Swedish law:\u003c\/strong\u003e The Environmental Code (1998:808), especially Chapter 2 with the general rules of consideration and Chapter 26 § 19 on internal control, regulates the responsibility of the operator. For certain permit-required or notification-required operations, the Ordinance (1998:901) on Internal Control for Operators also applies. Section 6 of that ordinance requires continuous and systematic risk assessment and documentation of results, when the operation is covered by the ordinance.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eVoluntary standard:\u003c\/strong\u003e ISO 14001:2026, also published as SS-EN ISO 14001:2026, is a standard for environmental management systems. It is not in itself a Swedish law. It replaces the 2015 edition, but organizations working toward certification need to purchase or have access to the full original standard and check transition requirements with their certification body. Purchasing or filling in this template does not entail ISO certification.\u003c\/p\u003e\n\n\u003cp\u003eThe product contains no ready-made claims about which individual laws apply to you. Documentation of chemicals, waste, emissions, permits, or incidents may require additional specialized templates and legal expertise.\u003c\/p\u003e\n\n\u003ch2\u003eCommon pitfalls\u003c\/h2\u003e\n\n\u003cp\u003eAn aspect and its environmental impact are confused, relevant supplier and life cycle stages are omitted, the score limit is assumed to be an official ISO threshold, regulatory requirements are handled as voluntary recommendations, or improvement measures are marked as completed before the result has been verified.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-faq\"\u003eFrequently asked questions\u003c\/h2\u003e\n\n\u003ch3\u003eIs this a complete ISO 14001:2026 template?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It is a delimited practical tool for environmental aspects, assessment, and follow-up, not a complete management system or a certification solution.\u003c\/p\u003e\n\n\u003ch3\u003eCan I use the Excel template in 2027 and later?\u003c\/h3\u003e\n\n\u003cp\u003eYes. Years and registers can be used even after 2027, but guidance and legal sources need to be reviewed regularly.\u003c\/p\u003e\n\n\u003ch3\u003eAre the risk scores legally or ISO-approved?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The illustrative scale is customizable and requires human judgment.\u003c\/p\u003e\n\n\u003ch3\u003eIs legal monitoring included automatically?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The requirement register is a structure for verified requirements that the organization fills in itself. No automatic updates against legal databases are included.\u003c\/p\u003e\n\n\u003ch3\u003eDoes the package work for small companies?\u003c\/h3\u003e\n\n\u003cp\u003eYes. The structure is intended to be usable without special software, but complex or permit-required operations may need specialist support.\u003c\/p\u003e\n\n\u003ch3\u003eAre Swedish and English included?\u003c\/h3\u003e\n\n\u003cp\u003eThe Word documents contain Swedish main versions and English reference sections. The Excel workbook is in Swedish and adapted to Swedish conditions.\u003c\/p\u003e\n\n\u003ch3\u003eDoes the Environmental Code have the same requirements for all companies?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The application of the obligations depends on the nature of the operation, environmental impact, permits, and special provisions. The ordinance on internal control for operators does not cover all operations.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-kallor\"\u003eOfficial sources\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.iso.org\/standard\/14001\"\u003eISO – ISO 14001:2026\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.sis.se\/produkter\/miljo-och-halsoskydd-sakerhet\/miljoskydd\/miljoledning\/ss-en-iso-1400120262\/\"\u003eSIS – SS-EN ISO 14001:2026\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.naturvardsverket.se\/vagledning-och-stod\/branscher-och-verksamheter\/egenkontroll\/\"\u003eSwedish Environmental Protection Agency – internal control for operators\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.riksdagen.se\/sv\/dokument-och-lagar\/dokument\/svensk-forfattningssamling\/miljobalk-1998808_sfs-1998-808\/\"\u003eThe Swedish Parliament – The Environmental Code\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/data.riksdagen.se\/dokument\/sfs-1998-901.html\"\u003eOrdinance (1998:901) on Internal Control for Operators\u003c\/a\u003e\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003e\u003cstrong\u003eDelivery:\u003c\/strong\u003e a digital ZIP package with seven files, without physical shipping. See also our \u003ca href=\"\/en\/collections\/kvalitetsledning-iso-mallar\"\u003etemplates for quality management and ISO\u003c\/a\u003e and \u003ca href=\"\/en\/collections\/produktion-industri-mallar\"\u003eproduction and industrial templates\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003cp\u003e\u003csmall\u003eMallbutiken.se | Version 1.0 | Fact-checked October 12, 2026 | Swedish + English reference.\u003c\/small\u003e\u003c\/p\u003e\n\n\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55711715983702,"sku":"MILJOASPEKTER-RISKBEDOMNING-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/miljoaspektregister-miljoriskbedomning-2027-hero.png?v=1791798136"},{"product_id":"garantiregister-garantibevakning-2026-2027-excel-word-pdf","title":"Warranty Register \u0026 Warranty Tracking 2026\/2027 – Excel, Word \u0026 PDF | Swedish + English","description":"\u003csection class=\"mb-product\" style=\"color:#17324D;line-height:1.75\"\u003e\n\u003ch2\u003eWarranty Register \u0026amp; Warranty Tracking 2026\/2027 – Excel Template for Equipment and Companies\u003c\/h2\u003e\n\n\u003cp\u003eHow many warranties does your company hold on computers, tools, machinery, installations, and other purchased equipment – and where are the original terms kept when something breaks? With this package, you can consolidate \u003cstrong\u003ewarranty expiry dates, asset IDs, suppliers, serial numbers, warranty certificates, and internal follow-up cases\u003c\/strong\u003e into a professional Excel register, complemented by editable templates in Word and PDF.\u003c\/p\u003e\n\n\u003cp\u003eThe package is designed for the \u003cstrong\u003ecompany’s own purchases and assets\u003c\/strong\u003e, not for customer returns or customer complaints. It therefore complements standard inventory or service maintenance registers and differs from the Mallbutiken separate product for complaint registers and return management.\u003c\/p\u003e\n\n\u003cnav aria-label=\"About the document template\"\u003e\u003cstrong\u003eAbout the document template:\u003c\/strong\u003e \u003ca href=\"#mb-ingar\"\u003eWhat's included\u003c\/a\u003e · \u003ca href=\"#mb-excel\"\u003eExcel tool\u003c\/a\u003e · \u003ca href=\"#mb-steg\"\u003eStep-by-step\u003c\/a\u003e · \u003ca href=\"#mb-juridik\"\u003eWarranty and complaints\u003c\/a\u003e · \u003ca href=\"#mb-faq\"\u003eFAQ\u003c\/a\u003e · \u003ca href=\"#mb-kallor\"\u003eSources\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv style=\"background:#E8F3EB;border-left:5px solid #397C5A;padding:15px;margin:18px 0\"\u003e\n\n\u003cstrong\u003eLegally and technically verified on October 12, 2026.\u003c\/strong\u003e Legal guidance is based on the Swedish Sale of Goods Act, the Consumer Sales Act, and the Swedish Consumer Agency's current information regarding warranties. The product is an administrative document template, not individual legal advice or a guarantee that claims against sellers can be enforced.\u003c\/div\u003e\n\n\u003ch2 id=\"mb-ingar\"\u003eIncluded in the package – 7 files\u003c\/h2\u003e\n\n\u003ctable style=\"width:100%;border-collapse:collapse\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#17324D;color:#fff\"\u003e\n\n\u003cth style=\"text-align:left;padding:10px\"\u003eDocument\u003c\/th\u003e\n\n\u003cth style=\"text-align:left;padding:10px\"\u003eFormat and usage\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DAE5ED\"\u003e\u003cstrong\u003eWarranty Register \u0026amp; Warranty Tracking\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DAE5ED\"\u003eExcel XLSX: six sheets with dashboard, 100 assets, 120 warranty cases, 100 actions, and 50 suppliers.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DAE5ED\"\u003e\u003cstrong\u003eWarranty Card \u0026amp; Terms Check\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DAE5ED\"\u003eWord DOCX + PDF: product details, supplier, serial number, documented warranty scope, validity, and control responsibility.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DAE5ED\"\u003e\u003cstrong\u003eWarranty Case \u0026amp; Supplier Follow-up\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DAE5ED\"\u003eWord DOCX + PDF: detected defect, evidence, notice to supplier, response, action, and internal follow-up.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px\"\u003e\u003cstrong\u003eSeparate User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px\"\u003eWord DOCX + PDF: step-by-step, legal limitations, common mistakes, secure archiving, and English quick guide.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003cp\u003e\u003cstrong\u003eTotal:\u003c\/strong\u003e 1 Excel workbook, 3 editable Word documents, and 3 searchable PDF files. The Word documents have Swedish master versions and \u003cstrong\u003eEnglish reference\u003c\/strong\u003e, adapted to Swedish conditions. Excel is in Swedish.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-excel\"\u003eWarranty Tracking in Excel – specific features\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e100 own assets:\u003c\/strong\u003e register product name, category, serial number, supplier, purchase and handover date, document reference, and responsible person.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eVerified warranty dates:\u003c\/strong\u003e manually enter start and end dates from agreements\/warranty certificates. Excel calculates remaining days but never derives the warranty from the date of purchase.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eInternal alerts:\u003c\/strong\u003e distinguish between missing warranty dates, upcoming warranty expirations, and expired warranties. Customize the alert threshold in days.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e120 supplier cases:\u003c\/strong\u003e track when a defect was detected, which counterparty was contacted, when a response was received, and when the next internal follow-up is due.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e100 actions:\u003c\/strong\u003e document service records, control points, documentation, responsibility, and internal deadlines.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e50 suppliers:\u003c\/strong\u003e collect support portals, phone, email, and the source of current warranty terms.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDashboard:\u003c\/strong\u003e view the number of registered assets, missing dates, upcoming expirations, expired warranty dates, and open cases.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eNo macros or subscriptions:\u003c\/strong\u003e the workbook is used locally in Excel and does not require a cloud service.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cdiv style=\"background:#FFF3D7;border-left:5px solid #D5A23D;padding:15px;margin:18px 0\"\u003e\n\n\u003cstrong\u003eImportant legal limitation:\u003c\/strong\u003e The status \"Warranty Expired\" only refers to the end date of the \u003cem\u003eentered commercial warranty\u003c\/em\u003e. It does not automatically mean that the statutory right to claim has expired. Excel does not calculate legal claim deadlines, does not send reminders, and does not assess whether a supplier is legally obligated to remedy a defect.\u003c\/div\u003e\n\n\u003ch2 id=\"mb-steg\"\u003eHow to use the warranty register\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eGather purchase documents:\u003c\/strong\u003e invoices, warranty certificates, manufacturer terms, serial numbers, and service history.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRegister the asset:\u003c\/strong\u003e assign each item a unique Asset ID that is also used in warranty cases and actions.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCheck terms:\u003c\/strong\u003e note the warrantor, validity, exceptions, and any registration or service conditions.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eEnter verified expiry date:\u003c\/strong\u003e do not enter an assumed 12- or 24-month date. If proof is missing, mark the information as unverified.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eSelect internal alert threshold:\u003c\/strong\u003e for example, 60 days before the documented warranty expiry and 14 days before an internal follow-up point.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDocument problems:\u003c\/strong\u003e use the case log when a defect is detected and maintain a separate, traceable dialogue with the correct supplier.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eFollow up on the response:\u003c\/strong\u003e set an internal control deadline and document the agreed action as well as the completion of the work.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eArchive:\u003c\/strong\u003e save the version of the terms, proof, and correspondence with appropriate access controls.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eWho can use this package?\u003c\/h2\u003e\n\n\u003cp\u003eParticularly suitable for small and medium-sized enterprises with IT equipment, workshops with machinery and tools, property managers with technical installations, offices with significant amounts of inventory, as well as associations and organizations with recurring purchases. For customer service, customer returns, and incoming customer complaints, a separate complaint and return register should be used.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-juridik\"\u003eThe difference between warranty and statutory right to claim\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eA warranty\u003c\/strong\u003e is a voluntary promise from the seller, manufacturer, or other warrantor. The actual warranty certificate and terms normally determine what is covered, who provided the warranty, and how long it lasts. Only register verified information from the original document.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eSales between businesses:\u003c\/strong\u003e the Sale of Goods Act (1990:931) is dispositive according to Section 3, meaning the parties' agreement can change many of the Act's default positions. Section 32 contains rules regarding complaints within a reasonable time and a two-year limit, with exceptions for warranties or similar commitments. Always assess agreements and factual circumstances – do not use Excel as a legal deadline calculator.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eSales from business to consumer:\u003c\/strong\u003e the Consumer Sales Act (2022:260) has specific mandatory rules. The Swedish Consumer Agency generally states a three-year right to claim for original defects in goods, even if a voluntary warranty has expired. Such consumer rules should not be uncritically applied to a company's own B2B purchases. For construction contracts, real estate, or special agreements, additional specific provisions may apply.\u003c\/p\u003e\n\n\u003ch2\u003eCommon risks and mistakes\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003eConfusing a warranty period with the right to claim.\u003c\/li\u003e\n\n\u003cli\u003eAssuming a supplier has promised a warranty just because a standard interval is common.\u003c\/li\u003e\n\n\u003cli\u003eUsing the purchase date when the actual warranty term links the start to delivery, registration, or commissioning.\u003c\/li\u003e\n\n\u003cli\u003eMissing a written complaint or documentation that the message reached the correct recipient.\u003c\/li\u003e\n\n\u003cli\u003eTreating the Excel internal alert as a valid legal deadline.\u003c\/li\u003e\n\n\u003cli\u003eFailing to save the correct version of the warranty terms or relevant receipts.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2 id=\"mb-faq\"\u003eFrequently asked questions\u003c\/h2\u003e\n\n\u003ch3\u003eIs this the same product as the complaint register and return management?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The warranty register refers to the \u003cstrong\u003eorganization's own purchases and equipment\u003c\/strong\u003e, while customer service and return management refer to customers contacting a selling business.\u003c\/p\u003e\n\n\u003ch3\u003eCan I enter warranties from different suppliers?\u003c\/h3\u003e\n\n\u003cp\u003eYes. Excel contains a separate supplier register and a warranty register with reference to each respective asset.\u003c\/p\u003e\n\n\u003ch3\u003eDoes Excel calculate the final claim date?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The workbook only calculates days up to a manually verified warranty expiry date. Claim deadlines depend on agreements, applicable law, and factual circumstances.\u003c\/p\u003e\n\n\u003ch3\u003eWill I receive emails or SMS when a warranty expires?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Status is shown in Excel when the workbook is opened or recalculated.\u003c\/p\u003e\n\n\u003ch3\u003eCan I use the file even after 2027?\u003c\/h3\u003e\n\n\u003cp\u003eYes. The workbook has dynamic dates. However, review legal guidance and updated terms regularly.\u003c\/p\u003e\n\n\u003ch3\u003eAre English versions included?\u003c\/h3\u003e\n\n\u003cp\u003eThe Word templates include English reference translations, and the guide has an English quick guide. Excel is in Swedish.\u003c\/p\u003e\n\n\u003ch3\u003eCan it be used for machines, IT, and technical installations?\u003c\/h3\u003e\n\n\u003cp\u003eYes, for simple register management. Industry-specific agreements, service requirements, and warranty liabilities must be checked separately.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-kallor\"\u003eLegal basis and official sources\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.riksdagen.se\/sv\/dokument-och-lagar\/dokument\/svensk-forfattningssamling\/koplag-1990931_sfs-1990-931\/\"\u003eThe Swedish Parliament – Sale of Goods Act (1990:931), specifically Sections 3 and 32\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.riksdagen.se\/sv\/dokument-och-lagar\/dokument\/svensk-forfattningssamling\/konsumentkoplag-2022260_sfs-2022-260\/\"\u003eThe Swedish Parliament – Consumer Sales Act (2022:260)\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.konsumentverket.se\/konsumentratt\/garanti\/\"\u003eSwedish Consumer Agency – Warranty and right to claim\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.konsumentverket.se\/marknadsratt-foretag\/konsumentkoplagen-for-foretag\/\"\u003eSwedish Consumer Agency – Consumer Sales Act for businesses\u003c\/a\u003e\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003e\u003cstrong\u003eFormat and delivery:\u003c\/strong\u003e Digital ZIP with 7 files (3 Word DOCX, 3 PDF, and 1 Excel XLSX). No physical item or shipping. See also our \u003ca href=\"\/en\/collections\/produktion-industri-mallar\"\u003etemplates for production and industry\u003c\/a\u003e and \u003ca href=\"\/en\/collections\/ekonomi-redovisning-mallar-i-excel-word-och-pdf\"\u003efinance and administration templates\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003cp\u003e\u003csmall\u003eMallbutiken.se | Version 1.0 | Legally and technically verified October 12, 2026 | Swedish + English reference.\u003c\/small\u003e\u003c\/p\u003e\n\n\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55712152977750,"sku":"GARANTIREGISTER-GARANTIBEVAKNING-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/garantiregister-garantibevakning-2027-hero.png?v=1791799692"},{"product_id":"tillstandsregister-myndighetsbevakning-2026-2027-excel-word-pdf","title":"Permit Register \u0026 Regulatory Monitoring 2026\/2027 – Excel, Word \u0026 PDF | Swedish + English","description":"\n\u003csection style=\"color:#17324D;line-height:1.75\"\u003e\n\u003ch2\u003ePermit Register \u0026amp; Authority Monitoring 2026\/2027 – Excel, Word \u0026amp; PDF\u003c\/h2\u003e\n\n\u003cp\u003eConsolidate your business's \u003cstrong\u003epermits, authority decisions, notifications, registrations, and inspection certificates\u003c\/strong\u003e in a professional register. This package helps Swedish companies, facilities, and property managers organize essential original documents, document conditions, monitor manually verified expiry dates, and follow up on internal control measures.\u003c\/p\u003e\n\n\u003cp\u003eWith an editable \u003cstrong\u003eExcel template containing six worksheets\u003c\/strong\u003e, two separate document templates, and a detailed user guide, the business gains a common structure for its administration – without having to build the register from scratch. \u003cstrong\u003e7 downloadable files\u003c\/strong\u003e are included: 1 XLSX, 3 DOCX, and 3 searchable PDF files.\u003c\/p\u003e\n\n\u003cnav aria-label=\"About the document template\"\u003e\u003cstrong\u003eAbout the document template:\u003c\/strong\u003e \u003ca href=\"#mb-ingar\"\u003eWhat's included\u003c\/a\u003e · \u003ca href=\"#mb-excel\"\u003eExcel functions\u003c\/a\u003e · \u003ca href=\"#mb-anvandning\"\u003eHow to use\u003c\/a\u003e · \u003ca href=\"#mb-juridik\"\u003eRules and limitations\u003c\/a\u003e · \u003ca href=\"#mb-faq\"\u003eFAQ\u003c\/a\u003e · \u003ca href=\"#mb-kallor\"\u003eSources\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv style=\"background:#E8F3ED;border-left:5px solid #347655;padding:17px;margin:20px 0\"\u003e\n\n\u003cstrong\u003eLegally and technically reviewed on October 12, 2026.\u003c\/strong\u003e The method has been cross-referenced with the Swedish Environmental Protection Agency's guidance on internal control, the Swedish Work Environment Authority's current regulations, and information from Verksamt.se. This is an administrative aid, not an official government service, automated legal monitoring, or a legal guarantee of valid permits.\u003c\/div\u003e\n\n\u003ch2 id=\"mb-ingar\"\u003eWhat is included in the package?\u003c\/h2\u003e\n\n\u003ctable style=\"border-collapse:collapse;width:100%\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#17324D;color:#fff\"\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eDocument\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eUsed for\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DBE5EA\"\u003e\u003cstrong\u003ePermit Register \u0026amp; Authority Monitoring.xlsx\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DBE5EA\"\u003eSix worksheets for permits, conditions, controls, authority contacts, dashboard, and instructions.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DBE5EA\"\u003e\u003cstrong\u003ePermit Card \u0026amp; Condition Control\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DBE5EA\"\u003eWord + PDF for issuer, decision number, activity, conditions, verification against original decisions, and internal documentation.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DBE5EA\"\u003e\u003cstrong\u003ePermit Review \u0026amp; Action Log\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DBE5EA\"\u003eWord + PDF for recurring reviews, changed operational conditions, risks, supporting documents, and decided measures.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px\"\u003e\u003cstrong\u003eSeparate User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px\"\u003eWord + PDF with step-by-step method, field explanations, legal limitations, sources, and English quick guide.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003cp\u003e\u003cstrong\u003eLanguage:\u003c\/strong\u003e Swedish main versions and English reference text in Word and PDF. The Excel file is in Swedish and designed for Swedish law and Swedish authority conditions.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-excel\"\u003eWhat the Excel permit register can do\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e150 permits and documents:\u003c\/strong\u003e register permits, notifications, registrations, inspection certificates, and other verified documents.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e200 conditions:\u003c\/strong\u003e collect individual authority or decision conditions with source, control method, responsible person, internal dates, and follow-up status.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e150 controls:\u003c\/strong\u003e for internal control, external inspections, authority contact, and internal follow-ups.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e50 authorities\/actors:\u003c\/strong\u003e document functional contacts, e-services, case references, and latest reconciliation.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eInternal renewal monitoring:\u003c\/strong\u003e highlight passed manually entered expiry dates, upcoming expiry dates, missing verification, or internal action dates.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eOverview\/dashboard:\u003c\/strong\u003e summarizes the number of registered permits, verification needs, control items, and potential follow-up needs.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eAdjustable warning horizon:\u003c\/strong\u003e set, for example, 60 days before a documented expiry date.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eWork offline:\u003c\/strong\u003e Excel without macros or subscriptions, with editable fields, filters, and control list instructions.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cdiv style=\"background:#FFF3D9;border-left:5px solid #D3A040;padding:16px;margin:18px 0\"\u003e\n\n\u003cstrong\u003eImportant:\u003c\/strong\u003e Not all permits have expiry dates or renewal requirements. The status \"DATE PASSED\" only means that a \u003cem\u003euser-entered date\u003c\/em\u003e has passed. \"NO EXPIRY DATE\" does not mean a permit is invalid or automatically valid indefinitely. Excel does not send email\/SMS reminders, does not automatically check legislation, and does not replace official authority decisions or inspection certificates.\u003c\/div\u003e\n\n\u003ch2 id=\"mb-anvandning\"\u003eHow to use the template package\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eInventory your documents:\u003c\/strong\u003e collect permits, notification confirmations, registration certificates, inspection certificates, and decision appendices for each business and location.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCheck the document type:\u003c\/strong\u003e an issued permit, a notification made, and an inspection certificate can have completely different legal significance.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRegister the permit:\u003c\/strong\u003e give it a unique ID and specify business location, authority, decision number, responsible function, and source reference.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eVerify validity:\u003c\/strong\u003e only enter dates you have been able to verify against decisions and current rules. If a verified expiry date is missing, leave the date field empty.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDocument the conditions:\u003c\/strong\u003e note relevant conditions, decision page or legal basis, and how they are controlled within the business.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003ePlan internal controls:\u003c\/strong\u003e set responsible persons and control or action dates yourself; these are not automatically authority deadlines.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eFollow up on status:\u003c\/strong\u003e regularly review Excel's warnings, check the original documents, and document what has actually been addressed.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003ePerform an annual or event-driven review:\u003c\/strong\u003e use the Word protocol during operational changes or when new requirements, new decisions, and new equipment are added.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eWho benefits from this product?\u003c\/h2\u003e\n\n\u003cp\u003eOperational managers in construction, industry, logistics, and property management, associations, and smaller organizations that handle multiple authority contacts or need to manage permit conditions and inspection documentation. A company can, for example, use it for operational permits and inspection certificates for specific equipment – but which documents are truly required must be determined on a case-by-case basis.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-juridik\"\u003ePermits, internal control, and current rules\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eThe Environmental Code (1998:808)\u003c\/strong\u003e places requirements on internal control for affected businesses, among other things through Chapter 26, Section 19. \u003cstrong\u003eThe Ordinance (1998:901) on the Operator's Internal Control\u003c\/strong\u003e contains further rules for the businesses covered by its scope. This does not mean that all businesses need the exact same register or permits.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eThe Swedish Work Environment Authority's AFS 2023:11\u003c\/strong\u003e contains rules on the use and inspection of certain lifting devices and other technical devices. Requirements and intervals vary depending on the device and must be obtained from current regulations and inspection certificates. The register therefore does not automatically calculate legally applicable inspection intervals.\u003c\/p\u003e\n\n\u003cp\u003eVerksamt.se describes which service businesses may be subject to permits and other formal requirements and provides links to responsible authorities. A final legal assessment requires verification of the specific business, its decisions, and current law. If a permit is unclear or breached, a specialist or competent authority should be contacted.\u003c\/p\u003e\n\n\u003ch2\u003eCommon mistakes to avoid\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003eRegistering a notification or inspection certificate as if it were an authority permit.\u003c\/li\u003e\n\n\u003cli\u003eAssuming that all permits have the same renewal period.\u003c\/li\u003e\n\n\u003cli\u003eTaking an internal date in Excel as a legal final application date.\u003c\/li\u003e\n\n\u003cli\u003eIgnoring conditions that apply regardless of the permit's expiry date.\u003c\/li\u003e\n\n\u003cli\u003eMarking a document as verified without reading the original document.\u003c\/li\u003e\n\n\u003cli\u003eLetting a control report replace a prescribed inspection or specific authority decision.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2 id=\"mb-faq\"\u003eFrequently asked questions\u003c\/h2\u003e\n\n\u003ch3\u003eCan Excel automatically tell me which permits my company needs?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Excel is a register for documents and requirements you have identified and verified yourselves. Authority requirements must be checked separately.\u003c\/p\u003e\n\n\u003ch3\u003eIs a permit without an expiry date automatically valid indefinitely?\u003c\/h3\u003e\n\n\u003ch3\u003eNo. The absence of an entered date may be because the document has not been checked. Conditions, revocation decisions, changed operations, or other legal limitations may affect validity.\u003c\/h3\u003e\n\n\u003ch3\u003eCan the register handle inspection certificates?\u003c\/h3\u003e\n\n\u003cp\u003eYes, as a separate document type. This does not mean that a certificate is an authority permit or that Excel replaces the prescribed inspection.\u003c\/p\u003e\n\n\u003ch3\u003eDoes Excel send automatic reminders?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The status is updated when Excel is recalculated. The responsible person must open the register themselves and plan recurring checks.\u003c\/p\u003e\n\n\u003ch3\u003eCan it be used even after 2027?\u003c\/h3\u003e\n\n\u003cp\u003eYes, the workbook has dynamic dates and is not locked to 2027. However, authority sources and relevant law must be updated continuously.\u003c\/p\u003e\n\n\u003ch3\u003eAre English versions included?\u003c\/h3\u003e\n\n\u003cp\u003eYes, Word forms and the guide contain English reference sections. The Swedish version and Swedish law are the starting point.\u003c\/p\u003e\n\n\u003ch3\u003eIs the package a complete database of legal requirements?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It contains a structure for conditions and controls, not an automatically updated, complete register of all legislation.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-kallor\"\u003eLegal information and primary sources\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.riksdagen.se\/sv\/dokument-och-lagar\/dokument\/svensk-forfattningssamling\/miljobalk-1998808_sfs-1998-808\/\"\u003eThe Swedish Parliament – Environmental Code (1998:808)\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.riksdagen.se\/sv\/dokument-och-lagar\/dokument\/svensk-forfattningssamling\/forordning-1998901-om-verksamhetsutovares_sfs-1998-901\/\"\u003eThe Swedish Parliament – Internal Control Ordinance (1998:901)\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.naturvardsverket.se\/vagledning-och-stod\/branscher-och-verksamheter\/egenkontroll\/\"\u003eSwedish Environmental Protection Agency – internal control for operators\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/beslutade-foreskrifter-som-trader-i-kraft-2025\/afs-202311\/\"\u003eSwedish Work Environment Authority – AFS 2023:11\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/verksamt.se\/bransch\/kontaktpunkt-tjansteforetag\"\u003eVerksamt.se – contact point and find permits\u003c\/a\u003e\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003e\u003cstrong\u003eFormat and delivery:\u003c\/strong\u003e Digital ZIP with 3 DOCX, 3 PDF, and 1 XLSX. No physical item and no shipping. See also \u003ca href=\"\/en\/collections\/kvalitetsledning-iso-mallar\"\u003eQuality Management \u0026amp; ISO – Templates\u003c\/a\u003e, \u003ca href=\"\/en\/collections\/produktion-industri-mallar\"\u003eProduction \u0026amp; Industry – Templates\u003c\/a\u003e and \u003ca href=\"\/en\/products\/miljoaspektregister-miljoriskbedomning-2026-2027-excel-word-pdf\"\u003eEnvironmental Aspect Register \u0026amp; Environmental Risk Assessment\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003cp\u003e\u003csmall\u003eMallbutiken.se | Version 1.0 | Technically reviewed 2026-10-12 | Swedish + English reference.\u003c\/small\u003e\u003c\/p\u003e\n\n\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55712549667158,"sku":"TILLSTANDSREGISTER-MYNDIGHET-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/tillstandsregister-myndighetsbevakning-2027-hero.png?v=1791802124"},{"product_id":"ventilation-inomhusklimat-driftjournal-ovk-2026-2027","title":"Ventilation \u0026 Indoor Climate 2026\/2027 – Operations Log, Measurement Protocols \u0026 OVK Monitoring | Excel, Word \u0026 PDF","description":"\u003csection style=\"color:#17324D;line-height:1.75\"\u003e\n\u003ch2\u003eVentilation \u0026amp; Indoor Climate 2026\/2027 – operation logs, measurement reports, and OVK monitoring in Excel\u003c\/h2\u003e\n\n\u003cp\u003eConsolidate your ventilation operation checks, filter changes, air quality measurements, deviations, and corrective actions in a professional, downloadable package. \u003cstrong\u003eVentilation \u0026amp; Indoor Climate 2026\/2027\u003c\/strong\u003e is designed for Swedish property owners, housing cooperatives (BRFs), property managers, and businesses that wish to document their \u003cstrong\u003einternal self-inspection of ventilation and indoor environment\u003c\/strong\u003e – without a new subscription.\u003c\/p\u003e\n\n\u003cp\u003eYou receive a formula-driven \u003cstrong\u003eExcel workbook with six sheets\u003c\/strong\u003e, two bilingual Word templates, and a detailed user guide. \u003cstrong\u003e7 delivery files:\u003c\/strong\u003e 1 XLSX, 3 DOCX, and 3 searchable PDFs. The Word documents and guide have Swedish master versions with English reference sections, based on Swedish law.\u003c\/p\u003e\n\n\u003cnav aria-label=\"About the document template\"\u003e\u003cstrong\u003eAbout the document template:\u003c\/strong\u003e \u003ca href=\"#mb-innehall\"\u003ePackage contents\u003c\/a\u003e · \u003ca href=\"#mb-excel\"\u003eExcel tool\u003c\/a\u003e · \u003ca href=\"#mb-anvand\"\u003eHow to use\u003c\/a\u003e · \u003ca href=\"#mb-ovk\"\u003eOVK \u0026amp; regulations\u003c\/a\u003e · \u003ca href=\"#mb-faq\"\u003eFAQ\u003c\/a\u003e · \u003ca href=\"#mb-kallor\"\u003eSources\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv style=\"background:#E9F3EC;border-left:5px solid #3A7F5A;padding:16px;margin:20px 0\"\u003e\n\n\u003cstrong\u003eLegally and technically verified: October 12, 2026.\u003c\/strong\u003e The material is based on the Swedish National Board of Housing, Building and Planning (Boverket) guidelines regarding OVK and the Public Health Agency of Sweden’s guidance on ventilation and property owner self-inspection. This is an internal documentation template – not an official OVK report, an inspection certificate, a guaranteed ventilation calculation, or a medical assessment.\u003c\/div\u003e\n\n\u003ch2 id=\"mb-innehall\"\u003eIncluded in the document package\u003c\/h2\u003e\n\n\u003ctable style=\"border-collapse:collapse;width:100%\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#17324D;color:white\"\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eDocument\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eFunction and format\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DEE8ED\"\u003e\u003cstrong\u003eVentilation \u0026amp; Indoor Climate – Operation Register\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DEE8ED\"\u003eExcel (XLSX), six sheets: Overview, Properties, Operation log, Indoor measurements, Actions, and Read me.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DEE8ED\"\u003e\u003cstrong\u003eVentilation inspection \u0026amp; operation log\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DEE8ED\"\u003eWord (DOCX) + PDF: visual inspection of filters, air diffusers, alarms, run times, and documentation of actions. English reference page.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DEE8ED\"\u003e\u003cstrong\u003eIndoor Climate – measurement \u0026amp; deviation report\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #DEE8ED\"\u003eWord + PDF: measurement point, temperature, relative humidity, CO₂, measurement equipment, conditions, and follow-up. English reference page.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px\"\u003e\u003cstrong\u003eDetailed user guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px\"\u003eWord + PDF: instructions, legal and technical limitations, data protection, authority sources, and an English quick guide.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003ch2 id=\"mb-excel\"\u003eWhat can the Excel template do?\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e50 buildings\/ventilation systems:\u003c\/strong\u003e register object ID, ventilation type (F, FT, FTX, natural ventilation, or other), responsible person, system ID, and reference to the latest OVK certificate.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eManual OVK date monitoring:\u003c\/strong\u003e enter the next date according to a verified inspection certificate. Excel displays DATE NOT VERIFIED, DATE PASSED, CHECK SOON, or MONITOR based on entered data.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e200 operation log entries:\u003c\/strong\u003e document visual inspections, filter changes, cleaning, run-time checks, alarms, and action requirements.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e150 indoor measurements:\u003c\/strong\u003e register temperature in °C, relative humidity in %, CO₂ in ppm, room, date, occupancy, measurement equipment, and observations.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e150 internal actions:\u003c\/strong\u003e responsibility, prioritized follow-up, internal deadline, status, and verified completion.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eOverview\/dashboard:\u003c\/strong\u003e number of buildings, passed registered dates, dates without verification, number of logs\/measurements, and overdue internal follow-ups.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eFilters and validation:\u003c\/strong\u003e register with clear headings, selectable control types and status, and color coding for certain internal monitoring statuses.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cdiv style=\"background:#FFF3D8;border-left:5px solid #D4A13D;padding:15px;margin:20px 0\"\u003e\n\n\u003cstrong\u003eImportant limitation:\u003c\/strong\u003e Excel does not calculate the correct statutory OVK interval for different buildings, does not fetch data from authorities, does not send email or SMS reminders, and does not determine if an OVK is approved. Dates in Excel are always the user's own data. An expired internal date alert is not an automatic official authority decision or an established prohibition on use.\u003c\/div\u003e\n\n\u003ch2 id=\"mb-anvand\"\u003eHow to use the package – step by step\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eInventory buildings and ventilation:\u003c\/strong\u003e gather operating instructions, unit designations, service records, and existing OVK reports.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRegister the building:\u003c\/strong\u003e enter a unique Object ID, ventilation type, and responsible function under Properties.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCheck OVK:\u003c\/strong\u003e only enter the next OVK date if it has been verified against a certificate or current expert assessment. Otherwise, leave the date blank and investigate the need.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDocument operations:\u003c\/strong\u003e use the ventilation inspection form during actual visual checks. Then register the results in the Operation Log.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eConduct relevant observations:\u003c\/strong\u003e use the measurement report if temperature, RH, or CO₂ are actually measured. Specify measurement equipment and conditions.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eInvestigate deviations:\u003c\/strong\u003e register the responsible person, action ID, and internal deadline. If necessary, hire a specialist or certified inspector.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eFollow up:\u003c\/strong\u003e ensure the action has been carried out, document the verification, and change the status to Completed.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eSave the documentation:\u003c\/strong\u003e store actual OVK certificates separately and document file references with appropriate data protection and access control.\u003c\/li\u003e\n\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eWho can benefit from this product?\u003c\/h2\u003e\n\n\u003cp\u003eProperty owners, BRF boards, small property managers, business premises, office buildings, landlords, and operational managers who want to build a consistent internal control routine. The package is a complement to existing property registers, error report registers, maintenance plans, and energy budget tools.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-ovk\"\u003eOVK, ventilation, and Swedish law\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eMandatory Ventilation Control (OVK)\u003c\/strong\u003e is regulated by, among other things, the Planning and Building Act (2010:900), the Planning and Building Ordinance (2011:338), and Boverket's regulations. Where OVK is required, the building owner is responsible for ensuring that the control is performed by a certified expert functional controller. Different buildings and ventilation systems may have different intervals, and one- or two-dwelling buildings are not covered by the requirement for recurring OVK. This template determines neither intervals nor OVK results.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eProperty owner's self-inspection:\u003c\/strong\u003e The Public Health Agency of Sweden's guidance emphasizes the need for routines regarding ventilation, filters, complaints, moisture, and other conditions that may affect the indoor environment. A previously approved OVK does not exclude the need for further investigations when there are indications of poor air quality.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eCO₂ measurements:\u003c\/strong\u003e The Public Health Agency of Sweden describes 1,000 ppm as an indicator of potential insufficient outdoor air flows in certain premises and situations, not as a general medical limit for carbon dioxide damage. This Excel template therefore does not set an automatic legal or medical \"approved\/not approved\" status based on temperature, RH, or CO₂.\u003c\/p\u003e\n\n\u003cp\u003eIn the event of suspected serious air pollution, moisture damage, operational errors, or health risks, an appropriate qualified expert should be engaged. Do not record residents' diagnoses or other sensitive personal data in a generally shared operation log.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-faq\"\u003eFrequently asked questions\u003c\/h2\u003e\n\n\u003ch3\u003eIs this an OVK report?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It is an internal operation and self-inspection template. Official OVK is performed and documented by a certified functional controller according to applicable rules.\u003c\/p\u003e\n\n\u003ch3\u003eDoes Excel automatically calculate the next OVK date?\u003c\/h3\u003e\n\n\u003cp\u003eNo. You enter the date verified against the current inspection certificate. Excel then only monitors the entered date.\u003c\/p\u003e\n\n\u003ch3\u003eCan I use the template during both 2026 and 2027?\u003c\/h3\u003e\n\n\u003cp\u003eYes. The registers and formulas use dynamic dates, but legislation, technical requirements, and authority sources must be checked in case of changes.\u003c\/p\u003e\n\n\u003ch3\u003eCan the template determine if the ventilation is approved?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Measurements and observations are a basis for internal follow-up, not automatic proof of correct air flows or fulfilled requirements.\u003c\/p\u003e\n\n\u003ch3\u003eAre filter changes and a cleaning log included?\u003c\/h3\u003e\n\n\u003cp\u003eYes. Both can be documented as separate inspection types in the Operation Log and the editable ventilation inspection form.\u003c\/p\u003e\n\n\u003ch3\u003eCan I log temperature, humidity, and carbon dioxide?\u003c\/h3\u003e\n\n\u003cp\u003eYes, with date, location, measurement equipment, and comments. The workbook contains no medical or certified technical assessment.\u003c\/p\u003e\n\n\u003ch3\u003eIs the product also in English?\u003c\/h3\u003e\n\n\u003cp\u003eThe Word documents contain English reference pages, and the guide includes an English quick guide. Excel is in Swedish and intended for Swedish property administration.\u003c\/p\u003e\n\n\u003ch3\u003eDo I need a cloud service?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The files can be managed locally in Microsoft Office or compatible software. No automatic transmission to authorities is included.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-kallor\"\u003eLegal and technical primary sources\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.boverket.se\/sv\/PBL-kunskapsbanken\/regler-om-byggande\/ovk\/\"\u003eBoverket – Mandatory ventilation control (OVK)\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.boverket.se\/sv\/byggande\/forebygg-fel-brister-skador\/risker-byggande\/risker-felaktig-ventilation\/regler-om-luft\/\"\u003eBoverket – Regulations on air\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.folkhalsomyndigheten.se\/regler-och-tillsyn\/tillsynsvagledning-och-stod\/halsoskydd-vagledning-och-tillsyn\/vagledning-om-ventilation\"\u003ePublic Health Agency of Sweden – Guidance on ventilation\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.folkhalsomyndigheten.se\/regler-och-tillsyn\/tillsynsvagledning-och-stod\/halsoskydd-vagledning-och-tillsyn\/tillsynsvagledning-om-halsoskydd-for-olika-typer-av-verksamheter\/tillsynsvagledning-om-inomhusmiljo-i-bostader\/tillsynsvagledning-om-fastighetsagarens-egenkontroll\/\"\u003ePublic Health Agency of Sweden – Property owner's self-inspection\u003c\/a\u003e\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003e\u003cstrong\u003eDelivery:\u003c\/strong\u003e ZIP with 1 Excel (.xlsx), 3 Word (.docx), and 3 searchable PDFs. Digital product without shipping. Naturally complements \u003ca href=\"\/en\/products\/energiuppfoljning-energikostnadsbudget-2026-2027-excel-word-pdf\"\u003eEnergy follow-up\u003c\/a\u003e, \u003ca href=\"\/en\/products\/vattenforbrukning-va-kostnadsuppfoljning-2026-2027-excel-word-pdf\"\u003eWater\/Sewage cost follow-up\u003c\/a\u003e, and \u003ca href=\"\/en\/products\/tillstandsregister-myndighetsbevakning-2026-2027-excel-word-pdf\"\u003ePermit register\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003cp\u003e\u003csmall\u003eMallbutiken.se | Version 1.0 | Source-verified 2026-10-12 | Swedish + English reference.\u003c\/small\u003e\u003c\/p\u003e\n\n\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55713736556886,"sku":"VENTILATION-INOMHUSKLIMAT-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/ventilation-inomhusklimat-2027-hero.png?v=1791808432"},{"product_id":"spc-processduglighet-styrdiagram-cp-cpk-2027","title":"SPC \u0026 Process Capability 2026\/2027 – I–MR Control Charts, Cp\/Cpk \u0026 Action Log | Excel\/Word\/PDF","description":"\u003csection class=\"mb-product-copy\" lang=\"en\" style=\"color:#17374c;line-height:1.75\"\u003e\n\u003ch2\u003eSPC \u0026amp; Process Capability 2026\/2027 – I–MR Control Charts and Cp\/Cpk in Excel\u003c\/h2\u003e\n\n\u003cp\u003eDo you want to monitor manufacturing variation and document whether a process appears stable? This \u003cstrong\u003eSPC template package\u003c\/strong\u003e combines five practical Swedish-language documents, two guides, and an Excel workbook for \u003cstrong\u003eI–MR control charts, control limits, Cp, Cpk, Pp, Ppk, measurement tracking, and non-conformance management\u003c\/strong\u003e. For workshops, CNC production, quality departments, and small manufacturing companies.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003e7 Word + 7 searchable A4 PDFs + 1 Excel with 9 tabs and 2 built-in control charts.\u003c\/strong\u003e The spreadsheet is blank upon delivery, complete with formulas, status fields, and practical control gates. No dummy production data included.\u003c\/p\u003e\n\n\u003cnav aria-label=\"Page content\" style=\"background:#edf6f7;padding:13px 15px;border-radius:10px\"\u003e\u003cstrong\u003eGo to:\u003c\/strong\u003e \u003ca href=\"#mb-spc-innehall\"\u003ePackage contents\u003c\/a\u003e · \u003ca href=\"#mb-spc-filer\"\u003eThe files\u003c\/a\u003e · \u003ca href=\"#mb-spc-excel\"\u003eExcel\u003c\/a\u003e · \u003ca href=\"#mb-spc-guide\"\u003eWorkflow\u003c\/a\u003e · \u003ca href=\"#mb-spc-villkor\"\u003eMethodology\u003c\/a\u003e · \u003ca href=\"#mb-spc-faq\"\u003eFAQ\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv style=\"padding:16px 20px;margin:18px 0;background:#eaf4ee;border-left:5px solid #197b7f;border-radius:10px\"\u003e\n\n\u003cstrong\u003eMethodology and source review: October 14, 2026.\u003c\/strong\u003e\u003cp style=\"margin:5px 0 0\"\u003eThe package is based on publicly described methodology for I–MR control charts and process capability. ISO 7870-2:2023 serves as guidance for Shewhart control charts, but the full standard text is not included. The product is not ISO-certified, and no automatic results constitute quality approval. The 2027 designation refers to the document version, not a claim regarding fixed future regulations.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv id=\"mb-spc-innehall\" style=\"padding:20px 21px;margin:21px 0;background:#EAF4F4;border:2px solid #cbdfe3;border-left:6px solid #197b7f;border-radius:13px\"\u003e\n\n\u003ch2 style=\"font-size:1.35em;margin:0 0 13px\"\u003e01. Package contents\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003e15 files in one ZIP:\u003c\/strong\u003e 7 editable Word files (.docx), 7 corresponding searchable PDF files (.pdf), and 1 functional Excel workbook (.xlsx) with nine sheets.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eLanguage:\u003c\/strong\u003e five Swedish main templates, Swedish user guide, and an English User Guide. The five main templates are not translated into English.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eVersion:\u003c\/strong\u003e 1.0, 2026\/2027. \u003cstrong\u003eDelivery:\u003c\/strong\u003e digital ZIP file. \u003cstrong\u003eFormat:\u003c\/strong\u003e Word, PDF, Excel. No physical shipping or subscription.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv id=\"mb-spc-filer\" style=\"padding:20px 21px;margin:21px 0;background:#FFFFFF;border:2px solid #cbdfe3;border-left:6px solid #197b7f;border-radius:13px\"\u003e\n\n\u003ch2 style=\"font-size:1.35em;margin:0 0 13px\"\u003e02. File content\u003c\/h2\u003e\n\n\u003cp\u003eEach document serves a separate function in a practical SPC process. The table lists all eight delivery components.\u003c\/p\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"width:100%;border-collapse:collapse;font-size:.94em\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#17374c;color:#fff\"\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eNo.\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eDocument\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eContent and usage\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003e01\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003e\u003cstrong\u003eSPC Plan and Control Setup\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003eProcess, critical measurement, responsibility, customer tolerances, sampling, and Phase I baseline.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003e02\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003e\u003cstrong\u003eMeasurement Instruction and Sampling Plan\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003eMeasurement method, gauge status, measurement order, and practical control steps.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003e03\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003e\u003cstrong\u003eI–MR Control Log\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003eIndividual observations, moving range, control signals, and review fields.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003e04\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003e\u003cstrong\u003eSPC Non-conformance and Root Cause Analysis\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003eSpecial causes, tracking, quarantine, corrective action, and verification.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003e05\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003e\u003cstrong\u003eProcess Capability Report Cp\/Cpk\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003eCp, Cpk, Pp, Ppk, calculation premises, and manual decision.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003e06\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003e\u003cstrong\u003eSwedish User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003eStep-by-step on measurement series, Excel, methodology assumptions, and sources.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003e07\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003e\u003cstrong\u003eEnglish User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003eExplains the Swedish templates, Excel, and statistical workflow; main templates are in Swedish.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003e08\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003e\u003cstrong\u003eExcel Tool for SPC\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003eNine tabs with two built-in charts, registers, formulas, and control functions.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dfe8eb\"\u003eXLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2 id=\"mb-spc-excel\"\u003eExcel Tool – nine tabs and two control charts\u003c\/h2\u003e\n\n\u003cp\u003eThe tool includes the worksheets \u003cstrong\u003eOverview, Parameters, Measurement Data, Control Limits, Capability, Non-conformances, Actions, Decisions, and Read Me\u003c\/strong\u003e. Enter up to 200 time-ordered observations and receive automatic moving-range values, indications for out-of-specification measurements, and signals against control limits following a documented baseline review.\u003c\/p\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eI–MR Chart:\u003c\/strong\u003e line charts for individual observations and moving ranges with control limits calculated from the first 25 measurements. Control limits require separate technical assessment before use.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eProcess Capability:\u003c\/strong\u003e calculates Cp\/Cpk using sigma within (MR-mean\/1.128) and Pp\/Ppk using total sample standard deviation for two-sided specifications. The calculation waits for at least 50 observations and a confirmation of a manually reviewed baseline.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eNon-conformance and Actions:\u003c\/strong\u003e custom registers for signals, suspected cause, responsibility, actual implementation, and effect verification. A registered case does not imply approval.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eOverview:\u003c\/strong\u003e twelve key metrics, including number of measurements, control signals, non-conformances, open actions, and manually approved decisions.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2 id=\"mb-spc-guide\"\u003eHow to use the package – step by step\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003eDefine property, process step, measurement method, unit, and the customer's current specification limits (LSL\/USL) in the SPC Plan.\u003c\/li\u003e\n\n\u003cli\u003eDocument sampling frequency, instrument status, and measurement order in the Measurement Instruction.\u003c\/li\u003e\n\n\u003cli\u003eFill in Parameters in Excel and record observations in Measurement Data chronologically.\u003c\/li\u003e\n\n\u003cli\u003eReview the preliminary baseline of 25 observations with a qualified expert. Register the final decision before using the limits.\u003c\/li\u003e\n\n\u003cli\u003eInvestigate control signals and out-of-specification measurements separately. Document actions and actual effect verification.\u003c\/li\u003e\n\n\u003cli\u003eInterpret Cp\/Cpk only after reviewing process stability, representative sampling, distribution, and measurement uncertainty. Use the separate Process Capability Report.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2 id=\"mb-spc-villkor\"\u003eMethodology, limitations, and terms of use\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eA control limit is not the same as a specification limit.\u003c\/strong\u003e Control limits estimate a process's variation; LSL and USL come from drawings or customer requirements. Therefore, a measurement between control limits is not automatically approved according to the drawing. The spreadsheet uses only individual measurements with moving range over two observations; it does not replace Xbar–R charts, distribution-fitted analysis, MSA\/Gage R\u0026amp;R, or customer-specific validation.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eProcess capability requires technical assessment.\u003c\/strong\u003e The statistical indices are preliminary working values, not decisions on product release. Such an assessment may also require distribution checks and more than 50 observations. The SPC package is a voluntary administrative and quality-technical aid, not a mandatory government form or a complete copy of an ISO standard.\u003c\/p\u003e\n\n\u003ch2\u003eSupplementary documents and relevant internal links\u003c\/h2\u003e\n\n\u003cp\u003eTo ensure measurement traceability, you can use the \u003ca href=\"\/en\/products\/kalibreringsregister-matdonskontroll-excel-2026-2027\"\u003eCalibration Register \u0026amp; Gauge Control\u003c\/a\u003e. For a broader quality assurance process, the \u003ca href=\"\/en\/products\/kvalitetsplan-kontrollprogram-2026-2027-iso-10005-kontrollregister-avvikelser-excel-word-pdf\"\u003eQuality Plan \u0026amp; Control Program\u003c\/a\u003e is available. If you need to plan maintenance tasks arising from process non-conformances, the \u003ca href=\"\/en\/products\/maskinregister-forebyggande-underhall-excel-2026-2027\"\u003eMachine Register \u0026amp; Preventive Maintenance\u003c\/a\u003e can supplement the work. See also the category \u003ca href=\"\/en\/collections\/kvalitetsledning-iso-mallar\"\u003eQuality Management \u0026amp; ISO\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-spc-faq\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\n\u003ch3\u003eWhat is the difference between Cp and Cpk?\u003c\/h3\u003e\n\n\u003cp\u003eCp describes the relationship between tolerance width and calculated short-term variation. Cpk also takes into account where the mean lies in relation to the tolerance limits.\u003c\/p\u003e\n\n\u003ch3\u003eIs the Excel tool a complete SPC system?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It is a practical calculation and documentation aid for I–MR and two-sided process capability, not a certified SPC system or an automated product release tool.\u003c\/p\u003e\n\n\u003ch3\u003eCan I use the template with more than 25 measurements?\u003c\/h3\u003e\n\n\u003cp\u003eYes. The workbook takes up to 200 measurements. The first 25 are used as a fixed preliminary Phase I baseline; technical stability assessment is always required.\u003c\/p\u003e\n\n\u003ch3\u003eWhat happens when no values have been registered?\u003c\/h3\u003e\n\n\u003cp\u003eThe overview counters show zero and capability values remain empty. Temporary test data are not included in the delivery.\u003c\/p\u003e\n\n\u003ch3\u003eAre the main templates also in English?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The five main templates are in Swedish. The English User Guide explains their use in English.\u003c\/p\u003e\n\n\u003ch2\u003eMethodological sources and version information\u003c\/h2\u003e\n\n\u003cp\u003eSources checked \u003cstrong\u003e2026-10-14\u003c\/strong\u003e: \u003ca href=\"https:\/\/www.itl.nist.gov\/div898\/handbook\/pmc\/section3\/pmc322.htm\"\u003eNIST – Individuals Control Charts\u003c\/a\u003e, \u003ca href=\"https:\/\/www.itl.nist.gov\/div898\/handbook\/pmc\/section1\/pmc16.htm\"\u003eNIST – Process Capability\u003c\/a\u003e, \u003ca href=\"https:\/\/www.itl.nist.gov\/div898\/handbook\/ppc\/section4\/ppc46.htm\"\u003eNIST – Assessing Process Capability\u003c\/a\u003e, and \u003ca href=\"https:\/\/www.iso.org\/standard\/78859.html\"\u003eISO 7870-2:2023, public standard description\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eVersion:\u003c\/strong\u003e 1.0 · \u003cstrong\u003eEdition:\u003c\/strong\u003e 2026\/2027 · \u003cstrong\u003eFile package:\u003c\/strong\u003e spc-processduglighet-2027.zip · \u003cstrong\u003eDelivery:\u003c\/strong\u003e downloadable digital ZIP after purchase, provided the file is linked to the product.\u003c\/p\u003e\n\n\u003caside class=\"mb-seo-guide\" style=\"background:#eef7f7;border-left:4px solid #117981;padding:14px 18px;margin:20px 0;border-radius:8px\"\u003e\u003cstrong\u003eUnderstand the method before using the spreadsheet:\u003c\/strong\u003e Read the \u003ca href=\"\/en\/blogs\/foretag\/spc-processduglighet-cp-cpk-styrdiagram-guide\"\u003eguide on SPC, Cp, Cpk, and control charts\u003c\/a\u003e featuring calculation examples, common mistakes, and a checklist.\u003c\/aside\u003e\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55753256272214,"sku":"SPC-IMR-CPK-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/spc-processduglighet-i-mr-cp-cpk-huvudbild-2027.png?v=1792004702"},{"product_id":"forstastyckskontroll-fai-mattprotokoll-2027","title":"First Article Inspection \u0026 FAI 2026\/2027 – Measurement Reports, Drawing Requirements \u0026 Release Register | Word\/PDF\/Excel","description":"\u003csection class=\"mb-product-copy\" lang=\"en\" style=\"color:#17374c;line-height:1.75\"\u003e\n\u003ch2\u003eFirst Article Inspection \u0026amp; FAI 2026\/2027 – measurement logs, drawing requirements, and Excel registry\u003c\/h2\u003e\n\n\u003cp\u003eDo you need to verify a \u003cstrong\u003efirst manufactured article against drawings and customer requirements\u003c\/strong\u003e before continuing production? This package for \u003cstrong\u003eFirst Article Inspection (FAI)\u003c\/strong\u003e helps manufacturers, CNC workshops, subcontractors, and quality departments to plan inspections, document actual measurement results, link materials and manufacturing processes to the correct article revision, and make a separate, traceable release decision.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eA total of 15 files: 7 Word, 7 searchable A4 PDFs, and one Excel tool with nine tabs.\u003c\/strong\u003e Five Swedish main templates, one Swedish user guide, and an English User Guide. Editable documents, no subscription or physical shipping.\u003c\/p\u003e\n\n\u003cnav style=\"background:#edf6f7;padding:12px 16px;border-radius:10px;margin:18px 0\" aria-label=\"Product contents\"\u003e\u003cstrong\u003eOn this page:\u003c\/strong\u003e \u003ca href=\"#fai-paket\"\u003eThe Package\u003c\/a\u003e · \u003ca href=\"#fai-filer\"\u003eFile Overview\u003c\/a\u003e · \u003ca href=\"#fai-excel\"\u003eExcel\u003c\/a\u003e · \u003ca href=\"#fai-steg\"\u003eWorkflow\u003c\/a\u003e · \u003ca href=\"#fai-standard\"\u003eRequirements and limitations\u003c\/a\u003e · \u003ca href=\"#fai-faq\"\u003eFAQ\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv style=\"padding:17px 20px;background:#eaf4ef;border-left:5px solid #197b7f;border-radius:10px;margin:18px 0\"\u003e\n\n\u003cstrong\u003eTechnical source and methodology review: October 14, 2026.\u003c\/strong\u003e\u003cp style=\"margin:7px 0 0\"\u003eThe templates are an independent, voluntary documentation aid. SAE AS9102C is a separate, protected industry standard for FAI in aerospace; original forms and the full standard text are \u003cstrong\u003enot\u003c\/strong\u003e included. The package is not claimed to satisfy AS9102C, ISO certification requirements, or any specific customer contract without supplementary review. 2027 is a version designation.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv id=\"fai-paket\" style=\"background:#e9f3f4;border:2px solid #cbdfe3;border-left:6px solid #197b7f;border-radius:13px;padding:21px;margin:20px 0\"\u003e\n\n\u003ch2 style=\"margin-top:0;font-size:1.32rem\"\u003e01. Package Contents\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e7 editable Word files (DOCX):\u003c\/strong\u003e five Swedish main documents, Swedish user guide, and English User Guide.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e7 corresponding searchable PDF files:\u003c\/strong\u003e A4 for printing, reading, and archiving.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e1 Excel workbook (XLSX):\u003c\/strong\u003e nine tabs with measurement comparisons, registry relationships, and documented decisions.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003e\u003cstrong\u003e15 delivery files in total.\u003c\/strong\u003e \u003cstrong\u003eLanguage:\u003c\/strong\u003e Swedish main templates with Swedish and English guides; not fully bilingual. \u003cstrong\u003eVersion:\u003c\/strong\u003e 1.0 – 2026\/2027. \u003cstrong\u003eDelivery:\u003c\/strong\u003e digital ZIP file without physical shipping.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv id=\"fai-filer\" style=\"background:#fff;border:2px solid #d5e1e4;border-left:6px solid #17374c;border-radius:13px;padding:21px;margin:20px 0\"\u003e\n\n\u003ch2 style=\"margin-top:0;font-size:1.32rem\"\u003e02. What the files contain\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"border-collapse:collapse;width:100%;font-size:.94em\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#17374c;color:white\"\u003e\n\n\u003cth style=\"text-align:left;padding:10px\"\u003eNo\u003c\/th\u003e\n\n\u003cth style=\"text-align:left;padding:10px\"\u003eDocument\u003c\/th\u003e\n\n\u003cth style=\"text-align:left;padding:10px\"\u003eContent and area of use\u003c\/th\u003e\n\n\u003cth style=\"text-align:left;padding:10px\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003e01\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003e\u003cstrong\u003eInspection plan and start-up protocol\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003eInspection identity, reason, drawing revision, scope, resources, and documented start decision.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003e02\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003e\u003cstrong\u003eDrawing requirements and measurement log\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003eCharacteristic ID, nominal value, LSL\/USL, measuring method, actual observation, evidence, and separate review.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003e03\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003e\u003cstrong\u003eMaterial and process verification\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003eMaterial certificates, batch\/traceability, machine, CNC program revision, tools, process, and verification.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003e04\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003e\u003cstrong\u003eNon-conformance and re-inspection\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003eLocking\/hold, actual deviation, root cause analysis, documented waiver, action, and re-inspection.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003e05\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003e\u003cstrong\u003eFinal report and release decision\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003eDocumentation, open points, decision authority, actual signature, limitations, and follow-up.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003e06\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003e\u003cstrong\u003eSwedish User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003eStep-by-step workflow, registry connection, tolerance limits, evidence, and sources.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003e07\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003e\u003cstrong\u003eEnglish User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003eEnglish explanation of the Swedish main templates and the Excel tool (main templates are not translated).\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003e08\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003e\u003cstrong\u003eExcel – FAI inspection registry\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003eNine tabs for inspection identities, requirements, measurement results, process, non-conformances, actions, and manual decisions.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d5e1e4\"\u003eXLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2 id=\"fai-excel\"\u003eThe Excel tool – nine useful tabs\u003c\/h2\u003e\n\n\u003cp\u003eThe workbook contains \u003cstrong\u003eOverview, Articles, Requirements Registry, Measurement Results, Process, Non-conformances, Actions, Decisions, and Read me\u003c\/strong\u003e. Registry-based key figures show the number of first article inspections, drawing requirements, recorded measurements, preliminary limit deviations, open non-conformances, and manually recorded decisions.\u003c\/p\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDrawing and requirement connection:\u003c\/strong\u003e unique requirement IDs and inspection IDs with clear reference to the current drawing revision.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003ePreliminary measurement comparison:\u003c\/strong\u003e formulas for actual values against specified lower and\/or upper limits. Empty limits are not interpreted as zero. Deviating units and missing requirement IDs are signaled.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eTraceable process:\u003c\/strong\u003e batch, material certificates, machine, CNC program version, tools, and evidence references are recorded.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eActions and decisions:\u003c\/strong\u003e separation between reported performance, impact analysis, and an actual manual release decision. No algorithm performs automatic approval.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2 id=\"fai-steg\"\u003eHow to conduct a First Article Inspection\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003eCreate an inspection ID and enter the article, drawing number, revision, work order, sample, and the reason for the inspection.\u003c\/li\u003e\n\n\u003cli\u003eInventory the customer's actual drawing requirements and any special inspection requirements. Register each requirement with a unique reference and correct units.\u003c\/li\u003e\n\n\u003cli\u003eCheck measuring method, current status of measuring equipment, material certificates, and actual machine\/program configuration.\u003c\/li\u003e\n\n\u003cli\u003eRegister actual measurement values with measurement ID, sample number, requirement ID, method, and evidence in Excel and the measurement log.\u003c\/li\u003e\n\n\u003cli\u003eInvestigate numerical deviations, missing documentation, uncertain measurements, and any customer waivers individually.\u003c\/li\u003e\n\n\u003cli\u003eHave an authorized person perform a final, documented assessment with signature, date, scope of the decision, and any conditions.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2 id=\"fai-standard\"\u003eLegal and quality engineering requirements\u003c\/h2\u003e\n\n\u003cp\u003eFirst Article Inspection is \u003cstrong\u003enot a general Swedish government form\u003c\/strong\u003e. If a contract stipulates requirements for, e.g., \u003cstrong\u003eSAE AS9102C (2023)\u003c\/strong\u003e, PPAP, or customer-specific FAI formats, the original requirements and applicable documentation order must be used. SAE describes AS9102C as supplementary to customer requirements and applicable regulations; the protected standard text must not be replaced by a general proprietary template.\u003c\/p\u003e\n\n\u003cp\u003eSIS's public guidance on ISO 9001:2015 highlights the importance of documentation for measurement resources, identification, change review, release, and non-conformances. The product is not ISO-certified, and an Excel calculation does not constitute an independent conformity assessment or delivery approval.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eImportant limitation:\u003c\/strong\u003e Excel does not automatically convert units of measurement and does not automatically review measurement uncertainty, drawing interpretation, sampling, special processes, or customer acceptance criteria. The customer must ensure the correct requirements, competence, and actual decision-making authority.\u003c\/p\u003e\n\n\u003ch2\u003eRelated products and further information\u003c\/h2\u003e\n\n\u003cp\u003eWhen measurement series need to be monitored over time, \u003ca href=\"\/en\/products\/spc-processduglighet-styrdiagram-cp-cpk-2027\"\u003eSPC \u0026amp; Process Capability with Control Charts in Excel\u003c\/a\u003e can complement the first article inspection. For the traceability of measuring equipment, there is \u003ca href=\"\/en\/products\/kalibreringsregister-matdonskontroll-excel-2026-2027\"\u003eCalibration Registry \u0026amp; Gauge Control\u003c\/a\u003e. With \u003ca href=\"\/en\/products\/kvalitetsplan-kontrollprogram-2026-2027-iso-10005-kontrollregister-avvikelser-excel-word-pdf\"\u003eQuality Plan \u0026amp; Inspection Program\u003c\/a\u003e, the inspection can be integrated into a larger quality system. For root cause investigation, the \u003ca href=\"\/en\/products\/8d-rapport-rotorsaksanalys-5-varfor-mall-2026-2027\"\u003e8D Report \u0026amp; Root Cause Analysis\u003c\/a\u003e is relevant.\u003c\/p\u003e\n\n\u003cp\u003eSee also the \u003ca href=\"\/en\/blogs\/foretag\/leverantorsavtal-kvalitet-leverans-ansvar-supply-chain\"\u003eguide on supplier agreements, quality, and delivery responsibility\u003c\/a\u003e when first article inspection is to be included in a supplier relationship, or browse \u003ca href=\"\/en\/collections\/produktion-industri-mallar\"\u003eProduction \u0026amp; Industry – Templates\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2 id=\"fai-faq\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\n\u003ch3\u003eWhat is FAI?\u003c\/h3\u003e\n\n\u003cp\u003eFirst Article Inspection is a documented verification of a first or representative article against specified requirements, often for a new article, drawing change, or process change. The scope is determined by customer requirements and the chosen method.\u003c\/p\u003e\n\n\u003ch3\u003eIs this an official AS9102C form?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The package was developed independently. It contains neither SAE's official forms nor licensed standard text and cannot be marketed as verified AS9102C-compliant.\u003c\/p\u003e\n\n\u003ch3\u003eDoes Excel provide automatic approval?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Numerical comparisons only provide preliminary indicators. Decisions, measurement uncertainty, customer requirements, and any waivers must be assessed and documented by an authorized person.\u003c\/p\u003e\n\n\u003ch3\u003eCan I use it for CNC manufacturing?\u003c\/h3\u003e\n\n\u003cp\u003eYes, as a general registration aid for article revisions, measurement results, machine\/program traceability, non-conformances, and release documentation. Customer-specific requirements must be supplemented.\u003c\/p\u003e\n\n\u003ch3\u003eAre all documents in English?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The five main templates are in Swedish. The English User Guide describes how to use them together with the Excel tool.\u003c\/p\u003e\n\n\u003ch2\u003eSources and version information\u003c\/h2\u003e\n\n\u003cp\u003eSource review \u003cstrong\u003eOctober 14, 2026\u003c\/strong\u003e: \u003ca href=\"https:\/\/www.sis.se\/nyheter-och-press\/nyheter\/nyheter2016\/vagledning-for-krav-pa-dokumenterad-information-enligt-iso-90012015\/\"\u003eSIS – guidance for documented information according to ISO 9001:2015\u003c\/a\u003e and \u003ca href=\"https:\/\/doi.org\/10.4271\/AS9102C\"\u003eSAE International – AS9102C, public scope description\u003c\/a\u003e. \u003cstrong\u003eEdition:\u003c\/strong\u003e 1.0, 2026\/2027; version years do not indicate established future rights. File package: \u003cstrong\u003eforstastyckskontroll-fai-2027.zip\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55753372467542,"sku":"FAI-FORSTASTYCK-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/forstastyckskontroll-fai-2027-huvudbild.png?v=1792006307"},{"product_id":"msa-gage-rr-matsystemanalys-excel-2027","title":"Measurement Systems Analysis MSA \u0026 Gage R\u0026R 2026\/2027 – 60 measurements, repeatability \u0026 reproducibility | Excel\/Word\/PDF","description":"\u003csection class=\"mb-template-product\" lang=\"en\" style=\"color:#17374c;line-height:1.7;max-width:980px\"\u003e\n\u003ch2\u003eMeasurement System Analysis MSA \u0026amp; Gage R\u0026amp;R 2026\/2027 – Excel, Word and PDF\u003c\/h2\u003e\n\n\u003cp\u003eCan your measurement results be used to control production, assess tolerances, and follow up on quality deviations? Before interpreting a measurement report or an SPC control chart, the \u003cstrong\u003erepeatability and reproducibility of the measurement process itself\u003c\/strong\u003e must be examined. This ready-to-use template package provides structure for \u003cstrong\u003eMSA (Measurement System Analysis) and Gage R\u0026amp;R\u003c\/strong\u003e in a manufacturing environment, featuring an executable spreadsheet for a clearly defined study type and professional reports.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003e15 files in one package:\u003c\/strong\u003e 7 editable Word (.docx), 7 searchable A4-PDFs, and an Excel workbook (.xlsx) with nine tabs. Five main Swedish documents, a Swedish guide, and an \u003cem\u003eEnglish User Guide\u003c\/em\u003e. For quality managers, CNC workshops, measurement technicians, and production companies. \u003cstrong\u003ePrice 79 SEK – one-time purchase.\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003cnav style=\"background:#eaf4f4;padding:12px 17px;border-radius:10px;margin:19px 0\" aria-label=\"Quick links\"\u003e\u003cstrong\u003eOn this page:\u003c\/strong\u003e \u003ca href=\"#mb-msa-innehall\"\u003eContents\u003c\/a\u003e · \u003ca href=\"#mb-msa-filer\"\u003eThe files\u003c\/a\u003e · \u003ca href=\"#mb-msa-excel\"\u003eExcel\u003c\/a\u003e · \u003ca href=\"#mb-msa-arbetsgang\"\u003eWorkflow\u003c\/a\u003e · \u003ca href=\"#mb-msa-metod\"\u003eMethod and responsibility\u003c\/a\u003e · \u003ca href=\"#mb-msa-faq\"\u003eFAQ\u003c\/a\u003e\u003c\/nav\u003e\n\u003cp style=\"background:#f4f8f8;padding:15px;border-left:4px solid #16777d;border-radius:6px\"\u003e\u003cstrong\u003eMethod review October 14, 2026.\u003c\/strong\u003e The support uses a \u003cstrong\u003ecrossed 10×3×2 study\u003c\/strong\u003e with the \u003cstrong\u003eAverage \u0026amp; Range method\u003c\/strong\u003e – not ANOVA. The copyrighted AIAG MSA manual and official forms are not included. The product is not an accredited measurement uncertainty tool, proof of ISO\/AIAG compliance, or an automatic decision on the suitability of a measurement system. The year 2027 denotes the version.\u003c\/p\u003e\n\n\u003cdiv id=\"mb-msa-innehall\" style=\"border:2px solid #cddfe2;border-left:6px solid #16777d;background:#e9f4f4;border-radius:13px;padding:20px;margin:22px 0\"\u003e\n\n\u003ch2 style=\"margin:0 0 10px;font-size:1.32rem\"\u003e01. Package contents\u003c\/h2\u003e\n\n\u003cul style=\"margin-top:0\"\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e7 Word files:\u003c\/strong\u003e five main Swedish templates, Swedish user guide, and English User Guide.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e7 corresponding PDF files:\u003c\/strong\u003e searchable text, A4 format, and print-friendly layout.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e1 Excel file:\u003c\/strong\u003e nine sheets with input for 60 measurement values, documented study prerequisites, and linked calculations.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp style=\"margin-bottom:0\"\u003e\u003cstrong\u003eTotal:\u003c\/strong\u003e 15 delivery files in ZIP. \u003cstrong\u003eLanguage:\u003c\/strong\u003e Swedish main documents as well as a Swedish and English guide (not fully bilingual). \u003cstrong\u003eVersion:\u003c\/strong\u003e 1.0 – 2026\/2027. \u003cstrong\u003eDelivery:\u003c\/strong\u003e downloadable digital file, no physical shipping or subscription.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv id=\"mb-msa-filer\" style=\"border:2px solid #cddfe2;border-left:6px solid #17374c;background:#fff;border-radius:13px;padding:20px;margin:22px 0\"\u003e\n\n\u003ch2 style=\"margin:0 0 10px;font-size:1.32rem\"\u003e02. What the files contain\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\n\n\u003ctable style=\"border-collapse:collapse;width:100%;min-width:610px;font-size:.95em\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#17374c;color:#fff\"\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eNo.\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eDocument\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eArea of use\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003e01\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003e\u003cstrong\u003eMSA study plan and assignment\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003eStudy ID, measurand, instrument, 10 parts, 3 operators, two measurement rounds, conditions, and authorized start decision.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003e02\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003e\u003cstrong\u003eSampling and randomization plan\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003eSelection of representative parts, blinding, measurement sequence, environment, and traceable registration of two trials.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003e03\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003e\u003cstrong\u003eGage R\u0026amp;R measurement record\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003eOriginal observations for parts P01–P10, operators A–C, and trials 1–2, plus control of 60 data points.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003e04\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003e\u003cstrong\u003eResults report and interpretation\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003eCalculated EV, AV, GRR, PV, TV, %GRR, ndc, method limitations, review, and signature.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003e05\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003e\u003cstrong\u003eDeviation, action, and restudy\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003eNon-conforming measurement system, locking, analysis, actual correction, and effect verification through a new study.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003e06\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003e\u003cstrong\u003eSwedish user guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003eStep by step, selection, Excel work, formulas, interpretation, limitations, and technical sources.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003e07\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003e\u003cstrong\u003eEnglish User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003eEnglish review of the Swedish main templates and workbook; not complete translations.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003e08\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003e\u003cstrong\u003eExcel – MSA Gage R\u0026amp;R\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003eNine sheets: Overview, Study Plan, Measurement Data, Calculation, Traceability, Deviations, Actions, Decisions, and Read me.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d4e1e4\"\u003eXLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\n\u003c\/div\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2 id=\"mb-msa-excel\"\u003eExcel tool with nine tabs and 60 measurements\u003c\/h2\u003e\n\n\u003cp\u003eThe workbook is prepared for ten \u003cstrong\u003ereusable parts (P01–P10)\u003c\/strong\u003e, three \u003cstrong\u003eoperators (A, B, and C)\u003c\/strong\u003e, and two \u003cstrong\u003erepeated measurements\u003c\/strong\u003e per operator and part. This provides a total of \u003cstrong\u003e60 actual observations\u003c\/strong\u003e. Result cells for GRR and variation components remain empty until all 60 numerical values have been entered. No fictitious production data is included.\u003c\/p\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eOverview:\u003c\/strong\u003e clear status indicators, number of registered observations, %GRR, ndc, open deviations, and manual decisions.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eStudy Plan:\u003c\/strong\u003e item, instrument, characteristic, unit, potential two-sided tolerance, and actual review.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eMeasurement Data:\u003c\/strong\u003e 30 operator\/part combinations, two trials, automatic range and average, and missing value indicator.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCalculation:\u003c\/strong\u003e \u003cstrong\u003eEV\u003c\/strong\u003e (repeatability), \u003cstrong\u003eAV\u003c\/strong\u003e (reproducibility), \u003cstrong\u003eGRR\u003c\/strong\u003e (combined measurement variation), \u003cstrong\u003ePV\u003c\/strong\u003e (part-to-part variation), \u003cstrong\u003eTV\u003c\/strong\u003e (total variation), \u003cstrong\u003e%GRR of TV\u003c\/strong\u003e, and \u003cstrong\u003endc\u003c\/strong\u003e. Optional percentage of two-sided tolerance is shown only with valid input. A chart shows part averages.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eTraceability, Deviations, Actions, and Decisions:\u003c\/strong\u003e register with responsibility, references, documented effect control, and decisions entered manually.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRead me:\u003c\/strong\u003e instructions, fixed statistical constants, method boundaries, and open sources.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2 id=\"mb-msa-arbetsgang\"\u003eHow to conduct a Gage R\u0026amp;R study\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eScope:\u003c\/strong\u003e define what is being measured, the instrument's function, area of use, acceptance criteria, and correct item\/drawing revision.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eSelect sample parts:\u003c\/strong\u003e select ten real parts that together reflect relevant process variation. The study assumes that each part can be remeasured without changing.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003ePlan the measurements:\u003c\/strong\u003e choose three competent operators, randomize the order separately for two trials, and blind previous results if possible.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCollect original data:\u003c\/strong\u003e enter actual observations into the measurement protocol and then into Excel. Keep part, operator, and trial numbers, as well as instrument and method references.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eReview calculations:\u003c\/strong\u003e verify that 60 actual measurement values are present and compare the calculated repeatability\/reproducibility against applicable customer and business requirements.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eMake a separate decision:\u003c\/strong\u003e document limitations, improvement actions, any restudy, and the responsible decision-maker's actual signature.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2 id=\"mb-msa-metod\"\u003eStatistical method and important limitations\u003c\/h2\u003e\n\n\u003cp\u003eThe \u003cem\u003eAverage \u0026amp; Range\u003c\/em\u003e method used employs two trials, three operators, and ten parts with fixed constants: \u003cstrong\u003eK1 = 0.8862\u003c\/strong\u003e, \u003cstrong\u003eK2 = 0.5231\u003c\/strong\u003e, \u003cstrong\u003eK3 = 0.3146\u003c\/strong\u003e. For example, \u003cstrong\u003eEV = average range × K1\u003c\/strong\u003e, while AV is estimated after correcting for the repeatability contribution. The estimates refer to \u003cstrong\u003e1 standard deviation (1σ)\u003c\/strong\u003e and should not be confused with six-sigma for spread intervals. \u003cstrong\u003e% tolerance\u003c\/strong\u003e uses 6×GRR divided by the valid two-sided tolerance width.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eMethod conditions:\u003c\/strong\u003e this is \u003cem\u003enot\u003c\/em\u003e an ANOVA analysis, and the specific interaction between operator and part is not calculated separately. The method does not replace a measurement uncertainty budget, testing for systematic error (\u003cem\u003ebias\u003c\/em\u003e), linearity, time stability, instrument resolution, or the customer's own acceptance criteria. %GRR can change significantly if the sample parts represent a narrower or wider process range. The suitability of the results must be assessed by an expert.\u003c\/p\u003e\n\n\u003cp\u003eMSA is not a general Swedish government form. Copyrighted manuals or standards should not be assumed to be included. The templates are independently designed as work support based on publicly described metrological methodology, including \u003ca href=\"https:\/\/www.itl.nist.gov\/div898\/handbook\/mpc\/section4\/mpc4.htm\" rel=\"nofollow noopener\"\u003eNIST – Gauge R\u0026amp;R studies\u003c\/a\u003e and \u003ca href=\"https:\/\/www.itl.nist.gov\/div898\/handbook\/mpc\/section4\/mpc46.htm\" rel=\"nofollow noopener\"\u003eNIST – Quantifying uncertainties\u003c\/a\u003e. The product's word choices do not constitute a claim of independent certification.\u003c\/p\u003e\n\n\u003ch2\u003eRelated templates, guides, and categories\u003c\/h2\u003e\n\n\u003cp\u003eA documented measurement system analysis provides a better foundation for \u003ca href=\"\/en\/products\/spc-processduglighet-styrdiagram-cp-cpk-2027\"\u003eSPC \u0026amp; Process Capability with I–MR control charts and Cp\/Cpk\u003c\/a\u003e, where it is important that measurement variation is not confused with process variation. In \u003ca href=\"\/en\/products\/forstastyckskontroll-fai-mattprotokoll-2027\"\u003eFirst Article Inspection \u0026amp; FAI\u003c\/a\u003e, measurements are documented against drawings and established requirements. Also check the gauge's history in \u003ca href=\"\/en\/products\/kalibreringsregister-matdonskontroll-excel-2026-2027\"\u003eCalibration Register \u0026amp; Gauge Control\u003c\/a\u003e. For a broader risk assessment, \u003ca href=\"\/en\/products\/fmea-feleffektanalys-mall-excel-2026-2027\"\u003eFMEA – Failure Mode and Effects Analysis\u003c\/a\u003e is a supplementary support. More products can be found in \u003ca href=\"\/en\/collections\/kvalitetsledning-iso-mallar\"\u003eQuality Management \u0026amp; ISO – Templates\u003c\/a\u003e and \u003ca href=\"\/en\/collections\/produktion-industri-mallar\"\u003eProduction \u0026amp; Industry – Templates\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-msa-faq\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\n\u003ch3\u003eHow many measurements are required for this template?\u003c\/h3\u003e\n\n\u003cp\u003eExactly 60 actual measurement values: ten parts times three operators times two trials. Other test setups or destructive testing require a different analysis method or a customized workbook.\u003c\/p\u003e\n\n\u003ch3\u003eWhat is the difference between EV and AV?\u003c\/h3\u003e\n\n\u003cp\u003eEV describes variation when the same operator repeats measurements under the study conditions; AV estimates the variation contribution between operators. GRR summarizes these two components, not all conceivable measurement uncertainty.\u003c\/p\u003e\n\n\u003ch3\u003eIs this an AIAG-certified MSA tool?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The package is based on generally described Gage R\u0026amp;R methodology but is not supplied with a licensed AIAG MSA manual, does not claim AIAG certification, and does not replace customer-specific instructions.\u003c\/p\u003e\n\n\u003ch3\u003eCan Excel automatically approve a measurement system?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The indices are preliminary aids. Approval requires competent evaluation, applicable acceptance criteria, and a separate actually documented decision.\u003c\/p\u003e\n\n\u003ch3\u003eCan I use the package for a CNC workshop?\u003c\/h3\u003e\n\n\u003cp\u003eYes, as a practical aid for non-destructive measurement studies with reusable parts, three operators, and two trials. Check measurement method, fixtures, drawing requirements, and instrument status.\u003c\/p\u003e\n\n\u003ch3\u003eAre the templates available in English?\u003c\/h3\u003e\n\n\u003cp\u003eThe main templates are in Swedish. An English User Guide explains their use but is not a complete translation of all templates.\u003c\/p\u003e\n\n\u003cp style=\"border-top:1px solid #d5e1e4;padding-top:13px;font-size:.92em\"\u003e\u003cstrong\u003eVersion:\u003c\/strong\u003e 1.0 · \u003cstrong\u003eSource and method review:\u003c\/strong\u003e 2026-10-14 · \u003cstrong\u003eDocument package:\u003c\/strong\u003e msa-gage-rr-2027.zip · \u003cstrong\u003eDelivery:\u003c\/strong\u003e digital, after purchase when file connection in Shopify has been verified.\u003c\/p\u003e\n\n\u003caside class=\"mb-seo-guide\" style=\"background:#eef7f7;border-left:4px solid #117981;padding:14px 18px;margin:20px 0;border-radius:8px\"\u003e\u003cstrong\u003eIn-depth about measurement precision:\u003c\/strong\u003e Read our \u003ca href=\"\/en\/blogs\/foretag\/msa-gage-rr-matsystemanalys-upprepbarhet-reproducerbarhet\"\u003eguide to MSA and Gage R\u0026amp;R\u003c\/a\u003e with step-by-step process, checklist, and examples of common errors.\u003c\/aside\u003e\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55753431679318,"sku":"MSA-GAGE-RR-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/msa-gage-rr-2027-huvudbild_ff01d0f0-fc48-4ba1-a2cb-366ae6d228fd.png?v=1792007852"},{"product_id":"cnc-verktygsregister-verktygslivslangd-2027","title":"CNC Tool Registry \u0026 Tool Life 2026\/2027 – Cutting Tools, Change Log \u0026 Costs | Excel\/Word\/PDF","description":"\u003csection class=\"mb-document-product\" lang=\"en\" style=\"line-height:1.72;color:#17374c\"\u003e\n\u003ch2\u003eCNC Tool Register \u0026amp; Tool Life 2026\/2027 – Excel, Word and PDF\u003c\/h2\u003e\n\n\u003cp\u003eHow long are the cutting tools in your CNC production being used? When do tool changes occur, what is the consumption cost, and which cutting edges need to be inspected? With \u003cstrong\u003eCNC Tool Register \u0026amp; Tool Life\u003c\/strong\u003e, you receive a structured template package for tracking \u003cstrong\u003ecutting tools, tool changes, wear measurements, actual cutting minutes, and parts produced\u003c\/strong\u003e. Designed for workshops, CNC operators, production engineers, supervisors, and smaller manufacturing companies.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003e15 editable and print-friendly files:\u003c\/strong\u003e 7 Word (DOCX), 7 searchable PDF, and 1 Excel workbook (XLSX) with nine tabs and status charts. Five Swedish master documents plus a Swedish and an English user guide. One-time purchase, no subscription.\u003c\/p\u003e\n\n\u003cnav aria-label=\"Jump to section\" style=\"border-radius:10px;background:#ecf5f5;padding:12px 16px;margin:16px 0\"\u003e\u003cstrong\u003eContents:\u003c\/strong\u003e \u003ca href=\"#mb-cnc-innehall\"\u003eThe Package\u003c\/a\u003e · \u003ca href=\"#mb-cnc-filer\"\u003eThe Files\u003c\/a\u003e · \u003ca href=\"#mb-cnc-excel\"\u003eExcel Tool\u003c\/a\u003e · \u003ca href=\"#mb-cnc-anvandning\"\u003eHow to use\u003c\/a\u003e · \u003ca href=\"#mb-cnc-metod\"\u003eMethod and safety\u003c\/a\u003e · \u003ca href=\"#mb-cnc-faq\"\u003eFAQ\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv style=\"padding:15px 18px;background:#f2f7f8;border-radius:10px;border-left:5px solid #197b7f;margin:16px 0\"\u003e\n\n\u003cstrong\u003eTechnical source review: October 14, 2026.\u003c\/strong\u003e\u003cp style=\"margin:7px 0 0\"\u003eCutting tool life varies based on tool material, cutting data, workpiece material, cooling, and process conditions. The package does not set generic safety or wear limits. The user must establish their own limits and conduct an actual risk assessment. The calculation does not replace the machine's safety instructions, physical tool inspection, or authorized decisions regarding continued operation. The designation 2027 indicates the document version.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv id=\"mb-cnc-innehall\" style=\"background:#eaf4f5;border:2px solid #c9dee2;border-left:6px solid #197b7f;border-radius:12px;padding:20px;margin:22px 0\"\u003e\n\n\u003ch2 style=\"margin-top:0;font-size:1.3rem\"\u003e01. Package Contents\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e7 Word files (DOCX):\u003c\/strong\u003e five Swedish, editable master templates, a Swedish guide, and an English User Guide.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e7 corresponding searchable PDF files:\u003c\/strong\u003e A4 for archiving, reading, and printing.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e1 Excel workbook (XLSX):\u003c\/strong\u003e nine calculation and register sheets with validation formulas, data validation, and graphical overviews.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003e\u003cstrong\u003eTotal 15 files in ZIP.\u003c\/strong\u003e Swedish is the primary language; an English guide explains the Swedish documents. Delivery: digital download, no physical shipping, and no subscription. Document version 1.0 – 2026\/2027.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv id=\"mb-cnc-filer\" style=\"background:#fff;border:2px solid #c9dee2;border-left:6px solid #17374c;border-radius:12px;padding:20px;margin:22px 0\"\u003e\n\n\u003ch2 style=\"margin-top:0;font-size:1.3rem\"\u003e02. What the files contain\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"border-collapse:collapse;width:100%;min-width:580px;font-size:.93em\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#17374c;color:white\"\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eNo\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eDocument\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eContent and function\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003e01\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003e\u003cstrong\u003eCNC Tool Plan and Life Routine\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003eSetting internal limits (min\/pcs), quality and safety risks, inspection frequency, and decision responsibility.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003e02\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003e\u003cstrong\u003eCutting Tool Card \u0026amp; Start-up Checklist\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003eUnique edge\/lifecycle ID, insert type, CNC machine, operation, cutting data, and risk control.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003e03\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003e\u003cstrong\u003eRun Log and Consumption Protocol\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003eActual cutting time, parts produced\/scrapped, order, operator, and log ID.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003e04\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003e\u003cstrong\u003eTool Change and Scrap Protocol\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003eActual change, old and new instance, reason for scrapping, cost, and follow-up.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003e05\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003e\u003cstrong\u003eWear Inspection and Non-conformance Report\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003eWear type, actual VB dimension, local limit, risk assessment, and effectiveness verification.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003e06\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003e\u003cstrong\u003eSwedish User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003eStep-by-step instructions, documentation, formulas, Excel instructions, data quality, and sources.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003e07\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003e\u003cstrong\u003eEnglish User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003eEnglish guidance for the Swedish master templates and Excel; not a full translation.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003e08\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003e\u003cstrong\u003eExcel – Tool Register\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003eNine tabs covering tool registry, run log, change history, wear, inventory, and costs.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d8e4e6\"\u003eXLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2 id=\"mb-cnc-excel\"\u003eTool Register in Excel – nine tabs and actual tracking\u003c\/h2\u003e\n\n\u003cp\u003eThe Excel workbook provides a clear workflow from the first use to actual tool changes, wear investigation, and cost follow-up. Users can register up to \u003cstrong\u003e200 tool instances, 400 run log entries\u003c\/strong\u003e, and separate registers with up to 200 events each. A \u003cem\u003etool instance\u003c\/em\u003e refers to a specific cutting edge or usage cycle – after a change, a new ID must be created so that the history is not accidentally reset.\u003c\/p\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eOverview:\u003c\/strong\u003e number of active instances, runs, changes, actual cutting minutes, parts produced, warning signals, blocks, inventory needs, open actions, and status charts.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eTool Register:\u003c\/strong\u003e insert article, machine, operation, self-determined life limit in minutes \u003cem\u003eor\u003c\/em\u003e parts, editable warning threshold, actual accumulated consumption, and warning indicators.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRun Log:\u003c\/strong\u003e up to 400 chronologically documented events, actual cutting time and production counts, plus instance ID verification.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eChanges \u0026amp; Scrap:\u003c\/strong\u003e change, reason for scrapping, old\/new cutting edge instance, documented actual cost, and execution.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eWear Inspection:\u003c\/strong\u003e wear type, observed VB dimension, separate locally established limit, manual assessment, and indicative comparison.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eInventory:\u003c\/strong\u003e article number, current reported balance, reorder point, unit price, and simple indicative inventory value.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eActions:\u003c\/strong\u003e responsibility, due date, actual status, and implemented effect check.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCosts:\u003c\/strong\u003e actual replacement costs, total cutting time, and preliminary cost key figures with explanations.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRead me:\u003c\/strong\u003e review of instance IDs, units, limitations, sources, and workflow.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003eThe workbook is delivered \u003cstrong\u003ewithout fictitious machine or consumption data\u003c\/strong\u003e. Key figures start at zero; results become meaningful only once the user has entered real data. No automatic CNC\/PLC connections or inventory deductions are included.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-cnc-anvandning\"\u003eHow to use the tool – step by step\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003eDocument the machining process, tool article, machine, operation, product requirements, and risk profile in the CNC tool plan.\u003c\/li\u003e\n\n\u003cli\u003eChoose an \u003cstrong\u003einternal, factually justified life limit\u003c\/strong\u003e per tool type and process, in cutting minutes or number of parts produced.\u003c\/li\u003e\n\n\u003cli\u003eCreate a \u003cstrong\u003eunique cutting edge instance\u003c\/strong\u003e in the Excel \"Tool Register\" sheet and complete a start-up checklist.\u003c\/li\u003e\n\n\u003cli\u003eRegister actual data in the Run Log. Excel sums minutes and parts separately and calculates the chosen consumption ratio.\u003c\/li\u003e\n\n\u003cli\u003ePhysically inspect wear, product dimensions, and consumption signals. Document any VB measurements against a locally chosen limit.\u003c\/li\u003e\n\n\u003cli\u003eDocument tool changes or scrapping, close the old instance, and create a new instance ID when replaced.\u003c\/li\u003e\n\n\u003cli\u003eManually adjust inventory balance and register actual completed actions, effect checks, and decision responsibilities.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2 id=\"mb-cnc-metod\"\u003eImportant method, operational, and safety limitations\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eWear is not always linear.\u003c\/strong\u003e Monitoring flank wear, crater wear, chipping, or plastic deformation may require different methods. A local numeric VB limit is not a universal safety limit. It must not replace the assessment of process risk, machine instructions, technical advice from the cutting tool manufacturer, or physical issues discovered by the operator.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eNo automatic release:\u003c\/strong\u003e when Excel shows \"BELOW LIMIT,\" it only means that the reported consumption is below a user-registered administrative limit. A deviant or damaged cutting edge may still require an immediate stop. Likewise, \"AT\/ABOVE LIMIT\" is not proof of a product defect – it is a signal for investigation.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eNo statutory standard form:\u003c\/strong\u003e this is an independently developed, voluntary production and quality administrative support tool. It does not replace the employer's instructions, risk assessments, work environment responsibilities, accounting, or applicable customer requirements. Reference to industrial methodology does not imply ISO certification or manufacturer certification.\u003c\/p\u003e\n\n\u003ch2\u003eSupplementary templates and relevant internal links\u003c\/h2\u003e\n\n\u003cp\u003eTo link tool changes to production efficiency, you can use \u003ca href=\"\/en\/products\/oee-tak-maskineffektivitet-excel-mall-2026-2027\"\u003eOEE – Machine Efficiency\u003c\/a\u003e. For ongoing dimensional variation after tool changes, there is \u003ca href=\"\/en\/products\/spc-processduglighet-styrdiagram-cp-cpk-2027\"\u003eSPC \u0026amp; Process Capability\u003c\/a\u003e. For start-up and drawing inspections, \u003ca href=\"\/en\/products\/forstastyckskontroll-fai-mattprotokoll-2027\"\u003eFirst Article Inspection \u0026amp; FAI\u003c\/a\u003e is relevant, and for reviewing the entire measurement process, \u003ca href=\"\/en\/products\/msa-gage-rr-matsystemanalys-excel-2027\"\u003eMeasurement System Analysis MSA \u0026amp; Gage R\u0026amp;R\u003c\/a\u003e. More documents are available in \u003ca href=\"\/en\/collections\/produktion-industri-mallar\"\u003eProduction \u0026amp; Industry – Templates\u003c\/a\u003e and \u003ca href=\"\/en\/collections\/kvalitetsledning-iso-mallar\"\u003eQuality Management \u0026amp; ISO – Templates\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-cnc-faq\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\n\u003ch3\u003eCan I track tool life in minutes and parts?\u003c\/h3\u003e\n\n\u003cp\u003eYes. The Run Log stores both values separately, but each registered cutting edge instance uses exactly one chosen unit to calculate its life ratio.\u003c\/p\u003e\n\n\u003ch3\u003eWhat happens when I change an insert?\u003c\/h3\u003e\n\n\u003cp\u003eDocument the change, mark the old cutting edge instance as replaced, and create a new instance with a new unique ID. Otherwise, two life cycles might incorrectly be summed into the same history.\u003c\/p\u003e\n\n\u003ch3\u003eCan the calculation automatically approve a cutting tool?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Formula-based signals are administrative indicators. Measurement, quality assessment, and workplace safety risks must be reviewed by the appropriate personnel.\u003c\/p\u003e\n\n\u003ch3\u003eAre tools automatically deducted from inventory?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Registered changes do not trigger automatic inventory transactions. The inventory sheet is based on actual reported balances, avoiding the risk of a logged event being incorrectly equated with a physical inventory change.\u003c\/p\u003e\n\n\u003ch3\u003eAre cutting data and life limits from manufacturers included?\u003c\/h3\u003e\n\n\u003cp\u003eNo. No generic cutting speeds, VB limits, or safe tool life values are pre-set. They must be selected for the specific cutting article and actual process.\u003c\/p\u003e\n\n\u003ch3\u003eAre all master templates available in English?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Five master documents are in Swedish. The English User Guide describes the contents of the documents and how the calculations are used.\u003c\/p\u003e\n\n\u003ch2\u003eSources and edition\u003c\/h2\u003e\n\n\u003cp\u003eTechnical review 2026-10-14. \u003ca href=\"https:\/\/blueprint.fastenal.com\/diagnosing-insert-wear-causes-signs-remedies.html\" rel=\"nofollow noopener\"\u003eSandvik Coromant – Diagnosing Insert Wear (2025)\u003c\/a\u003e, \u003ca href=\"https:\/\/cdn.sandvik.coromant.com\/files\/sitecollectiondocuments\/downloads\/global\/technical%20guides\/en-gb\/c-2920-031.pdf\" rel=\"nofollow noopener\"\u003eSandvik Coromant – Technical Guide on Insert Wear\u003c\/a\u003e, and \u003ca href=\"https:\/\/doi.org\/10.1108\/IJQRM-11-2022-0318\" rel=\"nofollow noopener\"\u003epeer-reviewed overview of tool life and flank wear\u003c\/a\u003e. Edition 1.0, document version 2026\/2027, ZIP \u003cstrong\u003ecnc-verktygsregister-livslangd-2027.zip\u003c\/strong\u003e. Neither protected manufacturer documents nor certification certificates are included.\u003c\/p\u003e\n\n\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55753557377366,"sku":"CNC-TOOLLIFE-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/cnc-verktygsregister-livslangd-2027-huvudbild_f507d924-b038-4948-90c1-160b73bf2fbd.png?v=1792009404"},{"product_id":"smed-stalltidsanalys-excel-stallinstruktion-2027","title":"SMED \u0026 Setup Time Analysis 2026\/2027 – Internal\/external setup time, setup instructions \u0026 Excel | Word\/PDF","description":"\u003csection lang=\"en\" class=\"mb-smed-product\" style=\"color:#17374c;line-height:1.7\"\u003e\n\u003ch2\u003eSMED \u0026amp; Changeover Time Analysis 2026\/2027 – Excel, Word and PDF for faster changeovers\u003c\/h2\u003e\n\n\u003cp\u003eDo you want to reduce unnecessary \u003cstrong\u003esetup and changeover times in production\u003c\/strong\u003e without confusing planned improvements with actual results? This document package provides support for observing a changeover, separating \u003cstrong\u003einternal setup time\u003c\/strong\u003e from \u003cstrong\u003eexternal preparation time\u003c\/strong\u003e, prioritizing measures, creating standardized setup instructions, and following up on whether downtime is truly decreasing.\u003c\/p\u003e\n\n\u003cp\u003eFor CNC workshops, manufacturing companies, production managers, maintenance, improvement leaders, and quality managers. \u003cstrong\u003e15 delivery files: 7 editable Word documents, 7 searchable A4 PDFs, and an Excel tool with nine tabs.\u003c\/strong\u003e Five main Swedish templates, a Swedish guide, and an English User Guide. One-time purchase, no subscription.\u003c\/p\u003e\n\n\u003cnav style=\"background:#ecf5f6;padding:13px 17px;border-radius:9px;margin:16px 0\"\u003e\u003cstrong\u003eJump to:\u003c\/strong\u003e \u003ca href=\"#mb-smed-innehall\"\u003eThe Package\u003c\/a\u003e · \u003ca href=\"#mb-smed-filer\"\u003eThe Files\u003c\/a\u003e · \u003ca href=\"#mb-smed-excel\"\u003eExcel\u003c\/a\u003e · \u003ca href=\"#mb-smed-steg\"\u003eWorkflow\u003c\/a\u003e · \u003ca href=\"#mb-smed-metod\"\u003eSMED and Safety\u003c\/a\u003e · \u003ca href=\"#mb-smed-faq\"\u003eFAQ\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv style=\"background:#f2f8f8;padding:15px 18px;border-left:5px solid #16777d;border-radius:9px;margin:16px 0\"\u003e\n\n\u003cstrong\u003eTechnical method review October 14, 2026.\u003c\/strong\u003e\u003cp style=\"margin:7px 0 0\"\u003eSMED (Single-Minute Exchange of Die) is an established improvement method that distinguishes work requiring machine downtime from work that can be prepared outside of the downtime. The term refers to the goal of single-digit minutes, not a guaranteed result. The package is independently designed and does not contain any licensed standard or training materials. It does not replace risk assessment, manufacturer instructions, energy isolation, or quality inspections. 2027 is the document version.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv id=\"mb-smed-innehall\" style=\"border:2px solid #cadee2;border-left:6px solid #16777d;border-radius:13px;padding:20px;margin:22px 0;background:#eaf4f5\"\u003e\n\n\u003ch2 style=\"font-size:1.3rem;margin-top:0\"\u003e01. Package Contents\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e7 Word files (DOCX):\u003c\/strong\u003e five editable main Swedish documents, a Swedish user guide, and an English User Guide.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e7 searchable PDF files:\u003c\/strong\u003e corresponding content in a professional A4 format for printing and archiving.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e1 Excel workbook (XLSX):\u003c\/strong\u003e nine worksheets with follow-up formulas, registers, controls, and an overview chart.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003e\u003cstrong\u003eTotal of 15 files in a ZIP.\u003c\/strong\u003e The main templates are in Swedish; the English guide provides supplementary guidance. Version 1.0 – 2026\/2027. Downloadable digital delivery, no physical shipping.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv id=\"mb-smed-filer\" style=\"border:2px solid #cadee2;border-left:6px solid #17374c;border-radius:13px;padding:20px;margin:22px 0;background:white\"\u003e\n\n\u003ch2 style=\"font-size:1.3rem;margin-top:0\"\u003e02. What the files contain\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\n\n\u003ctable style=\"min-width:600px;border-collapse:collapse;width:100%;font-size:.94em\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#17374c;color:#fff\"\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eNo\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eDocument\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003ePractical Application\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003e01\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003e\u003cstrong\u003eSMED Study Plan \u0026amp; Current State Analysis\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003eStudy purpose, part change, machine, uniform start\/stop definition for downtime, current state, and risk assessment.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003eWord DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003e02\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003e\u003cstrong\u003eObservation Protocol – Internal\/External steps\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003eActually measured work steps, waiting, transport, and demarcation between internal and external work.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003eWord DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003e03\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003e\u003cstrong\u003eSMED Action Plan \u0026amp; Improvement Experiments\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003eStep conversion, responsibility, expected savings, safety review, pilot, and impact documentation.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003eWord DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003e04\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003e\u003cstrong\u003eStandardized Setup Instruction \u0026amp; Checklist\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003ePreparations before stop, work during stop, check of guards, first approved part, and version control.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003eWord DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003e05\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003e\u003cstrong\u003eSetup Time Report – Before\/After \u0026amp; Decisions\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003eActual baseline and follow-up, planned vs. verified savings, quality deviations, and signed decision.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003eWord DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003e06\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003e\u003cstrong\u003eSwedish User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003eStep-by-step for all files, methods, controls, and limitations.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003eWord DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003e07\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003e\u003cstrong\u003eEnglish User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003eEnglish guide to the main Swedish templates and Excel; not a full translation.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003eWord DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003e08\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003e\u003cstrong\u003eExcel – SMED \u0026amp; Changeover Time Analysis\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003eNine tabs with before\/after calculation, setup log, improvements, standard work, deviations, and decisions.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d6e2e4\"\u003eExcel XLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\n\u003c\/div\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2 id=\"mb-smed-excel\"\u003eExcel for SMED – nine tabs and two separate time comparisons\u003c\/h2\u003e\n\n\u003cp\u003eThe Excel workbook contains \u003cstrong\u003eOverview, Parameters, Setup Steps, Setup Log, Improvements, Standard Work, Deviations, Decisions and Read me\u003c\/strong\u003e. It is delivered with \u003cstrong\u003eempty input fields without dummy production data\u003c\/strong\u003e. Prepared for 120 steps in the setup analysis, 200 measured changeovers in the log, a register of improvements and deviations, and actual manual decisions.\u003c\/p\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003ePlanned savings:\u003c\/strong\u003e summary of internal minutes before and after proposed measures in Setup Steps. Steps are classified as internal or external in both modes, making conversion traceable. Incomplete and negative minutes are flagged and not counted as valid steps.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eActual verification:\u003c\/strong\u003e Setup log with measured machine downtime during \u003cem\u003eBaseline\u003c\/em\u003e, \u003cem\u003ePilot\u003c\/em\u003e, and \u003cem\u003eFollow-up\u003c\/em\u003e. The overview compares the average of valid baseline and follow-up stops, separate from the planned improvements.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eResults and charts:\u003c\/strong\u003e number of steps, total downtime minutes, planned change in minutes and percent, measured comparison in minutes and percent, open deviations, and charts.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eImprovements:\u003c\/strong\u003e action owner, category, due date, actual status, and verified effect.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eStandard work and quality gate:\u003c\/strong\u003e work sequence, responsibility, safety checks, and requirements for the first approved part.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDecisions:\u003c\/strong\u003e approval or rejection entered by authorized personnel; no automatic machine or product approval.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2 id=\"mb-smed-steg\"\u003eWorkflow – how to use the SMED package\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDefine downtime:\u003c\/strong\u003e establish a comparable start and end condition, for example from the last approved part of article A to the first approved part of article B.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eObserve the current state:\u003c\/strong\u003e measure actual work steps, transport, waiting, search time, testing, and inspection. Document machine, part, operator, and measurement occasion.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eSeparate internal from external:\u003c\/strong\u003e indicate which tasks actually require downtime and which can be performed earlier or later – only when safe.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003ePlan improvements:\u003c\/strong\u003e standardize fixtures, prepare the next order, and create practical checklists. Perform a risk assessment for every proposed method change and obtain approval from the responsible party.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRegister in Excel:\u003c\/strong\u003e fill in Parameters, Setup Steps, and Setup Log. Complete Improvements and Standard Work.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eVerify after change:\u003c\/strong\u003e measure actual downtime using the same definition, check quality outcome and first approved part, and note changes in staffing or product mix.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eMake a separate decision:\u003c\/strong\u003e document evidence, remaining risks, approved instructions, and the responsible person in Decisions.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2 id=\"mb-smed-metod\"\u003eSMED methodology, machine safety and limitations\u003c\/h2\u003e\n\n\u003cp\u003eAccording to the Lean Enterprise Institute, SMED was developed by Shigeo Shingo and is based on distinguishing internal setup tasks from external ones, subsequently moving appropriate tasks outside of machine downtime and simplifying remaining activities. Internal setup time means tasks that require the machine to be stopped; external means preparations that can occur without stopping production. \u003cstrong\u003eExternal work is still work and should not be reported as eliminated total working time.\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eNo unsafe shortcuts:\u003c\/strong\u003e always adapt the work method to local risk assessments, manufacturer instructions, machine guards, energy isolation, potential LOTO routines, ergonomics, and staff competence. The SMED analysis does not constitute machine safety approval. The first approved part after the change requires actual quality assurance according to drawings, work instructions, and customer requirements.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eNo guaranteed setup time:\u003c\/strong\u003e a formula may show planned savings in the setup analysis, but that is not the same as measured downtime change. For comparable conclusions, actually documented setups, a reasonably representative sample, the same start\/end definition, and a review of product mix and staffing conditions are required.\u003c\/p\u003e\n\n\u003cp\u003eThe product is a \u003cstrong\u003evoluntary administrative template\u003c\/strong\u003e, not a government form, certification, or release document.\u003c\/p\u003e\n\n\u003ch2\u003eRelated products and internal links\u003c\/h2\u003e\n\n\u003cp\u003eChangeover time affects how much planned production time is used. Link the SMED follow-up to \u003ca href=\"\/en\/products\/oee-tak-maskineffektivitet-excel-mall-2026-2027\"\u003eOEE \u0026amp; TAK – Machine Efficiency\u003c\/a\u003e for a broader efficiency analysis. Use \u003ca href=\"\/en\/products\/produktionsplanering-kapacitetskalkyl-excel-2026-2027\"\u003eProduction Planning \u0026amp; Capacity Calculation\u003c\/a\u003e when the improvement is to be converted into planned orders. For cost implications, \u003ca href=\"\/en\/products\/produktionskostnad-maskintimkostnad-artikelkalkyl-excel-2026-2027\"\u003eProduction Cost \u0026amp; Machine Hourly Rate\u003c\/a\u003e can help.\u003c\/p\u003e\n\n\u003cp\u003eWhen the new setup is to be reviewed against drawings and inspection requirements, \u003ca href=\"\/en\/products\/forstastyckskontroll-fai-mattprotokoll-2027\"\u003eFirst-Piece Inspection \u0026amp; FAI\u003c\/a\u003e fits. For cutting tools and change logs, see \u003ca href=\"\/en\/products\/cnc-verktygsregister-verktygslivslangd-2027\"\u003eCNC Tool Register \u0026amp; Tool Life\u003c\/a\u003e. See also \u003ca href=\"\/en\/collections\/produktion-industri-mallar\"\u003eProduction \u0026amp; Industry – Templates\u003c\/a\u003e and \u003ca href=\"\/en\/collections\/kvalitetsledning-iso-mallar\"\u003eQuality Management \u0026amp; ISO – Templates\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-smed-faq\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\n\u003ch3\u003eWhat does SMED mean?\u003c\/h3\u003e\n\n\u003cp\u003eSingle-Minute Exchange of Die, a method for reducing changeover time. The goal of single-digit minutes is not a guarantee and does not automatically fit all processes.\u003c\/p\u003e\n\n\u003ch3\u003eWhat is the difference between internal and external setup time?\u003c\/h3\u003e\n\n\u003cp\u003eInternal time requires a stopped machine. External time can be performed before or after the stop without stopping the machine, but only if the work can actually be performed safely according to local rules.\u003c\/p\u003e\n\n\u003ch3\u003eCan Excel automatically prove the savings?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The workbook reports the planned change of analyzed steps and the actual change of registered downtime as two separate results. The quality and comparability of the measurement series must be reviewed.\u003c\/p\u003e\n\n\u003ch3\u003eCan I use the documents in a CNC workshop?\u003c\/h3\u003e\n\n\u003cp\u003eYes. They are built for workshops and other discrete manufacturing but need to be adapted to your own machine, process, customer requirements, and safety rules.\u003c\/p\u003e\n\n\u003ch3\u003eAre all templates in English?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The five main templates are Swedish, supplemented with a Swedish guide and an English User Guide for international teams.\u003c\/p\u003e\n\n\u003ch3\u003eAre 2027's new legal requirements included?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The year 2027 is a version designation. The package is a general work aid and does not promise any future regulatory changes or legal compliance.\u003c\/p\u003e\n\n\u003ch2\u003eSources and version information\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eMethod sources verified 2026-10-14:\u003c\/strong\u003e \u003ca href=\"https:\/\/www.lean.org\/lexicon-terms\/single-minute-exchange-of-die\/\" rel=\"nofollow noopener\"\u003eLean Enterprise Institute – Single-Minute Exchange of Die\u003c\/a\u003e and \u003ca href=\"https:\/\/en.leaninstituut.nl\/lean-lexicon\/changeover-time-reduction\" rel=\"nofollow noopener\"\u003eLean Management Institute – Changeover time reduction\u003c\/a\u003e. Document version 1.0 – 2026\/2027. File package \u003cstrong\u003esmed-stalltidsanalys-2027.zip\u003c\/strong\u003e. No protected standard text or licensed Lean publication is included.\u003c\/p\u003e\n\n\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55753791177046,"sku":"SMED-STALLTID-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/smed-stalltidsanalys-2027-huvudbild_0f48799a-c199-4497-bb4b-11baf3f6e945.png?v=1792011932"},{"product_id":"skiftoverlamning-produktionsdagbok-excel-2027","title":"Shift Handover \u0026 Production Log 2026\/2027 – Shift Report, Risks, Actions \u0026 Excel | Word\/PDF","description":"\u003csection class=\"mb-skift-produkt\" lang=\"en\" style=\"color:#17374c;line-height:1.73\"\u003e\n\u003ch2\u003eShift Handover \u0026amp; Production Diary 2026\/2027 – Shift Report, Risks, and Excel Registry\u003c\/h2\u003e\n\n\u003cp\u003ePrevent critical information regarding \u003cstrong\u003eproduction, machine downtime, blocked products, occupational health \u0026amp; safety risks, and open actions\u003c\/strong\u003e from being lost between shifts. This professional document package assists production managers, shift supervisors, team leads, CNC operators, and quality personnel in conducting and documenting a \u003cstrong\u003estructured shift handover\u003c\/strong\u003e and ongoing \u003cstrong\u003eproduction diary\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cp\u003eYou receive a complete routine for tasks from the outgoing shift, input for the next shift, and a separate receipt of acknowledgment – all complemented by a functional Excel workbook with nine sheets. \u003cstrong\u003e15 files in total: 7 editable Word documents, 7 searchable A4 PDFs, and 1 Excel file.\u003c\/strong\u003e Main templates in Swedish, Swedish user guide, and English User Guide. One-time purchase, no subscription.\u003c\/p\u003e\n\n\u003cnav style=\"background:#ecf5f5;border-radius:9px;padding:13px 17px;margin:19px 0\" aria-label=\"Shortcuts\"\u003e\u003cstrong\u003eOn this page:\u003c\/strong\u003e \u003ca href=\"#mb-skift-innehall\"\u003eThe Package\u003c\/a\u003e · \u003ca href=\"#mb-skift-filer\"\u003eThe Files\u003c\/a\u003e · \u003ca href=\"#mb-skift-excel\"\u003eExcel\u003c\/a\u003e · \u003ca href=\"#mb-skift-arbetsgang\"\u003eWorkflow\u003c\/a\u003e · \u003ca href=\"#mb-skift-ansvar\"\u003eSafety\u003c\/a\u003e · \u003ca href=\"#mb-skift-faq\"\u003eFAQ\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv style=\"background:#f3f8f8;border-left:5px solid #197b7f;border-radius:9px;padding:15px 18px;margin:19px 0\"\u003e\n\n\u003cstrong\u003eSource and methodology review: October 14, 2026.\u003c\/strong\u003e\u003cp style=\"margin:7px 0 0\"\u003eGuidance from \u003ca href=\"https:\/\/www.hse.gov.uk\/humanfactors\/topics\/shift-handover.htm\" rel=\"nofollow noopener\"\u003eHSE on Shift Handover\u003c\/a\u003e emphasizes preparation, verbal and written transfer, and verifying the recipient's understanding. The \u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/arbeta-med-arbetsmiljon\/systematiskt-arbetsmiljoarbete\/riskbedomning\/\" rel=\"nofollow noopener\"\u003eSwedish Work Environment Authority on risk assessment\u003c\/a\u003e clarifies employer responsibility. This template package is a voluntary documentation aid: \u003cstrong\u003ean acknowledgment receipt never replaces a risk assessment, operation or product release, permit management, or mandatory reporting.\u003c\/strong\u003e 2027 is a version designation, not a promise of established new regulations.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv id=\"mb-skift-innehall\" style=\"border:2px solid #cbdfe2;border-left:6px solid #197b7f;border-radius:12px;background:#ebf5f5;padding:22px;margin:22px 0\"\u003e\n\n\u003ch2 style=\"font-size:1.32rem;margin-top:0\"\u003e01. Package content\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e7 Word documents (DOCX):\u003c\/strong\u003e five main Swedish templates, Swedish user guide, and English User Guide – editable for your operational routines.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e7 searchable PDF files:\u003c\/strong\u003e content-corresponding two-sided A4 versions for archiving, printing, and handover.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e1 Excel workbook (XLSX):\u003c\/strong\u003e nine sheets with input fields, 13 operational KPIs, status checks, identification of incorrect shift IDs, and charts.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003e\u003cstrong\u003e15 files in one ZIP.\u003c\/strong\u003e Main templates in Swedish, separate Swedish and English guides (not a full English translation). Version 1.0 – 2026\/2027. Digital download; no physical shipping and no subscription.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv id=\"mb-skift-filer\" style=\"border:2px solid #cbdfe2;border-left:6px solid #17374c;border-radius:12px;padding:22px;margin:22px 0\"\u003e\n\n\u003ch2 style=\"font-size:1.32rem;margin-top:0\"\u003e02. What the files contain\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"border-collapse:collapse;width:100%;min-width:610px;font-size:.93em\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#17374c;color:white\"\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eNo\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eDocument\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eWhat you get\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003e01\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003e\u003cstrong\u003eShift Handover Report\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003eOperational status, current order, pending issues, risks, and verbal\/written handover.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003eWord DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003e02\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003e\u003cstrong\u003eProduction Diary\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003eActual manufactured\/scrapped quantities, downtime, machine status, and traceable order references.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003eWord DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003e03\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003e\u003cstrong\u003eRisk, Quality, and Blockage Handover\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003eOpen risks, blocked material, action, authorized decision, and transfer to next shift.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003eWord DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003e04\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003e\u003cstrong\u003eOpen Actions and Escalation\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003eCase ID, action owner, deadline, actual execution status, escalation, and evidence.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003eWord DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003e05\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003e\u003cstrong\u003eAcknowledgment Receipt\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003eChecklist for two-way handover, received information, control questions, and receipt.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003eWord DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003e06\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003e\u003cstrong\u003eSwedish User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003ePractical workflow, Excel instructions, safety limits, responsibilities, and references.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003eWord DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003e07\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003e\u003cstrong\u003eEnglish User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003eEnglish guidance for main Swedish templates and Excel. Not a full translation.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003eWord DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003e08\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003e\u003cstrong\u003eExcel: Shift Handover \u0026amp; Production Diary\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003eNine tabs with overview, shift register, production, downtime, quality, risks, actions, and receipt.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe5e7\"\u003eExcel XLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2 id=\"mb-skift-excel\"\u003eExcel for shift handover – nine linked tabs\u003c\/h2\u003e\n\n\u003cp\u003eThe Excel file is designed for shift operations where each shift is assigned a \u003cstrong\u003eunique shift ID\u003c\/strong\u003e. Related journal entries refer to the same ID. Formulas display registered data – they do not make decisions regarding safety or product quality. No fictitious operational data is included.\u003c\/p\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eOverview:\u003c\/strong\u003e 13 operational KPIs including number of shifts, documented productions, manufactured and scrapped parts, actual downtime duration, quality\/safety blocks, open actions, and acknowledged information.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eShift Register:\u003c\/strong\u003e up to 150 shifts with date, shift, machine, outgoing\/incoming personnel, order, and operational status. Unique IDs are verified.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eProduction Log:\u003c\/strong\u003e up to 300 production entries with order, item, planned quantity, actual quantity, scrap, and variance calculation. Negative or contradictory quantities are flagged; no automatic quality approvals.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDowntime Journal:\u003c\/strong\u003e up to 250 registered downtime events with machine, actual time in minutes, cause, status, and shift correlation.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eQuality:\u003c\/strong\u003e up to 200 quality cases, material blocks, evidence references, and person responsible. A \"released\" case always requires a formal original decision in the regular quality system.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRisks:\u003c\/strong\u003e up to 200 observations and blockage statuses, including responsible person, immediate action, and origin report.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eActions:\u003c\/strong\u003e up to 250 follow-up points with responsibility, status, deadline, impact reference, and verifier.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eReceipt:\u003c\/strong\u003e up to 150 verbal\/written acknowledgment receipt entries with checks for missing data and duplicates.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRead me:\u003c\/strong\u003e workflow, interpretation of calculated figures, data protection, safety limitations, and sources.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2 id=\"mb-skift-arbetsgang\"\u003eHow to perform a traceable shift handover\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCreate a Shift ID:\u003c\/strong\u003e register date, working time, machine, shift supervisor, and operational status in the Shift Register.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDocument production:\u003c\/strong\u003e record actual order, item, quantity, scrap, wait times, and interruptions in the Production Log and Downtime Journal.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eIdentify critical issues:\u003c\/strong\u003e register machine problems, open maintenance cases, safety issues, quality deviations, and blocked material with original reference.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003ePrepare the next shift:\u003c\/strong\u003e designate the responsible person and the next concrete action; specify deadline and escalation.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eHand over verbally and in writing:\u003c\/strong\u003e outgoing and incoming personnel review current status and open risks. The recipient is given the opportunity to ask clarifying questions.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eAcknowledge the information:\u003c\/strong\u003e record person, time, evidence reference, and any remaining uncertainty in the Receipt. The receipt implies only that information has been received.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eFollow up in original systems:\u003c\/strong\u003e near misses, risk assessments, maintenance permits, and product releases are handled via the company's regular, authorized processes.\u003c\/li\u003e\n\n\u003cli\u003e\n\u003c\/li\u003e\n\u003c\/ol\u003e\n\n\u003ch2 id=\"mb-skift-ansvar\"\u003eSafety, work environment, responsibilities, and limitations\u003c\/h2\u003e\n\n\u003cp\u003eA standard shift report can convey facts about \u003cstrong\u003eblocked equipment, isolations, risks, and materials\u003c\/strong\u003e, but is not a machine-specific risk assessment or permission to connect power, perform maintenance, or start equipment. The employer is responsible for the systematic work environment management and risk assessments; serious incidents must be reported according to applicable routines and requirements. The product does not replace AFS 2023:1, the machine manufacturer's safety instructions, or a company's approved lockout\/tagout procedures.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eCalculated quantity is not released quantity.\u003c\/strong\u003e The Excel calculation of \"manufactured minus scrapped\" only describes quantities for reporting. It does not certify compliance with drawings, batch approval, or delivery authorization. \"Acknowledged receipt\" is not proof that a risk or error has been resolved. The register is an internal tool and not a government form, ISO certification, or formal audit certificate.\u003c\/p\u003e\n\n\u003cp\u003eOnly register personal data necessary for the company's actual follow-up. Determine access rights, retention periods, and archiving according to your internal policies and data protection requirements.\u003c\/p\u003e\n\n\u003ch2\u003eSupplementary documents and internal links\u003c\/h2\u003e\n\n\u003cp\u003eDeepen your analysis of shift operational outcomes with \u003ca href=\"\/en\/products\/oee-tak-maskineffektivitet-excel-mall-2026-2027\"\u003eOEE \u0026amp; TEEP – Machine Effectiveness\u003c\/a\u003e. For documented changeovers and step-by-step efficiency improvements, there is \u003ca href=\"\/en\/products\/smed-stalltidsanalys-excel-stallinstruktion-2027\"\u003eSMED \u0026amp; Setup Time Analysis\u003c\/a\u003e. When the next shift needs to follow a current production plan, \u003ca href=\"\/en\/products\/produktionsplanering-kapacitetskalkyl-excel-2026-2027\"\u003eProduction Planning \u0026amp; Capacity Calculation\u003c\/a\u003e can assist. For machine and tool history, \u003ca href=\"\/en\/products\/cnc-verktygsregister-verktygslivslangd-2027\"\u003eCNC Tool Register \u0026amp; Tool Life\u003c\/a\u003e is recommended. For actual near-miss investigations, there is \u003ca href=\"\/en\/products\/tillbudsrapport-arbetsolycka-utredning-atgardsplan-2026-2027\"\u003eNear Miss Report \/ Workplace Accident\u003c\/a\u003e. See also \u003ca href=\"\/en\/collections\/produktion-industri-mallar\"\u003eProduction \u0026amp; Industry – Templates\u003c\/a\u003e and \u003ca href=\"\/en\/collections\/kvalitetsledning-iso-mallar\"\u003eQuality Management \u0026amp; ISO – Templates\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-skift-faq\"\u003eFrequently asked questions\u003c\/h2\u003e\n\n\u003ch3\u003eWhat should a shift handover include?\u003c\/h3\u003e\n\n\u003cp\u003eActual operational status, current order, production outcome, open defects, quality and work environment risks, the responsible person for the next shift, next action, and documented receipt.\u003c\/p\u003e\n\n\u003ch3\u003eCan I use the template for night shifts that cross midnight?\u003c\/h3\u003e\n\n\u003cp\u003eYes. Register the shift's unique ID, actual date, and local start\/end times according to your internal routine. Adjust date handling for shift changes.\u003c\/p\u003e\n\n\u003ch3\u003eDoes the Excel file automatically approve a shift report?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It calculates quantities, statuses, and identifies certain invalid data. All decisions regarding continued operation, blocking, and release must be made in the regular system by an authorized person.\u003c\/p\u003e\n\n\u003ch3\u003eIs this a mandatory legal form?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It is a practical documentation aid; the employer's existing obligations under work environment and other relevant legislation are unaffected.\u003c\/p\u003e\n\n\u003ch3\u003eAre the documents in English?\u003c\/h3\u003e\n\n\u003cp\u003eThe five main documents are in Swedish. The English User Guide explains how they can be used in international teams but does not translate all main templates.\u003c\/p\u003e\n\n\u003ch3\u003eCan I connect Excel directly to machines?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It is a local Excel workbook without PLC or MES integration and without automatic inventory or quality decisions.\u003c\/p\u003e\n\n\u003ch2\u003eSources and version information\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eSource control October 14, 2026:\u003c\/strong\u003e Health and Safety Executive – \u003ca href=\"https:\/\/www.hse.gov.uk\/humanfactors\/topics\/shift-handover.htm\" rel=\"nofollow noopener\"\u003eShift handover\u003c\/a\u003e; Swedish Work Environment Authority – \u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/arbeta-med-arbetsmiljon\/systematiskt-arbetsmiljoarbete\/riskbedomning\/\" rel=\"nofollow noopener\"\u003eRisk assessment of the work environment\u003c\/a\u003e. These sources provide methodology and responsibility orientation, not a claim that this document package is officially approved. \u003cstrong\u003eVersion:\u003c\/strong\u003e 1.0 \/ 2026–2027. \u003cstrong\u003eZIP:\u003c\/strong\u003e skiftoverlamning-produktionsdagbok-2027.zip.\u003c\/p\u003e\n\n\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55753915400534,"sku":"SKIFT-DAGBOK-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/skiftoverlamning-produktionsdagbok-2027-huvudbild_744f4b81-3039-41f5-92d9-14aef48825a8.png?v=1792013447"},{"product_id":"5s-revision-arbetsplatsstandard-checklista-excel-2027","title":"5S Audit \u0026 Workplace Standard 2026\/2027 – Checklist, Scorecard \u0026 Action Register | Excel\/Word\/PDF","description":"\u003csection class=\"mb-5s-template\" lang=\"en\" style=\"color:#17374c;line-height:1.72\"\u003e\n\u003ch2\u003e5S Audit \u0026amp; Workplace Standard 2026\/2027 – template in Excel, Word, and PDF\u003c\/h2\u003e\n\n\u003cp\u003eDo you want to implement \u003cstrong\u003e5S in the workplace\u003c\/strong\u003e and track results without loose checklists and hard-to-trace actions? With this well-developed package for \u003cstrong\u003e5S audit, 5S checklist, and workplace standard\u003c\/strong\u003e, you get five editable Swedish document templates, two guides, and a functional Excel tool. For workshops, manufacturing, warehouses, offices, production engineers, quality managers, and improvement teams that want to create order, visualize deviations, and document lasting improvements.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003e15 files in a downloadable ZIP:\u003c\/strong\u003e 7 Word (DOCX), 7 searchable A4-PDF, and 1 Excel (XLSX) with nine tabs, dashboard, and 15-point scorecard. Swedish master templates, Swedish guide, and English User Guide. One-time purchase, without subscription or physical shipping.\u003c\/p\u003e\n\n\u003cnav style=\"padding:13px 16px;background:#ecf5f5;border-radius:10px;margin:18px 0\" aria-label=\"Content\"\u003e\u003cstrong\u003eOn this page:\u003c\/strong\u003e \u003ca href=\"#mb-5s-paket\"\u003eThe Package\u003c\/a\u003e · \u003ca href=\"#mb-5s-filer\"\u003eThe Files\u003c\/a\u003e · \u003ca href=\"#mb-5s-excel\"\u003eExcel\u003c\/a\u003e · \u003ca href=\"#mb-5s-steg\"\u003eWorkflow\u003c\/a\u003e · \u003ca href=\"#mb-5s-metod\"\u003eMethod\u003c\/a\u003e · \u003ca href=\"#mb-5s-faq\"\u003eFAQ\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv style=\"padding:17px;background:#f3f8f8;border-left:5px solid #157b80;border-radius:10px;margin:20px 0\"\u003e\n\n\u003cstrong\u003eSource and method review: October 14, 2026.\u003c\/strong\u003e\u003cp style=\"margin:7px 0 0\"\u003e5S is a Lean methodology for sorting, organizing, cleaning, standardizing, and sustaining work methods. It is not an official Swedish government form or a certification requirement in itself. The templates are independently created based on publicly described methodology. They do not replace the employer's risk assessments, statutory inspections, machine safety routines, or the original text of applicable standards. The year 2027 is a version designation, not a promise of future regulations.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv id=\"mb-5s-paket\" style=\"border:2px solid #cbdfe2;border-left:6px solid #157b80;border-radius:12px;padding:21px;background:#eaf4f5;margin:22px 0\"\u003e\n\n\u003ch2 style=\"font-size:1.32rem;margin-top:0\"\u003e01. Package Contents\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e7 editable Word files (.docx):\u003c\/strong\u003e five Swedish master templates, Swedish user guide, and English User Guide.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e7 searchable PDF files (.pdf):\u003c\/strong\u003e content-equivalent A4 versions for archiving, printing, and follow-up.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e1 Excel workbook (.xlsx):\u003c\/strong\u003e nine worksheets with 15 assessment criteria, 50 audit sessions, and follow-up registry.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003e\u003cstrong\u003eTotal 15 files in ZIP.\u003c\/strong\u003e Language: five Swedish master templates and Swedish\/English guide. The master templates are not fully translated into English. Version 1.0 – 2026\/2027; local use without subscription.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv id=\"mb-5s-filer\" style=\"border:2px solid #cbdfe2;border-left:6px solid #17374c;border-radius:12px;padding:21px;background:#fff;margin:22px 0\"\u003e\n\n\u003ch2 style=\"font-size:1.32rem;margin-top:0\"\u003e02. What the files contain\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"border-collapse:collapse;width:100%;min-width:610px;font-size:.93em\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#17374c;color:#fff\"\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eNo.\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eDocument\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eContent and practical use\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003e01\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003e\u003cstrong\u003e5S Audit Plan\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003eArea, audit, responsibility, scope, and risk-based audit plan.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003e02\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003e\u003cstrong\u003e5S Assessment Sheet\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003e15 control criteria within Sort, Set in Order, Shine, Standardize, and Sustain.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003e03\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003e\u003cstrong\u003eDeviation \u0026amp; Photo Log\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003eFacts, references, local standard, evidence ID, risk, and correct escalation.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003e04\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003e\u003cstrong\u003eAction \u0026amp; Improvement Plan\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003eResponsibility, deadline, completed action, and documented impact verification.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003e05\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003e\u003cstrong\u003eWorkplace Standard \u0026amp; Handover\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003eVisual standard, shift responsibility, check frequency, and sign-off.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003e06\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003e\u003cstrong\u003eSwedish User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003eStep-by-step in Word and Excel, percentage calculation, N\/A, and safety limits.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003e07\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003e\u003cstrong\u003eEnglish User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003eEnglish guidance for the Swedish templates and Excel tool, not a full translation.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003e08\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003e\u003cstrong\u003e5S Audit \u0026amp; Action Follow-up – Excel\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003eNine sheets with scorecard, 50 audits, deviations, actions, standards, and dashboard.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe4e6\"\u003eXLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2 id=\"mb-5s-excel\"\u003e5S Checklist and Audit Tool in Excel\u003c\/h2\u003e\n\n\u003cp\u003eThe Excel file contains \u003cstrong\u003eOverview, Areas, Criteria, Audits, Scorecard, Deviations, Actions, Standards, and Read Me\u003c\/strong\u003e. It is free from dummy audit values and shows a clear startup overview. The chart updates when valid assessments are registered.\u003c\/p\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e15 fixed examples of criteria:\u003c\/strong\u003e three each for Sort (Seiri), Set in Order (Seiton), Shine (Seiso), Standardize (Seiketsu), and Sustain (Shitsuke). Customize the assessment descriptions according to the business's risks and work methods.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eScorecard for 50 audits:\u003c\/strong\u003e use a numeric scale 0–4 per criterion. A non-applicable criterion can be marked N\/A with justification in the audit records.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eResults only upon full assessment:\u003c\/strong\u003e a final result is displayed only when all 15 positions have been answered or marked N\/A. The percentage is calculated as the sum of points awarded divided by four times the number of numerically assessed criteria. N\/A is not counted as zero.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eTraceable action follow-up:\u003c\/strong\u003e registry for deviations, photo evidence, responsibility, deadline, and actual impact verification. \"Done\" should not be confused with \"Verified\".\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDashboard:\u003c\/strong\u003e number of audits, assessment occasions, average, open issues, unverified actions, incomplete scorecards, and 5S distribution.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eStandardized work method:\u003c\/strong\u003e version-controlled workplace standards with owners, next inspection, and evidence references.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2 id=\"mb-5s-steg\"\u003eHow to conduct a 5S audit\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003eSelect the work area, appoint those responsible, and define the scope of the audit.\u003c\/li\u003e\n\n\u003cli\u003eReview the five S's and adapt the 15 control criteria to the business's actual workplace standards.\u003c\/li\u003e\n\n\u003cli\u003eRegister a unique audit ID in the Audits Excel sheet and use the same row in the Scorecard.\u003c\/li\u003e\n\n\u003cli\u003eAssess each criterion 0–4 or mark N\/A when it is truly not applicable. Document observations and evidence.\u003c\/li\u003e\n\n\u003cli\u003eReport safety and quality risks immediately according to current workplace routines; they should never wait for an audit score.\u003c\/li\u003e\n\n\u003cli\u003eCreate a deviation and action with owner, deadline, evidence reference, and follow-up.\u003c\/li\u003e\n\n\u003cli\u003eCheck the actual improvement, update the local standard, and book the next audit.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2 id=\"mb-5s-metod\"\u003eWhat is 5S – and what does the result mean?\u003c\/h2\u003e\n\n\u003cp\u003eThe five concepts are \u003cstrong\u003eSeiri – sort\u003c\/strong\u003e, \u003cstrong\u003eSeiton – set in order\u003c\/strong\u003e, \u003cstrong\u003eSeiso – shine\/inspect\u003c\/strong\u003e, \u003cstrong\u003eSeiketsu – standardize\u003c\/strong\u003e, and \u003cstrong\u003eShitsuke – sustain\u003c\/strong\u003e. The Lean Enterprise Institute emphasizes that 5S is used to create visibility, stability, and continuous improvement – not just for cleaning.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eImportant disclaimer:\u003c\/strong\u003e a high percentage value only shows the outcome of the user's registered criteria assessments and is not an automatic assessment of legal compliance, safety, ergonomics, fire risk, or ISO certification. Actions affecting machines, guards, walkways, and labor require responsible assessment according to the company's regular routines. Personal data and photos are handled according to the company's own data protection organization's access and storage routines.\u003c\/p\u003e\n\n\u003ch2\u003eRelevant product templates and internal links\u003c\/h2\u003e\n\n\u003cp\u003eTo link improvements to production efficiency, you can complement with \u003ca href=\"\/en\/products\/oee-tak-maskineffektivitet-excel-mall-2026-2027\"\u003eOEE \u0026amp; TEEP – Machine Efficiency\u003c\/a\u003e. Work with changeovers is documented with \u003ca href=\"\/en\/products\/smed-stalltidsanalys-excel-stallinstruktion-2027\"\u003eSMED \u0026amp; Changeover Analysis\u003c\/a\u003e. For issues that must be passed on to the next shift, \u003ca href=\"\/en\/products\/skiftoverlamning-produktionsdagbok-excel-2027\"\u003eShift Handover \u0026amp; Production Diary\u003c\/a\u003e is suitable. For planned machine inspections, there is \u003ca href=\"\/en\/products\/maskinregister-forebyggande-underhall-excel-2026-2027\"\u003eMachine Register \u0026amp; Preventive Maintenance\u003c\/a\u003e, and for recurring problems and root causes \u003ca href=\"\/en\/products\/8d-rapport-rotorsaksanalys-5-varfor-mall-2026-2027\"\u003e8D Report \u0026amp; Root Cause Analysis\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003cp\u003eMore related templates are available in \u003ca href=\"\/en\/collections\/kvalitetsledning-iso-mallar\"\u003eQuality Management \u0026amp; ISO – Templates\u003c\/a\u003e and \u003ca href=\"\/en\/collections\/produktion-industri-mallar\"\u003eProduction \u0026amp; Industry – Templates\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-5s-faq\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\n\u003ch3\u003eWhat is included in the 5S audit?\u003c\/h3\u003e\n\n\u003cp\u003eYou get an audit plan, assessment sheet with 15 criteria, deviation log with evidence references, action plan, workplace standard, two guides, and an Excel tool with nine tabs.\u003c\/p\u003e\n\n\u003ch3\u003eHow does Excel calculate the 5S percentage?\u003c\/h3\u003e\n\n\u003cp\u003eIn a complete assessment, numeric points are summed and divided by the maximum possible score for those specific numerically assessed criteria. N\/A is excluded from the denominator. The result is not displayed if any of the 15 criteria lack an assessment.\u003c\/p\u003e\n\n\u003ch3\u003eHow are non-applicable criteria registered?\u003c\/h3\u003e\n\n\u003cp\u003eMark N\/A in the scorecard and justify in the audit records. If all criteria are marked N\/A, no assessable percentage is calculated.\u003c\/p\u003e\n\n\u003ch3\u003eDoes the template apply to CNC workshops and warehouses?\u003c\/h3\u003e\n\n\u003cp\u003eYes, as a general 5S and Lean support. Assessment criteria, risks, control frequency, and local standards must be adapted to the work area.\u003c\/p\u003e\n\n\u003ch3\u003eIs it an official ISO template or safety audit?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It is based on public 5S methodology and does not replace specific standard requirements, government inspections, or employer risk assessments.\u003c\/p\u003e\n\n\u003ch3\u003eIs everything in English?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The master templates are in Swedish. An English User Guide describes how the documents and Excel can be used.\u003c\/p\u003e\n\n\u003ch2\u003eSources and version information\u003c\/h2\u003e\n\n\u003cp\u003eMethod review \u003cstrong\u003eOctober 14, 2026\u003c\/strong\u003e with public guidance from \u003ca href=\"https:\/\/www.lean.org\/lexicon-terms\/five-s\/\" rel=\"nofollow noopener\"\u003eLean Enterprise Institute – Five S\u003c\/a\u003e and \u003ca href=\"https:\/\/www.lean.org\/the-lean-post\/articles\/how-do-i-implement-5s-when-operators-think-everyone-does-things-a-little-differently\/\" rel=\"nofollow noopener\"\u003eLean Enterprise Institute – How Do I Implement 5S?\u003c\/a\u003e. Protected training material is not included. Document version 1.0 – 2026\/2027. Delivery file: \u003cstrong\u003e5s-revision-arbetsplatsstandard-2027.zip\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55754027762006,"sku":"5S-AUDIT-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/5s-revision-arbetsplatsstandard-2027-huvudbild_21fa51af-f875-4826-af1f-2f909debc312.png?v=1792014784"},{"product_id":"reservdelsregister-kritiska-reservdelar-lager-excel-2027","title":"Spare Parts Register \u0026 Critical Spare Parts 2026\/2027 – Inventory Management, Min\/Max \u0026 Procurement Proposals | Excel\/Word\/PDF","description":"\u003csection lang=\"en\" class=\"mb-reservdelar-product\" style=\"line-height:1.72;color:#17374c\"\u003e\n\u003ch2\u003eSpare Parts Register \u0026amp; Critical Spare Parts 2026\/2027 – inventory management in Excel, Word and PDF\u003c\/h2\u003e\n\n\u003cp\u003eDo you have the right \u003cstrong\u003espare parts when a production machine needs repair\u003c\/strong\u003e? With this well-developed template package, workshops and maintenance departments can organize a \u003cstrong\u003espare parts register in Excel\u003c\/strong\u003e, link spare parts to machine IDs, document \u003cstrong\u003ecritical spare parts\u003c\/strong\u003e, record inventory movements, and track \u003cstrong\u003emin\/max levels, reorder points, lead times, and purchase proposals\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cp\u003eThe product is created for CNC workshops, manufacturing companies, technical services, and maintenance managers who need a practical register without the requirements of a full ERP or CMMS system. The package includes \u003cstrong\u003e15 files: 7 editable Word documents, 7 searchable A4 PDFs, and 1 Excel workbook with nine tabs\u003c\/strong\u003e. Five Swedish main templates, a Swedish user guide, and an English User Guide. One-time purchase without subscription.\u003c\/p\u003e\n\n\u003cnav aria-label=\"Table of Contents\" style=\"padding:13px 17px;margin:18px 0;border-radius:10px;background:#eaf4f5\"\u003e\u003cstrong\u003eOn this page:\u003c\/strong\u003e \u003ca href=\"#mb-res-paket\"\u003eThe package\u003c\/a\u003e · \u003ca href=\"#mb-res-filer\"\u003eThe files\u003c\/a\u003e · \u003ca href=\"#mb-res-excel\"\u003eExcel\u003c\/a\u003e · \u003ca href=\"#mb-res-process\"\u003eWorkflow\u003c\/a\u003e · \u003ca href=\"#mb-res-kritisk\"\u003eCriticality and responsibility\u003c\/a\u003e · \u003ca href=\"#mb-res-faq\"\u003eFAQ\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv style=\"background:#f2f7f8;border-left:5px solid #147b83;border-radius:9px;padding:16px 18px;margin:18px 0\"\u003e\n\n\u003cstrong\u003eMethod review October 14, 2026.\u003c\/strong\u003e\n\u003cp style=\"margin:7px 0 0\"\u003eTraditional reorder point planning can estimate needs through consumption during lead time plus safety stock. For spare parts with sporadic demand and high consequences in the event of failure, the decision must also take into account facility criticality, alternative suppliers, and outage risks. The spreadsheet's indicators are \u003cstrong\u003enot automatic purchase orders, physically confirmed balances, safety ratings, or accounting inventory values\u003c\/strong\u003e. The year 2027 indicates the document version, not future regulatory requirements.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv id=\"mb-res-paket\" style=\"border:2px solid #cbdfe2;border-left:6px solid #147b83;border-radius:13px;background:#eaf4f5;padding:21px;margin:22px 0\"\u003e\n\n\u003ch2 style=\"font-size:1.3rem;margin-top:0\"\u003e01. Package contents\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e7 Word documents (DOCX):\u003c\/strong\u003e five Swedish main templates with editable fields, a Swedish user guide, and an English User Guide.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e7 searchable PDF files:\u003c\/strong\u003e the same content as the respective Word template, clear A4 layout for documentation, reading, and printing.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e1 Excel workbook (XLSX):\u003c\/strong\u003e nine tabs for up to 120 spare parts items and 360 inventory movements, calculated balances, and separate control\/decision registers.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003e\u003cstrong\u003eTotal 15 delivery files in a ZIP archive.\u003c\/strong\u003e Five main templates in Swedish, one Swedish guide, and one English guide. The main templates are not available in a complete English version. Document version 1.0 – 2026\/2027. Digital delivery without physical shipping or subscription.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv id=\"mb-res-filer\" style=\"border:2px solid #cbdfe2;border-left:6px solid #17374c;border-radius:13px;background:#fff;padding:21px;margin:22px 0\"\u003e\n\n\u003ch2 style=\"font-size:1.3rem;margin-top:0\"\u003e02. What the files contain\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"border-collapse:collapse;width:100%;min-width:620px;font-size:.93em\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#17374c;color:#fff\"\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eNo\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eDocument\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eWhat you get\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003e01\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003e\u003cstrong\u003ePolicy for critical spare parts\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003eMachine and operational criticality, consequences of shortage, alternative suppliers, and manually approved levels.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003e02\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003e\u003cstrong\u003eSpare parts card \u0026amp; machine linkage\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003eSpare part ID, machine, drawing revision, compatibility, storage, supplier, and total lead time.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003e03\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003e\u003cstrong\u003eInventory movement \u0026amp; withdrawal log\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003eTraceable receipts, withdrawals, and adjustments with movement ID, physical count, and work order.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003e04\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003e\u003cstrong\u003eReorder point \u0026amp; purchasing decision\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003eLead time, safety stock, manual min\/max, stock position, proposal, and separate purchasing approval.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003e05\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003e\u003cstrong\u003eInventory \u0026amp; discrepancy report\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003eBooked vs. physical balance, difference, analysis, approval, and traceable correction movement.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003e06\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003e\u003cstrong\u003eSwedish user guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003eStep-by-step instructions, explanations of Excel calculations, data controls, limitations, and sources.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003e07\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003e\u003cstrong\u003eEnglish User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003eEnglish guidance for the Swedish main templates and workbook; no full translation.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003e08\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003e\u003cstrong\u003eExcel – Spare Parts Register \u0026amp; Inventory Management\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003eNine tabs for item register, movements, balance, criticality, purchase proposals, inventory, and actions.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d7e2e6\"\u003eXLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2 id=\"mb-res-excel\"\u003eSpare parts register in Excel – nine tabs and actual calculations\u003c\/h2\u003e\n\n\u003cp\u003eThe Excel workbook contains \u003cstrong\u003eOverview, Spare Parts, Transactions, Stock Status, Criticality, Ordering, Inventory, Actions, and Read Me\u003c\/strong\u003e. It is delivered without dummy stock balances or order history. Results are shown only once your own data is entered.\u003c\/p\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eSpare Parts:\u003c\/strong\u003e 120 rows with item ID, spare part name, machine connection, storage location, supplier, unit price, daily consumption, total lead time, safety stock, manual min\/max, criticality, and opening stock. Open purchases and reservations are also entered manually.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eTransactions:\u003c\/strong\u003e 360 inventory movements for receipts, withdrawals, and separately documented adjustments. Incorrect item IDs, duplicate movement IDs, and invalid quantities are flagged and not counted as valid movements in the inventory calculation.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eStock Status:\u003c\/strong\u003e calculated book balance = opening balance + approved positive movements − approved negative movements. \u003cem\u003eStock position\u003c\/em\u003e = book balance + manually registered open purchases − manually registered reservations.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eReorder point:\u003c\/strong\u003e use a locally decided manual minimum value or, when reliable data is available, a simple indicator: \u003cstrong\u003erounded (consumption per day × lead time + safety stock)\u003c\/strong\u003e. The formula is intentionally not an advanced forecast for sporadic failures.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eMin\/max and purchase proposals:\u003c\/strong\u003e compare stock position against reorder point and show a preliminary quantity up to a manually decided maximum level. No actual orders are created. Manual quantity, approval, and order numbers are documented in a separate tab.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCriticality:\u003c\/strong\u003e assessment basis for safety impact, production impact, lead time, and replaceability. The valuation is an indication; \u003cstrong\u003efinal risk classification is done manually\u003c\/strong\u003e.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eInventory:\u003c\/strong\u003e compare booked and physically counted balance without automatic adjustment. Correction requires a separate, traceable transaction ID after management approval.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eActions:\u003c\/strong\u003e document discrepancy, responsibility, priority, date, implemented action, and actual effect verification.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eOverview:\u003c\/strong\u003e status charts and key figures for registered items, critical items, reorder signals, invalid transactions, indicative book inventory value, and open actions.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2 id=\"mb-res-process\"\u003eHow to use the spare parts register\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eMap the spare parts:\u003c\/strong\u003e create unique item IDs and link the item to the correct machine, manufacturer designation, revision, storage location, and supplier.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eAssess impact in case of shortage:\u003c\/strong\u003e identify facility-critical components, alternative spare parts, actual total lead time, and any redundancy. Establish inventory policy based on business risks.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eInventory the starting position:\u003c\/strong\u003e record a physically verified opening balance – only once per item – and document evidence reference.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRecord all real movements:\u003c\/strong\u003e use unique movement IDs for receipts, withdrawals, and approved corrections.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eTrack stock position and proposals:\u003c\/strong\u003e supplement with confirmed open purchases and reservations. Review warnings, reorder points, and target levels.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eMake separate purchasing decisions:\u003c\/strong\u003e check need, supplier, price, lead time, and authorized approval. The spreadsheet's suggested quantity is not an order.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eReconcile against reality:\u003c\/strong\u003e inventory, analyze any differences, and post only corrections that have been approved.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2 id=\"mb-res-kritisk\"\u003eCritical spare parts, safety stock, and limitations\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eCritical spare parts may need to be stocked even with almost non-existent consumption history.\u003c\/strong\u003e If a unique component is required for a machine's safety or availability, a simple demand formula may miss the practical risk. For this reason, criticality is a separate, actual decision in the tool. The user must also verify that the spare part's technical revision and compatibility are correct before installation.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eNo automated inventory truth:\u003c\/strong\u003e Excel does not read machines, warehouse shelves, supplier confirmations, or the company's ERP. Balance and stock position are based on manually documented information. They should be reconciled through physical inventory and approved transactions. The indicative inventory value uses the specified unit price × booked quantity and does not replace the company's inventory valuation, accounting rules, or any obsolescence assessment.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eNo machine release or regulatory form:\u003c\/strong\u003e an available spare part balance does not mean that the equipment may be started. Follow manufacturer instructions, authorization routines, work environment requirements, and applicable product safety rules. The package is an independent administrative aid, not a CMMS, a certification, or a regulatory document.\u003c\/p\u003e\n\n\u003ch2\u003eRelated templates and informative guides\u003c\/h2\u003e\n\n\u003cp\u003eLink the spare parts' item and machine IDs to \u003ca href=\"\/en\/products\/maskinregister-forebyggande-underhall-excel-2026-2027\"\u003eMachine Register \u0026amp; Preventive Maintenance\u003c\/a\u003e. For production material and demand-driven purchasing, there is \u003ca href=\"\/en\/products\/materialbehovsplanering-mrp-inkopsplan-excel-2026-2027\"\u003eMRP Light – Material Requirements Planning\u003c\/a\u003e. Connect inventory shortages and downtime to \u003ca href=\"\/en\/products\/oee-tak-maskineffektivitet-excel-mall-2026-2027\"\u003eOEE \u0026amp; TAK – Machine Efficiency\u003c\/a\u003e. For documentation of contractual terms, service windows, and spare parts costs, there is \u003ca href=\"\/en\/products\/serviceavtal-underhallsavtal-2026-2027-sla-underhallsplan-prisbilaga-guide-word-pdf\"\u003eService Agreements \u0026amp; Maintenance Contracts\u003c\/a\u003e. When transferring operational and inventory shortages between shifts, \u003ca href=\"\/en\/products\/skiftoverlamning-produktionsdagbok-excel-2027\"\u003eShift Handover \u0026amp; Production Log\u003c\/a\u003e is a supplementary aid.\u003c\/p\u003e\n\n\u003cp\u003eAlso read our guides: \u003ca href=\"\/en\/blogs\/foretag\/serviceavtal-underhallsavtal-sla-responstid-ansvar\"\u003eService agreements, SLA and maintenance responsibility\u003c\/a\u003e, \u003ca href=\"\/en\/blogs\/foretag\/lagerinventering-lagervardering-regler-2026\"\u003eInventory counting and inventory valuation 2026\u003c\/a\u003e and \u003ca href=\"\/en\/blogs\/foretag\/leverantorsavtal-kvalitet-leverans-ansvar-supply-chain\"\u003eSupplier agreements – quality, delivery and risk\u003c\/a\u003e. More templates can be found in \u003ca href=\"\/en\/collections\/produktion-industri-mallar\"\u003eProduction \u0026amp; Industry – Templates\u003c\/a\u003e and \u003ca href=\"\/en\/collections\/kvalitetsledning-iso-mallar\"\u003eQuality Management \u0026amp; ISO – Templates\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-res-faq\"\u003eFrequently asked questions\u003c\/h2\u003e\n\n\u003ch3\u003eHow does the reorder point work in Excel?\u003c\/h3\u003e\n\n\u003cp\u003eIf a manual minimum value has been entered, it is used. Otherwise, if complete data is provided, Excel can calculate a simple reorder point as daily consumption multiplied by total lead time plus safety stock. It is a planning indicator, not an order.\u003c\/p\u003e\n\n\u003ch3\u003eWhat is meant by a critical spare part?\u003c\/h3\u003e\n\n\u003cp\u003eA component whose absence can have major consequences for, for example, safety, operation, or production. Criticality should be assessed based on the specific machine, redundancy, alternative delivery route, and consequence – not automatically from historical withdrawals.\u003c\/p\u003e\n\n\u003ch3\u003eCan Excel be used as a complete inventory system?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It is a local workbook without barcode integration, ERP synchronization, automatic inventory counting, supplier ordering, or role-based transaction system.\u003c\/p\u003e\n\n\u003ch3\u003eWhat happens if the same inventory movement is registered twice?\u003c\/h3\u003e\n\n\u003cp\u003eMovement ID is checked. Duplicate IDs are marked as errors and such records are not used as valid balance changes in the calculation's summary.\u003c\/p\u003e\n\n\u003ch3\u003eDoes inventory change the stock balance automatically?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The difference is shown separately; after approved review, a real correction movement needs to be registered with its own unique ID.\u003c\/p\u003e\n\n\u003ch3\u003eDoes the package contain ready-made lists of spare parts?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The delivery is free from dummy inventory, machine, and purchase data. The user registers their own spare parts and is responsible for technical accuracy.\u003c\/p\u003e\n\n\u003ch3\u003eAre the documents in English?\u003c\/h3\u003e\n\n\u003cp\u003eMain documents and Excel headers are in Swedish. A separate English User Guide is included, but not complete English versions of the five main templates.\u003c\/p\u003e\n\n\u003ch3\u003eIs it a legally approved template?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It is a voluntary tool for maintenance and inventory administration. The business's safety, accounting, and control obligations remain.\u003c\/p\u003e\n\n\u003ch2\u003eMethod sources and document version\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eReview October 14, 2026:\u003c\/strong\u003e \u003ca href=\"https:\/\/www.ibm.com\/think\/insights\/maintenance-parts-stocking-strategies\" rel=\"nofollow noopener\"\u003eIBM – Planned versus unplanned maintenance and spare-parts stocking strategies\u003c\/a\u003e and \u003ca href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/af9ef57f504840d2b81be8667206d485\/5697b6535fe6b74ce10000000a174cb4.html\" rel=\"nofollow noopener\"\u003eSAP Help – Reorder Point Planning\u003c\/a\u003e. The package does not reproduce licensed standard material. \u003cstrong\u003eVersion 1.0, 2026\/2027.\u003c\/strong\u003e Delivery file: reservdelsregister-kritiska-reservdelar-2027.zip.\u003c\/p\u003e\n\n\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55754052534614,"sku":"MRO-SPARES-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/reservdelsregister-kritiska-reservdelar-2027-huvudbild_ae6b26ed-a6b0-430e-aff0-407d90ae597d.png?v=1792015682"},{"product_id":"kanban-tvabinge-lagerpafyllnad-excel-2027","title":"Kanban \u0026 Two-Bin System 2026\/2027 – Replenishment Cards, Inventory Flow \u0026 Excel | Word\/PDF","description":"\u003csection lang=\"en\" class=\"mb-kanban-product\" style=\"line-height:1.72;color:#17374c\"\u003e\n\u003ch2\u003eKanban \u0026amp; Two-Bin System 2026\/2027 – Replenishment Cards, Inventory Flow, and Excel\u003c\/h2\u003e\n\n\u003cp\u003eDo you want to implement \u003cstrong\u003eKanban in production, workshops, or warehouses\u003c\/strong\u003e? This downloadable template package provides practical support for \u003cstrong\u003etwo-bin systems, Kanban cards, material supply, and replenishment\u003c\/strong\u003e. Document consumption signals, organize storage locations, and plan appropriately sized reserve containers without building an entire ERP system.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003e15 editable and searchable files:\u003c\/strong\u003e 7 Word (DOCX), 7 PDF, and 1 Excel (XLSX) with nine tabs. Five Swedish master templates, one Swedish guide, and one English user guide. The package is intended for warehouse managers, CNC workshops, material planners, and manufacturing companies with recurring consumption of standard items, fasteners, and consumables.\u003c\/p\u003e\n\n\u003cnav style=\"background:#eaf4f5;padding:13px 16px;border-radius:10px;margin:18px 0\" aria-label=\"Product content\"\u003e\u003cstrong\u003eJump to:\u003c\/strong\u003e \u003ca href=\"#mb-kanban-paket\"\u003ePackage contents\u003c\/a\u003e · \u003ca href=\"#mb-kanban-filer\"\u003eWhat the files contain\u003c\/a\u003e · \u003ca href=\"#mb-kanban-excel\"\u003eExcel\u003c\/a\u003e · \u003ca href=\"#mb-kanban-metod\"\u003eHow Kanban is used\u003c\/a\u003e · \u003ca href=\"#mb-kanban-risk\"\u003eLimitations\u003c\/a\u003e · \u003ca href=\"#mb-kanban-faq\"\u003eFAQ\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv style=\"padding:15px 17px;background:#f2f7f8;border-left:5px solid #137D81;border-radius:10px;margin:19px 0\"\u003e\n\n\u003cstrong\u003eMethod review: October 15, 2026.\u003c\/strong\u003e\u003cp style=\"margin:7px 0 0\"\u003eKanban is a signal for the production or movement of material in a pull-flow system. A two-bin system can use an empty container to request replenishment while the other is in use. It requires knowledge of actual lead times, a functional signaling chain, and physical control. \u003cstrong\u003eNo formula guarantees delivery, stock availability, or safety.\u003c\/strong\u003e The year 2027 denotes the document version, not new regulatory requirements. Method principles: \u003ca href=\"https:\/\/www.lean.org\/lexicon-terms\/kanban\/\" rel=\"nofollow noopener\"\u003eLean Enterprise Institute\u003c\/a\u003e and \u003ca href=\"https:\/\/scor.ascm.org\/practices\/best%20practices%20by%20category\/BP.009\" rel=\"nofollow noopener\"\u003eASCM SCOR BP.009\u003c\/a\u003e.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv id=\"mb-kanban-paket\" style=\"border:2px solid #cbdfe2;border-left:6px solid #137D81;border-radius:12px;background:#eaf4f5;padding:21px;margin:22px 0\"\u003e\n\n\u003ch2 style=\"font-size:1.33rem;margin-top:0\"\u003e01. Package contents\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e7 Word files (.docx):\u003c\/strong\u003e five editable Swedish master templates, one Swedish user guide, and an English User Guide.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e7 searchable PDF files:\u003c\/strong\u003e corresponding content in a clear A4 format for printing and archiving.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e1 Excel workbook (.xlsx):\u003c\/strong\u003e nine tabs with formula calculation for proposed reserve B, registration of actual signals, and separate journals.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003e\u003cstrong\u003eA total of 15 files in a ZIP.\u003c\/strong\u003e Five Swedish master documents plus guides in Swedish and English; this is not a complete English version of the templates. Template version 1.0 – 2026\/2027. Digital download, no subscription, and no physical shipping.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv id=\"mb-kanban-filer\" style=\"border:2px solid #cbdfe2;border-left:6px solid #17374c;border-radius:12px;padding:21px;margin:22px 0;background:#fff\"\u003e\n\n\u003ch2 style=\"font-size:1.33rem;margin-top:0\"\u003e02. What the files contain\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"border-collapse:collapse;width:100%;min-width:620px;font-size:.92em\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#17374c;color:#fff\"\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eNo.\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eDocument\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003ePractical function\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003e01\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003e\u003cstrong\u003eKanban Policy and Launch Plan\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003eRoles, scope, criticality, container sizing, trial period, and decision authority.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003eWord DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003e02\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003e\u003cstrong\u003eKanban Card – Two Containers\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003ePrintable card with item ID, revision, quantity, storage location, recipient, and signal path.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003eWord DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003e03\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003e\u003cstrong\u003eConsumption and Signal Log\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003eActual withdrawals, card\/signal ID, containers, and events requiring escalation.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003eWord DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003e04\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003e\u003cstrong\u003eReplenishment and Receipt Journal\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003eSeparate verification, actual order, promised date, actual receipt, and quality control.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003eWord DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003e05\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003e\u003cstrong\u003eDeviation and Kanban Audit\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003eActual material shortages, incorrect signals, action responsibility, root cause, and effect verification.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003eWord DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003e06\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003e\u003cstrong\u003eSwedish User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003eWorkflow, formulas, criteria for suitable items, and control of governance.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003eWord DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003e07\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003e\u003cstrong\u003eEnglish User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003eEnglish guidance for the Swedish master templates and the Excel tool.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003eWord DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003e08\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003e\u003cstrong\u003eExcel – Kanban and Two-Bin System\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003eNine tabs with item registry, proposed reserve B, consumption, signals, replenishment, deviations, and actions.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dae5e6\"\u003eExcel XLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2 id=\"mb-kanban-excel\"\u003eKanban in Excel – nine interconnected worksheets\u003c\/h2\u003e\n\n\u003cp\u003eThe workbook contains \u003cstrong\u003eOverview, Item Registry, Consumption, Kanban Card, Signals, Replenishment, Deviations, Actions, and Read Me\u003c\/strong\u003e. It is delivered without dummy item numbers, stock balances, or order details. Summaries are based on the user's actual entries.\u003c\/p\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eOverview:\u003c\/strong\u003e eleven indicators for items, sized reserve containers, warning levels, valid withdrawals, registered signals, actual orders, deviations, and unverified actions, as well as status charts.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eItem Registry:\u003c\/strong\u003e space for \u003cstrong\u003e120 items\u003c\/strong\u003e with item ID, revision, packaging multiple, consumption per day, actual lead time, potential order gap, safety margin, and actual container size A\/B.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eProposed Reserve B:\u003c\/strong\u003e a clear, simplified formula: round up to the nearest full package of \u003cstrong\u003edaily consumption × (lead time + potential order gap) + safety margin\u003c\/strong\u003e. Suggested and actual reserves are compared, but this does not constitute safety or purchasing approval.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eConsumption:\u003c\/strong\u003e 240 log rows for actually observed withdrawals. Checks for missing IDs, duplicate IDs, positive quantity, and known items prevent obvious errors from being counted in key performance indicators.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eKanban Card:\u003c\/strong\u003e 20 prepared print rows that pull item and reserve details from the registry. The signal address and card revision are filled in according to local instructions.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eSignals:\u003c\/strong\u003e 220 entries with actually triggered signals, recipients, status, and order reference. A registered signal is not an order.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eReplenishment:\u003c\/strong\u003e 200 rows for separately approved orders, calculated quantity, actual received quantity, date, and quality status. No external orders are sent from Excel.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDeviations and Actions:\u003c\/strong\u003e 120 and 160 rows respectively for shortages, lost cards, delivery problems, responsible parties, due dates, and actual effect verification.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2 id=\"mb-kanban-metod\"\u003eHow to use Kanban cards and two-bin systems\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eSelect suitable items:\u003c\/strong\u003e start with standard materials whose actual consumption is relatively predictable. Safety-critical or highly sporadic items may require separate risk-based control.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDetermine the right data basis:\u003c\/strong\u003e measure daily consumption, actual lead time including handling, ordering frequency, and uncertainty. Determine package size and safety margin locally.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDocument items and processes:\u003c\/strong\u003e give each item a unique ID, verify technical revision, responsible party, and material location, fill in the Excel Item Registry, and review the proposals.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCreate and print Kanban cards:\u003c\/strong\u003e mark container A\/B with item, quantity, local signal path, and revision. Perform a physical test of how the empty vessel or card is reported.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRegister actual withdrawals:\u003c\/strong\u003e enter actual consumption events into Consumption. Then send a signal to the authorized person and document it in Signals.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eControl purchasing and delivery:\u003c\/strong\u003e an authorized person reviews the need and, if necessary, places a real order in the existing purchasing system. Register the separate order, receipt, inspection, and the return of the card.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eFollow up and adjust:\u003c\/strong\u003e review material shortages, delivery variations, and the number of unnecessary signals. Only change container quantities and instructions after actual effect verification and decision-making.\u003c\/li\u003e\n\n\u003cli\u003e\n\u003c\/li\u003e\n\u003c\/ol\u003e\n\n\u003ch2 id=\"mb-kanban-risk\"\u003eImportant method and safety limitations\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eNo live connection to inventory or ERP:\u003c\/strong\u003e the workbook does not retrieve stock balances from the shelf and does not create orders, move material, or close physical signals. Consumption, Kanban signal, actual order, and receipt are four separate registrations. The card itself is not a receipt that material has been ordered or delivered.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eTwo-bin control is not a universal method:\u003c\/strong\u003e highly uneven demand, long or unreliable lead times, bulky goods, fire risks, hygiene requirements, technical revision requirements, or critical components may require a separate method. Ensure that the use and placement of containers comply with the company's work environment and quality procedures.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eThe reserve proposal is simplified:\u003c\/strong\u003e it is an operational planning basis and not a statistical service level guarantee or advice to automatically increase stock. Measured variation and local risks must be reviewed. The version 2026\/2027 is a release designation, not a certification.\u003c\/p\u003e\n\n\u003ch2\u003eSupplementary document templates and guides\u003c\/h2\u003e\n\n\u003cp\u003eFor overall production and purchasing planning, you can use \u003ca href=\"\/en\/products\/materialbehovsplanering-mrp-inkopsplan-excel-2026-2027\"\u003eMaterial Requirements Planning \u0026amp; MRP Light\u003c\/a\u003e. For spare parts inventory, critical items, and inventory counts, there is \u003ca href=\"\/en\/products\/reservdelsregister-kritiska-reservdelar-lager-excel-2027\"\u003eSpare Parts Registry \u0026amp; Critical Spare Parts\u003c\/a\u003e. For machine-specific availability, \u003ca href=\"\/en\/products\/maskinregister-forebyggande-underhall-excel-2026-2027\"\u003eMachine Registry \u0026amp; Preventive Maintenance\u003c\/a\u003e is used. Track the production impact of shortages with \u003ca href=\"\/en\/products\/oee-tak-maskineffektivitet-excel-mall-2026-2027\"\u003eOEE \u0026amp; TEEP – Machine Efficiency\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003cp\u003eRead related articles: \u003ca href=\"\/en\/blogs\/foretag\/materialbehovsplanering-mrp-stycklista-inkop\"\u003eMaterial Requirements Planning – BOM, net requirements, and purchasing\u003c\/a\u003e, \u003ca href=\"\/en\/blogs\/foretag\/produktion-kvalitetsledning-guide-mrp-oee-fmea-8d\"\u003eProduction Management and Quality Management\u003c\/a\u003e, and \u003ca href=\"\/en\/blogs\/foretag\/lagerinventering-lagervardering-regler-2026\"\u003eInventory and Valuation\u003c\/a\u003e. Explore \u003ca href=\"\/en\/collections\/produktion-industri-mallar\"\u003eProduction \u0026amp; Industry – Templates\u003c\/a\u003e and \u003ca href=\"\/en\/collections\/kvalitetsledning-iso-mallar\"\u003eQuality Management \u0026amp; ISO – Templates\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-kanban-faq\"\u003eFrequently asked questions about Kanban and two-bin systems\u003c\/h2\u003e\n\n\u003ch3\u003eWhat is Kanban?\u003c\/h3\u003e\n\n\u003cp\u003eKanban is a signal to initiate material movement or production in a pull-flow system. A physical card or an empty container can act as the signal carrier.\u003c\/p\u003e\n\n\u003ch3\u003eHow does a two-bin system work?\u003c\/h3\u003e\n\n\u003cp\u003eMaterial is first used from one container. When it becomes empty, a replenishment signal is started, while the other container is intended to last during the actual wait time. The system must be sized and tested locally.\u003c\/p\u003e\n\n\u003ch3\u003eDoes Excel calculate the correct Kanban container size automatically?\u003c\/h3\u003e\n\n\u003cp\u003eExcel suggests a reserve B based on the user's assumptions about consumption, total lead time, order gaps, safety margins, and packaging multiples. It does not guarantee that the level will be sufficient; management makes the decision.\u003c\/p\u003e\n\n\u003ch3\u003eDoes the workbook create a purchase order?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It documents actual signals, approved orders, and receipts but does not send orders or update any physical stock balances.\u003c\/p\u003e\n\n\u003ch3\u003eCan I use the templates in a CNC workshop, assembly line, or warehouse?\u003c\/h3\u003e\n\n\u003cp\u003eYes, for suitable standard items and material flows. Always adapt instructions, revisions, criticality, and container sizes to the workplace.\u003c\/p\u003e\n\n\u003ch3\u003eAre all documents in English?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The five master documents and the Excel file are in Swedish. The English User Guide describes how they are used but is not a complete translation.\u003c\/p\u003e\n\n\u003ch3\u003eIs any government-approved or ISO-certified model included?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The package is an independent documentation aid built on generally described Lean methodology. It is not a government form, system integration, or certification.\u003c\/p\u003e\n\n\u003ch2\u003eSources and document version\u003c\/h2\u003e\n\n\u003cp\u003eMethod review October 15, 2026, with \u003ca href=\"https:\/\/www.lean.org\/lexicon-terms\/kanban\/\" rel=\"nofollow noopener\"\u003eLean Enterprise Institute – Kanban\u003c\/a\u003e and \u003ca href=\"https:\/\/scor.ascm.org\/practices\/best%20practices%20by%20category\/BP.009\" rel=\"nofollow noopener\"\u003eASCM SCOR – Kanban\u003c\/a\u003e. Protected standard texts and certification materials are not included. Version 1.0, 2026\/2027. Delivery file: \u003cstrong\u003ekanban-tvabinge-lagerpafyllnad-2027.zip\u003c\/strong\u003e.\u003c\/p\u003e\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55768227283286,"sku":"KANBAN-2BIN-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/kanban-tvabinge-2027-huvudbild_42521135-6c31-4cce-82f9-ae3cb8d2f25c.png?v=1792065080"},{"product_id":"trucktillstand-riskbedomning-trucktrafik-2027","title":"Forklift Permit \u0026 Risk Assessment Forklift Traffic 2026\/2027 – Warehouse, Traffic Plan \u0026 Excel | Word\/PDF","description":"\u003csection class=\"mb-product-copy\" lang=\"en\" style=\"color:#17374c;line-height:1.75\"\u003e\n\u003ch2\u003eForklift authorization and risk assessment for safe forklift operations – Word, PDF and Excel\u003c\/h2\u003e\n\n\u003cp\u003eDoes the employer need to document \u003cstrong\u003ewritten driving permits for forklift operators, risk assessments for forklift traffic in warehouses, or a safe traffic plan\u003c\/strong\u003e? This package gathers the separate documents needed for a structured and traceable process: identifying actual collision risks, separating traffic routes from pedestrians, checking training records, deciding on personal permits, and following up on incidents and non-conformities.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003e15 files in one ZIP: seven editable Word (DOCX) files, seven corresponding searchable A4-PDFs, and one functional Excel workbook (XLSX) with nine tabs.\u003c\/strong\u003e Five main Swedish templates, one Swedish user guide, and an English User Guide. The 2026\/2027 year designation refers to the document edition, not a guarantee of future regulatory changes.\u003c\/p\u003e\n\n\u003cnav aria-label=\"Content\" style=\"padding:14px;background:#EDF6F7;border-radius:10px\"\u003e\u003ca href=\"#mb-truck-paket\"\u003ePackage contents\u003c\/a\u003e · \u003ca href=\"#mb-truck-filer\"\u003eWhat the files contain\u003c\/a\u003e · \u003ca href=\"#mb-truck-excel\"\u003eExcel\u003c\/a\u003e · \u003ca href=\"#mb-truck-lag\"\u003eRegulations\u003c\/a\u003e · \u003ca href=\"#mb-truck-faq\"\u003eFAQ\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv id=\"mb-truck-paket\" style=\"padding:21px;margin:24px 0;background:#E9F3F4;border:1px solid #CFDEE2;border-left:5px solid #197B7F;border-radius:13px\"\u003e\n\n\u003ch2 style=\"margin:0 0 12px\"\u003e01. Package contents\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e7 Word files (DOCX)\u003c\/strong\u003e – five Swedish work templates, a Swedish guide, and an English User Guide.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e7 searchable PDF files\u003c\/strong\u003e – corresponding documents in A4 for printing and archiving.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e1 Excel workbook (XLSX)\u003c\/strong\u003e – nine tabs with filtering, status fields, control references, and a formula-based overview.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003e\u003cstrong\u003eTotal of 15 files.\u003c\/strong\u003e Language: Swedish main documents and guide, supplementary English User Guide. Version 1.0 – 2026\/2027. Delivery: digital ZIP after purchase once the file is linked in Digital Products. All Word and PDF documents have two separate, framed information boxes.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv id=\"mb-truck-filer\" style=\"padding:21px;margin:24px 0;background:#FFF;border:1px solid #D2E0E4;border-radius:13px\"\u003e\n\n\u003ch2 style=\"margin:0 0 12px\"\u003e02. What the files contain – file by file\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"border-collapse:collapse;width:100%;font-size:.92em\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#17374C;color:#FFF\"\u003e\n\n\u003cth style=\"padding:12px;text-align:left\"\u003eDocument\u003c\/th\u003e\n\n\u003cth style=\"padding:12px;text-align:left\"\u003eUse and content\u003c\/th\u003e\n\n\u003cth style=\"padding:12px;text-align:left\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;vertical-align:top\"\u003e\u003cstrong\u003e01. Risk assessment forklift traffic and warehouse\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;vertical-align:top\"\u003eSite-based inventory of collisions, pedestrian traffic, intersections, loading docks, load securing, and risk severity.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;white-space:nowrap\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;vertical-align:top\"\u003e\u003cstrong\u003e02. Personal written forklift permit\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;vertical-align:top\"\u003eIssuer (employer or host company), operator, forklift types, work tasks, zones, restrictions, and signature.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;white-space:nowrap\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;vertical-align:top\"\u003e\u003cstrong\u003e03. Traffic plan and safety routines\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;vertical-align:top\"\u003eDriving routes, separation of pedestrians, local driving rules, loading zones, visibility, and shared workplaces.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;white-space:nowrap\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;vertical-align:top\"\u003e\u003cstrong\u003e04. Knowledge check and site introduction\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;vertical-align:top\"\u003eActual documentation of theory, practice, forklift type, local instructions, and the responsible assessor.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;white-space:nowrap\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;vertical-align:top\"\u003e\u003cstrong\u003e05. Inspection, incident, and action log\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;vertical-align:top\"\u003ePerformed inspections, near-misses, immediate actions, responsibilities, and verification of results.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;white-space:nowrap\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;vertical-align:top\"\u003e\u003cstrong\u003e06. Swedish User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;vertical-align:top\"\u003eTen concrete work steps, sources, common risks, and usage of all files.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;white-space:nowrap\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;vertical-align:top\"\u003e\u003cstrong\u003e07. English User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;vertical-align:top\"\u003eEnglish instructions for the Swedish templates and Excel; no English main templates included.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;white-space:nowrap\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;vertical-align:top\"\u003e\u003cstrong\u003e08. Excel register – nine tabs\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;vertical-align:top\"\u003eOverview, Risks, Permits, Operators, Inspections, Actions, Incidents, Evidence, and Read me.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dce7ea;white-space:nowrap\"\u003eXLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\u003cp\u003eAll work documents require real data, division of responsibilities, and – where relevant – signatures. No operator permits or risk levels are pre-approved.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2 id=\"mb-truck-lag\"\u003eWhen is a written forklift permit required?\u003c\/h2\u003e\n\n\u003cp\u003eAccording to \u003cstrong\u003eAFS 2023:11, Ch. 4, sections 16–17\u003c\/strong\u003e, a forklift operator must have documented theoretical and practical knowledge and a personal \u003cstrong\u003ewritten permit\u003c\/strong\u003e for forklift use. The permit must specify which forklift types and tasks it covers and must be issued by the employer or, when regulations require it for hired labor, the host company. \u003cstrong\u003eA forklift license or training certificate does not replace a written driving permit.\u003c\/strong\u003e The template file only provides a basis; it becomes a permit only when the correct issuer has made an actual assessment and made a decision.\u003c\/p\u003e\n\n\u003ch3\u003eRisk assessment, driving routes, and pedestrians\u003c\/h3\u003e\n\n\u003cp\u003e\u003cstrong\u003eAFS 2023:1, section 11\u003c\/strong\u003e, requires written risk assessments and that serious risks are identified. According to \u003cstrong\u003eAFS 2023:11, Ch. 4, section 8\u003c\/strong\u003e, forklift traffic should be separated from pedestrians and other activities where people are present if possible; otherwise, injury risks must be prevented with special consideration for poor visibility and warning options. Driving routes, speed, loading docks, and measures must be designed according to actual local conditions. \u003ca href=\"\/en\/products\/skyddsrond-arbetsmiljorond-2026-2027-checklista-riskbedomning-handlingsplan-word-pdf-excel\"\u003eSupplement with safety inspection and work environment round templates\u003c\/a\u003e when a broader work environment review is needed.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-truck-excel\"\u003eThe Excel tool: nine tabs with real-world follow-up\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eOverview, Risks, Permits, Operators, Inspections, Actions, Incidents, Evidence, and Read me.\u003c\/strong\u003e The file helps to keep track of permit decisions, documented competence checks, identified risks, and actually verified actions. The dashboard calculates, among other things, registered risks, manually flagged serious risks, registered permits, documented incidents, as well as open and verified closed actions.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eImportant distinction:\u003c\/strong\u003e a value for probability × consequence is indicative internal support and does not replace human judgment regarding whether a risk is serious. A recorded operator is not automatically authorized. An action reported as performed is not verified without a check. Empty tabs show 0, not that the workplace is risk-free.\u003c\/p\u003e\n\n\u003ch2\u003eHow to use the file package\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eIdentify the employer and the host company\u003c\/strong\u003e and clarify who is responsible for the risk assessment and individual permit.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eExamine actual forklift traffic\u003c\/strong\u003e at the workplace: pedestrian paths, intersections, doors, ramps, charging stations, and obstructions to visibility.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDocument risks and severity\u003c\/strong\u003e in file 01 and register responsibilities, deadlines, and evidence references in Excel.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDesign a traffic plan\u003c\/strong\u003e with physical separation where possible, local routines, and safe loading zones.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eVerify the operator's theory and practice\u003c\/strong\u003e as well as site-specific introduction with file 04.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eIssue or deny a personal forklift permit\u003c\/strong\u003e after an actual competence assessment with file 02.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCarry out inspections\u003c\/strong\u003e and register incidents, deficiencies, and actions with file 05 and Excel.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eFollow up on effectiveness and reassess\u003c\/strong\u003e in the event of changed traffic, new forklifts, incidents, or other relevant changes.\u003c\/li\u003e\n\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eSupplementary Mallbutiken templates\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003ca href=\"\/en\/products\/ensamarbete-riskbedomning-larmplan-sakerhetsrutiner-2026-2027\"\u003eLone work – risk assessment and alarm plan\u003c\/a\u003e for people working without immediate proximity to others.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003ca href=\"\/en\/products\/belastningsergonomi-riskbedomning-manuell-hantering-bildskarm-2026-2027\"\u003eErgonomics – manual handling\u003c\/a\u003e for lifting and ergonomic strain related to warehouse work.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003ca href=\"\/en\/collections\/produktion-industri-mallar\"\u003eProduction \u0026amp; Industry – templates\u003c\/a\u003e and \u003ca href=\"\/en\/collections\/arbetsmiljo-byggsakerhet-mallar\"\u003eWork Environment \u0026amp; Construction Safety – templates\u003c\/a\u003e for supplementary routines.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2 id=\"mb-truck-faq\"\u003eFrequently asked questions\u003c\/h2\u003e\n\n\u003ch3\u003eIs a forklift license sufficient to drive a forklift at the workplace?\u003c\/h3\u003e\n\n\u003cp\u003eNo. A training certificate is not the personal written permit that the employer or host company must issue according to the regulations.\u003c\/p\u003e\n\n\u003ch3\u003eMust the permit specify specific forklifts?\u003c\/h3\u003e\n\n\u003cp\u003eIt must clarify which forklift types and tasks it applies to. Also, specify location restrictions and activity-specific conditions when necessary.\u003c\/p\u003e\n\n\u003ch3\u003eDoes a risk assessment need to be done for a new warehouse layout?\u003c\/h3\u003e\n\n\u003cp\u003eYes, planned changes must be risk-assessed if they could lead to work environment risks. Traffic routes and pedestrian paths are particularly important to investigate during remodeling.\u003c\/p\u003e\n\n\u003ch3\u003eDoes Excel automatically approve an operator to drive?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Excel only registers documented facts and manually entered decisions. The individual competence check and written permit are done by the responsible issuer.\u003c\/p\u003e\n\n\u003ch3\u003eAre English main templates included?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The five main documents are in Swedish. The English User Guide explains how the Swedish templates and the Excel tool are used.\u003c\/p\u003e\n\n\u003ch2\u003eLegal sources and edition\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003ca href=\"https:\/\/www.av.se\/afs-202311\/\"\u003eSwedish Work Environment Authority – AFS 2023:11, Ch. 4 on forklift use\u003c\/a\u003e.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/afs-20231\"\u003eSwedish Work Environment Authority – AFS 2023:1 on systematic work environment management\u003c\/a\u003e.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003ca href=\"https:\/\/www.av.se\/produktion-industri-och-logistik\/fordon\/kunskaper-och-tillstand-for-saker-truckanvandning\"\u003eSwedish Work Environment Authority – Knowledge and permits for safe forklift use\u003c\/a\u003e.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003ca href=\"https:\/\/www.av.se\/produktion-industri-och-logistik\/fordon\/arbeta-forebyggande-for-att-minska-skador-och-olyckor-med-truckar\/\"\u003eSwedish Work Environment Authority – Prevent forklift accidents\u003c\/a\u003e.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003e\u003cstrong\u003eSource review: October 18, 2026. Document edition: 1.0 – 2026\/2027.\u003c\/strong\u003e The template is practical support in accordance with Swedish law; it is not authority-approved, externally lawyer-certified, or a guarantee of regulatory compliance.\u003c\/p\u003e\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55843563471190,"sku":"TRUCK-RISK-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/trucktillstand-riskbedomning-trucktrafik-huvudbild-2027_37caec91-8777-476f-8f9c-3ec326c8841c.png?v=1792327856"},{"product_id":"leveransavtal-b2b-leveransplan-order-excel-2027","title":"Delivery Agreement \u0026 Delivery Schedule B2B 2026\/2027 – Order, Delivery Receipt \u0026 Excel | Word\/PDF","description":"\u003csection lang=\"en\" class=\"mb-product-copy\" style=\"max-width:980px;color:#17374c;line-height:1.75\"\u003e\n\u003ch2\u003eB2B Delivery Agreement – template for continuous goods deliveries, orders, and delivery control\u003c\/h2\u003e\n\n\u003cp\u003eDoes your company need an editable \u003cstrong\u003edelivery agreement between businesses\u003c\/strong\u003e that is genuinely useful from the first order through to delivery receipt, claims, and change orders? This package distinguishes between \u003cstrong\u003eagreed delivery terms, binding orders, actual goods receipt, and verified rectifications\u003c\/strong\u003e. It makes it easier to document responsibilities, delivery times, prices, quality requirements, delays, and defects for recurring B2B goods purchases.\u003c\/p\u003e\n\n\u003cp\u003eThe delivery consists of \u003cstrong\u003e15 files: 7 Word (DOCX), 7 corresponding searchable A4-PDFs, and 1 Excel (XLSX) with nine functional tabs.\u003c\/strong\u003e Five Swedish work templates, a Swedish user guide, and a separate English User Guide. The documents are based on Swedish sales law and serve as a basis for negotiation, not as a finished approval of any specific transaction.\u003c\/p\u003e\n\n\u003cnav style=\"padding:13px;background:#eef6f6;border:1px solid #d1e3e4;border-radius:10px\"\u003e\u003ca href=\"#mb-paket\"\u003ePackage contents\u003c\/a\u003e · \u003ca href=\"#mb-filer\"\u003eFile by file\u003c\/a\u003e · \u003ca href=\"#mb-avtal\"\u003eUsage\u003c\/a\u003e · \u003ca href=\"#mb-excel\"\u003eExcel\u003c\/a\u003e · \u003ca href=\"#mb-faq\"\u003eFAQ\u003c\/a\u003e\u003c\/nav\u003e\n\u003cdiv id=\"mb-paket\" style=\"padding:20px;margin:22px 0;background:#e9f3f4;border:1px solid #cfe0e3;border-left:5px solid #197b7f;border-radius:13px\"\u003e\n\n\u003ch2 style=\"margin-top:0\"\u003e01. Package contents\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e7 editable Word (DOCX):\u003c\/strong\u003e five main Swedish documents, Swedish user guide, English User Guide.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e7 searchable PDF:\u003c\/strong\u003e corresponding A4 versions for printing and documentation.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003e1 Excel (XLSX):\u003c\/strong\u003e nine tabs, input fields, filters, status lists, order value, summary of approved delivered quantities, and a tracking dashboard.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDelivery:\u003c\/strong\u003e digital ZIP after purchase once the file is attached and verified in Digital Products.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eVersion 1.0 – 2026\/2027.\u003c\/strong\u003e Source review: October 18, 2026. The year 2027 is a release designation, not a guarantee of future legislative changes.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003eEach Word and PDF document features two separately framed information boxes describing the package and the function of the files.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv id=\"mb-filer\" style=\"padding:20px;margin:22px 0;border:1px solid #d5e2e5;border-radius:13px\"\u003e\n\n\u003ch2 style=\"margin-top:0\"\u003e02. What the files contain\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"width:100%;border-collapse:collapse;font-size:.92em\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#17374c;color:#fff\"\u003e\n\n\u003cth style=\"padding:12px;text-align:left\"\u003eDocument\u003c\/th\u003e\n\n\u003cth style=\"padding:12px;text-align:left\"\u003eFunction and usage\u003c\/th\u003e\n\n\u003cth style=\"padding:12px;text-align:left\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top\"\u003e\u003cstrong\u003e01. B2B Delivery Agreement\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top\"\u003eNegotiable agreement for continuous goods deliveries, order confirmation, price, delivery, transfer of risk, defects, delays, and disputes.\u003c\/td\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top;white-space:nowrap\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top\"\u003e\u003cstrong\u003e02. Order and Delivery Specification\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top\"\u003eArticle and order references, quantity, unit price, delivery date, loading\/unloading, and document requirements.\u003c\/td\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top;white-space:nowrap\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top\"\u003e\u003cstrong\u003e03. Delivery Receipt \u0026amp; Receiving Inspection\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top\"\u003eReceived and approved quantities, visible damages, supplementary quality inspection, and proof of receipt.\u003c\/td\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top;white-space:nowrap\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top\"\u003e\u003cstrong\u003e04. Claims \u0026amp; Non-Conformance Report\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top\"\u003eDate of claim, evidence, objective non-conformance, claimed remedy, agreed correction, and verification.\u003c\/td\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top;white-space:nowrap\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top\"\u003e\u003cstrong\u003e05. Change Order \u0026amp; Delivery Forecast\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top\"\u003eProposals and written accepted changes in quantities, schedule, specifications, and prices.\u003c\/td\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top;white-space:nowrap\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top\"\u003e\u003cstrong\u003e06. Swedish User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top\"\u003eWorkflow, checklists, commercial law limits, and verified primary sources.\u003c\/td\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top;white-space:nowrap\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top\"\u003e\u003cstrong\u003e07. English User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top\"\u003eEnglish guidance for the main Swedish documents and Excel.\u003c\/td\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top;white-space:nowrap\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top\"\u003e\u003cstrong\u003e08. Excel Register (nine tabs)\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top\"\u003eOverview, Agreements, Orders, Deliveries, Inspections, Non-conformances, Changes, Source Data, and Read Me.\u003c\/td\u003e\n\n\u003ctd style=\"padding:11px;border-bottom:1px solid #d9e6e8;vertical-align:top;white-space:nowrap\"\u003eXLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\u003cp\u003eThe forms include fields for actual article numbers, parties, amounts, order IDs, delivery, inspection results, and approvals. No fictitious goods deliveries, valid signatures, or approved claims are pre-filled.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2 id=\"mb-avtal\"\u003eWhat should a delivery agreement between businesses contain?\u003c\/h2\u003e\n\n\u003cp\u003eA clear B2B delivery agreement should state \u003cstrong\u003eparties, product specifications, ordering process, delivery and quality requirements, delivery date, handover, transfer of risk, prices, payment, handling of delays, claims, rectifications, and termination of the agreement\u003c\/strong\u003e. It is especially important to distinguish a binding delivery promise from a preliminary forecast and to specify which document prevails if the order and the framework agreement contain conflicting terms.\u003c\/p\u003e\n\n\u003cp\u003eAccording to the \u003ca href=\"https:\/\/www.riksdagen.se\/sv\/dokument-och-lagar\/dokument\/svensk-forfattningssamling\/koplag-1990931_sfs-1990-931\/\"\u003eSwedish Sale of Goods Act (1990:931)\u003c\/a\u003e, Section 3, the Act applies to a large extent unless the parties have agreed otherwise or if otherwise established by trade usage or industry practice. Provisions on delay can be found in Section 22, examination of goods in Section 31, and claims in Section 32. The terms of the agreement must be negotiated and adapted to the actual business transaction.\u003c\/p\u003e\n\n\u003ch2\u003eDelivery terms and Incoterms® 2020\u003c\/h2\u003e\n\n\u003cp\u003eWhen the parties wish to use \u003cstrong\u003eIncoterms® 2020\u003c\/strong\u003e, the correct three-letter rule, named place, and version must be explicitly stated in the agreement or order. The choice affects the allocation of delivery responsibility, costs, and risk. However, Incoterms® do not automatically regulate ownership, payment terms, or all consequences of breach of contract. \u003ca href=\"https:\/\/iccwbo.org\/business-solutions\/incoterms-rules\/\"\u003eICC's official guidance on Incoterms\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2 id=\"mb-excel\"\u003eExcel with nine practical tabs\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eOverview, Agreements, Orders, Deliveries, Inspections, Non-conformances, Changes, Source Data, and Read Me.\u003c\/strong\u003e The workbook contains formulas for order value (ordered quantity times price), summary of \u003cstrong\u003eapproved\u003c\/strong\u003e delivered units per order ID, remaining quantity, and deviating quantities. The formulas are tested with temporary input data that is not included in the empty delivery.\u003c\/p\u003e\n\n\u003cp\u003eThere are separate fields for actual received quantities and quantities approved after inspection. Statuses such as \u003cem\u003eplanned, under negotiation, approved,\u003c\/em\u003e and \u003cem\u003eclosed – verified\u003c\/em\u003e are entered manually. An Excel value is neither a binding order acceptance, a legally secured delay, nor an approval of a claim.\u003c\/p\u003e\n\n\u003ch2\u003eHow to use the delivery agreement template\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDefine the scope:\u003c\/strong\u003e ensure the template suits recurring goods purchases between traders and not a consumer purchase or a service-oriented construction contract.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCheck counterparties and authority:\u003c\/strong\u003e names, corporate registration numbers, signatories, and agreed document hierarchy.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eNegotiate the delivery agreement:\u003c\/strong\u003e specification, order process, price, payment, delivery location, handover, risk, and any limitation of liability.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eConfirm the order:\u003c\/strong\u003e use Annex 02 for date, quantity, article, price, recipient, and any named delivery clause.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDocument the receipt:\u003c\/strong\u003e note actual received quantities, visible damages, and completed inspection using file 03.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eHandle non-conformances in writing:\u003c\/strong\u003e document discovery date, claim, evidence, parties' positions, and any agreed measures in file 04.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eMake decisions about changes:\u003c\/strong\u003e use file 05 so that proposed changes are not confused with accepted order terms.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eFollow up in Excel:\u003c\/strong\u003e link the same agreement, order, and delivery ID to each entry and close actions only after actual inspection.\u003c\/li\u003e\n\n\u003cli\u003e\n\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eImportant limitations and legal precautions\u003c\/h2\u003e\n\n\u003cp\u003eA delivery receipt does not automatically mean final approval of all latent defects. The Sales of Goods Act's provisions regarding examination and claims, as well as any valid agreements, must be assessed for each defect. Automatic penalties, damages, deadlines, and liability caps should not be copied without explicit choices and legal review. For regulated products, international business, or significant delivery risks, customs, export control, product regulation, sanctions, and insurance must be reviewed separately.\u003c\/p\u003e\n\n\u003ch2\u003eRelated templates and relevant internal links\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003ca href=\"\/en\/products\/leverantorsavtal-supplier-agreement-2026-2027-word-pdf-english-svensk-ratt\"\u003eSupplier Agreement\u003c\/a\u003e – for a broader supplier relationship.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003ca href=\"\/en\/products\/ramavtal-mallpaket-2026-2027-word-pdf-svensk-ratt\"\u003eFramework Agreement for companies\u003c\/a\u003e – overall ordering and business framework.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003ca href=\"\/en\/products\/transportavtal-fraktorder-inrikes-vagtransport-2027\"\u003eTransport agreement and freight order\u003c\/a\u003e – contract with the carrier for domestic goods.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003ca href=\"\/en\/products\/avtalsregister-avtalsbevakning-2026-2027-excel-dashboard-word-pdf\"\u003eContract register and contract monitoring\u003c\/a\u003e – track outgoing agreements and contract dates.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003ca href=\"\/en\/collections\/foretagsavtal-mallar\"\u003eMore corporate agreement templates\u003c\/a\u003e and \u003ca href=\"\/en\/collections\/produktion-industri-mallar\"\u003eProduction and Industry\u003c\/a\u003e.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2 id=\"mb-faq\"\u003eFrequently asked questions\u003c\/h2\u003e\n\n\u003ch3\u003eWhat is the difference between a delivery agreement and a supplier agreement?\u003c\/h3\u003e\n\n\u003cp\u003eSupplier agreements can govern a long-term partnership on a broad level. This delivery agreement focuses on goods, specific orders, delivery occasions, receipt, and documented non-conformances.\u003c\/p\u003e\n\n\u003ch3\u003eIs the Sale of Goods Act mandatory between businesses?\u003c\/h3\u003e\n\n\u003cp\u003eThe Sale of Goods Act is to a large extent dispositive according to Section 3. However, terms must be clear, and other applicable rules may affect the transaction.\u003c\/p\u003e\n\n\u003ch3\u003eAre order and delivery schedules included in Excel?\u003c\/h3\u003e\n\n\u003cp\u003eYes. The workbook has separate tabs for agreements, orders, deliveries, inspections, non-conformances, changes, and source data with a formula-based overview.\u003c\/p\u003e\n\n\u003ch3\u003eCan I use Incoterms® 2020 in the delivery agreement?\u003c\/h3\u003e\n\n\u003cp\u003eYes, if the parties have explicitly agreed on a specific rule, named place, and version. The template package does not reproduce the full copyright-protected rules.\u003c\/p\u003e\n\n\u003ch3\u003eCan the template be used for consumer purchases?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It is intended for B2B purchases of goods and should not be confused with the mandatory protections of the Consumer Sales Act.\u003c\/p\u003e\n\n\u003ch3\u003eAre the agreements fully translated into English?\u003c\/h3\u003e\n\n\u003cp\u003eThe five work templates are in Swedish. There is a Swedish and an English user guide, but no English agreement versions.\u003c\/p\u003e\n\n\u003ch2\u003eOfficial sources and document edition\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.riksdagen.se\/sv\/dokument-och-lagar\/dokument\/svensk-forfattningssamling\/koplag-1990931_sfs-1990-931\/\"\u003eSwedish Parliament – Sale of Goods Act (1990:931)\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/iccwbo.org\/business-solutions\/incoterms-rules\/\"\u003eICC – Incoterms® rules\u003c\/a\u003e\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003e\u003cstrong\u003eEdition 1.0 – 2026\/2027. Source review: October 18, 2026.\u003c\/strong\u003e The documents are professional contract templates but are not government-approved or externally lawyer-certified and are not a guarantee of correct risk allocation in any specific transaction.\u003c\/p\u003e\n\n\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55844460790102,"sku":"LEV-AVTAL-B2B-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/leveransavtal-b2b-2027-huvudbild_16fdf887-4bec-48f6-9a3c-1b77240a595d.png?v=1792333514"},{"product_id":"driftstoppsrapport-maskinhaveri-riskkontroll-atgardslogg-excel","title":"Downtime Report \u0026 Machine Breakdown 2026\/2027 – Risk Assessment, Action Log and Excel | Word\/PDF","description":"\u003cdiv class=\"mb-product-description\"\u003e\n\n\u003cp\u003e\u003cstrong\u003eDowntime Report \u0026amp; Machine Failure – Word, PDF and Excel\u003c\/strong\u003e is an editable document package for businesses that need to record unplanned machine downtime, document risk issues and technical measures, and follow up on cases and estimated costs. The templates are designed as administrative support for machines used in Swedish businesses.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003e15 customer files in ZIP:\u003c\/strong\u003e 7 DOCX templates + 7 searchable PDF files + 1 Excel workbook with nine tabs. \u003cstrong\u003ePrice:\u003c\/strong\u003e SEK 79, one-time purchase. Digital delivery; no physical product is shipped.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eImportant safety limitation:\u003c\/strong\u003e No template or Excel status gives authorization to start or use a machine. Troubleshooting, risk assessment, inspection, any interlocks, and decisions on operation must be handled according to the manufacturer's instructions, the employer's safety routines, and relevant regulations. This is not a repair manual or safety certification.\u003c\/p\u003e\n\n\u003ch2\u003eHow the downtime template is used\u003c\/h2\u003e\n\n\u003cp\u003eRecord downtime with machine ID, time, and actual observations. Then document risk issues and refer to the separate competent assessment required. Log completed work, refer to technical documentation, and maintain traceability for a separate operational decision. A case must not be confused with an authority-approved inspection certificate.\u003c\/p\u003e\n\n\u003cdiv style=\"border:1px solid #b5c9d9;background:#eef5fa;border-radius:9px;padding:16px 20px;margin:16px 0\"\u003e\n\n\u003ch3 style=\"margin:0 0 7px;color:#123b65\"\u003e01. Package contents\u003c\/h3\u003e\n\n\u003cp style=\"margin:0\"\u003eFive Swedish working documents, one Swedish user guide, and one English User Guide – all seven in both Word (DOCX) and PDF. Also an editable Excel register (XLSX) with nine tabs. Total of 15 files. Version 1.0, published October 28, 2026.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv style=\"border:1px solid #b5c9d9;background:#eef5fa;border-radius:9px;padding:16px 2020;margin:16px 0\"\u003e\n\n\u003ch3 style=\"margin:0 0 7px;color:#123b65\"\u003e02. What the files contain\u003c\/h3\u003e\n\n\u003cp style=\"margin:0\"\u003eA downtime report, risk and interlock check, technical troubleshooting log, documentation for a possible return to operation, and final review. Excel collects cases, machines, risk issues, measures, inspection references, downtime hours, and administrative costs – not automatic safety decisions.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2\u003eComplete file list\u003c\/h2\u003e\n\n\u003ctable style=\"width:100%;border-collapse:collapse;font-size:.95em\"\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth style=\"text-align:left;padding:10px;border-bottom:2px solid #123b65\"\u003eDocument\u003c\/th\u003e\n\n\u003cth style=\"text-align:left;padding:10px;border-bottom:2px solid #123b65\"\u003eContent\u003c\/th\u003e\n\n\u003cth style=\"text-align:left;padding:10px;border-bottom:2px solid #123b65\"\u003eLanguage \/ format\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ef\"\u003e\u003cstrong\u003eMachine downtime report\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ef\"\u003eDate, machine ID, symptoms, status, incident flag, and escalation\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ef\"\u003eSwedish · DOCX \/ PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ef\"\u003e\u003cstrong\u003eRisk and interlock check\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ef\"\u003eBasis for risk issues and the need for separate inspections – not a start authorization\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ef\"\u003eSwedish · DOCX \/ PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ef\"\u003e\u003cstrong\u003eTroubleshooting and measures log\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ef\"\u003eTracks completed technical measures and verified observations\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ef\"\u003eSwedish · DOCX \/ PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ef\"\u003e\u003cstrong\u003eInspection before a possible return to operation\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ef\"\u003eDecision basis with reference to a separate competent operational decision\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ef\"\u003eSwedish · DOCX \/ PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ef\"\u003e\u003cstrong\u003eFinal review and handover\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ef\"\u003eClosure, remaining risks, follow-up, and document receipt\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ef\"\u003eSwedish · DOCX \/ PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ef\"\u003e\u003cstrong\u003eSwedish user guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ef\"\u003eStep-by-step instructions, work environment regulations, limitations, sources\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ef\"\u003eSwedish · DOCX \/ PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ef\"\u003e\u003cstrong\u003eEnglish User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ef\"\u003eEnglish instructions for the Swedish operational documents\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ef\"\u003eEnglish · DOCX \/ PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px\"\u003e\u003cstrong\u003eDowntime – machine register\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px\"\u003eNine tabs for follow-up of downtime, risk issues, measures, and costs\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px\"\u003eSwedish · XLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003ch2\u003eThe nine tabs and functions of the Excel template\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eOverview, Downtime Log, Machines, Risk Issues, Measures, Inspection Decision, Costs, Documents, and Read Me.\u003c\/strong\u003e When valid start and end times are entered, Excel can calculate administrative downtime in hours. If the end time is before the start time or the data is invalid, a validation prompt is displayed. Costs can be calculated as internal time × specified hourly cost plus service and materials. Invalid costs are flagged.\u003c\/p\u003e\n\n\u003cp\u003eNo function connects to the equipment, calculates the probability of personal injury, performs a safety assessment, creates an authority report, or gives the go-ahead to restart. The costs are estimates and are not accounting documentation but require a separate review.\u003c\/p\u003e\n\n\u003ch2\u003ePractical workflow\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRecord the downtime:\u003c\/strong\u003e time, equipment, symptoms, and relevant alarm\/document references.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eAddress personal risk:\u003c\/strong\u003e injuries and serious incidents are handled according to the organization's protected routines and, when required, through an authority report.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eIdentify applicable inspection requirements:\u003c\/strong\u003e the responsible competent function decides on the need for risk assessment, maintenance, and additional safety inspections.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDocument troubleshooting already performed:\u003c\/strong\u003e state who performed the work, which documents show the results, and what remains.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eSeparate the operational decision:\u003c\/strong\u003e refer to the competent, equipment-specific assessment; a form never replaces a safe procedure.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eFollow up:\u003c\/strong\u003e save the measures and inspection documentation, hand over the documentation, and record the administrative case closure.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eLegal starting points – Sweden\u003c\/h2\u003e\n\n\u003cp\u003eThe Swedish Work Environment Authority's \u003cstrong\u003eAFS 2023:1, §§ 11–13\u003c\/strong\u003e covers, among other things, risk assessment, investigation of work-related ill health, accidents, and serious incidents, as well as the implementation and documentation of measures. \u003cstrong\u003eAFS 2023:11, Chapter 2, §§ 15–19\u003c\/strong\u003e covers maintenance and certain inspections of work equipment, as well as documentation of inspection results. Specific machines may be subject to additional requirements.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eThe Work Environment Act, Chapter 3, Section 3 a\u003c\/strong\u003e contains requirements for reporting without delay, among other things, serious personal injuries and incidents that have posed a serious danger to life or health. An internal machine report is not such a report.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently asked questions\u003c\/h2\u003e\n\n\u003ch3\u003eIs the template an approved risk assessment for all machines?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It helps to document issues and completed assessments, but a valid risk assessment must be adapted to the work environment, equipment, and risks by the responsible competent function.\u003c\/p\u003e\n\n\u003ch3\u003eCan Excel tell when it is safe to start?\u003c\/h3\u003e\n\n\u003cp\u003eNo. An Excel status, a completed form, or a closed measure has no independent safety effect. Any technical inspections and operational decisions are handled separately.\u003c\/p\u003e\n\n\u003ch3\u003eWhat applies after a serious incident or personal injury?\u003c\/h3\u003e\n\n\u003cp\u003eThe employer must assess investigation, measure, and any reporting obligations. Serious incidents covered by the Work Environment Act must be reported without delay to the correct authority; this package does not replace the report.\u003c\/p\u003e\n\n\u003ch3\u003eAre Word, PDF, and Excel included?\u003c\/h3\u003e\n\n\u003cp\u003eYes: seven editable Word files, seven searchable print PDFs, and one Excel register. The PDF files are not marketed as interactive forms. The English User Guide is a guide, not an English translation of the Swedish working documents.\u003c\/p\u003e\n\n\u003ch3\u003eDoes Excel work without macros?\u003c\/h3\u003e\n\n\u003cp\u003eYes. The XLSX workbook uses standard formulas and data fields without VBA, external machine connection, or cloud service.\u003c\/p\u003e\n\n\u003ch2\u003eComplementary templates in the range\u003c\/h2\u003e\n\n\u003cp\u003eFor ongoing maintenance, see \u003ca href=\"\/en\/products\/maskinregister-forebyggande-underhall-excel-2026-2027\"\u003eMachine Register \u0026amp; Preventive Maintenance\u003c\/a\u003e. For separate work environment incidents, see \u003ca href=\"\/en\/products\/tillbudsrapport-arbetsolycka-utredning-atgardsplan-2026-2027\"\u003eNear-Miss Report \/ Work Accident\u003c\/a\u003e. For methodical root cause analysis, see \u003ca href=\"\/en\/products\/8d-rapport-rotorsaksanalys-5-varfor-mall-2026-2027\"\u003e8D Report \u0026amp; Root Cause Analysis\u003c\/a\u003e. See also \u003ca href=\"\/en\/collections\/inkop-leverantor-service-mallar\"\u003ePurchasing, Supplier and Service – Templates\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eSources and quality control\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/afs-20231\" rel=\"nofollow\"\u003eAFS 2023:1 – systematic work environment work\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/afs-202311\/\" rel=\"nofollow\"\u003eAFS 2023:11 – work equipment and safe use\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.riksdagen.se\/sv\/dokument-och-lagar\/dokument\/svensk-forfattningssamling\/arbetsmiljolag-19771160_sfs-1977-1160\/\" rel=\"nofollow\"\u003eWork Environment Act (1977:1160)\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/arbetsgivarens-ansvar-for-arbetsmiljon\/anmal-arbetsskada-dodsfall-och-allvarliga-tillbud-till-arbetsmiljoverket\/\" rel=\"nofollow\"\u003eSwedish Work Environment Authority – report serious incidents\u003c\/a\u003e\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003e\u003cstrong\u003eVersion 1.0 · Source control 2026-10-28 · Jurisdiction Sweden.\u003c\/strong\u003e Internal AI-assisted source review and technical document control have been performed. The product is not authority-approved, certified, or externally legally reviewed and does not replace individual advice from safety expertise.\u003c\/p\u003e\n\n\n\u003c\/div\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":56281158156630,"sku":"DRIFTSTOPP-MASKIN-V1","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/01_driftstopp_maskinhaveri_huvudbild_1600.jpg?v=1793184537"},{"product_id":"fat-sat-testprotokoll-2026-2027-acceptansprovning-avvikelser-och-excel-word-pdf","title":"FAT \u0026 SAT Test Protocol 2026\/2027 – Acceptance Testing, Deviations and Excel | Word\/PDF","description":"\u003ch2\u003eFAT \u0026amp; SAT – test protocols and acceptance testing for equipment and systems\u003c\/h2\u003e\n\u003cp\u003eDocument factory acceptance testing (FAT) and site acceptance testing (SAT) with traceability from requirements specification to measured results, deviations, retesting, and handover. The template package includes editable working documents in Word, searchable PDF versions, and an Excel register for test cases, results, outstanding items, and responsibilities.\u003c\/p\u003e\n\u003cdiv style=\"border:2px solid #2773a6;border-left:7px solid #153960;background:#edf4fa;padding:16px;border-radius:8px;margin:18px 0\"\u003e\n\n\u003ch2\u003e01. Package contents\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003e15 digital files in a ZIP:\u003c\/strong\u003e 7 Word (DOCX), 7 PDF, and 1 Excel (XLSX) file with nine tabs. Five Swedish working templates, one Swedish user guide, and one English reference guide.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\u003cdiv style=\"border:2px solid #2773a6;border-left:7px solid #153960;background:#edf4fa;padding:16px;border-radius:8px;margin:18px 0\"\u003e\n\n\u003ch2\u003e02. What the files contain\u003c\/h2\u003e\n\n\u003cp\u003eTesting strategy and test plan, factory protocol, site protocol, deviation and outstanding items report, acceptance certificate and handover, and guides. Excel provides a traceable test case list and Dashboard, with separate registers for FAT, SAT, deviations, actions, decisions, and documentation.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\u003ch2\u003eFile by file\u003c\/h2\u003e\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth\u003eDocument\u003c\/th\u003e\n\n\u003cth\u003eFormat\u003c\/th\u003e\n\n\u003cth\u003eContent\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e01 FAT\/SAT test plan and testing strategy\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\u003ctd\u003eProject, requirements, test criteria, witnesses, environment, and decision authority\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e02 FAT test protocol\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\u003ctd\u003eFactory testing, measured values, evidence, status, and deviations\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e03 SAT test protocol\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\u003ctd\u003eSite testing of installation and function with FAT references\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e04 Deviation and outstanding items report\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\u003ctd\u003eErrors, risks, actions, retesting, and remaining outstanding items\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e05 Acceptance certificate and handover\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\u003ctd\u003eTest overview, reservations, evidence, and authorized signatures\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e06 User Guide – Swedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\u003ctd\u003eWorkflow, responsibilities, test status, and legal limitations\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e07 User Guide – English\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\u003ctd\u003eEnglish reference guide and instructions for the Swedish templates\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e08 Test Register and Dashboard\u003c\/td\u003e\n\n\u003ctd\u003eXLSX\u003c\/td\u003e\n\n\u003ctd\u003e9 tabs: Dashboard, Test Cases, FAT, SAT, Deviations, Actions, Decisions, Documentation, and Read Me\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\u003ch2\u003eHow to use the FAT and SAT templates\u003c\/h2\u003e\u003col\u003e\n\n\u003cli\u003eIdentify the relevant equipment, requirements specification, and contract version.\u003c\/li\u003e\n\n\u003cli\u003eEstablish measurable acceptance criteria before testing.\u003c\/li\u003e\n\n\u003cli\u003ePerform FAT and document the actual measured value, tester, and any deviations.\u003c\/li\u003e\n\n\u003cli\u003ePerform SAT on site, checking the current installation, environment, and open FAT items.\u003c\/li\u003e\n\n\u003cli\u003eRecord deviations, corrections, retesting, and remaining outstanding items in Excel.\u003c\/li\u003e\n\n\u003cli\u003eDocument the agreed acceptance procedure and authorized signatures separately from the technical test status.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\u003ch2\u003eTechnical and contractual limitations\u003c\/h2\u003e\u003cp\u003eThese are independently developed administrative templates, not a copy of a licensed standard and not a technical certification. IEC 62381:2024 covers FAT, SAT, and SIT for automation systems in the process industry. Requirements, safety testing, and acceptance must be adapted to the specific project's contract, equipment, and regulations. A completed or signed test protocol does not automatically imply CE compliance, permission to commission, or transfer of contractual risk.\u003c\/p\u003e\n\u003ch2\u003eSources and version information\u003c\/h2\u003e\u003cul\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/webstore.iec.ch\/en\/publication\/67572\"\u003eIEC 62381:2024 – FAT, SAT, and SIT\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.isa.org\/standards-and-publications\/isa-standards\/isa-105-standards\"\u003eISA – acceptance testing from factory to plant\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/sid.siemens.com\/api\/khub\/documents\/PaJ7FOGosK_pJNU2yMaOIQ\/content\"\u003eSiemens – technical guidance for FAT and SAT\u003c\/a\u003e\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\u003ch2\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch3\u003eWhat is the difference between FAT and SAT?\u003c\/h3\u003e\u003cp\u003eFAT normally takes place at the supplier's facility before delivery or installation. SAT is performed on site in the installed environment. The exact arrangement is governed by the equipment, contract, and test plan.\u003c\/p\u003e\n\u003ch3\u003eCan I use the templates for machines and automation systems?\u003c\/h3\u003e\u003cp\u003eYes, as administrative documentation support once the technically responsible parties have established the test criteria. Special requirements for machine safety, functional safety, CE, and regulations must be checked separately.\u003c\/p\u003e\n\u003ch3\u003eDoes Excel calculate passed and failed tests?\u003c\/h3\u003e\u003cp\u003eYes. The Dashboard summarizes registered test IDs and status, as well as open deviations and overdue internal actions. The calculations do not constitute a legal acceptance assessment.\u003c\/p\u003e\n\u003ch3\u003eDoes the certificate replace a purchase agreement?\u003c\/h3\u003e\u003cp\u003eNo. The legal effect of acceptance and any handover depends on the terms of the agreement and the actual approval of the authorized party.\u003c\/p\u003e\n\u003ch3\u003eAre all the templates in English?\u003c\/h3\u003e\u003cp\u003eNo. Five working templates are in Swedish. A separate English user guide is included as a reference.\u003c\/p\u003e\n\u003ch3\u003eHow is the package delivered?\u003c\/h3\u003e\u003cp\u003eDigital ZIP with 15 files, after the product has been activated and the delivery file linked to Shopify Digital Products.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eVersion:\u003c\/strong\u003e 1.0 · October 31, 2026. \u003cstrong\u003eJurisdiction:\u003c\/strong\u003e Sweden. \u003cstrong\u003eMethod review:\u003c\/strong\u003e internal source control, no external technical or legal review. \u003ca href=\"\/en\/pages\/faq\"\u003eSee frequently asked questions\u003c\/a\u003e.\u003c\/p\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default","offer_id":56425678438742,"sku":"FAT-SAT-ACCEPTANS-2027-V1","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/fat-sat-huvudbild-2026-2027.png?v=1793446858"},{"product_id":"inomhusbrandpost-slangvinda-kontrolljournal-service","title":"Indoor Fire Hose Reel \u0026 Hose Cabinet – Inspection Log, Service \u0026 Action Register | Word\/PDF\/Excel","description":"\u003csection class=\"mb-product-content\" lang=\"sv\"\u003e\n\u003cp\u003e\u003cstrong\u003eIndoor Fire Hydrant \u0026amp; Hose Reel – Inspection Log, Service and Remedial Action Register\u003c\/strong\u003e is an administrative document package for property owners, managers and fire safety officers who want to document fixed indoor fire hydrants, hose reels and hose systems. The templates cover unit ID, visible inspection, service orders, actual service reports, non-conformities and separate follow-up inspections. \u003cstrong\u003eThey do not replace professional inspection, installation or testing in accordance with manufacturer instructions and applicable standards.\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003cdiv style=\"border:1px solid #b3cbdc;border-radius:12px;background:#eef5fa;padding:18px;margin:18px 0\"\u003e\n\n\u003ch2 style=\"margin:0 0 8px;color:#17324d\"\u003e01. Package Contents\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003e15 customer files:\u003c\/strong\u003e 7 Word (DOCX), 7 corresponding searchable PDF (A4) and 1 Excel workbook (XLSX). This comprises seven independent documents in two formats and a separate register. Five Swedish working documents, a Swedish user guide and a separate English User Guide are included. The Word files are editable, while the PDF files are intended for reading and printing.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv style=\"border:1px solid #b3cbdc;border-radius:12px;background:#fff;padding:18px;margin:18px 0\"\u003e\n\n\u003ch2 style=\"margin:0 0 8px;color:#17324d\"\u003e02. What the Files Contain\u003c\/h2\u003e\n\n\u003cp\u003eFacility register with inspection plan, visible inspection checklist, service order with follow-up of the actual report, separate non-conformity and risk management, and follow-up inspection with decision. The guides provide usage steps and legal limitations. Excel compiles manual registers and 14 KPIs.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eOrdered service is not completed service. Completed service is not automatically verified fire safety functionality.\u003c\/strong\u003e\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2\u003eWho Needs a Fire Hydrant Log?\u003c\/h2\u003e\n\n\u003cp\u003eThe package is suitable for businesses that manage existing indoor fire hydrants in facilities such as warehouses, industrial buildings and managed property portfolios. It is not a complete general SBA plan or a technically certified service protocol. For separate portable fire extinguishers, see \u003ca href=\"\/en\/products\/brandslackarkontroll-slackarregister-sba-journal-service-excel-word-pdf\"\u003eFire Extinguisher Inspection \u0026amp; Extinguisher Register\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eDocuments and Files\u003c\/h2\u003e\n\n\u003ctable style=\"border-collapse:collapse;width:100%\"\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth style=\"text-align:left\"\u003eDocument\u003c\/th\u003e\n\n\u003cth style=\"text-align:left\"\u003eFunction\u003c\/th\u003e\n\n\u003cth\u003eLanguage\u003c\/th\u003e\n\n\u003cth\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e1. Facility Register and Inspection Plan\u003c\/td\u003e\n\n\u003ctd\u003eFire hydrant ID, drawing, responsibility and locally determined inspection points\u003c\/td\u003e\n\n\u003ctd\u003eSV\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e2. Visible Inspection and Inspection Walkthrough\u003c\/td\u003e\n\n\u003ctd\u003eVisual access, signage and visible deficiencies\u003c\/td\u003e\n\n\u003ctd\u003eSV\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e3. Service Order and Report Receipt\u003c\/td\u003e\n\n\u003ctd\u003eAssignment, contractor and actual service report\u003c\/td\u003e\n\n\u003ctd\u003eSV\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e4. Non-conformity Report and Temporary Measures\u003c\/td\u003e\n\n\u003ctd\u003eObserved non-conformity, responsibility and risk follow-up\u003c\/td\u003e\n\n\u003ctd\u003eSV\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e5. Follow-up Inspection and Remedial Action Closure\u003c\/td\u003e\n\n\u003ctd\u003eBasis, remaining deficiencies and separate decision\u003c\/td\u003e\n\n\u003ctd\u003eSV\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e6. Swedish User Guide\u003c\/td\u003e\n\n\u003ctd\u003eExplanations, legal boundaries and official sources\u003c\/td\u003e\n\n\u003ctd\u003eSV\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e7. English User Guide\u003c\/td\u003e\n\n\u003ctd\u003eHow to use the Swedish documents under Swedish law\u003c\/td\u003e\n\n\u003ctd\u003eEN\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eExcel – Fire Hydrant Register\u003c\/td\u003e\n\n\u003ctd\u003eNine tabs, reference ID, administrative summaries\u003c\/td\u003e\n\n\u003ctd\u003eSV\u003c\/td\u003e\n\n\u003ctd\u003eXLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003ch2\u003eThe Excel Tool – Nine Tabs\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eStart, Units, Rounds, Service, Non-conformities, Remedial Actions, Follow-up Inspection, Dashboard and Read Me.\u003c\/strong\u003e The six operational registers are prepared for 300 entries per tab. Excel compiles registered fire hydrants, rounds, visible non-conformities, ordered and reported completed service, open non-conformities, remedial actions and separately registered return-to-service decisions. Input and calculation are kept separate. The workbook contains no macros or necessary external links.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eNote:\u003c\/strong\u003e neither Excel nor Word\/PDF can check water flow, hose condition, technical safety or legal compliance. Intervals must be determined based on the facility's actual instructions and applicable requirements.\u003c\/p\u003e\n\n\u003ch2\u003eHow to Use the Package\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003eCollect facility drawings, owner\/user responsibility, manufacturer instructions and previous service records.\u003c\/li\u003e\n\n\u003cli\u003eAssign each indoor fire hydrant a unique ID and document its location and local inspection interval.\u003c\/li\u003e\n\n\u003cli\u003ePerform only permitted visible inspections and mark uncertainty as \u003cem\u003eNot assessed\u003c\/em\u003e.\u003c\/li\u003e\n\n\u003cli\u003eRecord observed deficiencies separately and inform the responsible function of any potential need for protective measures.\u003c\/li\u003e\n\n\u003cli\u003eOrder qualified service if necessary; save the actual service report and link it to the unit ID.\u003c\/li\u003e\n\n\u003cli\u003ePerform a separate follow-up inspection and let the responsible person assess continued use based on the correct basis.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eLegal Prerequisites\u003c\/h2\u003e\n\n\u003cp\u003e\u003ca href=\"https:\/\/www.riksdagen.se\/sv\/dokument-och-lagar\/dokument\/svensk-forfattningssamling\/lag-2003778-om-skydd-mot-olyckor_sfs-2003-778\/\"\u003eChapter 2, Section 2 of the Fire Protection Act (2003:778)\u003c\/a\u003e regulates reasonable extinguishing and protective measures. \u003ca href=\"https:\/\/www.boverket.se\/sv\/PBL-kunskapsbanken\/regler-om-byggande\/brandskydd\/spridning-inom-byggnad\/inomhusbrandposter\/\"\u003eBFS 2024:7, Chapter 5, Section 39, as amended by BFS 2025:10\u003c\/a\u003e sets special requirements in certain warehouses and industrial buildings with rapid and intense fire spread; sprinklers are an alternative. Indoor fire hydrants are not required for all buildings.\u003c\/p\u003e\n\n\u003cp\u003e\u003ca href=\"https:\/\/www.mcf.se\/sv\/regler\/gallande-regler\/srvfs-20043\/\"\u003eSRVFS 2004:3\u003c\/a\u003e provides general guidance on SBA, not binding regulations. SIS states that \u003ca href=\"https:\/\/www.sis.se\/produkter\/miljo-och-halsoskydd-sakerhet\/skydd-mot-brand\/brandbekampning\/ssen671320092\/\"\u003eSS-EN 671-3:2009\u003c\/a\u003e is the applicable maintenance standard, but the full text has not been reviewed or reproduced in the templates. Service and technical testing require the correct competence and applicable documentation.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently Asked Questions\u003c\/h2\u003e\n\n\u003ch3\u003eIs a fire hydrant log mandatory by law?\u003c\/h3\u003e\n\n\u003cp\u003eNot this specific form. The need for documentation follows the building's and business's risks, applicable requirements and the organization's fire safety work.\u003c\/p\u003e\n\n\u003ch3\u003eMust every building have an indoor fire hydrant?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Boverket's special requirements apply to certain industrial and warehouse buildings; sprinklers are an alternative. Local conditions must be assessed separately.\u003c\/p\u003e\n\n\u003ch3\u003eHow often should a hose reel be inspected?\u003c\/h3\u003e\n\n\u003cp\u003eNo general interval is specified in the package. Check the manufacturer's instructions, relevant standard, agreement and actual risk assessment before determining the inspection plan.\u003c\/p\u003e\n\n\u003ch3\u003eCan I use a completed log as technical approval?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Recording in Word, PDF or Excel is administrative documentation. Technical functionality and decisions on use require separate relevant basis.\u003c\/p\u003e\n\n\u003ch3\u003eAre the PDF files interactively fillable?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The PDF versions are searchable and printable. Word is intended for editable completion.\u003c\/p\u003e\n\n\u003ch3\u003eWhat does the English User Guide mean?\u003c\/h3\u003e\n\n\u003cp\u003eThe English guide describes how the Swedish templates are used. It does not make the main templates English-language or adapted to the laws of other countries.\u003c\/p\u003e\n\n\u003ch2\u003eSources, Complementary Products and Version\u003c\/h2\u003e\n\n\u003cp\u003eSee \u003ca href=\"\/en\/products\/brandslackarkontroll-slackarregister-sba-journal-service-excel-word-pdf\"\u003eFire Extinguisher Inspection \u0026amp; Extinguisher Register\u003c\/a\u003e and \u003ca href=\"\/en\/collections\/husunderhall-skotseljournaler-mallar\"\u003eHome Maintenance \u0026amp; Care Logs\u003c\/a\u003e. Product version \u003cstrong\u003e1.0\u003c\/strong\u003e, AI-assisted source review \u003cstrong\u003eNovember 4, 2026\u003c\/strong\u003e. No external legal review, authority review or technical certification has been performed. Delivery format: digital ZIP. No physical delivery.\u003c\/p\u003e\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":56473069257046,"sku":"BRANDPOST-SLANGVINDA-V1","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/inomhusbrandpost_slangvinda_huvudbild_1600.jpg?v=1793800550"},{"product_id":"lyftbord-saxlyftbord-kontrolljournal-service-atgardsregister","title":"Scissor Lifts \u0026 Aerial Work Platforms – Inspection Log, Service \u0026 Action Register | Word\/PDF\/Excel","description":"\u003csection class=\"mb-product-copy\" lang=\"en\"\u003e\n\u003cp\u003e\u003cstrong\u003ePallet Tables \u0026amp; Stationary Scissor Lift Tables – Inspection Log, Service and Action Register\u003c\/strong\u003e is a comprehensive digital document package for Swedish workplaces with stationary lift tables for material handling. Consolidate equipment IDs, inspection programs, risk-free visual inspections, fault reports, service records and separately documented post-inspections into a cohesive workflow. Includes editable Word files, searchable PDF versions and an Excel file with nine tabs.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eImportant:\u003c\/strong\u003e The product applies to stationary material lift tables. Mobile scissor lifts for personnel lifting, vehicle tail lifts and vehicle lifts are not covered by this document package. A completed log is not an inspection certificate or a technical safety assessment.\u003c\/p\u003e\n\n\u003cdiv style=\"margin:19px 0;border:1px solid #bbd1e0;border-left:5px solid #215e90;border-radius:11px;background:#eef5fa;padding:18px 20px\"\u003e\n\n\u003ch2 style=\"margin:0 0 8px;color:#17324d\"\u003e01. Package Contents\u003c\/h2\u003e\n\n\u003cp style=\"margin:0\"\u003e\u003cstrong\u003e15 customer files:\u003c\/strong\u003e 7 Word (DOCX), 7 corresponding searchable PDF (A4) and one Excel register (XLSX) with nine tabs. The seven documents consist of five Swedish work templates, a Swedish user guide and an English User Guide. The main templates and Excel are in Swedish; only user guide number 7 is in English. Digital ZIP delivery.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv style=\"margin:19px 0;border:1px solid #bbd1e0;border-left:5px solid #215e90;border-radius:11px;background:#ffffff;padding:18px 20px\"\u003e\n\n\u003ch2 style=\"margin:0 0 8px;color:#17324d\"\u003e02. What the Files Contain\u003c\/h2\u003e\n\n\u003cp style=\"margin:0\"\u003eEquipment register with classification fields, inspection and patrol logs, fault reporting with immediate protective measures, service ordering, report receipt as well as separate post-inspection and return-to-service decisions. Excel compiles manually entered records. \u003cstrong\u003eOrdered service is not performed service; performed service does not automatically mean the device is safe.\u003c\/strong\u003e\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2\u003eWho Needs a Lift Table Log?\u003c\/h2\u003e\n\n\u003cp\u003eWarehouses, logistics, industrial facilities and workshops that use stationary material lift tables and need a structured inspection history. For the entire warehouse work environment, see \u003ca href=\"\/en\/products\/riskbedomning-lager-lagerarbete-handlingsplan-excel-2027\"\u003ewarehouse and warehouse work risk assessment\u003c\/a\u003e; for pallet racks, see pallet rack and racking inspection. These complement each other but do not replace each other.\u003c\/p\u003e\n\n\u003ch2\u003eDocument List\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"width:100%;border-collapse:collapse\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#eaf3f9\"\u003e\n\n\u003cth style=\"text-align:left;padding:8px\"\u003eDocument\u003c\/th\u003e\n\n\u003cth style=\"text-align:left;padding:8px\"\u003eFunction\u003c\/th\u003e\n\n\u003cth style=\"text-align:left;padding:8px\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003e01. Lift Table Register and Inspection Program\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003eInstallation ID, instructions, classification and responsibility\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003e02. Patrol Log and Visual Inspection\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003eRisk-free visual observations and reporting of deviations\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003e03. Fault Reporting and Protective Measures\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003eActually observed fault, risks and protective measures taken\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003e04. Service Ordering and Report Receipt\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003eOrder, actually performed service and report reference\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003e05. Post-Inspection and Return-to-Service Decision\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003eVerification, remaining points and separate manual decision\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003e06. Swedish User Guide\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003eStep-by-step workflow, legal sources and scope\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003e07. English User Guide\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003eEnglish instructions for the Swedish documents\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003e08. Excel – Operation and Inspection Register\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003eNine tabs, status lists and 15 administrative summaries\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border-bottom:1px solid #d9e5ed\"\u003eXLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\u003ch2\u003eExcel with Nine Tabs\u003c\/h2\u003e\n\n\u003cp\u003eThe Excel tool has \u003cstrong\u003eStart, Lift Table, Patrols, Fault Cases, Service, Actions, Post-Inspection, Dashboard and Read Me\u003c\/strong\u003e. Six operational registers each have 300 pre-filled data rows. The dashboard has 15 calculated key performance indicators, including registered lift tables, decommissioned devices, patrols, faults, ordered service, actually performed service and separately dated return-to-service decisions.\u003c\/p\u003e\n\n\u003cp\u003eExcel tests include registered deviation, decommissioned equipment, ordered service without a performance date, later entered performance date and return-to-service decisions that must be dated. All test items have been removed. No macros, automatic alarms, load tests, safety sensors or remote control are included.\u003c\/p\u003e\n\n\u003ch2\u003eHow to Use the Document Package\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003eObtain the manufacturer's instructions, previous certificates and actual model\/serial number information.\u003c\/li\u003e\n\n\u003cli\u003eIdentify the lift table's actual use and assess special rules – for example, if it is a level-adjusting device at a loading dock.\u003c\/li\u003e\n\n\u003cli\u003eEstablish a local inspection program with reference to the correct documentation. The template does not contain any universal inspection interval.\u003c\/li\u003e\n\n\u003cli\u003eOnly perform risk-free observations for which the personnel have sufficient competence; otherwise, note \u003cem\u003eNot assessed\u003c\/em\u003e.\u003c\/li\u003e\n\n\u003cli\u003eRecord faults and protective measures taken. Save the actual performance report and document the actual service date.\u003c\/li\u003e\n\n\u003cli\u003eHave the competent function review the documentation and decide on continued use; document this separately.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eWhich Rules and Standards Are Relevant?\u003c\/h2\u003e\n\n\u003cp\u003e\u003ca href=\"https:\/\/www.av.se\/afs-202311\/\"\u003eThe Swedish Work Environment Authority's AFS 2023:11\u003c\/a\u003e contains requirements for the safe use of work equipment and special inspection rules in Chapter 13 and Annex 12 for the devices covered. Classification is crucial. Among other things, it includes a special category for machine-driven devices at loading docks that level the height difference between vehicles and loading docks. It is incorrect to assume a single inspection interval for all lift tables.\u003c\/p\u003e\n\n\u003cp\u003e\u003ca href=\"https:\/\/www.sis.se\/produkter\/utrustning-for-materialhantering-a494a79b\/lyftdon\/ovrigt\/ss-en-1570-12024\/\"\u003eSS-EN 1570-1:2024\u003c\/a\u003e is a current standard for certain lift tables according to SIS. The full text of the standard has not been reviewed, and no design requirements or test values from it are stated here. See also the \u003ca href=\"https:\/\/www.riksdagen.se\/sv\/dokument-och-lagar\/dokument\/svensk-forfattningssamling\/arbetsmiljolag-19771160_sfs-1977-1160\/\"\u003eWork Environment Act\u003c\/a\u003e. Assess which regulation applies to the actual machine and operation.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently Asked Questions\u003c\/h2\u003e\n\n\u003ch3\u003eIs this lift table log mandatory by law?\u003c\/h3\u003e\n\n\u003cp\u003eNot this specific form. The employer may need to document inspections, risks and maintenance according to applicable requirements. How this is done depends on the machine type and the workplace conditions.\u003c\/p\u003e\n\n\u003ch3\u003eAre all stationary lift tables subject to inspection every two years?\u003c\/h3\u003e\n\n\u003cp\u003eNo, such a general statement is misleading. Special inspection rules depend on the type of device used and the context. Check AFS 2023:11, Annex 12, and the documentation for the actual equipment.\u003c\/p\u003e\n\n\u003ch3\u003eCan I use the template for a mobile scissor lift or a personnel lift?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The product covers stationary lift tables for goods. Personnel lifts and mobile scissor lifts require specially adapted documents and a legal assessment.\u003c\/p\u003e\n\n\u003ch3\u003eIs documented service enough to put the lift table back into operation?\u003c\/h3\u003e\n\n\u003cp\u003eNo. In addition to actual service, further expert inspection and possible legally required inspection measures may be required. Return-to-service must be decided separately with the correct documentation.\u003c\/p\u003e\n\n\u003ch3\u003eAre the PDF files fillable?\u003c\/h3\u003e\n\n\u003cp\u003eThe PDF versions are searchable and printable. The Word files are editable. We do not promise interactive fillable PDF forms.\u003c\/p\u003e\n\n\u003ch3\u003eIs everything translated into English?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The English User Guide explains how the Swedish work templates are used. The Excel register and work templates are in Swedish and designed for Swedish conditions.\u003c\/p\u003e\n\n\u003ch2\u003eRelated Templates, Sources and Version\u003c\/h2\u003e\n\n\u003cp\u003eSee \u003ca href=\"\/en\/collections\/lager-inventering-mallar\"\u003eWarehouse and Inventory – Templates\u003c\/a\u003e, \u003ca href=\"\/en\/products\/riskbedomning-lager-lagerarbete-handlingsplan-excel-2027\"\u003eRisk Assessment for Warehouses\u003c\/a\u003e and Pallet Rack Inspection. Official sources are linked above and in the guides.\u003c\/p\u003e\n\n\u003cp\u003e\u003csmall\u003eProduct version 1.0. AI-assisted legal source check performed November 5, 2026. No external legal review or technical third-party certification has been carried out. The product and ZIP refer to digital download.\u003c\/small\u003e\u003c\/p\u003e\n\n\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":56480202719574,"sku":"LYFTBORD-SAXLYFT-V1","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/lyftbord_saxlyftbord_huvudbild_1600.jpg?v=1793864431"},{"product_id":"sammansatt-produktionscell-2027-maskinintegrator-ce-granssnitt","title":"Complex production cell 2027 – integrator's interface, CE basis \u0026 safety testing | Word\/PDF\/Excel","description":"\u003csection lang=\"sv\" style=\"line-height:1.68;color:#183D57\"\u003e\n\u003cp\u003e\u003cstrong\u003eAre you going to build a production cell consisting of a robot, conveyor, fixtures and other equipment that together are controlled as a machine?\u003c\/strong\u003e Then you need to clarify who is responsible for \u003cstrong\u003ethe combined machine\u003c\/strong\u003e, which documents must come from each supplier, and which common safety functions must be risk-assessed and tested. This special package helps integrators and industrial companies collect the underlying documentation in an auditable way.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eLegal basis:\u003c\/strong\u003e EU Machinery Regulation \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2023\/1230\/2026-07-27\/eng\"\u003e(EU) 2023\/1230\u003c\/a\u003e applies mainly from \u003cstrong\u003e20 January 2027\u003c\/strong\u003e. The definition of a combined machine in \u003cstrong\u003eArticle 3.1(d)\u003c\/strong\u003e includes machines and partially completed machines that have been assembled and controlled for a common purpose so that they function as an integrated whole. It is not enough for two machines to happen to stand near each other. Also read the \u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/inspektioner-utredningar-och-kontroller\/produktregler-och-marknadskontroll\/produktregler\/krav-pa-maskiner\/sakra-sammansatta-maskiner-och-ce-markning\/\"\u003eSwedish Work Environment Authority guidance on combined machines and CE\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eQuick facts:\u003c\/strong\u003e 5 different Swedish operational templates + 1 Swedish user guide + 1 English User Guide. All seven documents are available as editable Word (DOCX) and searchable, printable PDF (A4), plus 1 Swedish Excel workbook with 9 tabs. \u003cstrong\u003e7 DOCX + 7 PDF + 1 XLSX = 15 customer files\u003c\/strong\u003e. Price: SEK 79.\u003c\/p\u003e\n\n\u003csection style=\"border:2px solid #B9D4E4;border-left:6px solid #26729C;background:#F0F7FB;border-radius:10px;padding:17px 20px;margin:19px 0\"\u003e\u003ch2 style=\"margin:0 0 9px;color:#174F72\"\u003e01 · Package contents\u003c\/h2\u003e\n\n\u003cp style=\"margin:0\"\u003eFive separate operational templates: \u003cstrong\u003eboundary assessment, supplier and responsibility matrix, joint risk and safety function analysis, technical file\/CE decision gate, and integration testing\/handover\u003c\/strong\u003e. One Swedish and one English user guide are included. Seven Word files with seven corresponding PDF files and one Excel register – a total of 15 files in a ZIP.\u003c\/p\u003e\u003c\/section\u003e\n\u003csection style=\"border:2px solid #B9D4E4;border-left:6px solid #26729C;background:#F0F7FB;border-radius:10px;padding:17px 20px;margin:19px 0\"\u003e\u003ch2 style=\"margin:0 0 9px;color:#174F72\"\u003e02 · What the files contain\u003c\/h2\u003e\n\n\u003cp style=\"margin:0\"\u003eModel and serial identification, control system boundaries, integrator responsibility, declaration of incorporation, and assembly instructions for partially completed machinery, risks between interacting units, evidence of emergency stop\/restart, applicable annexes, test ID, open non-conformities, and manual signing. The Excel file only summarizes registered data and cannot issue CE marking or determine operational safety.\u003c\/p\u003e\u003c\/section\u003e\n\u003ch2\u003eWho is the production cell integration package right for?\u003c\/h2\u003e\n\n\u003cp\u003eIt is particularly useful for \u003cstrong\u003esystem integrators, automation companies, robot integrators, machine builders, machine owners, technical project managers, and CE\/safety officers\u003c\/strong\u003e who are going to create a new combined production cell, for example, a robot that feeds a conveyor and a packaging machine with coordinated stop and safety functions.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eChoose a different template\u003c\/strong\u003e if the assignment only involves substantially modifying a single existing machine: then our \u003ca href=\"\/en\/products\/vasentlig-maskinandring-2027-artikel18-gransdragning\"\u003especial template for substantial modification of machinery according to Articles 3.16 and 18\u003c\/a\u003e is available. This product focuses on \u003cstrong\u003einterfaces and coordinated manufacturer responsibility for a new assembly\u003c\/strong\u003e, not on whether every component change in an older machine is substantial.\u003c\/p\u003e\n\n\u003ch2\u003eExactly what is included?\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"border-collapse:collapse;width:100%;min-width:600px\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#DFEDF5\"\u003e\n\n\u003cth style=\"text-align:left;padding:10px\"\u003eFile \/ document\u003c\/th\u003e\n\n\u003cth style=\"text-align:left;padding:10px\"\u003eSpecific use\u003c\/th\u003e\n\n\u003cth style=\"text-align:left;padding:10px\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003e01 Boundary assessment and integrator responsibility\u003c\/td\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003eAssess machines with a common purpose, control, and risk boundaries according to Article 3.1(d)\u003c\/td\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003e02 Supplier boundaries and responsibility matrix\u003c\/td\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003eMap constituent units, declarations of incorporation, and assembly instructions\u003c\/td\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003e03 Common safety functions and risks\u003c\/td\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003eDocument protection, stops, restart, interfaces, and actual test evidence\u003c\/td\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003e04 Technical file and CE decision gate\u003c\/td\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003eCollect Annex IV documentation and check the correct manufacturer responsibility and Article 25 pathway\u003c\/td\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003e05 Integration testing and handover\u003c\/td\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003eRecord results, open non-conformities, operating instructions, and formal sign-off\u003c\/td\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003e06 Swedish user guide\u003c\/td\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003eWorkflow, five control scenarios, dates, legal boundaries, and sources\u003c\/td\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003e07 English User Guide\u003c\/td\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003eInstructions for the five Swedish operational templates\u003c\/td\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003e08 Excel – nine tabs\u003c\/td\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003eRecord cells, machine modules, interfaces, risks, tests, documents, and actions\u003c\/td\u003e\n\n\u003ctd style=\"border:1px solid #C4D9E6;padding:10px\"\u003eXLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\u003ch2\u003eThe Excel register – nine tabs\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eCells, Modules, Interfaces, Risks, Testing, Documents, Actions, Overview, and Sources \u0026amp; guide.\u003c\/strong\u003e The register links each unit to the cell ID, responsible supplier, document ID, common safety function, risk, and actual test reference. The overview shows seven administrative metrics, including the number of registered production cells, machine modules, open risks, failed tests, missing technical documents, and open actions.\u003c\/p\u003e\n\n\u003cp\u003eThe workbook is delivered empty. Without entered customer data, all seven numbers are \u003cstrong\u003e0\u003c\/strong\u003e. The formulas have been tested with a constructed test case, and the test data has been cleared. No fictitious CE numbers, serial numbers, test reports, actual signatures, or government decisions are included in the package.\u003c\/p\u003e\n\n\u003ch2\u003eHow to use the document package\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eIdentify the cell.\u003c\/strong\u003e Specify which machines, modules, and any partially completed machines are being integrated. Assess the common purpose, material flow, and control according to Article 3.1(d).\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eEstablish responsibility.\u003c\/strong\u003e Document who is actually the manufacturer of the entire assembly, and request the relevant documents from each supplier.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eReview partially completed machines.\u003c\/strong\u003e These are handled with a \u003cstrong\u003edeclaration of incorporation according to Annex V Part B\u003c\/strong\u003e and \u003cstrong\u003eassembly instructions according to Annex XI\u003c\/strong\u003e, not as if they automatically had a final CE declaration for the entire production cell.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eInvestigate the interface risk.\u003c\/strong\u003e Ask a competent technical function to risk-assess common emergency stops, safety guards, restart, and malfunctions according to the relevant requirements in Annex III.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCollect technical documentation.\u003c\/strong\u003e Review Annex IV, Article 10, and the conformity assessment procedure in Article 25, including whether any Annex I category or notified body becomes relevant.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eTest and handover.\u003c\/strong\u003e Enter actual test results, non-conformities, signatures, and instruction references. Make a separate formal decision on conformity, CE, and commissioning when the requirements are actually met.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eFour relevant examples\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eRobot cell with common stop:\u003c\/strong\u003e a robot, a feeding station, and a conveyor have the same control system and common production goal. Assess whether the whole is a combined machine and map out the system-boundary safety functions.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eTwo adjacent standalone machines:\u003c\/strong\u003e machines that can be operated and protected independently of each other are not automatically a combined machine. Document the reasons before any CE process for the whole is decided.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003ePartially completed robot module:\u003c\/strong\u003e the supplier provides the declaration of incorporation and assembly instructions, while the integrator must assess the whole and final documentation.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eOlder cell with new safety PLC:\u003c\/strong\u003e investigate in a separate matter whether the assignment instead falls under the rules on substantial modification according to Article 18. Do not automatically assume that all reprogramming is substantial.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently Asked Questions\u003c\/h2\u003e\n\n\u003ch3\u003eMust every production line be CE marked as a single machine?\u003c\/h3\u003e\n\n\u003cp\u003eNot automatically. Article 3.1(d) requires that the actual coordination and common function be tested. When an assembly constitutes a machine, responsibility for the conformity of the final product may arise.\u003c\/p\u003e\n\n\u003ch3\u003eIs the supplier's CE marking on the robot enough?\u003c\/h3\u003e\n\n\u003cp\u003eNo, not as the only evidence of safety for an integrated whole. The machines can create new risks when they are controlled together, and the interfaces must be tested.\u003c\/p\u003e\n\n\u003ch3\u003eWhat does declaration of incorporation mean?\u003c\/h3\u003e\n\n\u003cp\u003eIt is a special document for partially completed machinery according to Annex V Part B. It is not the same document as the EU declaration of conformity for a finished combined machine.\u003c\/p\u003e\n\n\u003ch3\u003eDoes the template issue a CE certificate or safety calculation?\u003c\/h3\u003e\n\n\u003cp\u003eNo. No technical testing, PL\/SIL calculation, notified body review, or actual CE declaration is delivered. The templates help you follow up on actual evidence and decisions.\u003c\/p\u003e\n\n\u003ch3\u003eCan the package be used before 20 January 2027?\u003c\/h3\u003e\n\n\u003cp\u003eYes, as preparatory project documentation. For actual market placement and commissioning decisions before the effective date, the then-current machinery regulations must be assessed separately.\u003c\/p\u003e\n\n\u003ch3\u003eAre all documents in English?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The five operational templates and Excel are in Swedish. A Swedish guide and a separate English User Guide are included, but no full English versions of the five Swedish operational templates.\u003c\/p\u003e\n\n\u003ch2\u003eLegal sources and quality boundaries\u003c\/h2\u003e\n\n\u003cp\u003e\u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2023\/1230\/2026-07-27\/eng\"\u003eEU 2023\/1230, consolidated version 27 July 2026\u003c\/a\u003e · \u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/inspektioner-utredningar-och-kontroller\/produktregler-och-marknadskontroll\/produktregler\/krav-pa-maskiner\/den-nya-maskinforordningen\/\"\u003eSwedish Work Environment Authority information on the new Machinery Regulation\u003c\/a\u003e · \u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/inspektioner-utredningar-och-kontroller\/produktregler-och-marknadskontroll\/produktregler\/krav-pa-maskiner\/sakra-sammansatta-maskiner-och-ce-markning\/\"\u003eSwedish Work Environment Authority on combined machines and CE\u003c\/a\u003e. Relevant law: Article 3.1(d), Article 10, Article 18 for substantial modification, Article 25, and Annexes I, III, IV, V, and XI.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eVersion 1.0, AI-assisted legal source check on 10 November 2026.\u003c\/strong\u003e No external legal review, final technical safety assessment, harmonized standard text, actual testing, government review, or CE certification is included. Check current law, product category, and actual technical conditions.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eOther packages:\u003c\/strong\u003e \u003ca href=\"\/en\/products\/eu-maskinforordningen-machinery-regulation-2027-riskbedomning-ce-technical-file-word-pdf-excel\"\u003ebroader Machinery Regulation package\u003c\/a\u003e as well as \u003ca href=\"\/en\/products\/maskinforordningen-2027-digital-bruksanvisning-qr-test-pappersbegaran\"\u003edigital user manual for machines\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":56574454202710,"sku":"MACH-CELL-INTEGRATOR-2027-V1","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/01_Produktionscell_2027_Huvudbild_1600.png?v=1794344728"},{"product_id":"sakerhets-plc-2027-programandring-versionsbevis-aterstartsprov","title":"Safety PLC 2027 – program change, version evidence and restart test | Word\/PDF\/Excel","description":"\u003cdiv class=\"mb-product-copy\"\u003e\n\n\u003cp\u003e\u003cstrong\u003eAre you going to change a safety PLC program or update the control system's safety logic?\u003c\/strong\u003e Document the difference between the old and new versions, perform a traceable risk triage, plan and conduct controlled safety tests, and make an explicit decision before the plant can be restarted. This specialist package is designed for machine manufacturers, integrators, and machine safety officers in Sweden.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eQuick facts:\u003c\/strong\u003e 15 files (7 DOCX, 7 corresponding searchable PDFs, and 1 XLSX with 9 tabs), Swedish legal\/technical working documentation, a Swedish guide, and a separate English user guide. The PDF versions are static and not digitally fillable. \u003cstrong\u003ePrice: SEK 79 upon publication.\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003cdiv style=\"border:2px solid #8DADCA;border-radius:9px;padding:17px 19px;margin:17px 0;background:#F3F8FC\"\u003e\n\n\u003ch2\u003ePackage contents\u003c\/h2\u003e\n\n\u003cp\u003eFive Swedish working templates in Word and corresponding PDFs: program change request; risk triage and substantial machine change; safety function matrix and test plan; FAT\/SAT and restart test; release decision, rollback, and version evidence. A Swedish user guide and an English User Guide are also included in both Word and PDF. In addition, there is an editable Excel register with nine tabs. \u003cstrong\u003e7 Word + 7 PDF + 1 Excel = 15 customer files.\u003c\/strong\u003e\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv style=\"border:2px solid #8DADCA;border-radius:9px;padding:17px 19px;margin:17px 0;background:#F3F8FC\"\u003e\n\n\u003ch2\u003eWhat the files contain\u003c\/h2\u003e\n\n\u003cp\u003eMachine and control system ID, firmware, pre- and post-versions, description of changes, specific assessment of Articles 3.16 and 18, safety functions, test criteria, test results, version hash, actions, responsible parties, stop gates, and a separate decision on technical release and actual restart.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2\u003eWhen is the product useful?\u003c\/h2\u003e\n\n\u003cp\u003eExample: a change in logic regarding a protective door, emergency stop, safety I\/O, or version change in a PLC\/safety PLC system. The package is also useful when a passed FAT test must be followed by an SAT, when the firmware and the program's previous baseline need to be documented, or when a rollback requires new verification.\u003c\/p\u003e\n\n\u003ch2\u003eWhat is included – and what is not?\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth scope=\"col\"\u003eWorking file\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eSpecific function\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eLanguage and format\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e01 Program change request\u003c\/td\u003e\n\n\u003ctd\u003eDescribe the change, machine identity, version baseline, dependencies, and responsibilities.\u003c\/td\u003e\n\n\u003ctd\u003eSwedish · editable DOCX + searchable PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e02 Risk triage and substantial change\u003c\/td\u003e\n\n\u003ctd\u003eSeparate assessment of the cumulative criteria in Article 3.16, including a\/b criteria and potential manufacturer responsibility under Article 18.\u003c\/td\u003e\n\n\u003ctd\u003eSwedish · DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e03 Safety function matrix\u003c\/td\u003e\n\n\u003ctd\u003eLink risk analysis, protective function, safe behavior, and verifying test cases.\u003c\/td\u003e\n\n\u003ctd\u003eSwedish · DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e04 FAT\/SAT test protocol\u003c\/td\u003e\n\n\u003ctd\u003eReport controlled tests, expected results, actual results, evidence of measurements, deviations, and restart tests.\u003c\/td\u003e\n\n\u003ctd\u003eSwedish · DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e05 Release decision and rollback\u003c\/td\u003e\n\n\u003ctd\u003eManage technical stop gates, decision-making authority, restoration evidence, and separate commissioning control.\u003c\/td\u003e\n\n\u003ctd\u003eSwedish · DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e06 Swedish user guide\u003c\/td\u003e\n\n\u003ctd\u003ePractical sequence, typical cases, limitations, and official sources.\u003c\/td\u003e\n\n\u003ctd\u003eSwedish · DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e07 English User Guide\u003c\/td\u003e\n\n\u003ctd\u003eExplains how the Swedish templates are used, with a glossary. Not an English version of the working templates.\u003c\/td\u003e\n\n\u003ctd\u003eEnglish · DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e08 Excel register\u003c\/td\u003e\n\n\u003ctd\u003eRecord changes, functions, risk triage, FAT\/SAT, versions, actions, and decisions, and view an overview.\u003c\/td\u003e\n\n\u003ctd\u003eSwedish · editable XLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\u003ch2\u003eExcel: nine tabs and a traceable chain of control\u003c\/h2\u003e\n\n\u003cp\u003eThe tabs are \u003cstrong\u003eOverview, Changes, Functions, Risk triage, Testing, Versions, Actions, Decisions, and Read me.\u003c\/strong\u003e Excel includes controlled status selections and calculations that count, for example, open risk ratings, failed tests, open actions, and items marked “Do not release”. The formulas have been tested with synthetic test cases, and the customer file is delivered without test data. \u003cstrong\u003eExcel counts cases – it does not assess machine safety or approve any release.\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003ch2\u003eSeven-step workflow\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003eRecord the machine, the program version before the change, and the current firmware.\u003c\/li\u003e\n\n\u003cli\u003eSpecify the changed safety behavior, dependencies, and risk analysis.\u003c\/li\u003e\n\n\u003cli\u003eAssess whether the change falls under the Machinery Regulation's definition of a substantial change.\u003c\/li\u003e\n\n\u003cli\u003eEstablish safety functions and actual test criteria through a qualified expert.\u003c\/li\u003e\n\n\u003cli\u003ePerform verification in an approved, safe test environment; document failed results without overwriting previous evidence.\u003c\/li\u003e\n\n\u003cli\u003eAssess requirements for version and intervention traceability, archiving, and the technical file.\u003c\/li\u003e\n\n\u003cli\u003eMake a separate technical decision, followed by an actual operational\/restart decision in accordance with the organization's safety process.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eLegal basis and dates\u003c\/h2\u003e\n\n\u003cp\u003e\u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2023\/1230\/en\"\u003eThe Machinery Regulation (EU) 2023\/1230, consolidated version\u003c\/a\u003e shall generally apply from \u003cstrong\u003e20 January 2027\u003c\/strong\u003e (Article 54). Certain provisions apply earlier. \u003cstrong\u003eArticle 52\u003c\/strong\u003e contains transitional provisions, meaning that an existing machine does not automatically require a new CE assessment simply because someone updates a program.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eArticle 3.16\u003c\/strong\u003e defines a substantial change through several cumulative conditions: including a subsequent physical or digital change that was not planned by the manufacturer, a new hazard or increased risk, and specific safety requirements under points a or b. It is incorrect to call \u003cem\u003eevery\u003c\/em\u003e program change substantial. \u003cstrong\u003eArticle 18\u003c\/strong\u003e may entail manufacturer responsibility when a substantial change actually exists. \u003cstrong\u003eAnnex III, sections 1.1.9 and 1.2.1\u003c\/strong\u003e address, among other things, safety-critical software, control systems, and the recording of changes\/updated program versions. \u003cstrong\u003eAnnex IV\u003c\/strong\u003e applies to technical documentation.\u003c\/p\u003e\n\n\u003cp\u003eA specific provision in Annex III, section 1.2.1 f, concerns an intervention log and uploaded versions of safety software for five years after upload for the specified control purpose. This is not a general rule that personal data or secret source code must be archived for five years in an Excel file. Check applicability, confidentiality, data protection, and secure storage separately.\u003c\/p\u003e\n\n\u003cp\u003eSee also \u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/inspektioner-utredningar-och-kontroller\/produktregler-och-marknadskontroll\/produktregler\/krav-pa-maskiner\/den-nya-maskinforordningen\/\"\u003ethe Swedish Work Environment Authority's information on the new Machinery Regulation\u003c\/a\u003e. Potentially relevant standards, such as ISO 12100, ISO 13849-1, and IEC 62061, require separate competent application; the template package contains no PL\/SIL calculation.\u003c\/p\u003e\n\n\u003ch2\u003eDifference from other machine templates\u003c\/h2\u003e\n\n\u003cp\u003eThis package focuses on \u003cstrong\u003especific program versions, safety function tests, and release\/rollback evidence\u003c\/strong\u003e. For a more comprehensive legal assessment of whether a change is substantial, \u003ca href=\"\/en\/products\/vasentlig-maskinandring-2027-artikel18-gransdragning\"\u003eSubstantial Machine Change 2027\u003c\/a\u003e is also available. For general EU product documentation, see \u003ca href=\"\/en\/products\/eu-maskinforordningen-machinery-regulation-2027-riskbedomning-ce-technical-file-word-pdf-excel\"\u003eEU Machinery Regulation 2027 – Risk Assessment and Technical File\u003c\/a\u003e, and for more general acceptance testing, see \u003ca href=\"\/en\/products\/fat-sat-testprotokoll-2026-2027-acceptansprovning-avvikelser-och-excel-word-pdf\"\u003eFAT\/SAT Test Protocol\u003c\/a\u003e. The products serve different purposes.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently asked questions\u003c\/h2\u003e\n\n\u003ch3\u003eDoes a program change automatically make the machine a new CE product?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Make a concrete legal and technical assessment according to the applicable regulation and the machine's history. Article 3.16 requires more than the software being changed.\u003c\/p\u003e\n\n\u003ch3\u003eCan we release the machine if Excel shows zero failed tests?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Zero may mean that no test has been recorded. The responsible party must ensure an applicable risk assessment, complete verifications, and separate operational approval.\u003c\/p\u003e\n\n\u003ch3\u003eDoes it include a ready-made PLC program or a PL\/SIL calculation?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The product contains administrative templates and verification documentation, not programmable safety logic, fixed machine parameters, or certification.\u003c\/p\u003e\n\n\u003ch3\u003eAre the PDF files digitally fillable?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The PDFs are searchable and printable reference versions. Use DOCX and XLSX for editing.\u003c\/p\u003e\n\n\u003ch3\u003eAre the working templates available in English?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The five working templates and Excel are in Swedish. An English guide is included to assist with the Swedish documents.\u003c\/p\u003e\n\n\u003ch3\u003eCan we put all PLC source code in Excel?\u003c\/h3\u003e\n\n\u003cp\u003eThis is not recommended. Instead, record secure internal version IDs, hash values, and approved archive references. Limit access to protected documentation and source code.\u003c\/p\u003e\n\n\u003ch2\u003eVersion, delivery, and review level\u003c\/h2\u003e\n\n\u003cp\u003e\u003csmall\u003e\u003cstrong\u003eVersion 1.0 – November 12, 2026.\u003c\/strong\u003e The legal sources have been checked with AI assistance against the consolidated EU regulation and the Swedish Work Environment Authority's information. No independent external legal review, technical functional testing on a real plant, CE assessment, or regulatory certification has been performed. Complete and review the documents with someone who has expertise in the current machine and function.\u003c\/small\u003e\u003c\/p\u003e\n\n\n\u003c\/div\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":56588275351894,"sku":"SAFETYPLC-CHANGE-2027-V1","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/01_SafetyPLC_2027_huvudbild_1600.png?v=1794441155"},{"product_id":"energikartlaggning-10-85-tj-2027-handlingsplan","title":"EED 2027 – energy assessment 10\/85 TJ, three-year calculation and action plan | Word\/PDF\/Excel","description":"\u003cdiv class=\"mb-product-copy\"\u003e\n\n\u003cp\u003e\u003cstrong\u003eWill your company be covered by the new rules on energy audits and energy management systems?\u003c\/strong\u003e The EU's revised energy efficiency directive (EU) \u003cstrong\u003e2023\/1791 Article 11\u003c\/strong\u003e uses energy consumption instead of just company size: over \u003cstrong\u003e10 TJ\u003c\/strong\u003e per year on average over three years is the threshold for energy audits for companies that do not introduce energy management systems, while over \u003cstrong\u003e85 TJ\u003c\/strong\u003e refers to a certified energy management system.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eThis specialized documentation product helps companies prepare:\u003c\/strong\u003e compile electricity, heat, and fuels; document the three-year calculation; assess current legal status; prepare an assignment for a qualified energy auditor; create a concrete action plan and a correct basis for company management and potential future annual reports.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eImportant legal status as of 12 November 2026:\u003c\/strong\u003e the new Swedish law is \u003cstrong\u003estill under consideration by the Swedish Parliament\u003c\/strong\u003e. The current law (2014:266) on energy audits in large companies applies until otherwise decided. The government's referral to the Law Council proposed a new law from \u003cstrong\u003e1 January 2027\u003c\/strong\u003e, but this date and the Swedish transitional provisions should not be treated as final until they are adopted. The original dates of the EU directive, 11 October 2026 and 11 October 2027, are therefore \u003cstrong\u003enot automatically enforceable Swedish company deadlines\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cdiv style=\"border:2px solid #90B6CF;background:#EFF7FB;border-radius:10px;padding:18px 20px;margin:19px 0\"\u003e\n\n\u003ch2\u003ePackage contents\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003e01\u003c\/strong\u003e Company delimitation and 10\/85 TJ threshold assessment. \u003cstrong\u003e02\u003c\/strong\u003e Energy carriers and verifiable three-year calculation. \u003cstrong\u003e03\u003c\/strong\u003e Energy audit – expert, report, and recommendations. \u003cstrong\u003e04\u003c\/strong\u003e Energy management system – over 85 TJ and independent certification. \u003cstrong\u003e05\u003c\/strong\u003e Action plan, management decision, and annual report basis. \u003cstrong\u003e06\u003c\/strong\u003e Swedish user guide. \u003cstrong\u003e07\u003c\/strong\u003e English User Guide for the Swedish work templates. \u003cstrong\u003e08\u003c\/strong\u003e Excel register with nine tabs. The seven documents are delivered both as \u003cstrong\u003eeditable Word (DOCX)\u003c\/strong\u003e and \u003cstrong\u003esearchable PDF\u003c\/strong\u003e. Total \u003cstrong\u003e7 Word + 7 PDF + 1 Excel = 15 customer files.\u003c\/strong\u003e\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv style=\"border:2px solid #90B6CF;background:#EFF7FB;border-radius:10px;padding:18px 20px;margin:19px 0\"\u003e\n\n\u003ch2\u003eWhat the files contain\u003c\/h2\u003e\n\n\u003cp\u003eFields for company\/meter ID, three full measurement years, energy carriers (electricity, heat, cooling, gas, fuels), MWh and TJ, legal status, calculation evidence and data quality, qualified and independent energy auditor, ISO 50001-like system control, external certification evidence, risk and action prioritization, technical and economic feasibility, confidentiality review, and management attestation. Excel offers automatic three-year average calculation and eight status indicators.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2\u003eFor which companies?\u003c\/h2\u003e\n\n\u003cp\u003ePrimarily \u003cstrong\u003eenergy-intensive Swedish companies, industries, logistics operations, property companies, large warehouses, and process companies\u003c\/strong\u003e as well as their financial managers, energy managers, and environmental and sustainability functions. Smaller companies with high energy consumption may also need to prepare. The proposed Swedish delimitation is based, among other things, on a legal entity subject to annual reporting and use in Sweden, but the \u003cstrong\u003efinal definition must be checked against enacted law and regulations\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eFile overview\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth scope=\"col\"\u003eFile\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eWhat you can do\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e01 10\/85 TJ and organizational boundary\u003c\/td\u003e\n\n\u003ctd\u003eTest an actual company, three-year average, strict thresholds, Swedish legal status, and other obligations.\u003c\/td\u003e\n\n\u003ctd\u003eSwedish DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e02 Energy items and three-year basis\u003c\/td\u003e\n\n\u003ctd\u003eCollect sources for electricity, district heating, fuels, process energy, and measurement quality without double counting.\u003c\/td\u003e\n\n\u003ctd\u003eSwedish DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e03 Energy audit\u003c\/td\u003e\n\n\u003ctd\u003ePrepare procurement of a qualified independent expert, scope, report, and recommendations.\u003c\/td\u003e\n\n\u003ctd\u003eSwedish DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e04 Energy management system\u003c\/td\u003e\n\n\u003ctd\u003eTest system boundary, energy baseline, management process, and independent certification when the higher requirement becomes applicable.\u003c\/td\u003e\n\n\u003ctd\u003eSwedish DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e05 Action plan and annual report\u003c\/td\u003e\n\n\u003ctd\u003eDocument action, expected energy savings, investment decision, and confidentiality review.\u003c\/td\u003e\n\n\u003ctd\u003eSwedish DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e06 User guide\u003c\/td\u003e\n\n\u003ctd\u003eWorkflow, six case types, and official sources, with special check of Swedish legal status.\u003c\/td\u003e\n\n\u003ctd\u003eSwedish DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e07 English User Guide\u003c\/td\u003e\n\n\u003ctd\u003eInstructions for using the five Swedish operational templates and the Swedish workbook.\u003c\/td\u003e\n\n\u003ctd\u003eEnglish DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e08 Excel register\u003c\/td\u003e\n\n\u003ctd\u003eNine work tabs, calculated 3-year averages, threshold indicator, source register, and eight warning counters.\u003c\/td\u003e\n\n\u003ctd\u003eSwedish XLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\u003ch2\u003eExcel – nine tabs with automatic energy calculation\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eThree-year calculation, Energy items, Audit, Management system, Action plan, Annual report, Legal status, Overview, and Read me.\u003c\/strong\u003e Enter an internal company ID and verified use in MWh for \u003cstrong\u003ethree full years\u003c\/strong\u003e. The register calculates average MWh\/year and TJ\/year according to \u003cstrong\u003e1 MWh = 0.0036 TJ\u003c\/strong\u003e and automatically flags the indicative EU level.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eEight compilation indicators\u003c\/strong\u003e show registered companies, energy audit level (over 10 up to and including 85 TJ), energy management level (over 85 TJ), incomplete data quality, missing audit, missing system certificate, delayed actions, and unverified Swedish SFS status. Control formulas have been tested with synthetic cases and the delivered customer version has been cleared. \u003cstrong\u003eAn empty overview with zeros does not mean that the company complies with the law.\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003ch2\u003eLegal basis – careful differences\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eEU Directive 2023\/1791 Article 11.1:\u003c\/strong\u003e member states shall ensure that companies with an average annual energy use that \u003cstrong\u003eexceeds 85 TJ\u003c\/strong\u003e over the preceding three years, with all energy carriers combined, introduce an energy management system certified by an independent body. The directive specifies \u003cstrong\u003e11 October 2027\u003c\/strong\u003e as the EU implementation time for the system. \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/dir\/2023\/1791\/oj\/swe\"\u003eRead EED Article 11 in EUR-Lex\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eArticle 11.2:\u003c\/strong\u003e companies with a three-year average \u003cstrong\u003eover 10 TJ\u003c\/strong\u003e that do not introduce energy management systems shall be covered by energy audits. The EU directive specifies an initial audit by no later than \u003cstrong\u003e11 October 2026\u003c\/strong\u003e and thereafter at least every four years, with an independent qualified\/accredited expert or equivalent according to national order. The times should be kept separate from the Swedish implementation that has not yet been finally adopted.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eExact threshold value:\u003c\/strong\u003e 10 TJ and 85 TJ do not mean “over” these thresholds. EED thresholds use \u003cem\u003eexceeds\u003c\/em\u003e, which means that an exact comparison value does not automatically trigger the next level. The annual average must be calculated from actual energy values and correct unit conversion. \u003cstrong\u003e10 TJ corresponds to approximately 2.78 GWh and 85 TJ approximately 23.61 GWh per year.\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eAction plan and annual report:\u003c\/strong\u003e Article 11.2 requires that affected companies establish a feasible action plan for the energy audit recommendations and submit it to company management. The directive also addresses the publication of action plans and implementation status in the annual report, with protection for trade secrets and confidentiality. Final Swedish regulation should be tested before anything is published.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eSwedish legislative status 12 November 2026:\u003c\/strong\u003e \u003ca href=\"https:\/\/www.regeringen.se\/rattsliga-dokument\/lagradsremiss\/2026\/08\/energieffektivitet-i-foretag-och-i-fjarrvarme--och-fjarrkylesektorn\/\"\u003ethe government's Law Council referral 20 August 2026\u003c\/a\u003e proposed a new law from \u003cstrong\u003e1 January 2027\u003c\/strong\u003e. \u003ca href=\"https:\/\/www.riksdagen.se\/sv\/dokument-och-lagar\/dokument\/betankande\/energieffektivitet-i-foretag-och-i-fjarrvarme-och_he01nu5\/\"\u003eParliamentary matter 2026\/27:NU5\u003c\/a\u003e was still under consideration on 12 November. \u003ca href=\"https:\/\/www.energimyndigheten.se\/effektiv-energianvandning\/foretag\/lagar-och-krav-for-energieffektivisering-i-foretag\/energikartlaggning\/ny-lag-om-energiledningssystem-och-energikartlaggningar-i-foretag\/\"\u003eThe Swedish Energy Agency\u003c\/a\u003e describes a Swedish proposal with an audit \u003cstrong\u003ewithin one year\u003c\/strong\u003e and energy management system \u003cstrong\u003ewithin two years\u003c\/strong\u003e after the new law comes into force. None of these proposed start dates are specified as already applicable.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eCurrent law:\u003c\/strong\u003e until new Swedish law comes into force, large companies continue to be covered by \u003cstrong\u003eAct (2014:266) on energy audits in large companies\u003c\/strong\u003e and applicable regulations. Existing reporting and audit obligations do not cease just because a new law proposal is being considered.\u003c\/p\u003e\n\n\u003ch2\u003ePractical workflow\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003eDetermine which company, organization number, which sites and energy carriers are to be covered – and check which Swedish law actually applies.\u003c\/li\u003e\n\n\u003cli\u003eCollect energy data for three comparable full years. Record source evidence and mark gaps in the material.\u003c\/li\u003e\n\n\u003cli\u003eCalculate averages in MWh and TJ in Excel. Do not treat missing years as zero or electricity consumption as the entire energy basis.\u003c\/li\u003e\n\n\u003cli\u003eTest whether the EU level is over 10 TJ or over 85 TJ, without thereby assuming decided Swedish application.\u003c\/li\u003e\n\n\u003cli\u003eIn case of relevant audit requirement: procure a qualified independent expert and prepare a real energy audit assignment.\u003c\/li\u003e\n\n\u003cli\u003eIn case of relevant management system requirement: ensure that the process and certification are actually carried out by qualified bodies.\u003c\/li\u003e\n\n\u003cli\u003eDecide on actions and costs with management, follow up, and test what should be published according to current Swedish law.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eFrequently asked questions\u003c\/h2\u003e\n\n\u003ch3\u003eDo the new requirements apply to all companies with over 10 TJ already now?\u003c\/h3\u003e\n\n\u003cp\u003eNo, not as a general statement about current Swedish national law on 12 November 2026. The EU directive contains this threshold, but the Swedish implementation needs to be checked.\u003c\/p\u003e\n\n\u003ch3\u003eWhat do 10 and 85 TJ correspond to in MWh?\u003c\/h3\u003e\n\n\u003cp\u003e10 TJ is approximately 2,778 MWh and 85 TJ approximately 23,611 MWh per year. The company should normally assess the average over the preceding three years with all energy carriers combined.\u003c\/p\u003e\n\n\u003ch3\u003eIs exactly 10 TJ sufficient for the EED energy audit requirement?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Article 11 expressly uses “exceeds 10 TJ”. The threshold assessment, however, requires correct, non-rounded measurement data.\u003c\/p\u003e\n\n\u003ch3\u003eCan I fill in Excel with only electricity consumption?\u003c\/h3\u003e\n\n\u003cp\u003eIt is only sufficient if it actually corresponds to all the energy use that is legally required to be counted. Heat, cooling, process, and vehicle fuels may need to be included.\u003c\/p\u003e\n\n\u003ch3\u003eCan this product replace a certified energy auditor?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It helps to prepare data and follow actions, but does not perform an independent audit or certification.\u003c\/p\u003e\n\n\u003ch3\u003eDo we have to publish the entire energy audit report?\u003c\/h3\u003e\n\n\u003cp\u003eNot automatically. EED addresses the action plan and implementation status, with protection for trade secrets and confidentiality. Final Swedish regulation and the company's actual obligations must be tested.\u003c\/p\u003e\n\n\u003ch3\u003eIs Swedish law determined to apply from 1 January 2027?\u003c\/h3\u003e\n\n\u003cp\u003eThat was the government's proposal in the Law Council referral 20 August 2026, but a final parliamentary decision was not verified on 12 November 2026.\u003c\/p\u003e\n\n\u003ch3\u003eAre the PDFs digitally fillable and are all templates in English?\u003c\/h3\u003e\n\n\u003cp\u003eThe PDF files are searchable and printable; the Word and Excel originals are editable. An English user guide is included, but the work templates and Excel are in Swedish.\u003c\/p\u003e\n\n\u003ch2\u003eRelated Template Store products\u003c\/h2\u003e\n\n\u003cp\u003e\u003ca href=\"\/en\/products\/energiuppfoljning-energikostnadsbudget-2026-2027-excel-word-pdf\"\u003eEnergy monitoring and energy cost budget\u003c\/a\u003e for ongoing financial monitoring. \u003ca href=\"\/en\/products\/miljoaspektregister-miljoriskbedomning-2026-2027-excel-word-pdf\"\u003eEnvironmental aspect register ISO 14001\u003c\/a\u003e for environmental management basis. \u003ca href=\"\/en\/products\/datacenter-2027-500kw-pue-wue-eu-rapportering\"\u003eData center 2027 – 500 kW, PUE\/WUE and EU reporting\u003c\/a\u003e applies to another, specific energy rule. \u003cstrong\u003eThis new product is specialized on EED's 10\/85 TJ thresholds, three-year calculation, and preparation for Swedish implementation law.\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003ch2\u003eVersion and legal transparency\u003c\/h2\u003e\n\n\u003cp\u003e\u003csmall\u003e\u003cstrong\u003eVersion 1.0 · 12 November 2026 · Sweden\/EU.\u003c\/strong\u003e AI-assisted source review against EED 2023\/1791 Article 11, Swedish Energy Agency, government's Law Council referral, and parliamentary legislative matter. No independent external legal review, certified energy audit, independent ISO 50001 certification, actual authority reporting, or expert verification of real energy data has been carried out. The template is a preparation and documentation support, not an official certificate or a fixed Swedish authority form.\u003c\/small\u003e\u003c\/p\u003e\n\n\n\u003c\/div\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":56601150062934,"sku":"EED-ENERGI-10-85TJ-2027-V1","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/01_EED_10_85TJ_huvudbild_1600.png?v=1794524338"},{"product_id":"avfall-bortskaffande-artikel11-pic-bevis","title":"Waste for disposal 2026\/2027 – Article 11, recyclability assessment and PIC evidence | Word\/PDF\/Excel","description":"\n\u003cp\u003e\u003cstrong\u003eIs your company planning to transport waste across an EU border for disposal?\u003c\/strong\u003e From \u003cstrong\u003e21 May 2026\u003c\/strong\u003e, under EU Waste Shipment Regulation 2024\/1157, there is a general prohibition on such shipments within the EU unless they meet specific conditions and receive approval from the relevant authorities. For a genuine PIC notification, you often need to provide \u003cstrong\u003eevidence in accordance with Article 11.1(a) and Annex II, point 22\u003c\/strong\u003e.\u003c\/p\u003e\n\u003cp\u003eThis highly niche documentation product helps notifiers, industrial companies, environmental coordinators and waste consultants document \u003cstrong\u003erecycling options, technical and economic feasibility, the waste hierarchy, the proximity principle, permit status, supporting documentation from the authorities and transport restrictions\u003c\/strong\u003e – with a separate Excel log. It is \u003cstrong\u003enot\u003c\/strong\u003e a guarantee of permit, an official authority service or a completed classification of any actual waste stream.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eFormat:\u003c\/strong\u003e five Swedish working templates, one Swedish guide and one separate English User Guide, all in \u003cstrong\u003eeditable Word DOCX\u003c\/strong\u003e and \u003cstrong\u003esearchable A4 PDF\u003c\/strong\u003e. In addition, there is an \u003cstrong\u003eExcel workbook (XLSX) with nine tabs\u003c\/strong\u003e. Exactly \u003cstrong\u003e15 customer files\u003c\/strong\u003e in a digital ZIP. The PDFs are not interactive fillable forms.\u003c\/p\u003e\n\u003cdiv style=\"border:2px solid #245B93;border-radius:11px;background:#EDF5FD;padding:18px;margin:17px 0\"\u003e\n\n\u003ch2 style=\"margin:0 0 8px;color:#245B93\"\u003e01 · Package Contents\u003c\/h2\u003e\n\n\u003cp\u003e5 Swedish specialist templates: PIC application, recycling assessment under Article 11.1(a)(i)–(ii), waste hierarchy and derogation assessment, authority supporting documentation under Annex II, point 22, and decision\/transport restriction. Also included are a Swedish user guide and an English user guide. All seven in Word and PDF, plus an Excel workbook with nine tabs. \u003cstrong\u003e7 DOCX + 7 PDF + 1 XLSX = 15 files.\u003c\/strong\u003e\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\u003cdiv style=\"border:2px solid #245B93;border-radius:11px;background:#EDF5FD;padding:18px;margin:17px 0\"\u003e\n\n\u003ch2 style=\"margin:0 0 8px;color:#245B93\"\u003e02 · What the Files Contain\u003c\/h2\u003e\n\n\u003cp\u003eFields for actual waste codes, D-\/R-codes, waste origin, receiving installation, permits, test reports, recycling options in the country of origin, cost data, proximity and self-sufficiency assessments, supporting documentation, actual PIC receipt, financial security and contracts. The Excel workbook compiles \u003cstrong\u003eadministrative status and evidence references\u003c\/strong\u003e, never an automatic legal approval.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\u003ch2\u003eWho Is the Package Particularly Useful For?\u003c\/h2\u003e\n\u003cp\u003eIt is suitable for Swedish businesses planning \u003cstrong\u003ecross-border waste shipments for disposal\u003c\/strong\u003e, such as a specialised industrial waste stream that cannot easily be treated in the country of origin. Waste consultants, environmental managers, recycling\/treatment companies and cross-border transport administrators can also use the templates for coordination.\u003c\/p\u003e\n\u003cp\u003eIt is \u003cstrong\u003enot\u003c\/strong\u003e suitable for bypassing notification requirements using a standard Annex VII document. It is also not a package for general proof of receipt of green-listed waste for recycling, a local waste log or assurance that a particular waste installation is legally permitted.\u003c\/p\u003e\n\u003ch2\u003eExactly Which Documents Do You Get?\u003c\/h2\u003e\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"border-collapse:collapse;width:100%;min-width:680px\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#DEECF8\"\u003e\n\n\u003cth style=\"text-align:left;padding:10px\" scope=\"col\"\u003eDocument\u003c\/th\u003e\n\n\u003cth style=\"text-align:left;padding:10px\" scope=\"col\"\u003ePractical Use\u003c\/th\u003e\n\n\u003cth style=\"text-align:left;padding:10px\" scope=\"col\"\u003eLanguage\u003c\/th\u003e\n\n\u003cth style=\"text-align:left;padding:10px\" scope=\"col\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"text-align:left;padding:9px;border-bottom:1px solid #d3e2ef\"\u003e01 · PIC Application and Transport Choice\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d3e2ef\"\u003eClassify the waste, country, recipient, D-\/R-operation and actual notification trail.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d3e2ef\"\u003eSV\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d3e2ef\"\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"text-align:left;padding:9px;border-bottom:1px solid #d3e2ef\"\u003e02 · Article 11 – Recycling Options\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d3e2ef\"\u003eTechnical and economic assessment, recycling in the country of origin, test reports and supplier responses.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d3e2ef\"\u003eSV\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d3e2ef\"\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"text-align:left;padding:9px;border-bottom:1px solid #d3e2ef\"\u003e03 · Waste Hierarchy and Proximity Principle\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d3e2ef\"\u003eAssess the waste hierarchy, environmentally sound treatment, and the narrow derogation for small annual volumes.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d3e2ef\"\u003eSV\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d3e2ef\"\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"text-align:left;padding:9px;border-bottom:1px solid #d3e2ef\"\u003e04 · Annex II, Point 22 – Supporting Documentation from the Authorities\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d3e2ef\"\u003eFact-based draft supporting documentation that can be attached to a genuine PIC notification.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d3e2ef\"\u003eSV\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d3e2ef\"\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"text-align:left;padding:9px;border-bottom:1px solid #d3e2ef\"\u003e05 · PIC Decision and Transport Restriction\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d3e2ef\"\u003eReview conditions, actual receipt from the authorities, contracts, financial security and deviations.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d3e2ef\"\u003eSV\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d3e2ef\"\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"text-align:left;padding:9px;border-bottom:1px solid #d3e2ef\"\u003e06 · Swedish User Guide\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d3e2ef\"\u003eWorkflow, scenario cases, evidence requirements, relevant derogations and legal basis deviations.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d3e2ef\"\u003eSV\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d3e2ef\"\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"text-align:left;padding:9px;border-bottom:1px solid #d3e2ef\"\u003e07 · English User Guide\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d3e2ef\"\u003eEnglish instructions for the Swedish working documents, not an English legal translation.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d3e2ef\"\u003eEN\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d3e2ef\"\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"text-align:left;padding:9px\"\u003e08 · Article 11\/PIC Register\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px\"\u003eNine tabs for cases, waste, options, recipients, evidence, PIC, actions and a KPI overview.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px\"\u003eSV\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px\"\u003eXLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\u003ch2\u003eExcel – Nine Tabs with Actual Deviation Control\u003c\/h2\u003e\n\u003cp\u003eThe Excel workbook has the tabs \u003cstrong\u003eOverview, Cases, Waste, Options, Recipients, Evidence, PIC, Actions and Read Me\u003c\/strong\u003e. Each registered waste fraction can be linked to an internal case reference, classification, recycling assessment, evidence and actual authority case number. The status fields are used to determine whether supporting documentation is \u003cem\u003emissing\u003c\/em\u003e, \u003cem\u003eunder review\u003c\/em\u003e, or has received a concrete receipt. An action can be tracked from an open deficiency to a separate verified follow-up.\u003c\/p\u003e\n\u003cp\u003eThe workbook contains \u003cstrong\u003e712 formulas\u003c\/strong\u003e, including 12 automatic KPIs on the overview. 24 test checks with fictitious entries and subsequently reset registers have passed. No fictitious customer, waste installation, test report, authority receipt or cost is included in the customer version. A cell displaying \u003cem\u003eMANUAL REVIEW\u003c\/em\u003e does not mean that a permit exists.\u003c\/p\u003e\n\u003ch2\u003eHow the Documents Are Used – Nine Practical Steps\u003c\/h2\u003e\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eEstablish the waste and intent.\u003c\/strong\u003e Identify whether the material is waste, the actual D-operation, and which countries and installations are affected. Determine the correct PIC track, waste codes and specific import\/export restrictions.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eInvestigate technical recycling.\u003c\/strong\u003e Develop realistic recycling options, attempt to use actual specialised installations, test results and documented responses.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCompare economic sustainability.\u003c\/strong\u003e Document assumptions, capacity, transport, testing and treatment costs. The conclusion must be based on facts and applicable assessment criteria – not a standard template.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eSpecifically check the country of origin.\u003c\/strong\u003e Article 11.1(a)(ii) concerns whether the waste can be \u003cstrong\u003erecycled\u003c\/strong\u003e in the country where it was generated. This is a separate documentation issue.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eAssess the waste hierarchy and proximity.\u003c\/strong\u003e Demonstrate compliance with Article 4 of Directive 2008\/98\/EC, environmentally sound treatment, and the proximity and self-sufficiency principles.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eAssess any derogation very narrowly.\u003c\/strong\u003e Article 11.2 may, under certain proven circumstances involving small national annual volumes, affect Article 11.1(a)(ii) and (iii) – not other requirements or a general derogation from the prohibition.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003ePrepare the supporting documentation.\u003c\/strong\u003e Compile the arguments with source IDs in document 04 and link it to the actual PIC notification in accordance with Annex II, point 22. Do not fill in fictitious notification numbers.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCheck other necessary requirements.\u003c\/strong\u003e For example, other Article 11.1(b)–(h) requirements, actual permit assessment, contracts under Article 6 and financial security under Article 7. Additional national conditions may apply.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eAwait actual decisions.\u003c\/strong\u003e Transport must not start just because your internal files are completed. Document actual approvals, conditions and subsequent follow-up in Excel.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\u003ch2\u003eThe Exact Legal Basis – What Does Article 11 Mean?\u003c\/h2\u003e\n\u003cp\u003e\u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2024\/1157\/oj\/swe\"\u003eEU Regulation 2024\/1157 on waste shipments\u003c\/a\u003e applies primarily from \u003cstrong\u003e21 May 2026\u003c\/strong\u003e. Article 4.1 states the general rule prohibiting waste shipments intended for disposal without approval under Article 11. To apply for this approval, the PIC procedure is used for written prior notification and written prior approval. Article 11.1(a)(i)–(iii) requires the notifier to demonstrate \u003cstrong\u003ethree material conditions\u003c\/strong\u003e: recycling difficulties\/legal obligation, recycling difficulties in the country of origin, and compliance with the waste hierarchy and proximity\/self-sufficiency principles, including environmentally sound treatment.\u003c\/p\u003e\n\u003cp\u003eArticle 11.1 also contains conditions under (b)–(h), such as previous infringements, national prohibitions, compliance with environmental regulations and relevant treatment standards. Article 11.2 states a \u003cstrong\u003enarrow derogation\u003c\/strong\u003e from only certain steps when the total annual quantity in the exporting country is so small that a new specialised disposal installation there is not economically sustainable. According to Article 11.5, the Commission shall establish further criteria by \u003cstrong\u003e21 May 2027\u003c\/strong\u003e at the latest. Check new implementing acts before a later submission.\u003c\/p\u003e\n\u003ch3\u003eImportant Check: The Wording of Article 11.1(a)(ii)\u003c\/h3\u003e\n\u003cp\u003eThe \u003cstrong\u003eofficial Swedish wording of the EU Regulation\u003c\/strong\u003e concerns whether the waste cannot be \u003cstrong\u003erecycled\u003c\/strong\u003e in a technically feasible and economically sustainable way in the country where it was generated. A passage in the Swedish Environmental Protection Agency's guidance, reviewed on 6 November 2026, uses a different word for the corresponding point. The product's templates are based on the exact wording of the EU legal act and openly report the difference. This does not mean that we can issue a binding legal interpretation for a particular case.\u003c\/p\u003e\n\u003ch2\u003eAuthority Supporting Documentation, Contracts and Security\u003c\/h2\u003e\n\u003cp\u003e\u003ca href=\"https:\/\/www.naturvardsverket.se\/vagledning-och-stod\/avfall\/avfallstransporter-gransoverskridande\/anmala-gransoverskridande-avfallstransporter\/\"\u003eThe Swedish Environmental Protection Agency's guidance on notifiable waste\u003c\/a\u003e states that the notifier for waste intended for disposal must attach an account of Article 11.1(a). The legal act's \u003cstrong\u003eAnnex II, point 22\u003c\/strong\u003e requires corresponding evidence. The authority also describes requirements for contracts, financial security and correct waste codes. The templates are independent working documents and do not replace the authority's actual e-service or official notification documents.\u003c\/p\u003e\n\u003cp\u003eConcrete factors such as the composition of the waste, national treatment capacity, BAT requirements, transport distances and the content of contracts must be assessed by the actual responsible person. A row stating \"Release\" in Excel or a positive internal decision memo is never an authority approval.\u003c\/p\u003e\n\u003ch2\u003eDifference from Other Mallbutiken Products\u003c\/h2\u003e\n\u003cp\u003e\u003ca href=\"\/en\/products\/diwass-2027-bilaga-vii-gronlistat-avfall-foranmalan\"\u003eDIWASS 2027 – Annex VII and Two-Day Prior Notification\u003c\/a\u003e focuses on \u003cstrong\u003egreen-listed waste for recycling subject to an obligation to inform\u003c\/strong\u003e. \u003ca href=\"\/en\/products\/farligt-avfall-avfallsjournal-transportdokument-2026-2027\"\u003eHazardous Waste – Waste Log and Transport Documents\u003c\/a\u003e concerns broader waste administration. This new product is separate and narrow: \u003cstrong\u003eArticle 11's actual supporting documentation for permit assessment of disposal\u003c\/strong\u003e, with recycling assessment, environmental evidence, contract\/security checks and PIC status.\u003c\/p\u003e\n\u003ch2\u003eFrequently Asked Questions About Waste for Disposal\u003c\/h2\u003e\n\u003ch3\u003eAre All Waste Shipments for Disposal Prohibited?\u003c\/h3\u003e\u003cp\u003eThe general rule within the EU is a prohibition. There may be an opportunity for approval for certain shipments if all applicable conditions in Article 11 are met and the competent authorities actually grant the necessary approvals. This requires a concrete legal and technical assessment.\u003c\/p\u003e\n\u003ch3\u003eIs It Enough That the Waste Is Too Expensive to Recycle?\u003c\/h3\u003e\u003cp\u003eNo. The recycling issue must be assessed in accordance with Article 11.1(a)(i) and (ii), where both technical feasibility and economic sustainability must be demonstrated with sufficient supporting documentation. Other material conditions also apply.\u003c\/p\u003e\n\u003ch3\u003eIs Article 11.2 a Derogation for All Small Businesses?\u003c\/h3\u003e\u003cp\u003eNo. The provision concerns specific circumstances regarding small combined national annual volumes of a particular waste stream, not the size of the company, and only exempts two expressly stated conditions.\u003c\/p\u003e\n\u003ch3\u003eCan I Use Annex VII Instead of PIC?\u003c\/h3\u003e\u003cp\u003eNot when the waste shipment is subject to the requirement for prior notification and approval. Annex VII applies to a different information-obligated transport flow, typically certain green-listed fractions for recycling.\u003c\/p\u003e\n\u003ch3\u003eIs Document 04 the Swedish Environmental Protection Agency's Official Form?\u003c\/h3\u003e\u003cp\u003eNo. It is an editable internal document for compiling Article 11 evidence in the actual authority application.\u003c\/p\u003e\n\u003ch3\u003eDo We Also Need Contracts and Financial Security?\u003c\/h3\u003e\u003cp\u003eFor notifiable shipments, there are specific requirements for a written contract and, in relevant cases, financial security or equivalent insurance. These are checked separately in accordance with Articles 6–7 and current Swedish authority instructions.\u003c\/p\u003e\n\u003ch3\u003eDoes Excel Include Automatic Legality Checks?\u003c\/h3\u003e\u003cp\u003eNo. The formulas count cases, deviations, evidence statuses and open actions. Neither the waste code, authority competence, economic sustainability nor permit is assessed automatically.\u003c\/p\u003e\n\u003ch3\u003eHave You Issued a Permit or Made a Transport Notification?\u003c\/h3\u003e\u003cp\u003eNo. No authority documents have been submitted and no actual waste installations have been reviewed or received approval through this product.\u003c\/p\u003e\n\u003ch3\u003eAre the Word and PDF Files Fillable?\u003c\/h3\u003e\u003cp\u003eThe DOCX files are editable in compatible software. The PDF files are searchable and printable, but lack interactive form fields.\u003c\/p\u003e\n\u003ch3\u003eIs the Entire Package Translated into English?\u003c\/h3\u003e\u003cp\u003eNo. Five specialist templates and one guide are in Swedish. A separate English User Guide explains the Swedish workflow in English.\u003c\/p\u003e\n\u003ch2\u003eSource Control, Quality and Responsibility\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003eAI-assisted source control: 13 November 2026.\u003c\/strong\u003e Official sources are \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2024\/1157\/oj\/swe\"\u003eRegulation (EU) 2024\/1157\u003c\/a\u003e, \u003ca href=\"https:\/\/www.naturvardsverket.se\/vagledning-och-stod\/avfall\/avfallstransporter-gransoverskridande\/anmala-gransoverskridande-avfallstransporter\/\"\u003ethe Swedish Environmental Protection Agency's notification guidance\u003c\/a\u003e, \u003ca href=\"https:\/\/www.naturvardsverket.se\/vagledning-och-stod\/avfall\/avfallstransporter-gransoverskridande\/\"\u003ethe Swedish Environmental Protection Agency's current transport page\u003c\/a\u003e and \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/dir\/2008\/98\/oj\/swe\"\u003eWaste Directive 2008\/98\/EC\u003c\/a\u003e.\u003c\/p\u003e\n\u003cp\u003eAll seven DOCX and seven PDF files have been produced and checked, totaling 14 searchable A4 pages; the Excel workbook with nine tabs contains 712 formulas and has passed 24 checkpoints. Three authentic product images are based on documents and the workbook. \u003cstrong\u003eNo independent external legal review or actual installation\/authority check\u003c\/strong\u003e has taken place. The person using the material must check the legal status, national prohibitions, test results and the authority's conditions in the actual case.\u003c\/p\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":56612373463382,"sku":"MB-WSR-DISPOSAL-ART11-20261113-V1","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/avfall-bortskaffande-artikel11-pic-huvudbild-1600.png?v=1794581097"},{"product_id":"strategiska-ravaror-crma-artikel24-riskberedskap","title":"Strategic Raw Materials 2026\/2027 – supplier mapping, supply risk and action plan | Word\/PDF\/Excel","description":"\u003csection lang=\"sv\" style=\"line-height:1.65;color:#193957\"\u003e\n\u003cp\u003e\u003cstrong\u003eWhich strategic raw materials are critical to your production – and what happens if a supply chain is disrupted?\u003c\/strong\u003e According to Article 24 of EU Regulation \u003cstrong\u003e2024\/1252, the Critical Raw Materials Act (CRMA)\u003c\/strong\u003e, certain large manufacturers must assess their strategic raw material supply chains at least every three years, analyze disruption factors, and make efforts to reduce significant vulnerabilities.\u003c\/p\u003e\n\n\u003cp\u003eThis document package provides industry, procurement, quality, and sustainability teams with a \u003cstrong\u003econcrete, traceable workflow\u003c\/strong\u003e for applicability testing, supplier inquiries, mapping of extraction\/processing\/recycling, supply risks, substitution or diversification measures, and management decisions. The material has been adapted to the current Article 24 and distinguishes it from an ongoing proposal for new rules.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eYou get 15 customer files in a ZIP:\u003c\/strong\u003e \u003cstrong\u003e7 editable Word documents, 7 searchable A4 PDFs, and 1 Excel workbook with nine tabs\u003c\/strong\u003e. Five Swedish specialist documents, a Swedish user guide, and an English User Guide. All PDFs are printable and contain real searchable text; no interactive PDF form fields. Excel has \u003cstrong\u003e712 formulas\u003c\/strong\u003e, including 12 administrative key performance indicators. Price: SEK 79, digital download.\u003c\/p\u003e\n\n\u003cdiv style=\"padding:18px;border:2px solid #27669f;background:#edf5fc;border-radius:9px;margin:20px 0\"\u003e\n\n\u003ch2 style=\"margin-top:0;color:#20568a\"\u003e01 · Package Contents\u003c\/h2\u003e\n\n\u003cp\u003eFive Swedish expert templates: (1) scope and company thresholds, (2) raw material\/supplier inquiry, (3) supply and vulnerability assessment, (4) risk reduction action plan, and (5) management\/board support material. Also a Swedish and English guide. All seven as Word and searchable PDF, plus Excel with nine tabs. Total of 15 files in a ZIP.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv style=\"padding:18px;border:2px solid #27669f;background:#edf5fc;border-radius:9px;margin:20px 0\"\u003e\n\n\u003ch2 style=\"margin-top:0;color:#20568a\"\u003e02 · What the Files Contain\u003c\/h2\u003e\n\n\u003cp\u003eChecks for full-time employees and global net turnover, actual manufacturing category, strategic raw materials according to Annex I, authority identification, origin chain for extraction\/processing\/recycling, supplier evidence, documentation of unanswered questions, geographic and technical concentration risk, substitutes, action responsibility, impact assessment, internal decisions, and the next three-year review. \u003cstrong\u003eNo Excel status implies authority approval or actually verified raw material origin.\u003c\/strong\u003e\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2\u003eFor Which Companies Is the Package Relevant?\u003c\/h2\u003e\n\n\u003cp\u003eThe legal core is \u003cstrong\u003elarge manufacturing companies\u003c\/strong\u003e in the technology areas listed in Article 24.1. Examples: batteries, hydrogen equipment, renewable energy equipment, traction motors, heat pumps, data storage\/communications, mobile electronics, robotics, additive manufacturing, and advanced semiconductors.\u003c\/p\u003e\n\n\u003cp\u003eIt is not a general obligation for all companies that buy metals, sell electronics, or import spare parts. The definition of \u003cstrong\u003elarge enterprise\u003c\/strong\u003e in Article 2.29 requires \u003cstrong\u003emore than 500 employees on average AND over 150 million euros in global net turnover\u003c\/strong\u003e during the relevant financial year. Article 24.1 also describes the identification of affected large enterprises by the Member States. Smaller companies and suppliers may use the documents voluntarily, for example to answer customer questions, but should not be described as automatically legally obliged under Article 24.\u003c\/p\u003e\n\n\u003ch2\u003eExact File List – 7 Word, 7 PDF, and 1 Excel\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"border-collapse:collapse;width:100%;min-width:690px\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#dfebf7\"\u003e\n\n\u003cth scope=\"col\" style=\"padding:9px;text-align:left\"\u003eDocument\u003c\/th\u003e\n\n\u003cth scope=\"col\" style=\"padding:9px;text-align:left\"\u003eUse\u003c\/th\u003e\n\n\u003cth scope=\"col\" style=\"padding:9px;text-align:left\"\u003eLanguage\u003c\/th\u003e\n\n\u003cth scope=\"col\" style=\"padding:9px;text-align:left\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003cth style=\"padding:9px;text-align:left;border-bottom:1px solid #c8d7e7\" scope=\"row\"\u003e01. Article 24 – applicability testing\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #c8d7e7\"\u003eTwo size thresholds, relevant manufacturing, strategic raw materials, and Member State identification.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #c8d7e7\"\u003eSV\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #c8d7e7\"\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth style=\"padding:9px;text-align:left;border-bottom:1px solid #c8d7e7\" scope=\"row\"\u003e02. Supplier request for raw material origin\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #c8d7e7\"\u003eRequest extraction, processing, and recycling links, sources, and answers to missing information.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #c8d7e7\"\u003eSV\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #c8d7e7\"\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth style=\"padding:9px;text-align:left;border-bottom:1px solid #c8d7e7\" scope=\"row\"\u003e03. Raw material chain risk assessment\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #c8d7e7\"\u003eAssess disruption, concentration, vulnerability, and source security without an automatic legal risk score.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #c8d7e7\"\u003eSV\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #c8d7e7\"\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth style=\"padding:9px;text-align:left;border-bottom:1px solid #c8d7e7\" scope=\"row\"\u003e04. Risk reduction action plan\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #c8d7e7\"\u003eAlternative suppliers, substitution, reserves, testing, and evidence of actual effect.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #c8d7e7\"\u003eSV\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #c8d7e7\"\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth style=\"padding:9px;text-align:left;border-bottom:1px solid #c8d7e7\" scope=\"row\"\u003e05. Management and board support material\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #c8d7e7\"\u003eReport and evidence of decision with a clear distinction of when board reporting is voluntary or specifically required.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #c8d7e7\"\u003eSV\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #c8d7e7\"\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth style=\"padding:9px;text-align:left;border-bottom:1px solid #c8d7e7\" scope=\"row\"\u003e06. Swedish user guide\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #c8d7e7\"\u003eTen work steps, five scenarios, and checklist for legal edge cases.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #c8d7e7\"\u003eSV\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #c8d7e7\"\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth style=\"padding:9px;text-align:left;border-bottom:1px solid #c8d7e7\" scope=\"row\"\u003e07. English User Guide\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #c8d7e7\"\u003eEnglish instructions for the Swedish templates; no full translation.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #c8d7e7\"\u003eEN\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #c8d7e7\"\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"padding:9px;text-align:left\"\u003e08. CRMA Art. 24 – raw material register\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px\"\u003eNine Excel tabs for company, materials, suppliers, origin, risks, actions, and management decisions.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px\"\u003eSV\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px\"\u003eXLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\u003ch2\u003eExcel register with nine tabs\u003c\/h2\u003e\n\n\u003cp\u003eThe register tabs are \u003cstrong\u003eOverview, Company, Raw Materials, Suppliers, Origin, Risks, Actions, Board, and Read Me\u003c\/strong\u003e. The seven operational tabs each contain 50 empty rows, with two formula-based control signals per entry. The overview has \u003cstrong\u003e12 tested key performance indicators\u003c\/strong\u003e, including open supplier questions, incomplete origin links, registered risk scenarios, and risk reduction measures.\u003c\/p\u003e\n\n\u003cp\u003eThe workbook has been tested with fictitious entries that have since been deleted. The customer version starts with reset key performance indicators and no pre-filled real suppliers, mineral origins, or authority decisions. Only internal case and evidence IDs should be used in publicly shared files; trade secrets and raw material chain vulnerabilities should be handled in permission-controlled systems.\u003c\/p\u003e\n\n\u003ch2\u003eHow the package is used in practice\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDefine the company.\u003c\/strong\u003e Test both size thresholds, the type of manufacturing, and the current strategic raw material list. Check for any Member State identification.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eIdentify raw materials and components.\u003c\/strong\u003e Link raw materials to the actual product\/BOM and Annex I. Do not confuse the entire list of critical raw materials with strategic raw materials.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRequest supplier documentation.\u003c\/strong\u003e Document what extraction, processing, and recycling can be attributed. Provide concrete references, dates, and answers.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eHighlight data gaps.\u003c\/strong\u003e In the event of no response, publicly available information may be used to the extent possible under Article 24.3. Clearly mark the limitations.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eAssess actual disruptions.\u003c\/strong\u003e Map, for example, export restrictions, sole supplier, insufficient capacity, geopolitical risk, or price\/delivery time disruption.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDocument mitigation attempts.\u003c\/strong\u003e In the event of significant vulnerability: assess diversification, substitution, inventory reserves, capacity agreements, or alternative sources. Save test and decision evidence.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eAddress management reporting.\u003c\/strong\u003e Current Article 24.5 states that companies \u003cem\u003emay\u003c\/em\u003e report to the board. According to 24.6, a Member State \u003cem\u003emay\u003c\/em\u003e require it; check actual national implementation.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eFollow up at least every three years.\u003c\/strong\u003e Record the actual review period and new circumstances that justify an earlier reassessment.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eWhat does Article 24 of the CRMA actually require?\u003c\/h2\u003e\n\n\u003cp\u003e\u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2024\/1252\/oj\/swe\"\u003eEU Regulation 2024\/1252\u003c\/a\u003e specifies in Article 24.2 a risk assessment at least every three years and to the extent that the information is available. It shall cover: \u003cstrong\u003e(a)\u003c\/strong\u003e mapping of where strategic raw materials are extracted, processed, or recycled, \u003cstrong\u003e(b)\u003c\/strong\u003e analysis of what may affect supply, and \u003cstrong\u003e(c)\u003c\/strong\u003e assessment of vulnerability to delivery disruptions.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eArticle 24.3\u003c\/strong\u003e allows, when suppliers do not provide information despite a request, the use of the Commission's information under Article 20.4 or other public information to the extent possible. \u003cstrong\u003eArticle 24.4\u003c\/strong\u003e implies efforts to reduce significant identified vulnerabilities, for example through diversification or assessment of substitution. It is not an automatic requirement that every company selects a certain supplier or that all risks cease.\u003c\/p\u003e\n\n\u003ch2\u003eImportant difference: current law versus the 2026 EU proposal\u003c\/h2\u003e\n\n\u003cp\u003eThe Commission submitted \u003cstrong\u003eCOM(2025)946 \/ 2025\/0385(COD)\u003c\/strong\u003e, with a proposal for, among other things, more mapping elements, a changed identification process, and clearer board reporting. The European Parliament considered and voted on amendments on \u003cstrong\u003eOctober 20, 2026\u003c\/strong\u003e, but the matter was still subject to ongoing legislative procedure on November 13, 2026. \u003cstrong\u003eThe proposal wording is not used as already applicable obligations\u003c\/strong\u003e in this package. See the \u003ca href=\"https:\/\/oeil.europarl.europa.eu\/oeil\/en\/procedure-file?reference=2025%2F0385%28COD%29\"\u003eEU Parliament legislative file\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eDifference from Mallbutiken's existing CRMA template\u003c\/h2\u003e\n\n\u003cp\u003e\u003ca href=\"\/en\/products\/crma-permanentmagneter-varmepumpar-leverandorsbevis-databarare\"\u003ePermanent magnets in heat pumps – Article 28\/29\u003c\/a\u003e applies to magnet marking, data carriers, and recycling information for the product category. \u003cstrong\u003eThis product applies to Article 24's completely separate risk preparedness for large manufacturers\u003c\/strong\u003e, including supply chains, disruption scenarios, and risk reduction measures. It does not contain a magnet marking or product passport generator.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently Asked Questions (FAQ)\u003c\/h2\u003e\n\n\u003ch3\u003eDoes Article 24 apply to all Swedish industrial companies?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The rules are linked to the definition of a large enterprise, relevant manufacturing areas, strategic raw materials, and the Member State's identification of affected companies. Assess the actual legal entity.\u003c\/p\u003e\n\n\u003ch3\u003eWhat size must a company be?\u003c\/h3\u003e\n\n\u003cp\u003eArticle 2.29 states more than 500 average employees \u003cstrong\u003eand\u003c\/strong\u003e global net turnover over 150 million euros. The thresholds are cumulative, not alternative.\u003c\/p\u003e\n\n\u003ch3\u003eDo the requirements also apply to retailers without manufacturing?\u003c\/h3\u003e\n\n\u003cp\u003eNot solely because the retailer buys or sells critical raw materials. Article 24.1 refers to enumerated manufacturing companies. Other agreements or rules may understandably entail their own obligations.\u003c\/p\u003e\n\n\u003ch3\u003eAre all critical raw materials automatically strategic?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Check the strategic list in Article 3 and Annex I, not just the broader list of critical raw materials.\u003c\/p\u003e\n\n\u003ch3\u003eDo we need to know the exact address of every mine?\u003c\/h3\u003e\n\n\u003cp\u003eThe risk assessment shall be made to the extent that the data is available. Supplier data is requested, and public alternative sources may be used where Article 24.3 allows it. Missing information must be made visible, not fabricated.\u003c\/p\u003e\n\n\u003ch3\u003eMust the board approve a report every three years?\u003c\/h3\u003e\n\n\u003cp\u003eAccording to the current Article 24.5, a report may be submitted, and Article 24.6 allows the Member State to require it. Check current Swedish rules and authority decisions. A proposal for mandatory reporting that has not yet been adopted may not be described as applicable.\u003c\/p\u003e\n\n\u003ch3\u003eCan Excel provide a legal risk approval?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The twelve key performance indicators only count registered work statuses. Assessments of actual origin, materials, and vulnerability require real evidence.\u003c\/p\u003e\n\n\u003ch3\u003eCan the package be used for battery and robot production?\u003c\/h3\u003e\n\n\u003cp\u003eYes, when the company's actual circumstances fall within Article 24.1 and the manufacturing uses strategic raw materials. The package is not a machine safety or battery passport certification.\u003c\/p\u003e\n\n\u003ch3\u003eWhat happens when the 2025 EU proposal is adopted?\u003c\/h3\u003e\n\n\u003cp\u003eCheck the final legal act and its entry into force. The templates mark COM(2025)946 as an ongoing proposal per the product's source date; new requirements may require an updated template version.\u003c\/p\u003e\n\n\u003ch3\u003eAre all documents in English?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Five main templates, a Swedish guide, and Excel are in Swedish. A separate English User Guide describes the use but is not a full legal translation.\u003c\/p\u003e\n\n\u003ch3\u003eDo the templates contain real suppliers or control certificates?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It includes no verified information about real mines, countries, corporate suppliers, risk levels, or authority decisions. All information must be filled in by the customer.\u003c\/p\u003e\n\n\u003ch3\u003eAre the PDF files digitally fillable?\u003c\/h3\u003e\n\n\u003cp\u003eThey are searchable and printable without interactive fields. Editing takes place in Word and Excel.\u003c\/p\u003e\n\n\u003ch2\u003eVersion, Quality, and Sources\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eVersion 1.0 · AI-assisted legal source control November 13, 2026.\u003c\/strong\u003e Primary sources: \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2024\/1252\/oj\/swe\"\u003eCRMA Regulation (EU) 2024\/1252 Article 2.29 and 24\u003c\/a\u003e, \u003ca href=\"https:\/\/eur-lex.europa.eu\/legal-content\/EN\/TXT\/?uri=celex%3A52025PC0946\"\u003ethe Commission's proposal COM(2025)946\u003c\/a\u003e, \u003ca href=\"https:\/\/oeil.europarl.europa.eu\/oeil\/en\/procedure-file?reference=2025%2F0385%28COD%29\"\u003eongoing legislative file 2025\/0385(COD)\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003cp\u003eThe files have been QA-tested for integrity, searchable PDF text, Word\/PDF content, and Excel formulas. \u003cstrong\u003eNo external independent legal review, actual authority identification, real supplier control, raw material audit, or binding risk assessment\u003c\/strong\u003e has been carried out. It is a documentation method that requires the customer's own real documentation and qualified assessment. Digital ZIP is attached.\u003c\/p\u003e\n\n\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":56617040773462,"sku":"MB-CRMA-ART24-RISK-20261113-V1","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/crma-2026-strategiska-ravaror-artikel24-huvudbild-1600.png?v=1794602985"},{"product_id":"ied2-miljoledningssystem-artikel14a-bat-revision","title":"IED 2.0 environmental management system 2027 – Article 14a, BAT objectives, chemical inventory and audit evidence | Word\/PDF\/Excel","description":"\u003csection lang=\"sv\" style=\"line-height:1.68;color:#173B5B\"\u003e\n\u003cp\u003e\u003cstrong\u003eDo you operate a permit-required industrial installation covered by Chapter II of the Industrial Emissions Directive?\u003c\/strong\u003e The EU's revised Industrial Emissions Directive, \u003cstrong\u003eIED 2.0 through Directive (EU) 2024\/1785\u003c\/strong\u003e, tightens requirements for a \u003cstrong\u003esite-specific environmental management system under Article 14a\u003c\/strong\u003e. It must include, among other things, environmental objectives linked to BAT conclusions, risk assessment of hazardous substances, REACH inventory, substitution analysis, preventive measures, and external audit.\u003c\/p\u003e\n\n\u003cp\u003eThis specialist package helps industrial and environmental managers begin building the actual \u003cstrong\u003echain of evidence from IED requirements to environmental management system, BAT KPIs, substance register, substitution plan, and audit basis\u003c\/strong\u003e. It is aimed at, for example, installations in metalworking and surface treatment, chemical production, waste management, and other activities that are actually covered by Chapter II and Annex I. \u003cstrong\u003eNot all companies or factories are automatically covered.\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eIMPORTANT DATES:\u003c\/strong\u003e Article 14a of the EU Directive requires that the relevant environmental management system be implemented and the first external audit performed \u003cstrong\u003eno later than 1 July 2027\u003c\/strong\u003e, with a special exception for installations mentioned in Article 3.4 of Directive 2024\/1785. External audits will then take place at least every three years. \u003cstrong\u003eThis must not be confused with separate transitional rules for when already issued environmental permits are to be supplemented with EMS conditions.\u003c\/strong\u003e Also check Swedish implementing legislation and applicable sector BAT before actual use.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eFormat and delivery:\u003c\/strong\u003e \u003cstrong\u003e7 Word (DOCX) + 7 searchable PDF + 1 Excel (XLSX)\u003c\/strong\u003e, total of 15 digital customer files in ZIP. The package has five Swedish operational work templates, one Swedish and one separate English guide, plus a Swedish register with \u003cstrong\u003enine tabs, 712 formulas, and twelve administrative key figures\u003c\/strong\u003e. Word is editable; PDF is searchable and printable but lacks interactive form fields. Source review 14 November 2026.\u003c\/p\u003e\n\n\u003cdiv style=\"border:2px solid #245A91;border-left:7px solid #245A91;border-radius:10px;background:#EAF3FA;padding:18px;margin:20px 0\"\u003e\n\n\u003ch2 style=\"color:#245A91;margin:0 0 8px\"\u003e01 · Package contents\u003c\/h2\u003e\n\n\u003cp\u003eFive Swedish specialist documents: (1) IED applicability, BAT, and permit matrix, (2) the installation's environmental policy, BAT objectives, and metrics, (3) chemical inventory and REACH risk, (4) risk reduction and substitution plan, and (5) external audit, audit evidence, and confidentiality\/publication control. Also a Swedish user guide and English User Guide. All seven documents are available in both editable Word and searchable PDF. The Excel register adds nine tabs for traceable follow-up. \u003cstrong\u003eExactly 15 customer files.\u003c\/strong\u003e\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv style=\"border:2px solid #245A91;border-left:7px solid #245A91;border-radius:10px;background:#EAF3FA;padding:18px;margin:20px 0\"\u003e\n\n\u003ch2 style=\"color:#245A91;margin:0 0 8px\"\u003e02 · What the files contain\u003c\/h2\u003e\n\n\u003cp\u003eControl fields for installation ID, IED activity category, BAT conclusions, permit date, Swedish legal sources, objectives and measurement intervals, actual baseline, chemical substances and mixtures, SDS\/CAS\/EC, REACH SVHC and restriction assessment, possible emission pathway, substitution options, risk and post-control, external auditor qualification, actual audit report ID, and assessment of public information and confidentiality. \u003cstrong\u003eNo fabricated sample values, authority decisions, or auditor certificates are included.\u003c\/strong\u003e\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2\u003eExact file list – editable material and searchable PDFs\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"border-collapse:collapse;width:100%;min-width:690px\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#DAE9F5\"\u003e\n\n\u003cth scope=\"col\" style=\"padding:9px;text-align:left\"\u003eDocument\u003c\/th\u003e\n\n\u003cth scope=\"col\" style=\"padding:9px;text-align:left\"\u003eUse\u003c\/th\u003e\n\n\u003cth scope=\"col\" style=\"padding:9px;text-align:left\"\u003eLanguage\u003c\/th\u003e\n\n\u003cth scope=\"col\" style=\"padding:9px;text-align:left\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003cth style=\"text-align:left;padding:9px;border-bottom:1px solid #d4e1eb\" scope=\"row\"\u003e01 · Applicability and BAT requirements map\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d4e1eb\"\u003eIED Chapter II, Annex I, permit, BAT conclusions, and time\/exception assessment.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d4e1eb\"\u003eSwedish\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d4e1eb\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth style=\"text-align:left;padding:9px;border-bottom:1px solid #d4e1eb\" scope=\"row\"\u003e02 · Environmental policy, objectives, and KPIs\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d4e1eb\"\u003eMeasurable objectives for waste, energy, water, and hazardous substances with actual BAT reference.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d4e1eb\"\u003eSwedish\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d4e1eb\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth style=\"text-align:left;padding:9px;border-bottom:1px solid #d4e1eb\" scope=\"row\"\u003e03 · Chemical inventory and REACH risk\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d4e1eb\"\u003eHazardous substances in processes and mixtures, SDS, REACH SVHC, risk, emissions, and evidence.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d4e1eb\"\u003eSwedish\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d4e1eb\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth style=\"text-align:left;padding:9px;border-bottom:1px solid #d4e1eb\" scope=\"row\"\u003e04 · Substitution and action program\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d4e1eb\"\u003eAlternatives, technical environmental assessment, decided action, responsibility, and actual post-control.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d4e1eb\"\u003eSwedish\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d4e1eb\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth style=\"text-align:left;padding:9px;border-bottom:1px solid #d4e1eb\" scope=\"row\"\u003e05 · External audit and publicity\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d4e1eb\"\u003eAudit plan, accreditation, report evidence, publishable information, and confidentiality.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d4e1eb\"\u003eSwedish\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d4e1eb\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth style=\"text-align:left;padding:9px;border-bottom:1px solid #d4e1eb\" scope=\"row\"\u003e06 · Swedish user guide\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d4e1eb\"\u003eTen work steps, special application cases, and Swedish legal sources.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d4e1eb\"\u003eSwedish\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d4e1eb\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth style=\"text-align:left;padding:9px;border-bottom:1px solid #d4e1eb\" scope=\"row\"\u003e07 · English User Guide\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d4e1eb\"\u003eEnglish-language instructions for Swedish forms, not their full English translation.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d4e1eb\"\u003eEnglish\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #d4e1eb\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"padding:9px;text-align:left\"\u003e08 · IED control register\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px\"\u003eNine tabs with installations, BAT objectives, chemicals, substitution, actions, audits, and publication.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px\"\u003eSwedish\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px\"\u003eExcel XLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\u003ch2\u003eWho is the product relevant for?\u003c\/h2\u003e\n\n\u003cp\u003eEnvironmental managers, EHS\/HSE specialists, production managers, environmental consultants, and internal quality\/environmental coordinators at \u003cstrong\u003eIED installations covered by Chapter II\u003c\/strong\u003e. The package is useful when an operator wants to check where an existing ISO 14001 system needs to be supplemented, when external auditors are to receive comparable evidence, and when an installation needs to link chemical management to actual BAT objectives.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eNot suitable as the only basis\u003c\/strong\u003e for new environmental permits, emission measurements, environmental impact assessments, ISO 14001 certification, EMAS registration, a BAT assessment by an authority, or a completed transformation plan to 2030. Each activity must classify its IED category and application deadlines itself.\u003c\/p\u003e\n\n\u003ch2\u003eExcel workbook with nine tabs and 712 tested formulas\u003c\/h2\u003e\n\n\u003cp\u003eThe tabs are named \u003cstrong\u003eOverview, Installations, BAT Objectives, Chemicals, Substitution, Actions, Audits, Publication, and Read Me\u003c\/strong\u003e. Each work tab contains \u003cstrong\u003e100 empty registration rows\u003c\/strong\u003e as well as a control column that marks incomplete documentation. The overview summarizes twelve key figures, for example, installations with incomplete IED classification, BAT\/KPI without source, chemicals without identification, substitutions lacking assessment basis, actions requiring post-control, missing audit evidence, and outstanding public scrutiny.\u003c\/p\u003e\n\n\u003cp\u003eThey are \u003cstrong\u003eadministrative control signals – not legal or technical approvals\u003c\/strong\u003e. A test with an incomplete installation entry and a completed action case showed correct warnings. Test data has since been deleted. All twelve key figures therefore show \u003cstrong\u003e0 in the delivered customer file\u003c\/strong\u003e. Excel never automatically provides a BAT emission value, substance classification, substitution approval, or certification.\u003c\/p\u003e\n\n\u003ch2\u003eHow to use the package in ten steps\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eTest the IED scope.\u003c\/strong\u003e Analyze the exact installation, activity according to Annex I, Chapter II, and Swedish permit basis. The group's industry code is not enough.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRetrieve the current permit and BAT.\u003c\/strong\u003e Register actual permit conditions, main activity, sector BREFs, BAT conclusions, and document versions.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDistinguish between two legal timelines.\u003c\/strong\u003e Article 14a's environmental management system and 1 July 2027 should not be equated with Article 14.1 ba's separate transition for permit conditions. The EU Commission's notice from September 2026 explicitly distinguishes them.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eReuse existing routines with control.\u003c\/strong\u003e An ISO 14001 or EMAS system can provide evidence, but use a gap analysis against all Article 14a requirements.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eSet relevant environmental objectives.\u003c\/strong\u003e The objectives should cover waste prevention, resource and energy use, water reuse, and hazardous substance reduction. State the actual unit, baseline, and data source.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eLink the metrics to BAT.\u003c\/strong\u003e Document the installation's relevant BAT indicators and check for any sector-specific method, instead of using generic templates.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eInventory hazardous substances.\u003c\/strong\u003e State substances in the installation and emissions, even as components in mixtures. Check REACH Article 57, Annex XVII, SDS, and actual exposure basis.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eTest substitution and risk reduction.\u003c\/strong\u003e Document technically sustainable alternatives, possible environmental effects, implementation, responsibility, and actual post-control.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003ePlan independent audit.\u003c\/strong\u003e Test the requirements for an accredited body or competent environmental auditor, date, report ID, and non-compliance management. Internal signing is not the same as an external audit.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eTest publication and transformation plan.\u003c\/strong\u003e Article 14a.4 contains requirements for internet publication of relevant information with special limitations for protected interests. Certain installations are also affected by a later transformation plan under Article 27d.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eWhat rules underlie Article 14a?\u003c\/h2\u003e\n\n\u003ch3\u003eIED 2.0 – environmental management system as an installation requirement\u003c\/h3\u003e\n\n\u003cp\u003e\u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/dir\/2024\/1785\/oj\/swe\"\u003eDirective (EU) 2024\/1785\u003c\/a\u003e amends the older Industrial Emissions Directive 2010\/75\/EU. The new Article 14a says that Member States shall require a site-specific environmental management system for activities within the applicable Chapter II. The level of detail of the system shall be adapted to the nature, scope, complexity, and environmental impact of the installation. Existing system documents can be referred to when they actually cover the requirements.\u003c\/p\u003e\n\n\u003ch3\u003eWhat shall the environmental management system contain?\u003c\/h3\u003e\n\n\u003cp\u003e\u003cstrong\u003eArticle 14a.2 a–c:\u003c\/strong\u003e environmental policy objectives, environmental performance metrics, and BAT-linked indicators, in applicable cases also the results of energy mapping or energy management systems. \u003cstrong\u003eArticle 14a.2 d:\u003c\/strong\u003e chemical inventory for hazardous substances and mixtures, health\/environmental risks, and substitution analysis. \u003cstrong\u003eArticle 14a.2 e:\u003c\/strong\u003e preventive and corrective actions. \u003cstrong\u003eArticle 14a.2 f:\u003c\/strong\u003e where applicable, a transformation plan under Article 27d.\u003c\/p\u003e\n\n\u003ch3\u003eAudit obligation and 1 July 2027\u003c\/h3\u003e\n\n\u003cp\u003e\u003cstrong\u003eArticle 14a.4\u003c\/strong\u003e states that the environmental management system shall be implemented no later than \u003cstrong\u003e1 July 2027\u003c\/strong\u003e and externally audited for the first time no later than the same date, with a special transition\/exception under Article 3.4 of the amending directive. Audits shall then take place at least every three years by a body that meets the directive's competence conditions. This package is working documentation, not the audit.\u003c\/p\u003e\n\n\u003ch3\u003eAre existing permits automatically reviewed in 2027?\u003c\/h3\u003e\n\n\u003cp\u003e\u003cstrong\u003eNo.\u003c\/strong\u003e The EU Commission's \u003ca href=\"https:\/\/eur-lex.europa.eu\/legal-content\/SV\/TXT\/?uri=CELEX:52026XC04834\"\u003enotice of 15 September 2026, question 15\u003c\/a\u003e explains that the Article 14a system requirement itself \u003cstrong\u003edoes not\u003c\/strong\u003e mean that an already issued permit must be updated immediately. Requirements that environmental permits contain special EMS features under Article 14.1 ba may have their own deadlines and triggering events. Existing installations' conditions must be reviewed individually, including BAT decisions and possible end dates such as September 2036.\u003c\/p\u003e\n\n\u003ch3\u003eMust all companies have ISO 14001 or EMAS?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Article 14a requires an environmental management system with special content and prescribed external audit, not automatic ISO 14001 certification. The EU Commission confirms in question 16 that ISO 14001 or EMAS can be reused as a basis when relevant requirements are met. Formal equivalence must not be assumed without checking.\u003c\/p\u003e\n\n\u003ch3\u003eSwedish legislation must be reviewed separately\u003c\/h3\u003e\n\n\u003cp\u003eIED 2.0 is an \u003cstrong\u003eEU Directive\u003c\/strong\u003e that is to be implemented in Swedish law. \u003ca href=\"https:\/\/www.naturvardsverket.se\/vagledning-och-stod\/industriutslapp-ied\/industriutslappsdirektivet-ied\/\"\u003eThe Swedish Environmental Protection Agency describes IED and Swedish application rules\u003c\/a\u003e. \u003ca href=\"https:\/\/www.regeringen.se\/remisser\/2026\/07\/remiss-av-promemorian-forbattrat-genomforande-av-industriutslappsdirektivet\/\"\u003eThe Government's consultation KN2026\/01497\u003c\/a\u003e concerned further improvements of implementation during 2026. A consultation or memorandum is, however, \u003cstrong\u003enot in itself an adopted Swedish provision\u003c\/strong\u003e. Use the current Environmental Code, Industrial Emissions Ordinance, permit, and later regulations in the actual case.\u003c\/p\u003e\n\n\u003ch2\u003eDifference from nearby Mallbutiken products\u003c\/h2\u003e\n\n\u003cp\u003e\u003ca href=\"\/en\/products\/kemiska-risker-riskbedomning-kemikalieforteckning-2026-2027\"\u003eChemical risks – workplace environment and chemical inventory\u003c\/a\u003e helps, among others, employers with protection against chemical workplace environment risks. \u003ca href=\"\/en\/products\/miljoplan-byggentreprenad-avfallslogg-kemikalier-2026-2027-word-pdf-excel\"\u003eEnvironmental plan for construction \u0026amp; contracting\u003c\/a\u003e is primarily a construction project's waste and environmental control. \u003ca href=\"\/en\/products\/kvalitetsplan-kontrollprogram-2026-2027-iso-10005-kontrollregister-avvikelser-excel-word-pdf\"\u003eQuality plan and control program\u003c\/a\u003e provides general management. \u003cstrong\u003eThe new product, however, is specifically linked to IED Article 14a, Chapter II, BAT conclusions, chemical\/REACH risks, and accredited external audit\u003c\/strong\u003e – and therefore fills a clear separate product gap.\u003c\/p\u003e\n\n\u003ch2\u003eCommon questions about IED 2.0 and environmental management systems\u003c\/h2\u003e\n\n\u003ch3\u003eDoes Article 14a apply to all Swedish industrial companies?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The rules apply to installations that are actually covered by the relevant Chapter II in the revised Industrial Emissions Directive. The installation and activity classification must be tested separately.\u003c\/p\u003e\n\n\u003ch3\u003eIs 1 July 2027 a general permit deadline?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The date refers in Article 14a to the system's implementation and first external audit, with certain exceptions. Existing permit conditions have other transitional rules that the Commission explicitly distinguishes from the EMS requirement.\u003c\/p\u003e\n\n\u003ch3\u003eCan our ISO 14001 system be used?\u003c\/h3\u003e\n\n\u003cp\u003eYes, existing documents and routines can be reused where they correspond to Article 14a's and relevant BAT conclusions' requirements. This does not mean that an existing certification is automatically sufficient.\u003c\/p\u003e\n\n\u003ch3\u003eMust the chemical inventory include mixtures and SVHC?\u003c\/h3\u003e\n\n\u003cp\u003eYes, Article 14a.2 d covers hazardous substances even as components in mixtures, with special attention to REACH Article 57 and Annex XVII. Actual risk and substitution possibility must be assessed.\u003c\/p\u003e\n\n\u003ch3\u003eDoes Excel automatically calculate BAT limit values?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Excel stores controls and follow-up signals. BAT values, units, measurement methods, and applicable permit conditions must be retrieved from actual documents and checked by the responsible person.\u003c\/p\u003e\n\n\u003ch3\u003eWho may perform the external audit?\u003c\/h3\u003e\n\n\u003cp\u003eArticle 14a.4 states an accredited body or competent accredited\/licensed environmental auditor with special qualification. An internal environmental coordinator's certificate is not automatically such an audit.\u003c\/p\u003e\n\n\u003ch3\u003eIs a transformation plan to 2050 mandatory by 2027?\u003c\/h3\u003e\n\n\u003cp\u003eNot generally. Article 27d contains its own timeline, including 30 June 2030 for certain industrial activities. Test installation type and applicable later rules.\u003c\/p\u003e\n\n\u003ch3\u003eCan all our chemical information be published on the web?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Article 14a.4 contains a special procedure for internet publication of relevant EMS information as well as the possibility of masking\/exceptions for certain protected interests. Test the current implementing act and Swedish confidentiality\/publicity law.\u003c\/p\u003e\n\n\u003ch3\u003eIs the product a finished ISO 14001 certified system?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It contains work templates and an Excel journal, not a finished implementation, accreditation, emission control, or authority approval.\u003c\/p\u003e\n\n\u003ch3\u003eDo actual BAT conclusions and permits come with the package?\u003c\/h3\u003e\n\n\u003cp\u003eNo. No customer-specific activity facts, test data, BAT limits, or permits have been entered. They must be retrieved and registered by the user.\u003c\/p\u003e\n\n\u003ch3\u003eAre all seven documents in English?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Five Swedish specialist templates and a Swedish guide are supplemented with a separate English User Guide. The Excel register is in Swedish.\u003c\/p\u003e\n\n\u003ch3\u003eAre the PDF files fillable?\u003c\/h3\u003e\n\n\u003cp\u003eThe DOCX files are editable. The PDFs are searchable and printable but lack interactive form fields.\u003c\/p\u003e\n\n\u003ch2\u003eLegal sources, quality, and transparent limitations\u003c\/h2\u003e\n\n\u003cp\u003ePrimary sources: \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/dir\/2024\/1785\/oj\/swe\"\u003eDirective (EU) 2024\/1785, in particular Article 14a and Article 3\u003c\/a\u003e; \u003ca href=\"https:\/\/eur-lex.europa.eu\/legal-content\/EN\/TXT\/?uri=CELEX:02010L0075-20240804\"\u003erevised Industrial Emissions Directive 2010\/75\/EU\u003c\/a\u003e; \u003ca href=\"https:\/\/eur-lex.europa.eu\/legal-content\/SV\/TXT\/?uri=CELEX:52026XC04834\"\u003eCommission Q\u0026amp;A 15 September 2026\u003c\/a\u003e; \u003ca href=\"https:\/\/www.naturvardsverket.se\/vagledning-och-stod\/industriutslapp-ied\/industriutslappsdirektivet-ied\/\"\u003eSwedish Environmental Protection Agency's IED guidance\u003c\/a\u003e; \u003ca href=\"https:\/\/www.regeringen.se\/remisser\/2026\/07\/remiss-av-promemorian-forbattrat-genomforande-av-industriutslappsdirektivet\/\"\u003eongoing Swedish implementation work\u003c\/a\u003e. For the substance assessment: \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2006\/1907\/oj\/swe\"\u003eREACH Regulation 1907\/2006\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eVersion 1.0. AI-assisted legal source verification 14 November 2026.\u003c\/strong\u003e The package contains 7 DOCX, 7 searchable PDFs (14 pages) and 1 XLSX (nine tabs and 712 formulas), verified in a local ZIP with CRC and byte comparison. Three authentic product images are based on actual documents. \u003cstrong\u003eNo independent external legal review, accredited audit, permit review, actual emission\/chemical testing or verification of a specific installation's BAT requirements is included.\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":56619650613590,"sku":"MB-IED-ART14A-20261114-V1","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/ied2-miljoledningssystem-artikel14a-bat-huvudbild-1600.png?v=1794645859"},{"product_id":"3d-printade-reservdelar-2027-cad-provning-produktansvar","title":"3D-printed spare parts 2027 – CAD file, safety testing and product liability | Word\/PDF\/Excel","description":"\u003cdiv class=\"mb-product-copy\"\u003e\n\n\u003cp\u003e\u003cstrong\u003e3D-printed spare parts 2027 – CAD file, safety testing and product liability\u003c\/strong\u003e is a niche documentation package for companies that \u003cstrong\u003edevelop, sell or use digital manufacturing files and manufacture physical spare parts with 3D printers\u003c\/strong\u003e. It builds an unbroken chain of evidence: \u003cstrong\u003efile version → material batch → print job → safety test → delivery → change or complaint\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cp\u003eThe background is \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/dir\/2024\/2853\/oj\/swe\" rel=\"noopener\" target=\"_blank\"\u003eEU's new product liability directive (EU) 2024\/2853\u003c\/a\u003e. Articles 4.1–2 now expressly include \u003cstrong\u003edigital manufacturing files\u003c\/strong\u003e containing the functional information needed for automated manufacturing, for example with a 3D printer. This is not the same as all image files, visualizations or ordinary drawings. A technically usable CAD file or print job may, however, need to be assessed as a product in itself or physical good in itself.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eImportant Swedish status on November 14, 2026:\u003c\/strong\u003e \u003ca href=\"https:\/\/www.riksdagen.se\/sv\/dokument-och-lagar\/dokument\/proposition\/en-ny-produktansvarslag_he0312\/\" rel=\"noopener\" target=\"_blank\"\u003eproposition 2026\/27:12 on a new product liability act\u003c\/a\u003e has been submitted to the Swedish Parliament but is \u003cstrong\u003estill a bill\u003c\/strong\u003e. The government proposes entry into force on \u003cstrong\u003eJanuary 1, 2027\u003c\/strong\u003e. Article 2 of the EU directive specifies products placed on the market or put into service \u003cstrong\u003eafter December 9, 2026\u003c\/strong\u003e. The date and liability for an actual event must therefore be reviewed against the Swedish legislation decided at that time. The product is marketed as \u003cstrong\u003epreparation and documentation support\u003c\/strong\u003e, not as a statement that the bill is already law.\u003c\/p\u003e\n\n\u003cdiv style=\"border:2px solid #266B96;border-radius:12px;background:#EDF7FC;padding:18px;margin:18px 0\"\u003e\n\n\u003ch2 style=\"margin:0 0 9px\"\u003e01. Package contents\u003c\/h2\u003e\n\n\u003cp style=\"margin:0\"\u003e\u003cstrong\u003eFive Swedish work templates\u003c\/strong\u003e, a Swedish user guide and an \u003cstrong\u003eEnglish User Guide\u003c\/strong\u003e, all in both \u003cstrong\u003eeditable Word (DOCX)\u003c\/strong\u003e and corresponding \u003cstrong\u003esearchable, printable PDF\u003c\/strong\u003e. In addition, an \u003cstrong\u003eExcel register with 11 tabs and 18 control metrics\u003c\/strong\u003e. Total \u003cstrong\u003e15 customer files – 7 DOCX + 7 PDF + 1 XLSX\u003c\/strong\u003e in a digital ZIP. The PDF versions lack interactive form fields.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv style=\"border:2px solid #266B96;border-radius:12px;background:#F7FAFC;padding:18px;margin:18px 0\"\u003e\n\n\u003ch2 style=\"margin:0 0 9px\"\u003e02. What the files contain\u003c\/h2\u003e\n\n\u003cp style=\"margin:0\"\u003eTraceable registration of original file and checksum, copyright and manufacturer role, printer and slicer revision, material batch, intended physical function, risk analysis, \u003cstrong\u003eactual safety test with original report\u003c\/strong\u003e, affected customer\/delivery batch, version change and documented complaint. Excel shows \u003cstrong\u003emissing evidence, failed tests, high consequences and open blocking cases\u003c\/strong\u003e, but never certifies a part, does not establish liability for damages or decide whether CE marking is required.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2\u003eFiles in the package\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"border-collapse:collapse;width:100%;min-width:760px\"\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth style=\"background:#E8F2F9;padding:9px;text-align:left\"\u003eDocument\u003c\/th\u003e\n\n\u003cth style=\"background:#E8F2F9;padding:9px;text-align:left\"\u003ePractical function\u003c\/th\u003e\n\n\u003cth style=\"background:#E8F2F9;padding:9px;text-align:left\"\u003eLanguage\u003c\/th\u003e\n\n\u003cth style=\"background:#E8F2F9;padding:9px;text-align:left\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"text-align:left;padding:9px;border-bottom:1px solid #D2E1EA\"\u003e01. CAD file, product classification and liability\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #D2E1EA\"\u003eFile type, physical spare part, revision, publisher and actor role. Distinguishes functional manufacturing file from ordinary drawing.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #D2E1EA\"\u003eSV\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #D2E1EA\"\u003eDOCX + searchable PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"text-align:left;padding:9px;border-bottom:1px solid #D2E1EA\"\u003e02. Print order, material and process\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #D2E1EA\"\u003ePrinter, material batch, slicer, print setting, post-processing and actual process evidence.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #D2E1EA\"\u003eSV\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #D2E1EA\"\u003eDOCX + searchable PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"text-align:left;padding:9px;border-bottom:1px solid #D2E1EA\"\u003e03. Safety risk and testing\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #D2E1EA\"\u003eIntended use, malfunctions, test plan, actual original report and manual decision.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #D2E1EA\"\u003eSV\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #D2E1EA\"\u003eDOCX + searchable PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"text-align:left;padding:9px;border-bottom:1px solid #D2E1EA\"\u003e04. CAD revision and change control\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #D2E1EA\"\u003eFile hash before\/after change, affected batches, new test requirement and liability for substantial change.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #D2E1EA\"\u003eSV\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #D2E1EA\"\u003eDOCX + searchable PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"text-align:left;padding:9px;border-bottom:1px solid #D2E1EA\"\u003e05. Complaint, damage and batch block\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #D2E1EA\"\u003eNeutral damage case, original evidence, possible product block, verified correction and customer communication.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #D2E1EA\"\u003eSV\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #D2E1EA\"\u003eDOCX + searchable PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"text-align:left;padding:9px;border-bottom:1px solid #D2E1EA\"\u003e06. Swedish user guide\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #D2E1EA\"\u003eSeven work steps, legal sources, dating and instructions for Excel.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #D2E1EA\"\u003eSV\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #D2E1EA\"\u003eDOCX + searchable PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"text-align:left;padding:9px;border-bottom:1px solid #D2E1EA\"\u003e07. English User Guide\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #D2E1EA\"\u003eEnglish user instructions for the Swedish templates; not a complete English template set.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #D2E1EA\"\u003eEN\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px;border-bottom:1px solid #D2E1EA\"\u003eDOCX + searchable PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"padding:9px;text-align:left\"\u003e08. Excel – CAD, print and control register\u003c\/th\u003e\n\n\u003ctd style=\"padding:9px\"\u003e11 tabs with linkable file\/batch basis, test, delivery, actor and action.\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px\"\u003eSV\u003c\/td\u003e\n\n\u003ctd style=\"padding:9px\"\u003eXLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\u003ch2\u003eWhy a 3D-printed spare part needs its own chain of evidence\u003c\/h2\u003e\n\n\u003cp\u003eA physical spare part can look the same in two prints but have different properties depending on \u003cstrong\u003ematerial batch, layer orientation, slicer settings, printer and post-processing\u003c\/strong\u003e. Therefore, a file name or sales order is rarely enough to recreate the circumstances that applied to the delivered part. The package therefore requires separate and actual references to the \u003cstrong\u003eoriginal file, actual production batch and actual test report\u003c\/strong\u003e. It does not perform any technical simulations or strength calculations.\u003c\/p\u003e\n\n\u003ch2\u003eEU 2024\/2853: Product liability is not the same as product safety\u003c\/h2\u003e\n\n\u003cp\u003eThe directive provides rules for \u003cstrong\u003edamages when a product has a safety deficiency that causes compensable damage\u003c\/strong\u003e. Liability may apply to different economic actors depending on what they developed, manufactured, imported or substantially changed. \u003cstrong\u003eA user who logs a fault has not thereby proven legal liability.\u003c\/strong\u003e Therefore, the template distinguishes between reported deviation, technical investigation, causation, competent legal assessment and verified action.\u003c\/p\u003e\n\n\u003cp\u003eSeparately, \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2023\/988\/oj\/swe\" rel=\"noopener\" target=\"_blank\"\u003eEU's general product safety regulation 2023\/988 (GPSR)\u003c\/a\u003e applies to consumer products covered by it. Article 9 deals with the manufacturer's obligations and article 13 when another actor can be considered a manufacturer after a \u003cstrong\u003esubstantial change\u003c\/strong\u003e. Special rules may apply to, for example, electrical products, machinery or medical devices. \u003cstrong\u003eThere is no general CE requirement for every 3D-printed spare part\u003c\/strong\u003e; the correct product category and applicable rules must be tested.\u003c\/p\u003e\n\n\u003ch2\u003eVersion control: CAD, STL, STEP, G-code and print batch\u003c\/h2\u003e\n\n\u003cp\u003eThe templates distinguish between original design, replaceable geometry, slicer\/machine program and physical product. The Excel tab \u003cstrong\u003eCAD files\u003c\/strong\u003e has fields for actual file type, revision, SHA\/checksum and product ID. \u003cstrong\u003ePrints\u003c\/strong\u003e link an actual machine, a print job and material batch to exactly the revision that was used. A new file version must not automatically inherit earlier test evidence if safety is affected.\u003c\/p\u003e\n\n\u003ch2\u003eRisk assessment and testing\u003c\/h2\u003e\n\n\u003cp\u003eIdentify intended function, conceivable failure, burn and heat risk, sharp parts, electrical fault, chemical contact or foreseeable incorrect assembly. Safety-critical applications – for example load-bearing, pressurized or medical components – may require special expertise and product regulations. Document 03 provides fields for \u003cstrong\u003eactual test method, test batch, original report, outcome, reviewer and decision\u003c\/strong\u003e. A failed test is flagged internally as \u003cstrong\u003eFAILED – BLOCK\u003c\/strong\u003e; no formula can make a technically failed test pass.\u003c\/p\u003e\n\n\u003ch2\u003eExcel register with eleven tabs\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eOverview, CAD files, Prints, Material, Risks, Testing, Deliveries, Actors, Deviations, Actions and Read me.\u003c\/strong\u003e The overview counts 18 control metrics, for example number of registered files, missing file basis, unclear actors, print jobs without process evidence, failed tests, delivery blocks and incompletely verified actions.\u003c\/p\u003e\n\n\u003cp\u003eControls show, among others, \u003cstrong\u003eFILE BASIS MISSING, MANUFACTURING EVIDENCE MISSING, MATERIAL EVIDENCE MISSING, HIGH CONSEQUENCE – TEST, TEST EVIDENCE MISSING, FAILED – BLOCK, BLOCKED, EVIDENCE MISSING and EXPIRED\u003c\/strong\u003e. Zero in the overview means \u003cstrong\u003eno registered entries\u003c\/strong\u003e, never that an item has been approved. Under \u003cstrong\u003eActions!M2\u003c\/strong\u003e, a manual reference date is set as YYYYMMDD for expired actions.\u003c\/p\u003e\n\n\u003ch2\u003eHow you work with the package\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003eRegister the digital file's actual nature, version, source and intended physical spare part.\u003c\/li\u003e\n\n\u003cli\u003eAssess which economic actors create, change, import and deliver the file or part.\u003c\/li\u003e\n\n\u003cli\u003eBlock and archive actual original, revision and checksum before change.\u003c\/li\u003e\n\n\u003cli\u003eLink each print batch to actual printer, slicer, material batch and work order.\u003c\/li\u003e\n\n\u003cli\u003ePerform an individual risk assessment and save results from actual tests.\u003c\/li\u003e\n\n\u003cli\u003eDeliver only after a competent decision with applicable product regulations and documented basis.\u003c\/li\u003e\n\n\u003cli\u003eIn case of error: document neutrally, secure original evidence, assess risk, block affected batches if necessary and verify correction.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eFrequently asked questions\u003c\/h2\u003e\n\n\u003ch3\u003eIs a CAD or STL file always a product according to the new directive?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It is required that it is actually a digital manufacturing file with the functional information that makes automated manufacturing possible according to article 4.2. An ordinary image or visualization is not automatically such a file.\u003c\/p\u003e\n\n\u003ch3\u003eDoes the new Swedish product liability act already apply in November 2026?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Prop. 2026\/27:12 is still a Swedish Parliament matter. The government proposes entry into force on January 1, 2027. Check the Swedish Parliament's actual decision and transitional provisions before applying new law.\u003c\/p\u003e\n\n\u003ch3\u003eIs it December 9, 2026 or January 1, 2027 that applies?\u003c\/h3\u003e\n\n\u003cp\u003eArticle 2 of the EU directive applies to products that have been placed on the market or put into service after December 9, 2026. The government's Swedish bill proposes a national legal entry into force on January 1, 2027. These are different legal dates that must be kept separate.\u003c\/p\u003e\n\n\u003ch3\u003eMust every 3D-printed spare part be CE marked?\u003c\/h3\u003e\n\n\u003cp\u003eNo. CE requirements are determined by which EU product regulations apply to exactly that finished product. An internal risk journal never replaces a necessary assessment against such regulations.\u003c\/p\u003e\n\n\u003ch3\u003eIs a slicer profile sufficient evidence that a spare part holds?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Actual print process, material properties and relevant test method must be proven. A file version or setting image is not a strength report.\u003c\/p\u003e\n\n\u003ch3\u003eDoes a customer complaint mean that the seller is liable for damages?\u003c\/h3\u003e\n\n\u003cp\u003eNot automatically. The product's possible safety deficiency, compensable damage, causation and liable actor need to be assessed according to applicable law.\u003c\/p\u003e\n\n\u003ch3\u003eWhat languages and formats are included?\u003c\/h3\u003e\n\n\u003cp\u003eFive Swedish editable work templates and Swedish user guide, plus English User Guide, in both DOCX and searchable PDF. The Excel register is Swedish. PDF is printable but not an interactive form.\u003c\/p\u003e\n\n\u003ch3\u003eAre CAD models, test certificates or legal opinion included?\u003c\/h3\u003e\n\n\u003cp\u003eNo. No design files, actual test protocols, CE markings, authority decisions or lawyer certifications are included. The documents are work templates.\u003c\/p\u003e\n\n\u003ch2\u003eLegal sources and delivery terms\u003c\/h2\u003e\n\n\u003cp\u003e\u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/dir\/2024\/2853\/oj\/swe\" rel=\"noopener\" target=\"_blank\"\u003eEU 2024\/2853 – product liability directive\u003c\/a\u003e · \u003ca href=\"https:\/\/www.riksdagen.se\/sv\/dokument-och-lagar\/dokument\/proposition\/en-ny-produktansvarslag_he0312\/\" rel=\"noopener\" target=\"_blank\"\u003eProp. 2026\/27:12 – new Swedish product liability act (proposal)\u003c\/a\u003e · \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2023\/988\/oj\/swe\" rel=\"noopener\" target=\"_blank\"\u003eEU 2023\/988 – general product safety\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eVersion 1.0 · AI-assisted legal source control November 14, 2026 · Jurisdiction Sweden\/EU · Delivery ZIP.\u003c\/strong\u003e End customer can receive digital download. The material is not independently lawyer-reviewed, laboratory-tested or authority-certified.\u003c\/p\u003e\n\n\n\u003c\/div\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":56620470272342,"sku":"MB-3DPRINT-CAD-PLD-2027-V1","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/3d-printade-reservdelar-2027-cad-produktansvar-huvudbild.png?v=1794652037"},{"product_id":"maskinimportor-distributor-ce-dokumentkontroll-2027","title":"Machinery Regulation 2027 – importer \u0026 distributor: CE and documentation check | Word\/PDF\/Excel","description":"\u003cp\u003e\u003cstrong\u003eDo you import or sell finished machinery in Sweden ahead of the EU's new Machinery Regulation 2027?\u003c\/strong\u003e With this document package, importers and distributors can document their own preliminary check of CE marking, EU declaration of conformity, machine identification, manufacturer\/importer details, user manual, sources of evidence, and any sales or delivery restrictions. \u003cstrong\u003eImportant distinction:\u003c\/strong\u003e the package applies to finished machinery and related products under Articles 13 and 15 of EU 2023\/1230 – not partially completed machinery covered by special rules under Articles 14 and 16.\u003c\/p\u003e\n\u003ch2\u003eQuick facts before purchase\u003c\/h2\u003e\u003cp\u003e\u003cstrong\u003eTarget audience:\u003c\/strong\u003e Swedish importers, wholesalers, distributors, and industrial machinery resellers. \u003cstrong\u003eLaw:\u003c\/strong\u003e EU Regulation (EU) 2023\/1230, primarily applicable from 20 January 2027. \u003cstrong\u003e\u003c\/strong\u003e digital ZIP with 15 customer files: \u003cstrong\u003e5 Swedish working templates + Swedish user guide + separate English user guide\u003c\/strong\u003e, each document as an editable Word (DOCX) and corresponding searchable, printable PDF (14 files), plus Excel (XLSX) with nine tabs and 12 formula-based summaries (1 file). The PDF files are not interactively fillable. The five working templates are in Swedish; the English file is a guide, not the main English documents.\u003c\/p\u003e\n\u003csection aria-label=\"Package contents\" style=\"border:1px solid #adc5da;border-radius:12px;background:#edf4fa;padding:18px;margin:22px 0\"\u003e\u003ch2 style=\"margin:0 0 10px\"\u003e01 – Package contents\u003c\/h2\u003e\n\n\u003cp\u003e01 Application, role and timeline; 02 Importer's preliminary check; 03 Distributor's CE and document check; 04 Request for CE and supplier documentation; 05 Delivery restriction, correction and evidence log; 06 Swedish user guide; 07 English User Guide. All seven in DOCX and searchable PDF. 08 Excel register with nine worksheet tabs and 12 administrative indicators. \u003cstrong\u003eTotal 7 DOCX + 7 PDF + 1 XLSX = 15 files.\u003c\/strong\u003e\u003c\/p\u003e\u003c\/section\u003e\n\u003csection aria-label=\"What the files contain\" style=\"border:1px solid #adc5da;border-radius:12px;background:#fff;padding:18px;margin:22px 0\"\u003e\u003ch2 style=\"margin:0 0 10px\"\u003e02 – What the files contain\u003c\/h2\u003e\n\n\u003cp\u003eClear assessment of product category, actual role, and first placing on the market date; importer's special checks and ten-year archiving of the EU declaration; distributor's own supply checks; request for documents from the correct supplier; deficiency and restriction management; scenarios for older machinery, digital instructions, and own brand. Excel collects unique IDs, document evidence, deviations, activities, and follow-up. \u003cstrong\u003eNone of the tools issue an EU declaration, perform CE assessment, technical testing, or legal approval.\u003c\/strong\u003e\u003c\/p\u003e\u003c\/section\u003e\n\u003ch2\u003eWhen is the template suitable – and when is another required?\u003c\/h2\u003e\u003cp\u003e\u003cstrong\u003eExample 1:\u003c\/strong\u003e A Swedish importer wants to start marketing a finished workshop machine from a manufacturer outside the EU. The importer needs to check the manufacturer's documentation, EU declaration, CE marking, instructions, and their own details before placing it on the market. \u003cstrong\u003eExample 2:\u003c\/strong\u003e A Swedish reseller receives a batch of machinery from an importer within the EU and must check marking, documents, and instructions before supply.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eDo not use the package unchanged\u003c\/strong\u003e for partially completed machinery, which requires an EU declaration of incorporation, assembly instructions, and assessment under Articles 14\/16. In the case of own brand or substantial modification, manufacturer responsibility may arise under Article 18. For a machine that has already been lawfully placed on the market before 20 January 2027, Article 52 and the relevant earlier regulations must be examined. An internal form does not replace the manufacturer's risk assessment or certification procedure.\u003c\/p\u003e\n\u003ch2\u003eExact file list\u003c\/h2\u003e\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"width:100%;border-collapse:collapse\"\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth scope=\"col\"\u003eFile\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eCustomer function\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eLanguage and format\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e01 Application, role and timeline\u003c\/td\u003e\n\n\u003ctd\u003eProduct, role, older placing, partially completed product, and manufacturer responsibility\u003c\/td\u003e\n\n\u003ctd\u003eSwedish · DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e02 Importer's preliminary check\u003c\/td\u003e\n\n\u003ctd\u003eArt. 13 – CE, EU declaration, technical documentation, contact marking, instructions, and 10-year archive\u003c\/td\u003e\n\n\u003ctd\u003eSwedish · DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e03 Distributor's document check\u003c\/td\u003e\n\n\u003ctd\u003eArt. 15 – check before supply and separate stop\/correction fields\u003c\/td\u003e\n\n\u003ctd\u003eSwedish · DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e04 Request for supplier documentation\u003c\/td\u003e\n\n\u003ctd\u003eWrite to manufacturer\/supplier, request concrete documents, and note answers and evidence\u003c\/td\u003e\n\n\u003ctd\u003eSwedish · DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e05 Delivery restriction and correction\u003c\/td\u003e\n\n\u003ctd\u003eRecord actual deviation, internal pause, action, authority assessment, and re-check\u003c\/td\u003e\n\n\u003ctd\u003eSwedish · DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e06 User guide\u003c\/td\u003e\n\n\u003ctd\u003eSteps, legal boundaries, eight application examples, and completion\u003c\/td\u003e\n\n\u003ctd\u003eSwedish · DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e07 English User Guide\u003c\/td\u003e\n\n\u003ctd\u003eExplains the Swedish package and its limitations – no English working templates\u003c\/td\u003e\n\n\u003ctd\u003eEnglish · DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e08 Evidence register\u003c\/td\u003e\n\n\u003ctd\u003eNine tabs, status selection, date validation, and 12 administrative formulas\u003c\/td\u003e\n\n\u003ctd\u003eSwedish · XLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\u003ch2\u003eThe Excel register in practice\u003c\/h2\u003e\u003cp\u003eThe workbook contains \u003cstrong\u003eProducts, Actors, Importer Check, Distributor Check, Document Evidence, Deviations, Actions, Overview, and Read me \u0026amp; sources\u003c\/strong\u003e. Record product\/actor ID, document and marking evidence, and actual inspection results. Dropdowns distinguish between, among others, \u003cem\u003eRestricted\u003c\/em\u003e, \u003cem\u003eNeeds completion\u003c\/em\u003e, and \u003cem\u003eChecked by responsible person\u003c\/em\u003e. Nine date field areas are validated, and open deviations\/restrictions are marked. The overview counts 12 verified COUNTIF\/COUNTA indicators, including the boundary row for 150 prepared input rows. The formulas \u003cstrong\u003enever\u003c\/strong\u003e calculate CE validity, legal release, or a legal deadline. The customer file has no fictional product entries or macros. Practical print testing in a specific version of Excel is not included in the verified test basis.\u003c\/p\u003e\n\u003ch2\u003eStep by step\u003c\/h2\u003e\u003col\u003e\n\n\u003cli\u003eDetermine whether it is finished machinery or a related product and what actor role you actually have.\u003c\/li\u003e\n\n\u003cli\u003eCheck the first placing on the market and whether the transition under Article 52 affects the machine.\u003c\/li\u003e\n\n\u003cli\u003eThe importer or distributor goes through the \u003cstrong\u003edifferent\u003c\/strong\u003e statutory checkpoints in document 02 or 03.\u003c\/li\u003e\n\n\u003cli\u003eRequest missing documents in document 04, link each piece of evidence to the correct model and version, and check that digital documents are actually accessible and usable according to the rules.\u003c\/li\u003e\n\n\u003cli\u003eStop or complete the case in case of suspected deficiency. Document authority assessment and actual action separately.\u003c\/li\u003e\n\n\u003cli\u003eAttest manually, archive documentation, and follow up in Excel. Hire a qualified CE\/legal expert where the machine's design, risk profile, or responsibility requires it.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\u003ch2\u003eLegal prerequisites\u003c\/h2\u003e\u003cp\u003e\u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2023\/1230\/2026-07-27\/eng\"\u003eRegulation (EU) 2023\/1230, consolidated on 27 July 2026\u003c\/a\u003e regulates manufacturers, importers, and distributors. \u003cstrong\u003eArticle 13\u003c\/strong\u003e places special requirements on the importer: for example, ensuring the manufacturer's applicable assessment, technical documentation according to Annex IV A, CE and EU declaration, own contact marking, user manuals, and a copy of the EU declaration for at least ten years from placing on the market. \u003cstrong\u003eArticle 15\u003c\/strong\u003e requires the distributor's own check of, among others, CE, EU declaration, user manual\/language, and actor details. None of these checks is an automatic CE approval. \u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/inspektioner-utredningar-och-kontroller\/produktregler-och-marknadskontroll\/produktregler\/krav-pa-maskiner\/den-nya-maskinforordningen\/\"\u003eThe Swedish Work Environment Authority\u003c\/a\u003e describes the entry into force and the difference from older Swedish machinery regulations.\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eDigital user manuals\u003c\/strong\u003e may be used according to Article 10.7 under conditions of availability, download, printing, and preservation, as well as special paper information for certain non-professional use. \u003cstrong\u003eEU declaration\u003c\/strong\u003e can, according to Article 10.8 under specified conditions, be accessed digitally via a web address or machine-readable code. Therefore, do not require a paper original as a general legal condition when a valid digital solution is permitted. \u003cstrong\u003ePartially completed machinery\u003c\/strong\u003e requires a different track and a different documentation basis.\u003c\/p\u003e\n\u003ch2\u003eCompare with related products\u003c\/h2\u003e\u003cp\u003e\u003ca href=\"\/en\/products\/eu-maskinforordningen-machinery-regulation-2027-riskbedomning-ce-technical-file-word-pdf-excel\"\u003eEU Machinery Regulation – risk assessment, CE and technical file\u003c\/a\u003e is primarily aimed at the manufacturer's process. \u003ca href=\"\/en\/products\/vasentlig-maskinandring-2027-artikel18-gransdragning\"\u003eSubstantial machinery modification 2027\u003c\/a\u003e applies to the assessment of modifications and manufacturer responsibility. \u003ca href=\"\/en\/products\/maskinforordningen-2027-digital-bruksanvisning-qr-test-pappersbegaran\"\u003eDigital user manual 2027\u003c\/a\u003e applies especially to the conditions for digital documentation. This package focuses on the importer's and distributor's own check in the distribution chain.\u003c\/p\u003e\n\u003ch2\u003eFrequently asked questions\u003c\/h2\u003e\n\u003ch3\u003eMust an importer issue the manufacturer's CE declaration again?\u003c\/h3\u003e\u003cp\u003eNo, not automatically. The importer shall, among other things, check the manufacturer's procedure and keep a copy of the relevant EU declaration according to Article 13. However, under own brand or in case of substantial modification, other rules and manufacturer responsibility may become relevant.\u003c\/p\u003e\n\u003ch3\u003eCan the distributor sell a machine where the CE marking is missing?\u003c\/h3\u003e\u003cp\u003eNot according to the standard rule for covered finished machinery. If the distributor considers or has reason to believe that the product does not meet the requirements, it must not be supplied until it has been brought into conformity.\u003c\/p\u003e\n\u003ch3\u003eMust the user manual always be on paper?\u003c\/h3\u003e\u003cp\u003eNo. Article 10.7 allows digital documentation under detailed conditions. Certain essential safety information may still need to be provided on paper when the product is intended for or reasonably foreseeable to be used by non-professionals.\u003c\/p\u003e\n\u003ch3\u003eDoes the checklist also apply to partially completed machinery?\u003c\/h3\u003e\u003cp\u003eNo. Articles 14 and 16 have a special documentation track for partially completed machinery. This package should not be used unchanged for them.\u003c\/p\u003e\n\u003ch3\u003eDoes the regulation apply retroactively to older machinery?\u003c\/h3\u003e\u003cp\u003eNot generally. Article 52 and evidence of when a machine was actually placed on the market must be examined in the individual case.\u003c\/p\u003e\n\u003ch3\u003eDoes Excel check the machine's CE status automatically?\u003c\/h3\u003e\u003cp\u003eNo. Excel only counts administrative statuses, not technical safety, competence, legal conformity, or validity of the EU declaration.\u003c\/p\u003e\n\u003ch3\u003eAre the PDFs fillable and are the working templates in English?\u003c\/h3\u003e\u003cp\u003ePDF is searchable and printable, but not interactively fillable. The working templates are in Swedish. A separate English user guide is included.\u003c\/p\u003e\n\u003ch2\u003eSources, version, and review status\u003c\/h2\u003e\u003cp\u003e\u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2023\/1230\/2026-07-27\/eng\"\u003eEUR-Lex – consolidated regulation 2023\/1230 (27 July 2026)\u003c\/a\u003e and \u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/inspektioner-utredningar-och-kontroller\/produktregler-och-marknadskontroll\/produktregler\/krav-pa-maskiner\/den-nya-maskinforordningen\/\"\u003eThe Swedish Work Environment Authority – the new machinery regulation\u003c\/a\u003e. Product version \u003cstrong\u003e1.0, 14 November 2026\u003c\/strong\u003e, AI-assisted legal source check A\/B and internal document\/file\/scenario tests. No independent external legal, technical CE, laboratory, or authority review. No guarantee that a specific machine is legal or safe. Supplier: Svenska Dokumentmallar \/ Mallbutiken.se.\u003c\/p\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":56621597196630,"sku":"MB-MACH-IMP-DIST-20261114-V1","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/01-maskinf2027-importor-distributor-ce-huvudbild-1600_40dc158f-6797-45f0-be80-95af80c9e047.png?v=1794663080"},{"product_id":"plc-hmi-backup-aterlasningsprov-aterstartsbeslut","title":"PLC\/HMI – backup, recovery test and restart decision | Word\/PDF\/Excel","description":"\n\u003cp\u003e\u003cstrong\u003ePLC\/HMI – backup, reload test and restart decision\u003c\/strong\u003e is a digital template package for maintenance engineers, automation managers and industrial operators who need to document configuration copies, isolated testing, actual evidence and a separate decision before restarting a production cell. It \u003cstrong\u003edoes not create backups, reload any PLC or automatically approve machine safety\u003c\/strong\u003e.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eQuick facts:\u003c\/strong\u003e Swedish usage and legal context • 7 independent documents (5 Swedish work templates, 1 Swedish guide, 1 English User Guide) • 7 editable DOCX + 7 searchable, printable PDFs + 1 XLSX with nine tabs = \u003cstrong\u003e15 files\u003c\/strong\u003e • Document version 1.0 • Delivery format: digital ZIP. The PDF files do not contain interactive fillable fields. The English guide is not a translation of the work templates.\u003c\/p\u003e\n\u003csection style=\"border:2px solid #24558B;border-radius:10px;padding:16px;margin:18px 0\"\u003e\u003ch2\u003e01. Package contents\u003c\/h2\u003e\n\n\u003cp\u003eFive Swedish work documents: 01 system register and applicability; 02 backup order and copy evidence; 03 isolated reload test – test plan; 04 reload test – results and deviations; 05 restart decision and acknowledgment. In addition, a Swedish user guide, an English User Guide for the Swedish templates and an Excel register. All seven text documents are available in both DOCX and PDF formats.\u003c\/p\u003e\u003c\/section\u003e\n\u003csection style=\"border:2px solid #24558B;border-radius:10px;padding:16px;margin:18px 0\"\u003e\u003ch2\u003e02. What the files contain\u003c\/h2\u003e\n\n\u003cp\u003eFields for PLC\/HMI system ID, CPU and firmware, project baseline, HMI\/runtime, I\/O and license dependencies, backup ID and copy evidence, approved test environment, expected and observed test results, deviation ID, qualified technical review and separate restart decision. Excel compiles administrative statuses; no automatic security or legal review is performed.\u003c\/p\u003e\u003c\/section\u003e\n\u003ch2\u003eWho should choose the package – and when is it not suitable?\u003c\/h2\u003e\u003cp\u003e\u003cstrong\u003eSuitable for:\u003c\/strong\u003e (1) a maintenance technician who needs to document a planned backup of PLC and HMI projects, (2) an industrial operator who wants to follow up on an isolated reload test and document what was actually verified. \u003cstrong\u003eNot suitable for:\u003c\/strong\u003e live restoration, changes to safety logic, unauthorized restarts, complete CE\/machine safety assessments or automated backups. Qualified OT and machine safety expertise is required when risks warrant it.\u003c\/p\u003e\n\u003ch2\u003eAll files – actual table of contents\u003c\/h2\u003e\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"width:100%;border-collapse:collapse\"\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth scope=\"col\"\u003eDocument\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eFunction\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eLanguage\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e01 OT system register and applicability\u003c\/td\u003e\n\n\u003ctd\u003eSystems, roles, technical limitations, applicability issues\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e02 Backup order and copy evidence\u003c\/td\u003e\n\n\u003ctd\u003eVersion, dependencies, actual copy, integrity statement\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e03 Isolated reload test\u003c\/td\u003e\n\n\u003ctd\u003eTest plan, barriers, conditions, stop criteria\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e04 Test results and deviations\u003c\/td\u003e\n\n\u003ctd\u003eTechnical observations, evidence, retesting, manual results\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e05 Restart decision and acknowledgment\u003c\/td\u003e\n\n\u003ctd\u003eSeparate decision by the authorized person in charge and subsequent acknowledgment\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e06 User guide\u003c\/td\u003e\n\n\u003ctd\u003eInstructions, cases, limitations, sources\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e07 English User Guide\u003c\/td\u003e\n\n\u003ctd\u003eEnglish instructions for the Swedish forms\u003c\/td\u003e\n\n\u003ctd\u003eEnglish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e08 Excel register\u003c\/td\u003e\n\n\u003ctd\u003eAdministrative registration and status tracking\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eXLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\u003cp\u003eDOCX can be edited in a compatible word processor. PDF is searchable and printable but is \u003cstrong\u003enot\u003c\/strong\u003e interactively fillable. XLSX requires compatible spreadsheet software.\u003c\/p\u003e\n\u003ch2\u003eThe Excel tool in practice\u003c\/h2\u003e\u003cp\u003eNine tabs: Machines, Copies, Reload test, Test points, Deviations, Actions, Decisions, Overview and Read me. The register contains 170 formula cells with administrative summaries and completion checks, drop-down lists for manual statuses and clear separate fields. For example: a registered copy does not automatically result in a passed test; a test marked “Completed – not verified” is counted separately from “Verified in isolated test environment”. A passed isolated test is not an automatic restart condition.\u003c\/p\u003e\n\u003ch2\u003eHow to use the templates\u003c\/h2\u003e\u003col\u003e\n\n\u003cli\u003eIdentify the machine, control system, configuration and authorized roles in document 01.\u003c\/li\u003e\n\n\u003cli\u003eDefine safety functions, licenses, firmware and protected copies; document actual copy evidence in 02.\u003c\/li\u003e\n\n\u003cli\u003ePlan a safe isolated test environment, risk assessment and stop criteria in 03.\u003c\/li\u003e\n\n\u003cli\u003eRecord actual outcomes, checkpoints, supporting documentation and deviations in 04 and Excel.\u003c\/li\u003e\n\n\u003cli\u003eRequest the necessary technical\/safety validation. Have the appropriate decision-maker sign a separate STOP, WAIT or restart decision in 05.\u003c\/li\u003e\n\n\u003cli\u003eArchive documents, test evidence and identifiers in a protected system. Do not include passwords or confidential control system details in the shared register.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\u003ch2\u003eSwedish law and important limitations\u003c\/h2\u003e\u003cp\u003e\u003ca href=\"https:\/\/www.riksdagen.se\/sv\/dokument-och-lagar\/dokument\/svensk-forfattningssamling\/cybersakerhetslag-20251506_sfs-2025-1506\/\"\u003eThe Cybersecurity Act (2025:1506), Chapter 2, Section 3\u003c\/a\u003e contains risk-based requirements for continuity management, among others, for covered operators. \u003ca href=\"https:\/\/lagen.nu\/mcffs\/2026:11\"\u003eMCFFS 2026:11, Section 28\u003c\/a\u003e addresses the restoration of information within established acceptable timeframes and the need for backups for its applicable target group; the scope and exemptions of the regulation should be checked for each organization. \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/dir\/2022\/2555\/oj\/eng\"\u003eNIS2 Directive Article 21.2 c\u003c\/a\u003e mentions continuity, backups and disaster recovery. \u003ca href=\"https:\/\/www.ncsc.se\/sv\/cybersakerhet\/10-rekommenderade-sakerhetsatgarder\/6-sakerhetskopiera-och-testa-aterstallning-av-information\/\"\u003eNCSC recommends\u003c\/a\u003e that backups be combined with restoration testing. No universal statutory PLC testing intervals are claimed for all companies.\u003c\/p\u003e\n\u003cp\u003eThis is a technical-administrative documentation aid with AI-assisted source control; not a machine manual, legal expert opinion, certification, technical testing of the customer's equipment or guarantee of safe restart. No external lawyer or independent machine safety engineer has reviewed the product version.\u003c\/p\u003e\n\u003ch2\u003eCompare with related templates\u003c\/h2\u003e\u003cp\u003eDo you need a \u003cem\u003egeneral IT backup routine\u003c\/em\u003e instead of a specific industrial PLC\/HMI process? See \u003ca href=\"\/en\/products\/backupplan-sakerhetskopiering-aterlasningstest-word-pdf-excel\"\u003eBackup plan \u0026amp; reload test\u003c\/a\u003e. If the work instead concerns an actual \u003cem\u003eprogram change in a safety PLC\u003c\/em\u003e, the machine's specific change, risk and validation process should be used.\u003c\/p\u003e\n\u003ch2\u003eFrequently asked questions\u003c\/h2\u003e\u003ch3\u003eDoes Excel create a backup of the PLC or HMI?\u003c\/h3\u003e\u003cp\u003eNo. Excel is an administrative tool for documenting ID, test status, decisions and deviations.\u003c\/p\u003e\u003ch3\u003eIs one copy enough to restart the machine?\u003c\/h3\u003e\u003cp\u003eNo. Documented copying, isolated testing, technical verification and an authorized restart decision are separate steps. Relevant safety functions must be assessed separately.\u003c\/p\u003e\u003ch3\u003eIs NIS2 a requirement for all PLC installations?\u003c\/h3\u003e\u003cp\u003eNo. The application of the regulations depends on the operator, sector and other legal criteria. The template can be used voluntarily even outside the scope of the law.\u003c\/p\u003e\u003ch3\u003eIs the PDF fillable and are the templates in English?\u003c\/h3\u003e\u003cp\u003eThe PDF is searchable and printable but lacks interactive fillable fields. The five work templates are in Swedish; a separate English user guide is included.\u003c\/p\u003e\n\u003ch2\u003eSources, dates and transparency\u003c\/h2\u003e\u003cp\u003eProduct version 1.0 • Source review November 17, 2026 • Swedish law and applicable EU regulations. Official sources are available in the section above. No guarantee of regulatory approval, Google ranking or AI exposure.\u003c\/p\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default","offer_id":56670452777302,"sku":"MB-PLC-OT-RESTORE-261117-V1","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/01_plc_hmi_backup_huvudbild_1600.png?v=1794917075"},{"product_id":"maskin-ota-firmware-release-rollback-andringsbeslut-2027","title":"Machine OTA Update 2027 – Security Firmware, Rollback Test, and Change Decision | Word\/PDF\/Excel","description":"\u003cp\u003e\u003cstrong\u003eIs an existing industrial machine going to receive a remote program or firmware update?\u003c\/strong\u003e Then you need to be able to show exactly which machine and version are affected, what changes in the safety functions, which tests have actually been run, how a failed attempt is handled, and who decided on the restart. This specialist package provides a coherent \u003cstrong\u003eOTA release case\u003c\/strong\u003e in Word, searchable PDF, and Excel, with a special assessment of the rules on substantial modification in the EU Machinery Regulation.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant:\u003c\/strong\u003e This is documentation and decision support, not a testing tool, CE certificate, regulatory approval, declaration of conformity, or substitute for a qualified machine safety analysis.\u003c\/p\u003e\n\u003ch2\u003eQuick facts – is the package right for you?\u003c\/h2\u003e\u003cp\u003e\u003cstrong\u003eFor:\u003c\/strong\u003e machine manufacturers, integrators, industrial companies, production managers, system administrators, and suppliers with remotely updated machine software. \u003cstrong\u003eJurisdiction:\u003c\/strong\u003e Swedish operations\/EU machine regulations. \u003cstrong\u003eFormat:\u003c\/strong\u003e 7 editable Word (DOCX), 7 searchable print-friendly PDF (not digitally fillable), and one Excel workbook (XLSX) with nine tabs; \u003cstrong\u003e15 customer files\u003c\/strong\u003e. \u003cstrong\u003eLanguage:\u003c\/strong\u003e five Swedish templates + Swedish guide + English instruction guide, with Swedish Excel registers. Planned delivery upon publication: ZIP.\u003c\/p\u003e\n\u003cdiv style=\"border:2px solid #9bb8d0;border-radius:10px;background:#f1f7fc;padding:17px;margin:18px 0\"\u003e\n\n\u003ch2 style=\"margin-top:0\"\u003e01. Package contents\u003c\/h2\u003e\n\n\u003cp\u003eFive fillable Swedish specialist documents, one Swedish user guide, and one English User Guide. Each of the seven documents is provided in Word and PDF. In addition, there is an Excel workbook with nine tabs. \u003cstrong\u003e7 independent document functions × 2 file formats + 1 Excel = 15 files.\u003c\/strong\u003e\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\u003cdiv style=\"border:2px solid #9bb8d0;border-radius:10px;background:#f1f7fc;padding:17px;margin:18px 0\"\u003e\n\n\u003ch2 style=\"margin-top:0\"\u003e02. What the files contain\u003c\/h2\u003e\n\n\u003cp\u003eMachine and release ID, version hash, safety delta before and after the update, assessment of the manufacturer's foreseen changes, stop test and negative test cases, rollout and rollback plan, signed decisions, customer notification, evidence and version registers. Excel distinguishes between registered, planned, actually tested, and manually approved status.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\u003ch2\u003eWhen is it the right product – and when is it not?\u003c\/h2\u003e\u003cp\u003e\u003cstrong\u003eRight:\u003c\/strong\u003e (1) A machine manufacturer is rolling out a remote firmware patch and wants to document the change, signature control, functional testing, and safe restart. (2) A machine owner is going to approve a supplier update with changed machine behavior and must assess whether Article 3.16\/18 requires an enhanced conformity assessment process.\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eNot right:\u003c\/strong\u003e for performing an actual safety test, writing a safety PLC program, getting CE marking automatically, running a cyber incident process, or documenting regular data export. See separate templates for \u003ca href=\"\/en\/products\/sakerhets-plc-2027-programandring-versionsbevis-aterstartsprov\"\u003esafety PLC\u003c\/a\u003e and \u003ca href=\"\/en\/products\/vasentlig-maskinandring-2027-artikel18-gransdragning\"\u003efull assessment of substantial machine modification\u003c\/a\u003e.\u003c\/p\u003e\n\u003ch2\u003eFile by file – exact content\u003c\/h2\u003e\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"width:100%;border-collapse:collapse\"\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth scope=\"col\"\u003eDocument\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eWork step\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eLanguage\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e01 OTA change request\u003c\/td\u003e\n\n\u003ctd\u003eMachine identification, version, supplier's plan and scope\u003c\/td\u003e\n\n\u003ctd\u003eSV\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e02 Safety delta\u003c\/td\u003e\n\n\u003ctd\u003eChanged hazard\/risk, protective measure, and manual Article 3.16\/18 assessment\u003c\/td\u003e\n\n\u003ctd\u003eSV\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e03 OTA test protocol\u003c\/td\u003e\n\n\u003ctd\u003eSignature, stop\/interlock, failed update, retest\u003c\/td\u003e\n\n\u003ctd\u003eSV\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e04 Rollback and rollout\u003c\/td\u003e\n\n\u003ctd\u003ePreparations, pilot, version evidence, restoration, and restart\u003c\/td\u003e\n\n\u003ctd\u003eSV\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e05 Release decision and evidence\u003c\/td\u003e\n\n\u003ctd\u003eApproval, customer notification, evidence list, and archive\u003c\/td\u003e\n\n\u003ctd\u003eSV\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e06 Swedish user guide\u003c\/td\u003e\n\n\u003ctd\u003eLegislation, workflow, decision tree, and four scenarios\u003c\/td\u003e\n\n\u003ctd\u003eSV\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e07 English User Guide\u003c\/td\u003e\n\n\u003ctd\u003eInstructions for the five Swedish working templates\u003c\/td\u003e\n\n\u003ctd\u003eEN\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e08 Excel register – OTA Release\u003c\/td\u003e\n\n\u003ctd\u003eNine tabs for machines, changes, test cases, risk delta, and evidence\u003c\/td\u003e\n\n\u003ctd\u003eSV\u003c\/td\u003e\n\n\u003ctd\u003eXLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\u003ch2\u003eHow does the Excel register work?\u003c\/h2\u003e\u003cp\u003eThe tabs are \u003cstrong\u003eOverview, Machines, Changes, Safety Delta, Test Cases, Restoration, Approvals, Evidence, and Read Me\u003c\/strong\u003e. The Overview counts registered entries and manual statuses such as paused release, unverified rollback, and failed test cases. Fictional test entries have been cleared from the final file; the customer workbook is empty. No formula approves a machine, determines a substantial modification, or issues any CE decision. No macros or external data connections are included.\u003c\/p\u003e\n\u003ch2\u003eStep by step – a real release case\u003c\/h2\u003e\u003col\u003e\n\n\u003cli\u003eIdentify the machine, currently installed version, and exact update file; check actual manufacturer documentation.\u003c\/li\u003e\n\n\u003cli\u003eDescribe whether the update can change safety-relevant behavior and assess any substantial modification with a qualified assessor.\u003c\/li\u003e\n\n\u003cli\u003eDetermine stop conditions, acceptance criteria, and evidence requirements. Perform controlled positive and negative tests.\u003c\/li\u003e\n\n\u003cli\u003ePlan pilot, phased rollout, restoration, and specially signed safe restart; let risks determine whether automatic rollback is suitable at all.\u003c\/li\u003e\n\n\u003cli\u003eDocument the human release decision. Log actually performed rollouts separately from planned ones.\u003c\/li\u003e\n\n\u003cli\u003eInform affected operators, preserve signed test evidence, version logs, and any updated safety information.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\u003ch2\u003eLegal and applicability – substantial machine modification\u003c\/h2\u003e\u003cp\u003e\u003cstrong\u003eRegulation (EU) 2023\/1230\u003c\/strong\u003e will start applying mainly on \u003cstrong\u003e20 January 2027\u003c\/strong\u003e. Article \u003cstrong\u003e3.16\u003c\/strong\u003e defines substantial modification; it can also apply to a \u003cem\u003edigital\u003c\/em\u003e modification after market introduction or commissioning, but requires, among other things, that the modification was not foreseen by the manufacturer and that a new or increased risk requires special significant protective measures. Article \u003cstrong\u003e18\u003c\/strong\u003e can then mean that the person who performs the modification assumes the manufacturer's responsibility. A regular safety update does not automatically become a substantial modification.\u003c\/p\u003e\u003cp\u003eAnnex III describes, among other things, protection and traceability for safety-relevant software as well as safe control systems. Check the consolidated text: \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2023\/1230\/2026-07-27\/eng\"\u003eEU Machinery Regulation\u003c\/a\u003e. The complementary \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2024\/2847\/oj\"\u003eCyber Resilience Act\u003c\/a\u003e has a different material application and timeline: the main rules apply mainly from 11 December 2027, while certain vulnerability\/incident reporting in Article 14 applies from 11 September 2026.\u003c\/p\u003e\u003cp\u003eChanges implemented before the general application date of the Machinery Regulation must also be assessed according to the then applicable product and occupational safety regulations. The document is a \u003cstrong\u003ereadiness\/work support\u003c\/strong\u003e and does not claim that all machines and all types of OTA releases are covered by the same obligations.\u003c\/p\u003e\n\u003ch2\u003eCompare adjacent products\u003c\/h2\u003e\u003cp\u003e\u003ca href=\"\/en\/products\/vasentlig-maskinandring-2027-artikel18-gransdragning\"\u003eSubstantial machine modification 2027\u003c\/a\u003e for broader machine modification cases and CE boundary determination. \u003ca href=\"\/en\/products\/sakerhets-plc-2027-programandring-versionsbevis-aterstartsprov\"\u003eSafety PLC 2027\u003c\/a\u003e for version evidence and functional testing of PLC. \u003ca href=\"\/en\/products\/cra-komponentleverantor-sbom-sarbarhetsavisering\"\u003eCRA component supplier\u003c\/a\u003e for SBOM and third-party security. This new package focuses especially on \u003cstrong\u003eremote distribution of machine firmware and safe release decisions\u003c\/strong\u003e.\u003c\/p\u003e\n\u003ch2\u003eFrequently asked questions\u003c\/h2\u003e\u003ch3\u003eDoes every firmware update need to be CE marked again?\u003c\/h3\u003e\u003cp\u003eNo. It depends on the actual scope of the change, the manufacturer's foreseeability, risk impact, and applicable regulations. This template helps to structure the assessment, not to decide it automatically.\u003c\/p\u003e\n\u003ch3\u003eDoes the package work for Siemens PLC\/HMI?\u003c\/h3\u003e\u003cp\u003eIt can be used as administrative documentation even in a Siemens environment, but contains no ready-made Siemens programs, safety PLC code, certified safety tests, or general technical compatibility guarantee.\u003c\/p\u003e\n\u003ch3\u003eCan Excel calculate if a release is safe?\u003c\/h3\u003e\u003cp\u003eNo. The Overview shows registered manual statuses. An authorized person must assess the evidence and sign the actual decision.\u003c\/p\u003e\n\u003ch3\u003eIs a ready-made rollback solution included?\u003c\/h3\u003e\u003cp\u003eNo. The package contains a planning and verification template. The technical possibility and safety of restoration must be assessed for each machine and supplier.\u003c\/p\u003e\n\u003ch3\u003eCan the PDF files be filled in as forms?\u003c\/h3\u003e\u003cp\u003eNo. The PDF files are searchable and printable. Fill in the Word versions and the Excel register.\u003c\/p\u003e\n\u003ch3\u003eAre the work templates available in English?\u003c\/h3\u003e\u003cp\u003eThe five operational templates are Swedish. English User Guide contains instructions for them, not corresponding English legal documents.\u003c\/p\u003e\n\u003ch2\u003eSources, version, and transparency\u003c\/h2\u003e\u003cp\u003eVersion 1.0 · AI-assisted legal source review on 17 November 2026. No external legal review, actual functional safety testing, CE certification, or regulatory confirmation has been performed. For new versions, check applicable law and current product documentation before use. \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2023\/1230\/oj\"\u003eOriginal text of the regulation\u003c\/a\u003e · \u003ca href=\"https:\/\/digital-strategy.ec.europa.eu\/en\/policies\/cyber-resilience-act\"\u003eCommission's CRA guidance\u003c\/a\u003e.\u003c\/p\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":56673448690006,"sku":"MB-OTA-MASKIN-20261117-V1","price":399.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/01_ota_safety_hero_1600.jpg?v=1794927514"},{"product_id":"kontrollvagning-produktionscell-tolerans-avvikelse","title":"In-process weighing in production cell – measurement protocol, tolerance deviation and release documentation | Word\/PDF\/Excel","description":"\u003csection class=\"mb-product-copy\" lang=\"sv\" style=\"color:#17374c;line-height:1.65\"\u003e\n\u003cp\u003e\u003cstrong\u003eControl weighing in the production cell – document internal weight control from the measurement plan to the manual release decision.\u003c\/strong\u003e A practical template package for production technicians, quality managers, operators, and shift supervisors who weigh products or components against their own established tolerances. Intended for \u003cstrong\u003einternal quality control\u003c\/strong\u003e, not for scale approval for legally regulated weighing, finished goods packaging control, or automatic release.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003e15 customer files: 7 editable Word (DOCX) files, 7 corresponding searchable A4 PDFs, and 1 Excel (XLSX) workbook with nine worksheets.\u003c\/strong\u003e Five Swedish operational documents, one Swedish user guide, and a separate English User Guide. The PDF files are not interactively fillable. \u003c\/p\u003e\n\n\u003cdiv id=\"mb-vag-innehall\" style=\"padding:18px 20px;margin:20px 0;border:2px solid #c5dce4;border-radius:12px;background:#f4f9fb\"\u003e\n\n\u003ch2 style=\"margin-top:0\"\u003e01. Package Contents\u003c\/h2\u003e\n\n\u003cp\u003eFive Swedish operational templates, one Swedish user guide, and one English user guide, each available as a Word file and a searchable PDF. In addition, an Excel workbook. \u003cstrong\u003eSeven standalone text documents, one register tool, 15 files in total.\u003c\/strong\u003e The main templates are in Swedish; the English guide does not include English templates.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv id=\"mb-vag-filer\" style=\"padding:18px 20px;margin:20px 0;border:2px solid #c5dce4;border-radius:12px;background:#fff\"\u003e\n\n\u003ch2 style=\"margin-top:0\"\u003e02. What the Files Contain\u003c\/h2\u003e\n\n\u003cp\u003eCommon identifiers for product, batch, shift, operator, and scale; fields for gross, tare, net, and internal min\/max limits; documented deviations and reference samples; follow-up responsibility, actual verification, and a separate, authorized decision to hold or release.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2\u003eWho Should Choose the Template – and When Is Something Else Needed?\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eSuitable for:\u003c\/strong\u003e a workshop checking piece weights between shifts and an industrial company that needs to track batch deviations against internally established specifications. \u003cstrong\u003eNot suitable on its own for:\u003c\/strong\u003e scales used for legally regulated purposes, checking the legally required quantity of finished packaged goods, legal verification, external calibration, safety-critical processes, or comprehensive statistical sampling planning. In such cases, applicable requirements, authorized competence, and special controls are required.\u003c\/p\u003e\n\n\u003ch2\u003eAll Files – What Do You Get?\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"border-collapse:collapse;width:100%;min-width:650px\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#17465c;color:#fff\"\u003e\n\n\u003cth style=\"text-align:left;padding:10px\"\u003eFile and Document\u003c\/th\u003e\n\n\u003cth style=\"text-align:left;padding:10px\"\u003eWhat It Is Used For\u003c\/th\u003e\n\n\u003cth style=\"text-align:left;padding:10px\"\u003eLanguage and Format\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea\"\u003e\u003cstrong\u003e01. Measurement Plan and Internal Tolerance Definition\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea\"\u003eSelect identified item, weight limit, sample size, scale, and responsibility\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea;white-space:nowrap\"\u003eSV · DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea\"\u003e\u003cstrong\u003e02. Batch Control Weighing Protocol\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea\"\u003eRecord gross, tare, net, reference, and individual samples\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea;white-space:nowrap\"\u003eSV · DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea\"\u003e\u003cstrong\u003e03. Deviation Report and Quarantine Decision\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea\"\u003eHold, investigate, document reweighing and evidence\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea;white-space:nowrap\"\u003eSV · DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea\"\u003e\u003cstrong\u003e04. Reference Sample and Scale Function Check\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea\"\u003eCheck internal reference weight without calling it legal verification\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea;white-space:nowrap\"\u003eSV · DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea\"\u003e\u003cstrong\u003e05. Release Decision and Shift Handover\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea\"\u003eDistinguish measurement results, actual check, and authorized decision\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea;white-space:nowrap\"\u003eSV · DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea\"\u003e\u003cstrong\u003e06. Swedish User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea\"\u003eWorkflow, scope, and completion checklist\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea;white-space:nowrap\"\u003eSV · DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea\"\u003e\u003cstrong\u003e07. English User Guide\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea\"\u003eEnglish instructions for the Swedish main templates, not a translation\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea;white-space:nowrap\"\u003eEN · DOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea\"\u003e\u003cstrong\u003e08. Control Weighing Register\u003c\/strong\u003e\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea\"\u003eNine worksheets with measurement data, reference samples, deviations, actions, and decisions\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #dbe6ea;white-space:nowrap\"\u003eSV · XLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\u003cp\u003e\u003cstrong\u003eEditing:\u003c\/strong\u003e DOCX and XLSX are intended for editing in a compatible word processor\/spreadsheet program. PDF is searchable and intended for reading, printing, and archiving, not as an interactive e-form.\u003c\/p\u003e\n\n\u003ch2\u003eThe Excel Register in Practice\u003c\/h2\u003e\n\n\u003cp\u003eNine tabs: \u003cstrong\u003eRead Me, Measurement Plan, Measurements, Scales, Reference Samples, Deviations, Actions, Decisions, and Overview.\u003c\/strong\u003e In the measurement register, net weight is calculated as gross weight minus tare and compared with the entered internal min\/max limit. Example: gross 1,012 g and tare 12 g gives net 1,000 g; with an internal limit of 995–1,005 g, “WITHIN INTERNAL TOLERANCE” is displayed. A result outside the range is flagged but \u003cstrong\u003enever determines legal compliance, hold, or release on its own\u003c\/strong\u003e. The blank workbook contains no fictitious customer measurements. Reference sample limits and operational decisions require manually established values.\u003c\/p\u003e\n\n\u003ch2\u003eHow to Use the Documents\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003eEstablish internal requirements, agreed specifications, sample size, and responsibility.\u003c\/li\u003e\n\n\u003cli\u003eIdentify the scale, instructions, and relevant reference sample before measurement.\u003c\/li\u003e\n\n\u003cli\u003eRecord measured gross values, tare, and batch ID; compare with the decided internal tolerance.\u003c\/li\u003e\n\n\u003cli\u003eDocument deviation, quarantine, possible reweighing, actual check, and action.\u003c\/li\u003e\n\n\u003cli\u003eHave an authorized person separately document the release or hold decision; sign when the process requires it.\u003c\/li\u003e\n\n\u003cli\u003eArchive original measurement values, protocols, supporting documentation, and version information.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eLegal Framework and Important Limitations\u003c\/h2\u003e\n\n\u003cp\u003eThere is no general Swedish legal rule that gives all industrial internal weight controls a common gram limit. Use only actual and documented product\/customer specifications. Separate requirements apply to scales and uses covered by metrological regulations. \u003ca href=\"https:\/\/www.swedac.se\/amnesomraden\/krav-pa-vagar\/\" rel=\"noopener\"\u003eSwedac describes which scales and uses are covered\u003c\/a\u003e. \u003ca href=\"https:\/\/regelverk.swedac.se\/foreskrifter\/swedac\/stafs-2016-12.html\" rel=\"noopener\"\u003eSTAFS 2016:12\u003c\/a\u003e covers non-automatic scales in specified applications. \u003ca href=\"https:\/\/www.swedac.se\/amnesomraden\/krav-pa-forpackningar\/\" rel=\"noopener\"\u003eSwedac on finished packaging\u003c\/a\u003e describes special quantity control. Internal limits in this workbook are not an alternative to these requirements.\u003c\/p\u003e\n\n\u003cp\u003eThe material is AI-assisted source-checked as of November 18, 2026, for the defined use. No external legal review, accredited metrological check, certification, customer-specific sampling method, or guaranteed legal compliance is included. For legally regulated weighing, product safety risks, special customer standards, or unclear requirements, an expert should be consulted.\u003c\/p\u003e\n\n\u003ch2\u003eDifference from Related Templates\u003c\/h2\u003e\n\n\u003cp\u003eDo you need to manage the calibration history of measuring equipment rather than a production batch? See \u003ca href=\"\/en\/products\/kalibreringsregister-matdonskontroll-excel-2026-2027\"\u003eCalibration Register \u0026amp; Measuring Equipment Control\u003c\/a\u003e. For analysis of measurement process variation, see \u003ca href=\"\/en\/products\/msa-gage-rr-matsystemanalys-excel-2027\"\u003eMSA \u0026amp; Gage R\u0026amp;R\u003c\/a\u003e. For the product's first article and drawing check, see \u003ca href=\"\/en\/products\/forstastyckskontroll-fai-mattprotokoll-2027\"\u003eFirst Article Inspection \u0026amp; FAI\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently Asked Questions\u003c\/h2\u003e\n\n\u003ch3\u003eIs This a Calibration Template?\u003c\/h3\u003e\n\n\u003cp\u003eNo. You get an internal reference sample and traceable operational control. It does not replace a calibration certificate or prescribed verification.\u003c\/p\u003e\n\n\u003ch3\u003eCan Excel Automatically Approve a Batch?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The formulas show numerical deviation against specified internal limits. Hold, retesting, and release are separate, documented human decisions.\u003c\/p\u003e\n\n\u003ch3\u003eDoes the Package Work for an Automatic Checkweigher?\u003c\/h3\u003e\n\n\u003cp\u003eAs a complementary internal event and measurement log when the company's own process requirements allow it. It does not replace machine safety, functional testing, verified instrument requirements, or special rules for automatic scales.\u003c\/p\u003e\n\n\u003ch3\u003eAre the PDF Files Fillable?\u003c\/h3\u003e\n\n\u003cp\u003eThey are searchable and printable, but not interactively fillable. Use the Word version for electronic entry.\u003c\/p\u003e\n\n\u003ch3\u003eAre the Documents in English?\u003c\/h3\u003e\n\n\u003cp\u003eThe five operational templates and the Excel sheet are in Swedish. A separate English User Guide shows how the Swedish files are used.\u003c\/p\u003e\n\n\u003ch2\u003eSources and Version\u003c\/h2\u003e\n\n\u003cp\u003eEdition 1.0 · November 18, 2026 · Swedish business. Source review: Swedac – \u003ca href=\"https:\/\/www.swedac.se\/amnesomraden\/krav-pa-vagar\/\"\u003eRequirements for scales\u003c\/a\u003e, \u003ca href=\"https:\/\/regelverk.swedac.se\/foreskrifter\/swedac\/stafs-2016-12.html\"\u003eSTAFS 2016:12\u003c\/a\u003e, and \u003ca href=\"https:\/\/www.swedac.se\/amnesomraden\/krav-pa-forpackningar\/\"\u003eRequirements for packaging\u003c\/a\u003e. Product images 2–3 show authentic excerpts from the delivered version. The package is delivered as a digital ZIP.\u003c\/p\u003e\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":56689433182550,"sku":"MB-VAGKONTROLL-PROD-261118-V1","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/01_kontrollvagning_huvudbild_1600.png?v=1795003720"},{"product_id":"ai-visionsystem-produktionscell-modellbyte-provserie-frislappning","title":"AI vision system in production cell – model change, pilot series and release decision | Word\/PDF\/Excel","description":"\u003csection lang=\"sv\" style=\"line-height:1.65\"\u003e\n\u003cp\u003e\u003cstrong\u003eAre you changing, retraining, or updating an AI model that inspects products with a camera in a production cell?\u003c\/strong\u003e This Swedish template package helps industrial, quality, and automation teams document the system version, representative sample set, human ground truth, misclassifications, deviations, and an authorized release decision. \u003cstrong\u003eImportant limitation:\u003c\/strong\u003e intended solely for quality inspection, not for AI systems that control machine safety, emergency stops, or other personal safety functions. Such a connection requires separate competent safety assessment.\u003c\/p\u003e\n\n\u003ch2\u003eQuick overview – choose the right document package\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eUse:\u003c\/strong\u003e AI vision systems for quality control in Sweden. \u003cstrong\u003eDelivery:\u003c\/strong\u003e The ZIP download contains 7 editable DOCX files, 7 searchable PDF files and 1 XLSX workbook (15 files in total).\u003cstrong\u003eLanguage:\u003c\/strong\u003e five Swedish working documents, one Swedish guide, and a separate English User Guide; Excel in Swedish. \u003cstrong\u003eSoftware:\u003c\/strong\u003e Word and Excel or compatible editing software. The PDF files are not interactive fillable forms. \u003c\/p\u003e\n\n\u003cdiv style=\"border:2px solid #245B84;border-radius:10px;background:#EDF5FB;padding:17px 19px;margin:18px 0\"\u003e\n\n\u003ch2 style=\"margin:0 0 9px\"\u003e01. Package contents\u003c\/h2\u003e\n\n\u003cp style=\"margin:0\"\u003eFive Swedish working templates (model identity, safety screening, sample set, classification test, and release decision), one Swedish user guide, and one English User Guide. Each standalone document is available in Word\/DOCX and a corresponding searchable PDF: 7 + 7 = 14 files. In addition, there is an editable Excel workbook with nine tabs (1 XLSX). \u003cstrong\u003eTotal of 15 customer files – seven standalone documents, not 15 different templates.\u003c\/strong\u003e\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv style=\"border:2px solid #245B84;border-radius:10px;background:#FFFFFF;padding:17px 19px;margin:18px 0\"\u003e\n\n\u003ch2 style=\"margin:0 0 9px\"\u003e02. What the files contain\u003c\/h2\u003e\n\n\u003cp style=\"margin:0\"\u003eIdentify the old and new AI model, test environment, and rollback version; separate non-safety-critical quality sorting from machine safety; predetermine the actual sample selection and acceptance criteria; compare the manual ground truth with the AI classification; count false accepts and false rejects; manage deviations, retesting, and a traceable manual decision branch. \u003cstrong\u003eExcel does not automate CE, legal, or safety approval.\u003c\/strong\u003e\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2\u003eWho should use the templates – and when are they not right?\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eSituation 1:\u003c\/strong\u003e a camera has received a retrained quality model and you need to show that defect types are detected with comparable ground truth before deployment. \u003cstrong\u003eSituation 2:\u003c\/strong\u003e quality technicians change the classification threshold for defective components and need to document false accepts, false rejects, the sample set's borderline cases, and a version-locked decision.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eChoose other materials and a specialist\u003c\/strong\u003e if the camera is part of a safety circuit, person detection, interlocking, protective stop, or modification that could affect the machine's compliance. This package is not a machine risk assessment, CE technical file, harmonized testing method, general safety PLC test, or complete AI Act high-risk assessment.\u003c\/p\u003e\n\n\u003ch2\u003eAll files – actual function and language\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"border-collapse:collapse;width:100%;min-width:700px\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#245B84;color:#fff\"\u003e\n\n\u003cth scope=\"col\" style=\"padding:10px;text-align:left\"\u003eDocument\u003c\/th\u003e\n\n\u003cth scope=\"col\" style=\"padding:10px;text-align:left\"\u003ePurpose\u003c\/th\u003e\n\n\u003cth scope=\"col\" style=\"padding:10px;text-align:left\"\u003eLanguage\u003c\/th\u003e\n\n\u003cth scope=\"col\" style=\"padding:10px;text-align:left\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003e01. Model change and system identity\u003c\/th\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003eModel ID, camera, thresholds, operating environment, and rollback\u003c\/td\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003eSwedish\u003c\/td\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003e02. Safety delimitation and risk assessment\u003c\/th\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003eSTOP screening if machine safety or a protective function is affected\u003c\/td\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003eSwedish\u003c\/td\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003e03. Sample set and acceptance criteria\u003c\/th\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003ePredetermined sample selection, reference ground truth, and limits\u003c\/td\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003eSwedish\u003c\/td\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003e04. Classification test and deviations\u003c\/th\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003eFalse accepts\/false rejects, correction, and retesting\u003c\/td\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003eSwedish\u003c\/td\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003e05. Release and rollback plan\u003c\/th\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003eManual authorized decision, version locking, and post-check\u003c\/td\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003eSwedish\u003c\/td\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003e06. Swedish user guide\u003c\/th\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003eInstructions, legal limits, sources, and final checklist\u003c\/td\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003eSwedish\u003c\/td\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003e07. English User Guide\u003c\/th\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003eEnglish instructions for the Swedish working templates\u003c\/td\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003eEnglish\u003c\/td\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\" style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003e08. Excel – sample set and status register\u003c\/th\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003eNine tabs, test results, deviation, risk, and decision logs\u003c\/td\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003eSwedish\u003c\/td\u003e\n\n\u003ctd style=\"border-bottom:1px solid #D5E4EF;padding:10px;vertical-align:top;text-align:left\"\u003eXLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\u003cp\u003eThe DOCX versions are editable in a compatible word processor. The PDF versions are searchable and intended for reading\/printing but are not interactive fillable PDFs. Excel (XLSX) is an editable workbook with formulas and drop-down lists. The English guide is guidance – not English versions of the Swedish working documents.\u003c\/p\u003e\n\n\u003ch2\u003eHow Excel works in practice\u003c\/h2\u003e\n\n\u003cp\u003eThe workbook has nine tabs: \u003cstrong\u003eOverview, System, Versions, Sample Set, Deviations, Risk Assessment, Actions, Decisions, and Read Me.\u003c\/strong\u003e In the Sample Set tab, you manually enter the reference ground truth and AI class for each test object: \u003cem\u003eAccepted\u003c\/em\u003e or \u003cem\u003eRejected\u003c\/em\u003e. A formula classifies the row as \u003cstrong\u003eCorrect\u003c\/strong\u003e, \u003cstrong\u003eFalse Accept\u003c\/strong\u003e, or \u003cstrong\u003eFalse Reject\u003c\/strong\u003e. If a class is missing, no result is displayed. The Overview counts the number and percentage of fully classified objects; administrative decision branches and deviations are counted separately.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eAnonymized test example:\u003c\/strong\u003e four test objects with manual ground truth yield two correct results, one false accept, and one false reject – that is, 25 percent of each error type in this particular small test series. These fictional test tasks have been removed from the delivered customer workbook. The figures do not constitute automatic acceptance limits; you must determine the actual criteria, a representative sample, and an authorized quality assessment yourself.\u003c\/p\u003e\n\n\u003ch2\u003eStep by step\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003ePrepare:\u003c\/strong\u003e gather model versions, camera\/lighting configuration, product criteria, and previously approved test materials.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDelimit:\u003c\/strong\u003e check and document that the AI camera does not affect the machine's safety functions or personnel safety. Stop the quality flow and escalate if there is uncertainty.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003ePlan:\u003c\/strong\u003e establish the reference ground truth, representative sample set, and technical acceptance requirements before testing.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eTest:\u003c\/strong\u003e record actual test results, false accepts, false rejects, borderline cases, and deviations.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDecide:\u003c\/strong\u003e document exactly one decision branch with an authorized attestation. Planned, tested, decided, and actually deployed are different statuses.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eVerify and archive:\u003c\/strong\u003e check post-start, saved model data, evidence, and actual rollback capability.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eLegal prerequisites and limitations\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eWork environment:\u003c\/strong\u003e before planned changes, the employer shall investigate whether they may entail risks to health or accidents and assess them according to the relevant provisions in \u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/afs-20231\/\"\u003eAFS 2023:1\u003c\/a\u003e. A completed screening is not a substitute for such an actual risk assessment. Use of work equipment may also require special inspection according to \u003ca href=\"https:\/\/www.av.se\/afs-202311\/\"\u003eAFS 2023:11\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eMachine regulations:\u003c\/strong\u003e the \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2023\/1230\/2026-07-27\/eng\"\u003eMachinery Regulation (EU) 2023\/1230\u003c\/a\u003e will start to apply mainly on January 20, 2027. The article on substantial modification is only relevant when the actual requirements are met. Changes solely to quality classification are not automatically a substantial machine modification. Assess the machine's status and applicable regulations at the actual date of modification.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eAI and images:\u003c\/strong\u003e the \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2024\/1689\/2026-07-27\/eng\"\u003eAI Act (EU) 2024\/1689\u003c\/a\u003e does not classify all quality cameras as high-risk; product-integrated safety AI may require different assessment and has a special application period. If the image material identifies persons, \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2016\/679\/oj\"\u003eGDPR (EU) 2016\/679\u003c\/a\u003e may apply. The package is not an official form and provides no certification, external legal review, or guaranteed legal compliance.\u003c\/p\u003e\n\n\u003ch2\u003eWhat is the difference compared to other documents?\u003c\/h2\u003e\n\n\u003cp\u003eFor a change that affects the machine's safety or manufacturer liability: \u003ca href=\"\/en\/products\/vasentlig-maskinandring-2027-artikel18-gransdragning\"\u003eSubstantial machine modification – Article 18\u003c\/a\u003e. For changes in a safety-controlled PLC: \u003ca href=\"\/en\/products\/sakerhets-plc-2027-programandring-versionsbevis-aterstartsprov\"\u003eSafety PLC – program change and restart test\u003c\/a\u003e. For system integration and safety testing of the entire cell: \u003ca href=\"\/en\/products\/sammansatt-produktionscell-2027-maskinintegrator-ce-granssnitt\"\u003eIntegrated production cell – interface and CE documentation\u003c\/a\u003e. These are different user tasks and are not replaced by this quality testing package.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently asked questions\u003c\/h2\u003e\n\n\u003ch3\u003eIs every AI vision system high-risk according to the AI Act?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Decide based on the camera's actual intended use, safety connection, and applicable regulations. Regular product quality sorting is not automatically high-risk AI.\u003c\/p\u003e\n\n\u003ch3\u003eDo we have to CE-mark the machine when the AI model is retrained?\u003c\/h3\u003e\n\n\u003cp\u003eNot automatically. A machine modification requires an actual technical and legal assessment of the impact; if possible safety changes occur, a competent specialist should be engaged.\u003c\/p\u003e\n\n\u003ch3\u003eCan Excel approve the sample set itself?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Excel classifies manually entered results and sums the number and percentage. Representativeness, acceptance limits, deviations, and release are decided manually.\u003c\/p\u003e\n\n\u003ch3\u003eHow do we distinguish false accept from false reject?\u003c\/h3\u003e\n\n\u003cp\u003eFalse accept means that the reference ground truth says an item is defective but the AI accepts it. False reject means that the reference ground truth accepts the item but the AI rejects it.\u003c\/p\u003e\n\n\u003ch3\u003eCan we use the files for protective stop or person detection?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Protective functions and personnel safety are expressly excluded and require special machine safety assessment.\u003c\/p\u003e\n\n\u003ch3\u003eAre the Swedish templates available in English?\u003c\/h3\u003e\n\n\u003cp\u003eNo. A separate English User Guide is included, but the five main documents and the Excel workbook are in Swedish.\u003c\/p\u003e\n\n\u003ch2\u003eSources and version information\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eVersion 1.0\u003c\/strong\u003e · November 18, 2026 · AI-assisted check of official legal sources and actual file functions. \u003cstrong\u003eNo independent external lawyer or machine safety expert has reviewed or approved the file version.\u003c\/strong\u003e Official legal sources are linked directly above. The product's technical tests apply to the exemplary formula and document function – not to a verification of any customer's actual machine or AI model.\u003c\/p\u003e\n\n\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default","offer_id":56689702273366,"sku":"MB-AI-VISION-QA-261118-V1","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/01_ai_vision_huvudbild_1600.png?v=1795005538"},{"product_id":"manoverpanel-tryckknappsstation-produktionscell-funktionsprov","title":"Control panel in production cell – push-button station, functional test and safety boundary definition | Word\/PDF\/Excel","description":"\u003cp\u003e\u003cstrong\u003eDo you need to add a new push-button station to an existing production cell or move control functions from the HMI to a local panel?\u003c\/strong\u003e The package helps automation, production, maintenance, and machine personnel document change requirements, check risk boundaries, define functional requirements, collect actual test evidence, and hand over to operations. \u003cstrong\u003eIt is a documentation aid, not a PLC solution, a technical safety certificate, or an automatic approval to start the machine.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eQuick facts:\u003c\/strong\u003e 15 files: seven editable DOCX files, seven corresponding searchable PDFs, and one XLSX workbook with nine tabs. Five Swedish working documents, a Swedish guide, and an English User Guide. The PDF files are printable but \u003cstrong\u003enot interactively fillable\u003c\/strong\u003e. Excel and the main templates are in Swedish. Software for DOCX, PDF, and XLSX is required. Digital ZIP download.\u003c\/p\u003e\n\u003cdiv style=\"border:2px solid #668EAF;border-radius:10px;padding:17px;margin:17px 0;background:#F2F7FC\"\u003e\n\n\u003ch2 style=\"margin-top:0\"\u003e01 · Package Contents\u003c\/h2\u003e\n\n\u003cp\u003eFive Swedish working templates: change request, functional matrix, risk and safety interface, functional test with deviations, and commissioning\/handover decision. Also a Swedish guide and English User Guide. All seven are available in DOCX and corresponding PDF, totaling 14 document files. An XLSX workbook is also included as file number 15.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\u003cdiv style=\"border:2px solid #668EAF;border-radius:10px;padding:17px;margin:17px 0;background:#F2F7FC\"\u003e\n\n\u003ch2 style=\"margin-top:0\"\u003e02 · What the Files Contain\u003c\/h2\u003e\n\n\u003cp\u003eFields for machine\/cell ID, panel ID, function, current and proposed operation, risk decision, requirements reference, actual observation, deviations, retesting, technical reviewer, and version-controlled document handover. Excel displays counted cases and administrative statuses but does not calculate safety performance or legal compliance.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\u003ch2\u003eWho Is the Template For?\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003eExample A:\u003c\/strong\u003e An industrial company wants to install local START, STOP, and RESET controls on an existing production cell and needs to track the change request, I\/O testing, and operator instructions. \u003cstrong\u003eExample B:\u003c\/strong\u003e A maintenance team is modifying a push-button station and wants to ensure that safety functions have been assessed separately before operations takes over.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eChoose a different resource\u003c\/strong\u003e for designing emergency stops or safety PLCs, electrical wiring diagrams, PLC programming, a complete machine CE process, validating the performance level of safety functions, or general machine maintenance procedures. Use expert competence for actual installation, risk analysis, and safety systems.\u003c\/p\u003e\n\u003ch2\u003eExact File List\u003c\/h2\u003e\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"width:100%;min-width:620px;border-collapse:collapse\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#e3f0f8\"\u003e\n\n\u003cth scope=\"col\"\u003eDocument\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003ePractical Function\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eLanguage\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eChange Request\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eMachine ID, changed commands, and assessment of regulatory compliance\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eSwedish\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eControl Device Functional Matrix\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eSTART, STOP, RESET, door opening, and cycle stop with separate requirements\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eSwedish\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eRisk Assessment and Interface\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eUnintended start, protection, reset, and expert testing\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eSwedish\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eFunctional Test and Deviations\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eTest plan, actual observations, retesting, and technical reviewer\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eSwedish\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eCommissioning and Handover\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eChecklist, original evidence, and administrative lock\/handover decision\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eSwedish\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eSwedish User Guide\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eStep-by-step usage, risk boundary definition, and source support\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eSwedish\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eEnglish User Guide\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eInstructions for Swedish forms; not English-language legal documents\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eEnglish\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eExcel – Change Log\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eNine tabs, filters, data validation, and administrative status counters\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eSwedish\u003c\/td\u003e\n\n\u003ctd style=\"padding:8px;border:1px solid #d3e0eb;vertical-align:top\"\u003eXLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\u003cp\u003eThe Word versions can be edited. The PDF versions are searchable and printable, without interactive fields. The English guide is an instruction for the Swedish working templates, not a translation of them.\u003c\/p\u003e\n\u003ch2\u003eExcel in Practice – Which Functions Work?\u003c\/h2\u003e\n\u003cp\u003eThe workbook has the tabs \u003cstrong\u003eOverview, Panels, Functions, Risks, Test, Deviations, Actions, Evidence, and Read Me\u003c\/strong\u003e. All logs have columns for their own references and filtering; relevant status fields have data validation. The Overview summarizes registered panels, functions, open risks, failed tests, open deviations, verified actions, and received but unverified evidence.\u003c\/p\u003e\n\u003cp\u003eThe formulas have been tested with a fictitious case in each log (all seven summaries showed 1) and after clearing (all showed 0). There is no test person data in the customer file. Excel does \u003cstrong\u003enot\u003c\/strong\u003e perform CE assessment, PL\/SIL calculation, control system validation, legal deadline calculation, or actual technical testing.\u003c\/p\u003e\n\u003ch2\u003eStep-by-Step Workflow\u003c\/h2\u003e\u003col\u003e\n\n\u003cli\u003eIdentify the existing cell, change requirement, responsible person, and latest technical document version.\u003c\/li\u003e\n\n\u003cli\u003eSeparate production functions from protection\/safety functions and identify the impact of the change.\u003c\/li\u003e\n\n\u003cli\u003eHave a competent responsible person establish risk and legal boundaries before installation.\u003c\/li\u003e\n\n\u003cli\u003eDescribe each control device, its intended effect, and the conditions for activation.\u003c\/li\u003e\n\n\u003cli\u003ePerform expertly planned tests; document the actually observed result and deviations.\u003c\/li\u003e\n\n\u003cli\u003eRemediate, retest, and verify critical deviations before any commissioning decision is made.\u003c\/li\u003e\n\n\u003cli\u003eHand over updated instructions, drawings, revision ID, and separate technical approval, and archive the evidence.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\u003ch2\u003eLegal Prerequisites and Safety Boundaries\u003c\/h2\u003e\n\u003cp\u003e\u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/afs-202311\/\"\u003eAFS 2023:11 on the safe use of work equipment\u003c\/a\u003e includes, among other things, the use of and requirements for control devices, start, stop, and safety functions (see Chapter 2 and Annex 1). \u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/afs-20234\/\"\u003eAFS 2023:4 on products – machinery\u003c\/a\u003e contains the Swedish product regulations applicable as of the date of this edition. \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2023\/1230\/oj\"\u003eRegulation (EU) 2023\/1230\u003c\/a\u003e will mainly begin to apply on \u003cstrong\u003e20 January 2027\u003c\/strong\u003e. It contains provisions on substantial modification, including in Article 3 and Article 18, but a certain panel modification does \u003cem\u003enot automatically\u003c\/em\u003e constitute such a modification. Also read \u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/inspektioner-utredningar-och-kontroller\/produktregler-och-marknadskontroll\/produktregler\/krav-pa-maskiner\/den-nya-maskinforordningen\/\"\u003eThe Swedish Work Environment Authority's guidance on the new Machinery Regulation\u003c\/a\u003e.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eImportant:\u003c\/strong\u003e A RESET device, a cycle stop, a normal stop, and an emergency stop are not interchangeable functions. A receipt must not be treated as a safe start command without separate risk and design testing. Safety-related design, control, control body when applicable, manufacturer documentation, and actual operating conditions must be assessed by the appropriate expert. A completed document never creates CE marking or verified safety.\u003c\/p\u003e\n\u003ch2\u003eWhich Nearby Package Should You Choose?\u003c\/h2\u003e\n\u003cp\u003eTo test whether a change can change the manufacturer's responsibility: \u003ca href=\"https:\/\/mallbutiken.se\/products\/vasentlig-maskinandring-2027-artikel18-gransdragning\"\u003eSubstantial Machine Modification and CE Boundary Definition\u003c\/a\u003e. For safety PLC modification: \u003ca href=\"https:\/\/mallbutiken.se\/products\/sakerhets-plc-2027-programandring-versionsbevis-aterstartsprov\"\u003eSafety PLC – Program Change and Restart Test\u003c\/a\u003e. For backing up an existing control system: \u003ca href=\"https:\/\/mallbutiken.se\/products\/plc-hmi-backup-aterlasningsprov-aterstartsbeslut\"\u003ePLC\/HMI – Backup and Readback Test\u003c\/a\u003e.\u003c\/p\u003e\n\u003ch2\u003eFrequently Asked Questions\u003c\/h2\u003e\n\u003ch3\u003eCan a new start button be installed on an existing production cell?\u003c\/h3\u003e\u003cp\u003eIt depends on the machine, change, and risk profile. Change and risk assessment, as well as the correct technical competence, are required; the template itself provides no installation or start approval.\u003c\/p\u003e\n\u003ch3\u003eAre cycle stop or hold the same as emergency stop?\u003c\/h3\u003e\u003cp\u003eNo. A normal process stop and a safety function have different purposes and must be tested separately based on the equipment's risks and applicable regulations.\u003c\/p\u003e\n\u003ch3\u003eIs the RESET button allowed to start the machine at the same time?\u003c\/h3\u003e\u003cp\u003eIt must not be assumed. Reset and start must be risk assessed and functionally checked based on the machine's protection and applicable requirements.\u003c\/p\u003e\n\u003ch3\u003eDoes every panel change require new CE marking?\u003c\/h3\u003e\u003cp\u003eNo, not automatically. The actual change and the product regulation applicable at the time must be assessed separately by a competent responsible person.\u003c\/p\u003e\n\u003ch3\u003eCan Excel certify that the safety function is approved?\u003c\/h3\u003e\u003cp\u003eNo. Excel is only a case and evidence log. Actual verification and legal assessment must be done separately.\u003c\/p\u003e\n\u003ch3\u003eAre the Swedish templates translated into English?\u003c\/h3\u003e\u003cp\u003eNo. Only the English User Guide is in English; the working templates and Excel are in Swedish. The PDF versions are not interactively fillable.\u003c\/p\u003e\n\u003ch2\u003eVersion, Sources, and Transparent Review Status\u003c\/h2\u003e\n\u003cp\u003eEdition \u003cstrong\u003e1.0\u003c\/strong\u003e. AI-assisted check of official sources and actual files: \u003cstrong\u003e20 November 2026\u003c\/strong\u003e. Sources: \u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/afs-202311\/\"\u003eAFS 2023:11\u003c\/a\u003e, \u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/afs-20234\/\"\u003eAFS 2023:4\u003c\/a\u003e, \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2023\/1230\/oj\"\u003eEU 2023\/1230\u003c\/a\u003e, and \u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/inspektioner-utredningar-och-kontroller\/produktregler-och-marknadskontroll\/produktregler\/krav-pa-maskiner\/den-nya-maskinforordningen\/\"\u003eThe Swedish Work Environment Authority's guidance\u003c\/a\u003e. After eventual publication, file linking, test purchase, and control of public catalog content remain.\u003c\/p\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":56712686043478,"sku":"MANOVERPANEL-CELL-261120","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/manoverpanel-01-huvudbild-1600.png?v=1795157116"},{"product_id":"ai-visionsystem-felaktig-ok-partisparr-aterstart","title":"AI vision system – incorrect OK sorting, part jams and safe restart | Word\/PDF\/Excel","description":"\u003cdiv class=\"mb-product-description\"\u003e\n\n\u003cp\u003e\u003cstrong\u003eHas an AI camera in the production cell approved a defective product – and have more products already passed inspection?\u003c\/strong\u003e With this specialized document package, production, quality, and automation teams can document a discovered operational failure, define the risk period, trace potentially incorrectly approved batches, perform a re-inspection against an actual manual reference, and make two separate, authorized decisions: product release and actual production restart.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eQuick facts:\u003c\/strong\u003e Swedish business operation · five Swedish work templates + Swedish user guide + separate English User Guide · each document in editable Word (DOCX) and searchable, printable PDF. Also includes a Swedish Excel register (XLSX) with nine tabs and ten administrative indicators. \u003cstrong\u003e7 DOCX + 7 PDF + 1 XLSX = 15 customer files in a digital ZIP.\u003c\/strong\u003e The PDF versions lack interactive form fields. No physical delivery.\u003c\/p\u003e\n\n\u003csection style=\"border:2px solid #275D81;background:#EAF3F8;border-radius:10px;padding:17px;margin:20px 0\"\u003e\n\u003ch2\u003e01 · Package contents\u003c\/h2\u003e\n\n\u003cp\u003eFive Swedish specialist templates: \u003cstrong\u003e(1)\u003c\/strong\u003e operational deviation and initial safety screening, \u003cstrong\u003e(2)\u003c\/strong\u003e batch tracing and actual hold, \u003cstrong\u003e(3)\u003c\/strong\u003e re-inspection against a human reference, \u003cstrong\u003e(4)\u003c\/strong\u003e root cause, corrective action, and verification, \u003cstrong\u003e(5)\u003c\/strong\u003e manual final decision on product and production. Also \u003cstrong\u003e(6)\u003c\/strong\u003e Swedish guide and \u003cstrong\u003e(7)\u003c\/strong\u003e English User Guide. All seven documents in DOCX and PDF; one XLSX register is also included.\u003c\/p\u003e\n\n\u003c\/section\u003e\n\u003csection style=\"border:2px solid #275D81;background:#F6FAFD;border-radius:10px;padding:17px;margin:202px 0\"\u003e\n\u003ch2\u003e02 · What the files contain\u003c\/h2\u003e\n\n\u003cp\u003eFields for incident ID, camera and AI model, version, lighting, uncertain inspection period, product\/SKU, lot and serial number, actual warehouse\/ERP hold, reference standard and camera decision per sample item, false OK\/NOK, risk scaling, technical root cause, change evidence, verification, signature, and post-inspection. \u003cstrong\u003eExcel does not control a machine, release products, or perform a physical batch hold.\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003c\/section\u003e\n\u003ch2\u003eWho needs the template?\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eTypical case 1:\u003c\/strong\u003e A machining cell has a camera for quality control. The operator discovers that a defective product received an OK marking. The business needs to trace all products since the last verified correct inspection, document an actual hold, and perform a manual re-inspection.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eTypical case 2:\u003c\/strong\u003e A vision sensor begins incorrectly rejecting correct products after lighting conditions change. The company wants to document the quality deviation and correction, but without automatically classifying it as a serious workplace incident or a high-risk AI failure.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eImportant boundaries:\u003c\/strong\u003e The product is intended for AI\/vision-based \u003cem\u003equality inspection\u003c\/em\u003e, not for testing, certifying, or restarting personal safety functions such as light curtains, safety gates, interlocks, emergency stop circuits, or safety PLCs. If such a function is affected, the authorized machine safety officer must handle the matter in a separate safety process.\u003c\/p\u003e\n\n\u003ch2\u003eExact file list\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"border-collapse:collapse;width:100%;min-width:680px\"\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth scope=\"col\"\u003eDocument\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eUse\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eLanguage\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e01 Operational Deviation\u003c\/td\u003e\n\n\u003ctd\u003eDiscovered misclassification, initial risk assessment, and report acknowledgment\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + searchable PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e02 Tracing and Batch Hold\u003c\/td\u003e\n\n\u003ctd\u003eRisk period, lot, warehouse location, and actual hold evidence\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e03 Re-inspection\u003c\/td\u003e\n\n\u003ctd\u003eActual manual reference, AI classification, and deviation results\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e04 Corrective Action\u003c\/td\u003e\n\n\u003ctd\u003eRoot cause, correction, version\/parameter evidence, and test results\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e05 Final Decision\u003c\/td\u003e\n\n\u003ctd\u003eSeparate decisions for product batch and production restart\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e06 Swedish User Guide\u003c\/td\u003e\n\n\u003ctd\u003eScoping, legal sources, step-by-step, and four scenarios\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e07 English User Guide\u003c\/td\u003e\n\n\u003ctd\u003eEnglish instructions for the Swedish forms and workbook\u003c\/td\u003e\n\n\u003ctd\u003eEnglish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e08 Excel Register\u003c\/td\u003e\n\n\u003ctd\u003eNine work tabs, ten formulas\/indicators, and classification log\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eXLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\u003ch2\u003eExcel – actual classification support, without false approval\u003c\/h2\u003e\n\n\u003cp\u003eThe nine tabs are \u003cstrong\u003eOverview, Incidents, Batches, Re-inspections, Actions, Safety, Decisions, Evidence, and Read Me\u003c\/strong\u003e. Each work tab has 150 pre-filled data rows and relevant status fields. The overview calculates ten administrative metrics for incidents, batches, actual holds, re-inspections, false OKs, false NOKs, safety escalation, and manual decisions.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eFunctionally tested:\u003c\/strong\u003e If the manually verified reference is NOK and the AI camera says OK, Excel gives \u003cstrong\u003eFalse OK\u003c\/strong\u003e. The opposite combination gives \u003cstrong\u003eFalse NOK\u003c\/strong\u003e. Two OKs give \u003cstrong\u003eCorrect\u003c\/strong\u003e. An incompletely specified test gives an empty result. The overview metrics and zeroing are also verified with fictitious test cases; the customer file contains no such cases.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eNOTE:\u003c\/strong\u003e A formula result is not a statistical acceptance test or a release decision. The number of samples, sample selection, actual product requirements, machine safety, and actual inventory status must be assessed by competent persons.\u003c\/p\u003e\n\n\u003ch2\u003eHow a discovered misclassification is handled\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDocument immediately:\u003c\/strong\u003e specify the camera, actual time, misclassification, model version, and independent observation.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eSafety screen:\u003c\/strong\u003e if personal safety or dangerous work equipment may be affected – follow local stop\/safety procedures and escalate.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eTrace backward:\u003c\/strong\u003e establish the latest documented correct inspection, potential batches, and already delivered units.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eActually hold:\u003c\/strong\u003e note physical segregation, ERP\/warehouse decision, performer, and evidence.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eRe-inspect:\u003c\/strong\u003e compare the AI system's actual classification against the human-validated reference standard and document uncertainties.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCorrect and verify:\u003c\/strong\u003e investigate causes, document technical testing, and any model\/parameter changes.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDecide separately:\u003c\/strong\u003e an authorized person decides on the products; the authorized production\/safety function makes its own decision on restart and post-inspection.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eLegislation – what is actually relevant?\u003c\/h2\u003e\n\n\u003cp\u003e\u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/afs-20231\/\"\u003eAFS 2023:1 on systematic work environment management\u003c\/a\u003e includes, among other things, the employer's investigation and assessment of risks, risk assessment before changes, and in Section 12, investigation of serious near-misses\/accidents when the conditions are met. Every quality deviation is \u003cstrong\u003enot\u003c\/strong\u003e automatically such a near-miss.\u003c\/p\u003e\n\n\u003cp\u003e\u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/afs-202311\/\"\u003eAFS 2023:11 on safe use of work equipment\u003c\/a\u003e contains requirements relevant to the safe handling of work equipment, including during operational failure and work in risk areas. This form does not instruct how a machine is actually secured or started – the company's machine-specific procedures and authorized functions must be used.\u003c\/p\u003e\n\n\u003cp\u003e\u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2024\/1689\/oj\"\u003eEU AI Act (EU) 2024\/1689\u003c\/a\u003e does not mean that every quality camera is classified as high-risk AI. Article 6 and the system's actual safety function are significant in the applicable classification. \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2023\/1230\/oj\"\u003eEU Machinery Regulation (EU) 2023\/1230\u003c\/a\u003e will mainly apply from \u003cstrong\u003eJanuary 20, 2027\u003c\/strong\u003e; special rules and transitional issues must be examined based on the machine.\u003c\/p\u003e\n\n\u003cp\u003eIf potentially unsafe consumer products have already been delivered, a separate assessment must be made according to applicable sector-specific legislation and, where relevant, \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/reg\/2023\/988\/oj\"\u003eGPSR (EU) 2023\/988\u003c\/a\u003e. The package does not replace a recall plan or a regulatory notification.\u003c\/p\u003e\n\n\u003ch2\u003eDifference from other Mallbutiken products\u003c\/h2\u003e\n\n\u003cp\u003e\u003ca href=\"https:\/\/mallbutiken.se\/products\/ai-visionsystem-produktionscell-modellbyte-provserie-frislappning\"\u003eAI vision system – model change, pilot series, and release decision\u003c\/a\u003e is suitable for a planned model\/recipe change before commissioning. \u003ca href=\"https:\/\/mallbutiken.se\/products\/sakerhets-plc-2027-programandring-versionsbevis-aterstartsprov\"\u003eSafety PLC – program change and restart test\u003c\/a\u003e is relevant for safety-controlled functions. This new product focuses on the \u003cstrong\u003ealready occurred quality deviation and the tracing of affected products\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently asked questions\u003c\/h2\u003e\n\n\u003ch3\u003eWhat does false OK mean?\u003c\/h3\u003e\n\n\u003cp\u003eThat the system approved a product that was assessed as rejected during independent inspection according to the current product requirement.\u003c\/p\u003e\n\n\u003ch3\u003eDoes Excel automatically calculate how many products are safe?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Excel helps with actually recorded classification results and statuses. Representativeness, acceptance limits, and actual batch release require a separate decision.\u003c\/p\u003e\n\n\u003ch3\u003eCan we restart the machine when we have filled out the template?\u003c\/h3\u003e\n\n\u003cp\u003eNo. A filled-out form or an Excel value does not grant the right to restart. Follow the machine's safety procedures and required authorized decisions.\u003c\/p\u003e\n\n\u003ch3\u003eDo the high-risk requirements of the AI Act apply to all cameras?\u003c\/h3\u003e\n\n\u003cp\u003eNo. A camera for quality sorting is not automatically a safety component. The system's actual function, applicable product legislation, and the AI Act's criteria must be analyzed.\u003c\/p\u003e\n\n\u003ch3\u003eWhat do we do if the products have already been delivered?\u003c\/h3\u003e\n\n\u003cp\u003eDocument which lots may be affected and escalate to the person responsible for product and customer safety. Separate regulatory\/customer actions may be required depending on the product and risk.\u003c\/p\u003e\n\n\u003ch3\u003eAre the PDF files digitally fillable?\u003c\/h3\u003e\n\n\u003cp\u003eNo. They are searchable and can be printed. Edit the work documents in DOCX.\u003c\/p\u003e\n\n\u003ch3\u003eAre the work templates available in English?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The five work templates and Excel are in Swedish. The English User Guide explains how the Swedish files are used.\u003c\/p\u003e\n\n\u003ch2\u003eVersion, sources, and document control\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eVersion 1.0 · November 21, 2026.\u003c\/strong\u003e Internal AI-assisted legal source check and synthetic scenario tests against AFS 2023:1, AFS 2023:11, AI Act, and the Machinery Regulation. No independent legal review, actual industrial testing, CE assessment, or regulatory certification. The customer must use their own approved instructions, machine data, and competent decision-makers. The delivery app and any public channel are activated separately.\u003c\/p\u003e\n\n\n\u003c\/div\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":56730162233686,"sku":"MB-AIVISIONINC-261121-V1","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/ai-visionsystem-felaktig-ok-partisparr-huvudbild-1600.png?v=1795232741"},{"product_id":"vagsystem-plc-hmi-integrationsprov-viktprov-excel-2026","title":"Integration test for weighing systems with PLC\/HMI – signal matrix, weight test \u0026 Excel | Word\/PDF","description":"\u003cdiv class=\"mb-mallpaket\" lang=\"sv\"\u003e\n\n\u003ch2\u003eIntegration test for weighing systems to PLC\/HMI – test protocol, signal matrix and Excel\u003c\/h2\u003e\n\n\u003cp\u003eFor automation engineers, maintenance and integrators who need to prove that the weight value is actually transferred from the scale indicator via the PLC to the HMI. The package includes \u003cstrong\u003esignal mapping, project-specific weight tests, HMI\/alarm tests, deviations and separate decisions before handover\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cdiv style=\"border:1px solid #286BA5;background:#EFF6FB;padding:16px;margin:16px 0\"\u003e\n\n\u003ch3\u003ePackage contents\u003c\/h3\u003e\n\n\u003cp\u003eSix Swedish work templates: (1) system requirements and integration plan, (2) signal and data mapping, (3) weight tests and measurement chain, (4) HMI, alarm and sequence tests, (5) deviation and retest, (6) handover and decision receipt. In addition, a Swedish and an English user guide and an Excel register with ten tabs.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv style=\"border:1px solid #286BA5;background:#EFF6FB;padding:16px;margin:16px 0\"\u003e\n\n\u003ch3\u003eWhat the files contain\u003c\/h3\u003e\n\n\u003cp\u003eTotal \u003cstrong\u003e18 customer files\u003c\/strong\u003e: eight editable Word files, eight corresponding searchable PDF versions, one Excel register and one README. The work templates and Excel are in Swedish; the English file is a separate user guide, not a translation of the work templates. The PDF versions are static and not digitally fillable.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch3\u003eFrom reference weight to HMI – the workflow\u003c\/h3\u003e\n\n\u003col\u003e\n\n\u003cli\u003eIdentify scale model, PLC, HMI, communication method and software version.\u003c\/li\u003e\n\n\u003cli\u003eRecord raw signal, PLC tag, data type, weight unit and scaling.\u003c\/li\u003e\n\n\u003cli\u003eSpecify the project's verified acceptance limits and reference weight.\u003c\/li\u003e\n\n\u003cli\u003eMeasure actual weight on indicator, PLC and HMI with test ID.\u003c\/li\u003e\n\n\u003cli\u003eDocument status, communication loss, tare\/zeroing and any alarms under approved test conditions.\u003c\/li\u003e\n\n\u003cli\u003eClose deviations with a new retest and document technical handover separately from contractual acceptance and commissioning.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch3\u003eExcel: ten work tabs with internal weight comparison\u003c\/h3\u003e\n\n\u003cp\u003eThe workbook contains Overview, System, Signals, Weight Test, HMI Test, Deviations, Actions, Decisions, Traceability and Read Me. Under Weight Test, the difference \u003cstrong\u003eHMI weight minus reference weight\u003c\/strong\u003e is calculated and compared with a tolerance that the customer must specify themselves from approved project requirements. A green cell only means that the specified difference is within the manually selected tolerance – not that the scale, the facility or the commissioning is certified.\u003c\/p\u003e\n\n\u003ch3\u003eFrequently asked questions\u003c\/h3\u003e\n\n\u003ch4\u003eDoes the package work with Siemens PLC and HMI?\u003c\/h4\u003e\n\n\u003cp\u003eYes, as equipment-neutral documentation support. The actual address mapping and configuration must be obtained from supplier manuals and own project files. No Siemens program code or wiring list is included.\u003c\/p\u003e\n\n\u003ch4\u003eDoes it include ready-made connection for HL318 PLUS SSC?\u003c\/h4\u003e\n\n\u003cp\u003eNo. Such a connection requires that original documentation, current PLC hardware, interfaces and safety requirements are verified separately.\u003c\/p\u003e\n\n\u003ch4\u003eIs this a calibration certificate or statutory scale verification?\u003c\/h4\u003e\n\n\u003cp\u003eNo. If the scale is used for a regulated purpose, there may be special control requirements that only authorized bodies can fulfill.\u003c\/p\u003e\n\n\u003ch4\u003eIs the material certified according to SS-EN IEC 62381:2025?\u003c\/h4\u003e\n\n\u003cp\u003eNo. The standard is a subject reference for FAT\/SAT\/SIT. The licensed full text is not included, and we do not claim full standard compliance.\u003c\/p\u003e\n\n\u003ch4\u003eWhat do I need before I start?\u003c\/h4\u003e\n\n\u003cp\u003eCorrect facility documentation, scale and communication manuals, risk assessment, verified test weights, the project's tolerance requirements and a competent technical test leader.\u003c\/p\u003e\n\n\u003ch3\u003eLegal and technical limitation\u003c\/h3\u003e\n\n\u003cp\u003eThe package is an administrative documentation support for Swedish operations. It does not replace electrical authorization, work environment and machine safety assessment, CE process, Swedacs measurement regulations or accredited control. Two AI-assisted source control steps and file tests have been performed on November 21, 2026. No external lawyer, certified measurement technician or accredited control body has approved the material.\u003c\/p\u003e\n\n\u003cp\u003eOfficial sources: \u003ca href=\"https:\/\/www.swedac.se\/amnesomraden\/krav-pa-vagar\/\"\u003eSwedac – Requirements for scales\u003c\/a\u003e, \u003ca href=\"https:\/\/www.swedac.se\/amnesomraden\/vagar-2\/\"\u003eSwedac – Scales\u003c\/a\u003e, \u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/afs-20234\/\"\u003eSwedish Work Environment Authority – AFS 2023:4\u003c\/a\u003e, \u003ca href=\"https:\/\/www.sis.se\/produkter\/produktionsteknik\/industriell-processtyrning\/matning-och-styrning-av-industriella-processer\/ss-en-iec-623812025\/\"\u003eSIS – SS-EN IEC 62381:2025\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003cp\u003e\u003cem\u003eDelivery: digital download (ZIP) · Sweden · document version 1.0\u003c\/em\u003e\u003c\/p\u003e\n\n\n\u003c\/div\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":56733466165590,"sku":"MB-VAG-PLC-HMI-SAT-2026-V1","price":249.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/vagsystem-plc-hmi-integrationsprov-hero-2026.jpg?v=1795271272"},{"product_id":"dieselavgaser-arbetsplats-riskbedomning-utsug-exponering-2026","title":"Diesel exhaust in workshops \u0026 depots 2026\/2027 – Risk assessment, extraction \u0026 exposure register | Word\/PDF\/Excel","description":"\u003csection lang=\"sv\" style=\"color:#173B59;line-height:1.7;max-width:960px\"\u003e\n\u003ch2\u003eDiesel exhaust at the workplace – risk assessment, exhaust extraction and CMR registers\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eDo you have diesel engines operating in a workshop, depot, terminal or garage?\u003c\/strong\u003e This Swedish template package allows employers to map exhaust sources, document risks, assess whether exposure can be technically eliminated, monitor exhaust extraction and review measurement and register requirements. You get \u003cstrong\u003eWord, a searchable PDF and an Excel register\u003c\/strong\u003e for administrative follow-up.\u003c\/p\u003e\n\n\u003cp\u003eDiesel exhaust is covered by special rules for carcinogenic exposure in \u003cstrong\u003eAFS 2023:10, Chapter 8\u003c\/strong\u003e. An amendment taking effect from \u003cstrong\u003e9 April 2026\u003c\/strong\u003e clarified the requirement to eliminate exposure where technically possible. A form, a ventilation test or a value below the limit value does not automatically mean that workplace conditions are approved.\u003c\/p\u003e\n\n\u003cdiv style=\"border:1px solid #BBD4E5;background:#EFF6FA;padding:18px 20px;border-radius:9px;margin:17px 0\"\u003e\n\n\u003ch3 style=\"margin:0 0 8px\"\u003ePackage contents\u003c\/h3\u003e\n\n\u003cp style=\"margin:0\"\u003e\u003cstrong\u003e5 Swedish workplace templates + Swedish user guide + English User Guide + 1 administrative Excel workbook with nine tabs.\u003c\/strong\u003e A total of \u003cstrong\u003e7 editable Word files (DOCX), 7 corresponding searchable PDF files and 1 Excel workbook (XLSX)\u003c\/strong\u003e – 15 customer files as a digital ZIP download.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv style=\"border:1px solid #BBD4E5;background:#EFF6FA;padding:18px 20px;border-radius:9px;margin:17px 0\"\u003e\n\n\u003ch3 style=\"margin:0 0 8px\"\u003eWhat the files contain\u003c\/h3\u003e\n\n\u003cp style=\"margin:0\"\u003eSource inventory and risk assessment, documented elimination assessment and action plan, exhaust extraction and ventilation control, measurement requirements and review of measurement reports, and a special Word template for a personal CMR exposure register when there is a legal obligation to keep one. The Excel file contains administrative source IDs, control statuses, measurement data, actions and references to protected personnel registers.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch3\u003eWho is the template package suitable for?\u003c\/h3\u003e\n\n\u003cp\u003eFor \u003cstrong\u003eworkshops, vehicle depots, indoor garages, service facilities, warehouses and other employers\u003c\/strong\u003e who need to manage potential exposure to diesel exhaust. The package is adapted to Swedish occupational health and safety law and is intended for employer documentation – not technical design, accredited air measurement or medical examination. Additional special rules may apply to underground mining and tunnelling.\u003c\/p\u003e\n\n\u003ch3\u003eAll files – five workplace templates, two guides and Excel\u003c\/h3\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"border-collapse:collapse;width:100%\"\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth scope=\"col\" style=\"text-align:left\"\u003eFile\u003c\/th\u003e\n\n\u003cth scope=\"col\" style=\"text-align:left\"\u003eFunction\u003c\/th\u003e\n\n\u003cth scope=\"col\" style=\"text-align:left\"\u003eLanguage\u003c\/th\u003e\n\n\u003cth scope=\"col\" style=\"text-align:left\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e01\u003c\/td\u003e\n\n\u003ctd\u003eSource inventory and risk assessment\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e02\u003c\/td\u003e\n\n\u003ctd\u003eElimination and action plan\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e03\u003c\/td\u003e\n\n\u003ctd\u003eExhaust extraction and ventilation control\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e04\u003c\/td\u003e\n\n\u003ctd\u003eMeasurement requirements and measurement results\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e05\u003c\/td\u003e\n\n\u003ctd\u003eCMR exposure registers and follow-up\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e06\u003c\/td\u003e\n\n\u003ctd\u003eUser guide\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e07\u003c\/td\u003e\n\n\u003ctd\u003eEnglish User Guide\u003c\/td\u003e\n\n\u003ctd\u003eEnglish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e08\u003c\/td\u003e\n\n\u003ctd\u003eAdministrative Excel register (nine tabs)\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eXLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\u003ch3\u003eThe Excel register – nine tabs and tested formulas\u003c\/h3\u003e\n\n\u003cp\u003eThe tabs are \u003cstrong\u003eOverview, Start, Exhaust sources, Risks, Extraction, Measurements, Actions, CMR index and Legal sources\u003c\/strong\u003e. The workbook counts actual registered sources, risk assessments, controls, measurement data and actions. When an actual measurement value and a manually verified comparison value are entered, Excel can calculate the \u003cstrong\u003evalue\/limit value\u003c\/strong\u003e and flag the need for review. The spreadsheet does not determine whether a measurement is representative, whether the values have the correct time weighting or whether the workplace environment is safe.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003ePrivacy:\u003c\/strong\u003e Excel is only an administrative index. Do not record employees' names, personal identity numbers, health information or personal exposure values here. The separate Word template for CMR registers should be used in the employer's access-controlled and securely archived system when the obligation to keep a register has been assessed.\u003c\/p\u003e\n\n\u003ch3\u003eHow to use the material\u003c\/h3\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eInventory:\u003c\/strong\u003e identify diesel engines, operations, premises, affected employee categories and which activities may cause exposure.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eAssess elimination:\u003c\/strong\u003e document whether exhaust fumes can be technically avoided, for example through alternative technology or by operating outdoors.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCheck the extraction:\u003c\/strong\u003e record actual functional checks, service records and deviations – not assumed approvals.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eAssess measurement requirements:\u003c\/strong\u003e appoint an expert when required and retain an actual measurement report. If occupational hygiene measurement is not required, the reasons must be documented.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eFollow up and register:\u003c\/strong\u003e manage actions and separately assess whether registers of exposed employees should be established and maintained.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch3\u003eImportant legal requirements\u003c\/h3\u003e\n\n\u003cp\u003e\u003cstrong\u003eElimination:\u003c\/strong\u003e Chapter 8, Sections 13–17 of AFS 2023:10 contains special provisions for work involving exposure to diesel exhaust, among other things. Technically possible elimination must be prioritised; remaining exposure must be minimised in accordance with applicable rules.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eMeasurement:\u003c\/strong\u003e Chapter 7, Sections 10–11 of AFS 2023:10 covers assessment and measurement. AFS 2023:14 specifies a level limit value of \u003cstrong\u003e0.05 mg\/m³ for diesel exhaust measured as elemental carbon\u003c\/strong\u003e at the time of this product's source control (21 November 2026). Other relevant exhaust components, such as nitrogen dioxide, may also need to be measured. Always check the current wording and appropriate comparable measurement conditions.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eRegisters:\u003c\/strong\u003e Chapter 8, Section 20 of AFS 2023:10 may require a personal register when exposure is of such magnitude that it may pose a risk to health. The register must contain relevant personal and exposure data and may need to be retained for a very long time in accordance with the Work Environment Ordinance. Assess actual applicability and archiving requirements – not all brief contacts with exhaust fumes automatically entail the same registration obligation.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eScope:\u003c\/strong\u003e The templates do not replace employer responsibility, the involvement of safety representatives, occupational health and safety technical assessments, prescribed measurements, medical examinations or decisions to stop hazardous work. They are not official authority forms or a certificate of a safe workplace environment.\u003c\/p\u003e\n\n\u003ch3\u003eFrequently asked questions\u003c\/h3\u003e\n\n\u003ch4\u003eMust diesel exhaust always be measured?\u003c\/h4\u003e\n\n\u003cp\u003eNot necessarily. If the concentration cannot be assessed as acceptable in another reliable way, occupational hygiene measurement is required in accordance with applicable rules. The reasons for not measuring must be documented in writing.\u003c\/p\u003e\n\n\u003ch4\u003eIs it enough if the concentration is below the limit value?\u003c\/h4\u003e\n\n\u003cp\u003eNo. In addition to the limit values, there is an obligation to assess technically possible elimination and minimise exposure. Results must be reviewed with regard to the work activity, representativeness and other substances in the exhaust.\u003c\/p\u003e\n\n\u003ch4\u003eWhen is an exposure register required?\u003c\/h4\u003e\n\n\u003cp\u003eWhen there is relevant exposure of such magnitude that it may pose a risk to health in accordance with Chapter 8, Section 20 of AFS 2023:10. The personal register template must be stored securely; the Excel index does not replace a complete exposure register.\u003c\/p\u003e\n\n\u003ch4\u003eCan I enter measurement values in Excel myself?\u003c\/h4\u003e\n\n\u003cp\u003eYes, if the values are actual and have a documented source and unit. Excel then calculates a simple ratio. This does not mean that an occupational hygiene measurement or safety assessment has been carried out or approved.\u003c\/p\u003e\n\n\u003ch4\u003eAre English workplace templates included?\u003c\/h4\u003e\n\n\u003cp\u003eNo. Five workplace documents and the Swedish guide are in Swedish. A separate \u003cstrong\u003eEnglish User Guide\u003c\/strong\u003e explains how the Swedish templates are used. The Word file is editable; the PDF version is searchable and printable, but is not intended as an interactive form.\u003c\/p\u003e\n\n\u003ch4\u003eWhich template is suitable for other chemical workplace risks?\u003c\/h4\u003e\n\n\u003cp\u003eFor a general inventory of chemicals, \u003ca href=\"\/en\/products\/kemiska-risker-riskbedomning-kemikalieforteckning-2026-2027\"\u003eChemical risks – risk assessment and chemical inventory\u003c\/a\u003e is a closely related alternative. This package focuses instead on exhaust sources, elimination assessment, ventilation, occupational hygiene assessments and the special register issue.\u003c\/p\u003e\n\n\u003ch3\u003eLegal sources and review status\u003c\/h3\u003e\n\n\u003cp\u003e\u003cstrong\u003eProduct version 1.0\u003c\/strong\u003e. Internal legal source review carried out \u003cstrong\u003e21 November 2026\u003c\/strong\u003e. The material was developed with AI assistance and technically tested; no external lawyer, occupational hygiene expert or authority has approved it.\u003c\/p\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/afs-202310\/\" rel=\"noopener\"\u003eSwedish Work Environment Authority – AFS 2023:10, especially Chapters 7–8.\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/afs-202310\/forfattningshistorik-afs-202310\/\" rel=\"noopener\"\u003eAFS 2023:10 legislative history – amendment 9 April 2026\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/afs-202314\/\" rel=\"noopener\"\u003eSwedish Work Environment Authority – AFS 2023:14, limit values\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.av.se\/halsa-och-sakerhet\/kemiska-risker\/risker-for-vissa-amnen-produkter-och-verksamheter\/damm-rok-och-dimma\/dieselavgaser\/\" rel=\"noopener\"\u003eSwedish Work Environment Authority – guidance on diesel exhaust\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/arbeta-med-arbetsmiljon\/systematiskt-arbetsmiljoarbete\/\" rel=\"noopener\"\u003eSwedish Work Environment Authority – systematic work environment management\u003c\/a\u003e\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Standard","offer_id":56734048616790,"sku":"MB-DIESELAVGASER-2026-V1","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/mallbutiken-dieselavgaser-2026-produktomslag.png?v=1795277255"},{"product_id":"tradamm-snickeri-2026-riskbedomning-utsug-cmr-register","title":"Wood dust in woodworking 2026\/2027 – Risk assessment, extraction, measurement basis \u0026 CMR register | Word\/PDF\/Excel","description":"\u003csection lang=\"sv\" style=\"max-width:960px;color:#173B59;line-height:1.74\"\u003e\n\u003ch2\u003eWood dust in woodworking and the wood industry – occupational health and safety templates for 2026\/2027\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eDo you work with sawing, planing, routing or sanding wood?\u003c\/strong\u003e Document the risks of wood dust from source to control measure with a practical package for employers, woodworking shops and furniture manufacturers. You will receive five Swedish work templates, two guides and an Excel register for \u003cstrong\u003ewood species, dust sources, risk assessment, technical elimination, local exhaust ventilation, occupational hygiene measurement data and CMR register review\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cp\u003eThe clarification that applies from \u003cstrong\u003e9 April 2026\u003c\/strong\u003e in AFS 2023:10 means that work involving wood dust from deciduous trees, among other things, may not be carried out if the exposure can be technically eliminated. Dust from deciduous trees is also covered by special provisions for carcinogenic exposure. A measured value below the limit value does not replace the assessment of elimination or measures to reduce exposure.\u003c\/p\u003e\n\n\u003cdiv style=\"border:2px solid #BED9E8;background:#EDF6FB;border-radius:9px;padding:18px 2020px;margin:20px 0\"\u003e\n\n\u003ch3 style=\"margin:0 0 8px\"\u003ePackage contents\u003c\/h3\u003e\n\n\u003cp style=\"margin:0\"\u003e\u003cstrong\u003eFive Swedish work templates, a Swedish user guide and an English User Guide\u003c\/strong\u003e – each in editable Word (DOCX) and searchable PDF – as well as \u003cstrong\u003ean Excel register with nine tabs\u003c\/strong\u003e. A total of \u003cstrong\u003e7 Word files, 7 PDF files and 1 Excel (XLSX) = 15 customer files\u003c\/strong\u003e in a digital ZIP delivery.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv style=\"border:2px solid #BED9E8;background:#EDF6FB;border-radius:9px;padding:18px 20px;margin:20px 0\"\u003e\n\n\u003ch3 style=\"margin:0 0 8px\"\u003eWhat the files contain\u003c\/h3\u003e\n\n\u003cp style=\"margin:0\"\u003eInventory of dust sources and wood species, documented assessment of technically feasible elimination, control log for local exhaust ventilation and cleaning, decision on measurement and review of actual measurement reports, as well as a separate Word template for CMR register assessment and follow-up. The Excel file provides an \u003cstrong\u003eimpersonal administrative index\u003c\/strong\u003e with eight tested key figures and a simple ratio for verifiable comparable measurement values.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch3\u003eWhich wood species and work steps are covered?\u003c\/h3\u003e\n\n\u003cp\u003eThe package distinguishes between \u003cstrong\u003edeciduous wood (hardwoods), coniferous wood (softwoods), pressure-treated timber and mixed\/unknown materials\u003c\/strong\u003e. According to AFS 2023:14 Annex 1, the following occupational exposure limit values apply for \u003cstrong\u003einhalable dust\u003c\/strong\u003e at the time of this product's source control on 22 November 2026:\u003c\/p\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"width:100%;border-collapse:collapse\"\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth scope=\"col\" style=\"text-align:left\"\u003eDust category\u003c\/th\u003e\n\n\u003cth scope=\"col\" style=\"text-align:left\"\u003eOEL (mg\/m³)\u003c\/th\u003e\n\n\u003cth scope=\"col\" style=\"text-align:left\"\u003eSpecial control\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eDeciduous wood \/ hardwoods\u003c\/td\u003e\n\n\u003ctd\u003e2\u003c\/td\u003e\n\n\u003ctd\u003eAssess CMR rules and any register requirements.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eConiferous wood \/ softwoods\u003c\/td\u003e\n\n\u003ctd\u003e2\u003c\/td\u003e\n\n\u003ctd\u003eDocument the same basic chemical risks.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003ePressure-treated timber\u003c\/td\u003e\n\n\u003ctd\u003e0.5\u003c\/td\u003e\n\n\u003ctd\u003eAlso investigate risks from treatment substances.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eMixture or unknown material\u003c\/td\u003e\n\n\u003ctd\u003eNo automatic conclusion\u003c\/td\u003e\n\n\u003ctd\u003eCheck correct application and measurement fraction with an expert.\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\u003cp\u003e\u003cstrong\u003eLimit values are binding but are not safety guarantees.\u003c\/strong\u003e A measurement must relate to the correct dust fraction, representative work and a relevant time-weighted average. The employer must assess cumulative risks, dust dispersion and preventive measures.\u003c\/p\u003e\n\n\u003ch3\u003eAll 15 customer files\u003c\/h3\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"width:100%;border-collapse:collapse\"\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth scope=\"col\" style=\"text-align:left\"\u003eFile\u003c\/th\u003e\n\n\u003cth scope=\"col\" style=\"text-align:left\"\u003eWork step\u003c\/th\u003e\n\n\u003cth scope=\"col\" style=\"text-align:left\"\u003eLanguage\u003c\/th\u003e\n\n\u003cth scope=\"col\" style=\"text-align:left\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e01\u003c\/td\u003e\n\n\u003ctd\u003eWood species, dust sources and written risk assessment\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e02\u003c\/td\u003e\n\n\u003ctd\u003eElimination, alternatives and control measure decision\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e03\u003c\/td\u003e\n\n\u003ctd\u003eLocal exhaust ventilation, ventilation and dust-safe cleaning\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e04\u003c\/td\u003e\n\n\u003ctd\u003eMeasurement requirements, original report and exposure data\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e05\u003c\/td\u003e\n\n\u003ctd\u003eCMR register review and control measure follow-up\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e06\u003c\/td\u003e\n\n\u003ctd\u003eUser guide with legal control points\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e07\u003c\/td\u003e\n\n\u003ctd\u003eEnglish User Guide – guidance for Swedish templates\u003c\/td\u003e\n\n\u003ctd\u003eEnglish\u003c\/td\u003e\n\n\u003ctd\u003eDOCX + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e08\u003c\/td\u003e\n\n\u003ctd\u003eWood dust – administrative risk and exposure register\u003c\/td\u003e\n\n\u003ctd\u003eSwedish\u003c\/td\u003e\n\n\u003ctd\u003eXLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\u003ch3\u003eExcel with nine tabs and actual functional tests\u003c\/h3\u003e\n\n\u003cp\u003eThe workbook contains \u003cstrong\u003eOverview, Start, Wood species, Work step, Exhaust ventilation, Measurements, Control measures, CMR index and Sources\u003c\/strong\u003e. Eight key figures show, among other things, registered risk sources, controls, measurement data, deviations, open and verified control measures and the need for further register review. The file is delivered without pre-filled cases or example persons.\u003c\/p\u003e\n\n\u003cp\u003eIn the Measurements tab, Excel can calculate the ratio \u003cstrong\u003eactual measured value \/ manually verified limit value\u003c\/strong\u003e, but only when both figures are provided. The function is mathematically tested with 0.8\/0.5 = 1.60 and 0.8\/2.0 = 0.40. It does \u003cstrong\u003enot\u003c\/strong\u003e determine whether the measurement is representative, whether the wrong dust fraction was used or whether work may continue.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eImportant for personal data:\u003c\/strong\u003e The Excel index is not a personal CMR exposure register. Do not enter personal names, personal identity numbers, individual exposure or medical data in the spreadsheet. Any personal register required by AFS 2023:10 Chapter 8, Section 20 must be established in the employer's secure, access-controlled system, with the correct retention period.\u003c\/p\u003e\n\n\u003ch3\u003eHow to use the package\u003c\/h3\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eInventory wood species and processes:\u003c\/strong\u003e map work steps that generate dust and document actual exposure.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eAssess elimination first:\u003c\/strong\u003e document whether the work step or dust source can be avoided using technically feasible alternatives.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCheck local exhaust ventilation and cleaning:\u003c\/strong\u003e record actual operational controls, deficiencies and control measures without automatic approvals.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eAssess the need for measurement:\u003c\/strong\u003e obtain an occupational hygiene report when a reliable assessment cannot be made in any other way; also document the reasons for deciding against it.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eFollow up properly:\u003c\/strong\u003e conduct a separate CMR assessment when deciduous wood dust is relevant, decide on protected registers and retain evidence of control measures and re-inspections.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch3\u003eFrequently asked questions\u003c\/h3\u003e\n\n\u003ch4\u003eIs wood dust carcinogenic?\u003c\/h4\u003e\n\n\u003cp\u003eExposure to dust from deciduous trees is expressly covered by the special CMR rules in AFS 2023:10. Research highlighted by the industry organisation TMF in June 2026 also shows long-term risks from occupational exposure to wood dust. This does not mean that a new lower binding limit value has been introduced.\u003c\/p\u003e\n\n\u003ch4\u003eDo we always need to measure the wood dust content?\u003c\/h4\u003e\n\n\u003cp\u003eNot automatically. The employer must carry out occupational hygiene measurements if the content cannot otherwise be reliably assessed as acceptable in relation to the limit values. The reasons for the decision to abstain must be documented in writing. Special rules apply after measures to reduce air pollution.\u003c\/p\u003e\n\n\u003ch4\u003eIs it enough if the measured value is below 2 mg\/m³?\u003c\/h4\u003e\n\n\u003cp\u003eNo. For pressure-treated timber, 0.5 mg\/m³ is specified for inhalable dust, and the wrong fraction or sampling conditions can make the comparison misleading. Even if the value is below the relevant limit value, the obligation to eliminate or reduce exposure according to applicable rules remains.\u003c\/p\u003e\n\n\u003ch4\u003eWhen are CMR registers required?\u003c\/h4\u003e\n\n\u003cp\u003eIn relevant deciduous wood dust work and exposure to such an extent that it may pose a risk to health, Chapter 8, Section 20 may require a personal register of employees. It must be kept separate from the administrative Excel index in the package.\u003c\/p\u003e\n\n\u003ch4\u003eCan this template replace a technical exhaust control or measurement?\u003c\/h4\u003e\n\n\u003cp\u003eNo. It provides documentation fields for actual controls, expert assessments and report references – not a technical testing method, a statement or a safety certification.\u003c\/p\u003e\n\n\u003ch4\u003eAre the PDF files digitally fillable?\u003c\/h4\u003e\n\n\u003cp\u003eThe PDF versions are searchable and printable. They do not have promised interactive form fields. Edit in Word and use Excel for administrative follow-up entries.\u003c\/p\u003e\n\n\u003ch4\u003eAre all templates included in English?\u003c\/h4\u003e\n\n\u003cp\u003eThe five work templates and the Swedish guide are in Swedish. The separate \u003cstrong\u003eEnglish User Guide\u003c\/strong\u003e explains how the Swedish documents are used.\u003c\/p\u003e\n\n\u003ch3\u003eLegal sources and product version\u003c\/h3\u003e\n\n\u003cp\u003e\u003cstrong\u003eProduct version 1.0, internal AI-assisted legal source check 22 November 2026.\u003c\/strong\u003e The documents are technically tested but have not been externally reviewed or approved by a lawyer, occupational hygienist or authority. Always check the latest legal wording and actual workplace conditions.\u003c\/p\u003e\n\n\u003cul\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/afs-202310\/\"\u003eAFS 2023:10 – chemical occupational health risks and special CMR requirements\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/afs-202314\/\"\u003eAFS 2023:14 – occupational exposure limit values for wood dust\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/afs-202310\/forfattningshistorik-afs-202310\/\"\u003eAFS 2023:10 – legislative history and amendment from 2026-04-09\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.tmf.se\/om-tmf\/nyheter\/2026\/06\/enkla-atgarder-kan-minska-halsorisker-vid-hantering-av-tradamm\/\"\u003eTMF – research results and practical measures\u003c\/a\u003e\u003c\/li\u003e\n\n\u003cli\u003e\u003ca href=\"https:\/\/www.prevent.se\/riskbedomning\"\u003ePrevent – free general occupational health and safety template\u003c\/a\u003e\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003cp\u003eRelated general template: \u003ca href=\"\/en\/products\/kemiska-risker-riskbedomning-kemikalieforteckning-2026-2027\"\u003eChemical risks – risk assessment and safety instructions\u003c\/a\u003e. This package is instead specialised for wood dust material groups, process exhaust ventilation, measurement comparisons and CMR register issues.\u003c\/p\u003e\n\n\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Standard","offer_id":56740928717142,"sku":"MB-TRADAMM-2026-V1","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/mallbutiken-tradamm-snickeri-2026-produktomslag.png?v=1795319891"}],"url":"https:\/\/mallbutiken.se\/en\/collections\/produktion-industri-mallar.oembed?page=3","provider":"Mallbutiken","version":"1.0","type":"link"}