{"product_id":"bensinangor-steg-ii-driftjournal-kontroll","title":"Gasoline vapors Stage II 2026\/2027 – Operating log, monitoring, troubleshooting \u0026 re-checking | Word\/PDF\/Excel","description":"\u003csection lang=\"sv\"\u003e\u003cp\u003e\u003cstrong\u003eOperation log for Stage II petrol vapour recovery – for the petrol station licence holder.\u003c\/strong\u003e Keep together actual self-monitoring per pump, the manufacturer's maintenance schedule, recurring inspections, reports and fault follow-up in accordance with TSFS 2016:36. The package is intended for Swedish stations with Stage II systems, not for technical testing or complete environmental and dangerous substances self-monitoring.\u003c\/p\u003e\n\n\u003cdiv style=\"border:1px solid #b8cfdf;background:#eef5fa;padding:16px;margin:16px 0\"\u003e\n\n\u003ch2\u003ePackage contents\u003c\/h2\u003e\n\n\u003cp\u003eFive Swedish work templates, a Swedish start guide and an English User Guide in 7 editable DOCX and 7 searchable PDF files, plus a Swedish XLSX register. 15 customer files in a digital ZIP, version 1.0.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv style=\"border:1px solid #b8cfdf;padding:16px;margin:16px 0\"\u003e\n\n\u003ch2\u003eWhat the files contain\u003c\/h2\u003e\n\n\u003cp\u003ePump cards, operation log, inspection tracking, change records and fault follow-up. Excel collects pump ID, log ID, inspection ID and fault ID, and displays administrative key figures. No inspection certificates or own measurement instructions are included.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2\u003eDocument list\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth scope=\"col\"\u003eDocument\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eUse\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eFormat and language\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e01 Station and pump cards\u003c\/td\u003e\n\n\u003ctd\u003eTurnover, applicability, responsibility, system and maintenance schedule.\u003c\/td\u003e\n\n\u003ctd\u003eDOCX\/PDF, SV\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e02 Operation log per petrol pump\u003c\/td\u003e\n\n\u003ctd\u003eActual self-monitoring, maintenance carried out and non-compliance references.\u003c\/td\u003e\n\n\u003ctd\u003eDOCX\/PDF, SV\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e03 Inspection tracking and report receipt\u003c\/td\u003e\n\n\u003ctd\u003eInspection type, accreditation, date, results, marking and archive.\u003c\/td\u003e\n\n\u003ctd\u003eDOCX\/PDF, SV\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e04 Change, repair and new inspection\u003c\/td\u003e\n\n\u003ctd\u003eInspection requirements, actual status and records prior to commissioning.\u003c\/td\u003e\n\n\u003ctd\u003eDOCX\/PDF, SV\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e05 Failed inspection and fault follow-up\u003c\/td\u003e\n\n\u003ctd\u003eFindings, verified deadline, responsible person, remedial action and new report.\u003c\/td\u003e\n\n\u003ctd\u003eDOCX\/PDF, SV\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e06 Start guide\u003c\/td\u003e\n\n\u003ctd\u003eWorkflow, three fictitious scenarios, sources and limitations.\u003c\/td\u003e\n\n\u003ctd\u003eDOCX\/PDF, SV\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e07 English User Guide\u003c\/td\u003e\n\n\u003ctd\u003eEnglish guidance for the Swedish work templates.\u003c\/td\u003e\n\n\u003ctd\u003eDOCX\/PDF, EN\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e08 Inspection register\u003c\/td\u003e\n\n\u003ctd\u003eSix tabs with four work registers and seven administrative indicators.\u003c\/td\u003e\n\n\u003ctd\u003eXLSX, SV\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\u003ch2\u003eWhat requirements apply to Stage II petrol vapours?\u003c\/h2\u003e\n\n\u003cp\u003eAccording to \u003ca href=\"https:\/\/www.transportstyrelsen.se\/TSFS\/TSFS%202016_36k.pdf\"\u003eTSFS 2016:36, consolidated with TSFS 2019:55\u003c\/a\u003e, Section 5, the general rule for Stage II applies when actual or planned annual turnover exceeds 500 m³, or 100 m³ when the station is integrated into a building with residential premises or workplaces. Special exemptions exist. According to Section 6, every petrol pump must have a maintenance schedule from the system's manufacturer, importer or seller and a log of self-monitoring and maintenance.\u003c\/p\u003e\n\n\u003cp\u003eAccording to Sections 12–16, accredited inspection is required before commissioning and at specified changes and repairs, as well as recurring inspection. Annual inspection is the general rule; at least every three years applies only to systems with verified monitoring according to Annex D in the specified standard. According to Sections 17–19, reports must be kept for at least three years and a failed result requires handling of the previous inspection mark. If reported faults are not rectified within 30 days, petrol may not be transferred until rectification and new inspection. This does not mean that unsafe equipment may be used during the deadline. The separate automatic shut-off function according to Section 3 and conditional temperature exemptions according to Sections 14 and 19 must be respected. See \u003ca href=\"https:\/\/www.swedac.se\/amnesomraden\/gasaterforingssystem-for-bensinangor\/\"\u003eSwedac's guidance on accredited inspections\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eHow to use the package\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003eCreate a station ID and a pump ID for each pump. Collect the maintenance schedule and certification records.\u003c\/li\u003e\n\n\u003cli\u003eLog actual self-monitoring and actual maintenance measures according to the supplier's instructions.\u003c\/li\u003e\n\n\u003cli\u003eOrder the prescribed inspection from the correct accredited inspection body and register the report and the next verified date.\u003c\/li\u003e\n\n\u003cli\u003eFor changes and repairs: document inspection requirements and the inspection body's decision.\u003c\/li\u003e\n\n\u003cli\u003eFollow fault cases and actual operating status. Close only when relevant evidence and decisions are available.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eExcel – six tabs\u003c\/h2\u003e\n\n\u003cp\u003eStart, Overview, Pumps, Log, Inspections and Faults. Four work registers with 50 pre-filled rows each. The overview counts pumps, log entries, inspection entries, failed inspections, open faults, closed without a new report, and other completion flags. Dates are registered from verified records; the workbook does not calculate statutory deadlines. Entered references are not verified certificates. An empty overview means that no entries have been registered.\u003c\/p\u003e\n\n\u003ch2\u003eFictitious example\u003c\/h2\u003e\n\n\u003cp\u003eP-01 has a registered log entry J-01 and inspection report K-01 with a failed result. Fault case F-01 is registered as open and Excel counts one failed inspection and one open fault. If F-01 is changed to Closed without a new report reference, the register shows New report missing. When reference R-02 is entered, that specific administrative flag disappears; the licence holder must still check the actual content of the report and current operating conditions.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently asked questions\u003c\/h2\u003e\n\n\u003ch3\u003eDoes every petrol pump need its own operation log?\u003c\/h3\u003e\n\n\u003cp\u003eYes, Section 6 covers every petrol pump. Document actual inspections and maintenance per pump.\u003c\/p\u003e\n\n\u003ch3\u003eCan all stations with an automatic alarm be inspected every three years?\u003c\/h3\u003e\n\n\u003cp\u003eNo. A system that meets Annex D is required according to Section 15; support it with relevant records.\u003c\/p\u003e\n\n\u003ch3\u003eAre 30 days a permission to continue using faulty equipment?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Also follow actual safety requirements, local routines, automatic shut-offs and the inspection body's decision.\u003c\/p\u003e\n\n\u003ch3\u003eCan the template replace the inspection body's report?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It collects report references and work records but does not perform an inspection.\u003c\/p\u003e\n\n\u003ch3\u003eAre Stage I or complete LBE and ATEX routines included?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The package is intended for Stage II documentation. Separate obligations should be handled outside this package.\u003c\/p\u003e\n\n\u003ch3\u003eWhat programs do I need?\u003c\/h3\u003e\n\n\u003cp\u003eWord-compatible word processor for DOCX, PDF reader and XLSX-compatible spreadsheet program. DOCX has been tested in LibreOffice Writer, the Excel register with a spreadsheet engine. PDF is searchable and printable, not interactively fillable.\u003c\/p\u003e\n\n\u003cp\u003e\u003cem\u003eAI-assisted legal source check November 26, 2026. No independent legal or technical review. Digital download; no physical product.\u003c\/em\u003e\u003c\/p\u003e\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":56854638002518,"sku":"MB-BENSINANGOR-STEGII-V1","price":15.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/bensinangor-steg-ii-1-4A71.png?v=1795693746","url":"https:\/\/mallbutiken.se\/en\/products\/bensinangor-steg-ii-driftjournal-kontroll","provider":"Mallbutiken","version":"1.0","type":"link"}