{"product_id":"eed-artikel26-fjarrvarme-5mw-femarsplan-natforluster","title":"EED Article 26 – district heating 5 MW test, five-year plan and network losses | Word\/PDF\/Excel","description":"\u003cdiv class=\"mb-product-copy\" lang=\"sv\"\u003e\n\n\u003cp\u003e\u003cstrong\u003eDo you operate a district heating or cooling system and need to prepare for the EED's stricter efficiency requirements?\u003c\/strong\u003e The EU's revised energy efficiency directive, \u003cstrong\u003e(EU) 2023\/1791 Article 26.5\u003c\/strong\u003e, includes a specific planning track for existing networks with a total output heat and cooling capacity \u003cstrong\u003eexceeding 5 MW\u003c\/strong\u003e that do not meet relevant efficiency criteria. The system operator must be able to document its system boundaries, energy mix, network losses, and a concrete improvement plan. This template package brings together the working documents in Word, PDF, and Excel.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eImportant for Swedish customers:\u003c\/strong\u003e In the Swedish Government Legal Council referral from 20 August 2026, national supplementary rules are proposed to enter into force on \u003cstrong\u003e1 January 2027\u003c\/strong\u003e. During the product's internal source control on 17 November 2026, the proposal had \u003cstrong\u003enot been confirmed as adopted Swedish law\u003c\/strong\u003e. This is a tool for preparation and traceable documentation, not evidence that a particular requirement or regulatory procedure already applies in Sweden.\u003c\/p\u003e\n\n\u003csection aria-label=\"Package contents\" style=\"border:2px solid #86B3CF;background:#EDF5FA;border-radius:12px;padding:18px;margin:20px 0\"\u003e\n\u003ch2\u003ePackage contents\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003e15 customer files:\u003c\/strong\u003e five Swedish working templates, a Swedish user guide, and a separate English User Guide. All seven documents are available as \u003cstrong\u003eeditable Word (DOCX)\u003c\/strong\u003e and \u003cstrong\u003ematching searchable PDF\u003c\/strong\u003e. In addition, \u003cstrong\u003e1 Swedish Excel workbook with nine tabs\u003c\/strong\u003e is included. Total: 7 Word + 7 PDF + 1 Excel. The PDF files are printable but lack interactive fillable fields; only the guide, not the five working templates, is in English.\u003c\/p\u003e\u003c\/section\u003e\n\u003csection aria-label=\"What the files contain\" style=\"border:2px solid #86B3CF;background:#F8FBFD;border-radius:12px;padding:18px;margin:20px 0\"\u003e\n\u003ch2\u003eWhat the files contain\u003c\/h2\u003e\n\n\u003cp\u003eDocumentation to identify the network operator and actual system boundaries, measurement of total output capacity (MW), comparable MWh for supply and delivery, technically reconciled distribution losses, separate data on renewable heat, waste heat, and highly efficient combined heat and power, the correct criterion year, decided actions, and actually verified effects. A special protocol keeps \u003cstrong\u003eplanned, submitted, acknowledged, and formally approved by the authority\u003c\/strong\u003e separate.\u003c\/p\u003e\u003c\/section\u003e\n\u003ch2\u003eWho benefits from the product?\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eDistrict heating operators:\u003c\/strong\u003e a municipal or private operator may have several adjacent networks and needs to first assess each system's actual boundary and total output capacity. \u003cstrong\u003eTechnical operations:\u003c\/strong\u003e energy flows from heat production and waste heat suppliers must be reconciled against district heating deliveries, measurement boundaries, and network losses. \u003cstrong\u003eBusiness and sustainability managers:\u003c\/strong\u003e a five-year plan for network measures, renewable heat, and waste heat connection needs to be able to be followed up through actual decisions and achieved effects.\u003c\/p\u003e\n\n\u003cp\u003eDistrict cooling systems may also be covered. The product is not intended as a general residential energy calculation, an operating log for a district heating plant, ISO 50001 certification, or energy mapping of companies at 10 or 85 TJ according to EED Article 11.\u003c\/p\u003e\n\n\u003ch2\u003eAll files\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth scope=\"col\"\u003eFile\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eWork step\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\"\u003eApplicability and system boundary\u003c\/th\u003e\n\n\u003ctd\u003eAssess actual output capacity over 5 MW, network boundary, operator, and current criteria.\u003c\/td\u003e\n\n\u003ctd\u003eSV DOCX\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\"\u003eEnergy balance and network losses\u003c\/th\u003e\n\n\u003ctd\u003eMeasurement boundaries, supply, deliveries, reconciliation, loss difference, and uncertainty.\u003c\/td\u003e\n\n\u003ctd\u003eSV DOCX\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\"\u003eEnergy mix and efficiency criteria\u003c\/th\u003e\n\n\u003ctd\u003eSeparate renewable heat, waste heat, and combined heat and power; avoid double counting.\u003c\/td\u003e\n\n\u003ctd\u003eSV DOCX\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\"\u003eFive-year plan and measures\u003c\/th\u003e\n\n\u003ctd\u003eAssess possible investments, budget, responsibility, stages, and actual benefit.\u003c\/td\u003e\n\n\u003ctd\u003eSV DOCX\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\"\u003eRegulatory review and acknowledgment\u003c\/th\u003e\n\n\u003ctd\u003eFollow Swedish legislative status and keep drafts, submitted, acknowledgment, and approval separate.\u003c\/td\u003e\n\n\u003ctd\u003eSV DOCX\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\"\u003eSwedish user guide\u003c\/th\u003e\n\n\u003ctd\u003eEight control steps with EU and Swedish legal sources, as well as clear boundaries.\u003c\/td\u003e\n\n\u003ctd\u003eSV DOCX\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\"\u003eEnglish User Guide\u003c\/th\u003e\n\n\u003ctd\u003eEnglish instructions for the Swedish working templates and Excel register.\u003c\/td\u003e\n\n\u003ctd\u003eEN DOCX\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003cth scope=\"row\"\u003eExcel register with nine tabs\u003c\/th\u003e\n\n\u003ctd\u003eSystems, energy flows, energy mix, criterion assessment, five-year plan, approvals, and sources.\u003c\/td\u003e\n\n\u003ctd\u003eSV XLSX\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\u003ch2\u003eHow to use the working templates\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDefine the system.\u003c\/strong\u003e Enter the network's name, boundaries, operator, available network maps, capacity sources, and relevant responsible person. Assess whether the total output heat and cooling capacity actually \u003cstrong\u003eexceeds 5 MW\u003c\/strong\u003e, with a verifiable technical source.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eKeep different regulatory boundaries separate.\u003c\/strong\u003e The 5 MW capacity threshold according to Article 26 is not the 10\/85 TJ company boundaries according to Article 11. Separate purchased electricity capacity, network capacity, annual supplied energy, and delivered energy.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eEstablish an energy balance.\u003c\/strong\u003e Collect time-stamped, comparable MWh for supply to the network and deliveries within the same measurement boundary. Note internal consumption, energy storage, and measurement uncertainty. A negative difference should be investigated, not automatically considered a negative network loss.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eClassify the energy sources.\u003c\/strong\u003e Identify renewable energy, waste heat, combined heat and power, purchased heat, and other sources separately. Prevent double counting of the same heat delivery and state actual measurement and certification sources.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eAssess the correct criterion year.\u003c\/strong\u003e The directive has a criterion up to 2027 and other criteria from 2028, 2035, and later. Always check the time-bound wording and national law before classifying the system as efficient.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCreate a five-year plan.\u003c\/strong\u003e Prioritize technically and economically assessed measures for lower distribution losses, better primary energy efficiency, and an increased share of renewable energy\/waste heat. Add responsibility, expected effect, budget, timeline, and actual management decision.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eVerify the regulatory path.\u003c\/strong\u003e According to Article 26.5, the plan must presuppose approval from the competent authority. First establish what final Swedish law states, the correct authority, which annexes are required, and actual acknowledgment. An internal plan or sent email is not regulatory approval.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eFollow up on actual effect.\u003c\/strong\u003e Decided measure, technically performed measure, and energy result confirmed by measurement should be registered separately.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eWhat applies according to EED Article 26?\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eEfficient system – Article 26.1:\u003c\/strong\u003e The EU directive specifies a gradual tightening of the criteria for how district heating and cooling systems can be classified as efficient. Up to 31 December 2027, this includes, among other things, certain levels of renewable energy, waste heat, and combined heat and power; from 2028, other alternative combinations and later tightenings are added. The actual classification requires technical assessment and applicable definitions. \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/dir\/2023\/1791\/oj\/swe\"\u003eRead the official Swedish EU text\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003ePlanning obligation – Article 26.5:\u003c\/strong\u003e the directive prescribes that from 1 January 2025 and every five years thereafter, member states shall ensure plans for affected existing systems over 5 MW that do not meet the criteria in point 1(b–e). A plan shall cover more efficient primary energy use, reduced distribution losses, and an increased renewable share, and be approved by the competent authority. \u003ca href=\"https:\/\/eur-lex.europa.eu\/legal-content\/SV\/TXT\/?uri=CELEX%3A32024H2395\"\u003eThe Commission's recommendation (EU) 2024\/2395\u003c\/a\u003e provides non-binding interpretive guidance.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eSweden – rules still proposed:\u003c\/strong\u003e The government presented a \u003ca href=\"https:\/\/www.regeringen.se\/rattsliga-dokument\/lagradsremiss\/2026\/08\/energieffektivitet-i-foretag-och-i-fjarrvarme--och-fjarrkylesektorn\/\"\u003eGovernment Legal Council referral on 20 August 2026\u003c\/a\u003e with a proposal for planning requirements for inefficient district heating and cooling systems and planned entry into force on 1 January 2027. The regulation and its regulatory provisions must be rechecked before actual use. The obligation of the member state under the EU directive must not be incorrectly described as an identical already entered into force Swedish obligation for every individual company.\u003c\/p\u003e\n\n\u003ch2\u003eExcel with nine tabs and controlled formulas\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eRead me, Overview, System, Energy Flows, Energy Mix, Criterion Assessment, Five-Year Plan, Approvals, and Sources.\u003c\/strong\u003e Eight compilations follow registered systems, manually classified systems over 5 MW, controlled energy flows, total supply, total deliveries, calculated MWh difference, decided actions, and actually confirmed regulatory decisions. The workbook has 368 formulas and has been tested with eight fictitious key figure outcomes, before the customer version was saved without test cases.\u003c\/p\u003e\n\n\u003cp\u003eFor comparable measurement boundaries, \u003cstrong\u003esupplied energy minus delivered energy\u003c\/strong\u003e is used as an administrative indication of network loss. It is not the same as independent measurement inspection, primary energy calculation, or legal classification. Excel provides no automatic 5 MW assessment, no guarantee of correctness for source data, and no official regulatory decision.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently Asked Questions\u003c\/h2\u003e\n\n\u003ch3\u003eDoes EED Article 26 apply the same as energy mapping at 10 or 85 TJ?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Article 26 applies to efficient district heating and cooling systems and may entail five-year planning over 5 MW. Companies' energy mapping and energy management systems according to Article 11 use other energy use thresholds instead.\u003c\/p\u003e\n\n\u003ch3\u003eIs the Swedish law already decided in November 2026?\u003c\/h3\u003e\n\n\u003cp\u003eAt the internal control on 17 November 2026, there is a Government Legal Council referral with proposed entry into force on 1 January 2027. It is not sufficient grounds to claim that the legislation already applies. Check parliamentary decisions and final regulations.\u003c\/p\u003e\n\n\u003ch3\u003eIf our network has exactly 5 MW, is it covered by the Article 26.5 threshold?\u003c\/h3\u003e\n\n\u003cp\u003eThe wording of the directive states that the total output capacity must \u003cstrong\u003eexceed 5 MW\u003c\/strong\u003e. Exactly 5 MW therefore does not pass the boundary according to its wording; however, check the actual definition and national application.\u003c\/p\u003e\n\n\u003ch3\u003eCan Excel determine if a district heating system is efficient?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The efficiency criteria change over time and require technically controlled data on energy sources, combined heat and power, waste heat, network boundary, and defined calculation rules.\u003c\/p\u003e\n\n\u003ch3\u003eWhat happens if deliveries are greater than registered supply?\u003c\/h3\u003e\n\n\u003cp\u003eThe workbook can show a negative difference. It is a deviation signal that must be investigated based on measurement boundaries, internal flows, storage, external supply, and measurement quality; it does not prove a physical negative loss.\u003c\/p\u003e\n\n\u003ch3\u003eMust a plan be approved by an authority?\u003c\/h3\u003e\n\n\u003cp\u003eArticle 26.5 prescribes that plans shall presuppose approval by the competent authority. Which Swedish authority and which exact national procedures apply must be checked when Swedish law and regulation are decided.\u003c\/p\u003e\n\n\u003ch3\u003eAre all documents in English?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The five operational templates, the Swedish guide, and the Excel register are in Swedish. English User Guide is a separate user instruction in English; operational templates are not fully translated.\u003c\/p\u003e\n\n\u003ch3\u003eHas the package been certified by an energy expert or lawyer?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Internal AI-assisted legal source control and technical file\/formula tests have been carried out. External legal, energy-technical, regulatory, or ISO review is not included.\u003c\/p\u003e\n\n\u003ch2\u003eSources, delivery, and version\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eProduct version 1.0 · 17 November 2026.\u003c\/strong\u003e Legal sources: \u003ca href=\"https:\/\/eur-lex.europa.eu\/eli\/dir\/2023\/1791\/oj\/swe\"\u003eEED (EU) 2023\/1791, Article 26\u003c\/a\u003e, \u003ca href=\"https:\/\/eur-lex.europa.eu\/legal-content\/SV\/TXT\/?uri=CELEX%3A32024H2395\"\u003ethe Commission's recommendation (EU) 2024\/2395\u003c\/a\u003e, \u003ca href=\"https:\/\/www.regeringen.se\/rattsliga-dokument\/lagradsremiss\/2026\/08\/energieffektivitet-i-foretag-och-i-fjarrvarme--och-fjarrkylesektorn\/\"\u003ethe government's Swedish Government Legal Council referral\u003c\/a\u003e, and \u003ca href=\"https:\/\/www.energimyndigheten.se\/effektiv-energianvandning\/foretag\/lagar-och-krav-for-energieffektivisering-i-foretag\/energikartlaggning\/ny-lag-om-energiledningssystem-och-energikartlaggningar-i-foretag\/\"\u003ethe Swedish Energy Agency's information on ongoing implementation work\u003c\/a\u003e. See also \u003ca href=\"\/en\/products\/energikartlaggning-10-85-tj-2027-handlingsplan\"\u003ethe Template Store's separate EED template for the company boundaries 10\/85 TJ\u003c\/a\u003e. No regulatory registration or program connection is included.\u003c\/p\u003e\n\n\n\u003c\/div\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":56667247378774,"sku":"MB-EED26-FJVARME-261117-V1","price":8.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/01_eed26_huvudbild_1600.png?v=1794907743","url":"https:\/\/mallbutiken.se\/en\/products\/eed-artikel26-fjarrvarme-5mw-femarsplan-natforluster","provider":"Mallbutiken","version":"1.0","type":"link"}