{"product_id":"kontrollplan-enligt-pbl-2026-2027-bygglov-riskbedomning-avfallshanteringsplan-word-pdf-excel","title":"Control Plan according to PBL 2026\/2027 – Building Permit, Risk Assessment \u0026 Waste Management Plan | Word\/PDF\/Excel","description":"\u003csection class=\"mb-product-description\" lang=\"en\"\u003e\n\u003ch2\u003eInspection plan according to the Planning and Building Act (PBL) 2026\/2027 – complete template package for building permits and construction projects\u003c\/h2\u003e\n\n\u003cp\u003ePrepare a \u003cstrong\u003eproject-specific proposal for an inspection plan according to the Planning and Building Act\u003c\/strong\u003e with clear requirement references, inspection responsibilities, documentation, and follow-up. The package also includes a \u003cstrong\u003erisk assessment, a separate waste management plan\u003c\/strong\u003e, English working documents, step-by-step guides, and a structured Excel register.\u003c\/p\u003e\n\n\u003cp\u003eFor developers, certified inspection experts, property owners, and smaller construction projects that need an editable, cohesive framework. \u003cstrong\u003ePrice: 79 SEK – one-time purchase.\u003c\/strong\u003e\u003c\/p\u003e\n\n\u003cnav aria-label=\"About the document template\"\u003e\u003cstrong\u003eAbout the document template:\u003c\/strong\u003e \u003ca href=\"#mb-innehall\"\u003eWhat is included\u003c\/a\u003e · \u003ca href=\"#mb-anvandning\"\u003eHow to use the template\u003c\/a\u003e · \u003ca href=\"#mb-pbl\"\u003ePBL 2026\/2027\u003c\/a\u003e · \u003ca href=\"#mb-faq\"\u003eFAQ\u003c\/a\u003e\u003c\/nav\u003e\n\u003caside style=\"background:#EDF7F0;border-left:4px solid #397A5C;padding:14px 16px;margin:18px 0\"\u003e\u003cstrong\u003eLegally and technically reviewed: October 14, 2026.\u003c\/strong\u003e Designed based on the Swedish National Board of Housing, Building and Planning's (Boverket) current PBL guidance and legislative changes from July 1, 2026. Source-checked does not mean that the documents are individually approved by the building committee or externally certified.\u003c\/aside\u003e\n\u003ch2 id=\"mb-innehall\"\u003eIncluded in the package – 13 files\u003c\/h2\u003e\n\n\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth\u003eDocument\u003c\/th\u003e\n\n\u003cth\u003eUse\u003c\/th\u003e\n\n\u003cth\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eInspection plan according to PBL – Swedish\u003c\/td\u003e\n\n\u003ctd\u003eProject details, risk-based inspection points, requirements, responsibilities, methods, notifications, and version control.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eRisk assessment\u003c\/td\u003e\n\n\u003ctd\u003eDocument technical risks, requirements, and which inspections should be included.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eWaste management plan according to PBL\u003c\/td\u003e\n\n\u003ctd\u003eReuse, fractions, recycling, hazardous substances, and follow-up.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eBuilding Control Plan – English\u003c\/td\u003e\n\n\u003ctd\u003eEnglish working translation adapted to Swedish conditions.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eUser guide – Swedish\u003c\/td\u003e\n\n\u003ctd\u003eDetailed workflow, common errors, and regulatory sources.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eUser Guide – English\u003c\/td\u003e\n\n\u003ctd\u003eInstructions for English-speaking project staff.\u003c\/td\u003e\n\n\u003ctd\u003eWord + PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eInspection plan PBL-register\u003c\/td\u003e\n\n\u003ctd\u003eExcel workbook with project overview, inspection points, risk register, waste plan, and notifications.\u003c\/td\u003e\n\n\u003ctd\u003eExcel (XLSX)\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\n\n\u003ch2\u003eWhy use a PBL-adapted inspection plan?\u003c\/h2\u003e\n\n\u003cp\u003eThe inspection plan used in the building process according to the PBL is not identical to the contractor's standard self-inspection. The inspection plan is a project-specific framework detailing which inspections must be performed, against which requirements, by whom, and how, as well as relevant regulatory milestones. The material therefore complements our \u003ca href=\"\/en\/products\/egenkontroll-bygg-mall-2026-2027-word-pdf-excel\"\u003econstruction self-inspection template\u003c\/a\u003e but serves a different primary purpose.\u003c\/p\u003e\n\n\u003caside style=\"background:#FFF3CD;padding:15px 16px;margin:16px 0\"\u003e\u003cstrong\u003eImportant:\u003c\/strong\u003e The template is a draft, not an approved inspection plan. The building committee may determine that an inspection plan is not required in certain simpler cases. Inspection points, form of inspection, documentation, and any requirements for specialists must be determined for the specific project. A separate waste management plan may be required, but according to the PBL, there are exceptions when the need is clearly absent.\u003c\/aside\u003e\n\u003ch2 id=\"mb-anvandning\"\u003eHow to use the documents\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003eCheck the project's case type, requirements, and any exemptions with the building committee.\u003c\/li\u003e\n\n\u003cli\u003eGather current documents, drawing revisions, decisions, and project leads.\u003c\/li\u003e\n\n\u003cli\u003ePerform the risk assessment and identify essential, concrete inspections.\u003c\/li\u003e\n\n\u003cli\u003eFor each inspection, specify what is being inspected, against which requirement, who is performing the inspection, and which method is used.\u003c\/li\u003e\n\n\u003cli\u003eDocument notifications, site visits, and documents that may be required before the final status approval.\u003c\/li\u003e\n\n\u003cli\u003ePrepare a waste management plan if the project falls under such requirements.\u003c\/li\u003e\n\n\u003cli\u003eFollow up in Excel, save signed certificates, and document changes to the plans.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2 id=\"mb-pbl\"\u003eApplicable rules for 2026\/2027\u003c\/h2\u003e\n\n\u003cp\u003eInspection plans are regulated in, among others, the \u003cstrong\u003ePlanning and Building Act (2010:900), Chapter 10, Sections 6–8\u003c\/strong\u003e. Waste management plans are covered in \u003cstrong\u003eChapter 10, Section 8 a\u003c\/strong\u003e. Provisions regarding inspection forms and the building process were changed on \u003cstrong\u003eJuly 1, 2026\u003c\/strong\u003e. Boverket's new building regulations apply fully to new cases from this date; older cases may be subject to transitional rules. The template does not replace current regulations or building committee decisions.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003ePrimary sources:\u003c\/strong\u003e \u003ca href=\"https:\/\/www.boverket.se\/sv\/PBL-kunskapsbanken\/Lov--byggande\/Byggprocessen\/Kontrollplan\/\"\u003eBoverket – Inspection plan\u003c\/a\u003e · \u003ca href=\"https:\/\/www.boverket.se\/sv\/PBL-kunskapsbanken\/lov--byggande\/byggprocessen\/kontrollplan\/kontrollplanens-innehall\/\"\u003eBoverket – Contents of the inspection plan\u003c\/a\u003e · \u003ca href=\"https:\/\/www.boverket.se\/sv\/om-boverket\/nyheter-aktuellt\/nyheter\/nu-galler-boverkets-nya-byggregler\/\"\u003eBoverket – New building regulations\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eCommon mistakes and risks\u003c\/h2\u003e\n\n\u003cul\u003e\n\n\u003cli\u003eUsing standard inspections without linking them to project-specific risks.\u003c\/li\u003e\n\n\u003cli\u003eReferring to old drawings or outdated rules.\u003c\/li\u003e\n\n\u003cli\u003eLacking a responsible inspector or an actual inspection method.\u003c\/li\u003e\n\n\u003cli\u003eConfusing the authority's inspection plan with the contractor's self-inspection.\u003c\/li\u003e\n\n\u003cli\u003eAssuming that an Excel status implies technical approval.\u003c\/li\u003e\n\n\u003cli\u003eOverlooking reuse and waste management where a separate waste plan is required.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch2 id=\"mb-faq\"\u003eFrequently Asked Questions\u003c\/h2\u003e\n\n\u003ch3\u003eIs the inspection plan ready to be submitted to the municipality?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The document is a professional, editable framework and must be filled with project-specific inspections, supporting data, and responsibilities. The municipality's requirements and decisions govern.\u003c\/p\u003e\n\n\u003ch3\u003eIs this the same as construction self-inspection?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The contractor's self-inspection of work performed is a separate documentation process; the PBL inspection plan relates to the project's planned inspection of relevant public requirements.\u003c\/p\u003e\n\n\u003ch3\u003eAre both Word and PDF included?\u003c\/h3\u003e\n\n\u003cp\u003eYes, six editable Word documents and the corresponding six searchable A4-PDFs, plus an Excel register.\u003c\/p\u003e\n\n\u003ch3\u003eIs English included?\u003c\/h3\u003e\n\n\u003cp\u003eYes. English inspection plan references and an English guide are included, adapted to Swedish conditions. They are not official forms for the building regulations of other countries.\u003c\/p\u003e\n\n\u003ch3\u003eIs Excel mandatory?\u003c\/h3\u003e\n\n\u003cp\u003eNo, Excel is an optional follow-up tool with formulas and status lists. Formal documentation and evidence must still be assessed and approved by authorized individuals.\u003c\/p\u003e\n\n\u003ch3\u003eWhat happens after the purchase?\u003c\/h3\u003e\n\n\u003cp\u003eThe product is digital and consists of a ZIP package. For automatic delivery after purchase, the file package must first be verified as linked to the product variant in Shopify Digital Products.\u003c\/p\u003e\n\n\u003ch2\u003eFormat and limitation of liability\u003c\/h2\u003e\n\n\u003cp\u003eVersion 1.0 · Reviewed October 14, 2026 · Swedish + English reference · DOCX, PDF and XLSX. This is an administrative and technical document support tool, not individual legal or structural engineering advice. Consult a certified inspection expert, designer, specialist, or lawyer when the nature of the project requires it.\u003c\/p\u003e\n\n\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55738976108886,"sku":"KONTROLLPLAN-PBL-AVFALL-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/kontrollplan_pbl_2027_hero.png?v=1791968196","url":"https:\/\/mallbutiken.se\/en\/products\/kontrollplan-enligt-pbl-2026-2027-bygglov-riskbedomning-avfallshanteringsplan-word-pdf-excel","provider":"Mallbutiken","version":"1.0","type":"link"}