{"product_id":"stafs-2026-2-vattenmatare-va-kontrollintervall-partiprovning","title":"STAFS 2026:2 water meters – inspection interval, batch testing \u0026 documentation register | Word\/PDF\/Excel","description":"\u003csection lang=\"sv\" class=\"mb-product-copy\" style=\"line-height:1.7;color:#20394a\"\u003e\n\u003cp\u003e\u003cstrong\u003eWater meter control according to the new STAFS 2026:2 – a practical work and documentation package for Swedish water and sewerage authorities.\u003c\/strong\u003e Inventory meters, perform a documented assessment of applicable regulations, plan inspection intervals, prepare statistical meter batches, order accredited inspection, and follow up on non-conformities, removal from service, and archiving. The package is designed to create a traceable internal workflow, not to perform metrological inspection.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eDigital template package:\u003c\/strong\u003e 7 editable Word files (DOCX), 7 corresponding searchable and printable PDFs, and 1 Swedish Excel register with nine tabs (XLSX). Total of 15 delivery files, seven of which are independent documents\/guides and one separate Excel tool. Five specialist templates + Swedish user guide + English User Guide. The PDF files are not interactively fillable.\u003c\/p\u003e\n\n\u003cdiv style=\"margin:20px 0;border:2px solid #B9D2E0;border-radius:12px;padding:18px 20px;background:#EEF6F9\"\u003e\n\n\u003ch2 style=\"margin-top:0\"\u003ePackage contents\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003e5 specialist templates\u003c\/strong\u003e in both Word and PDF, \u003cstrong\u003e2 user guides\u003c\/strong\u003e in both Word and PDF, and \u003cstrong\u003e1 Excel workbook\u003c\/strong\u003e – 15 files in a ZIP. All work templates and spreadsheets are in Swedish. The English guide explains the Swedish documents but is not an English version of all the templates. Version 1.0, November 18, 2026.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv style=\"margin:20px 0;border:2px solid #B9D2E0;border-radius:12px;padding:18px 20px;background:white\"\u003e\n\n\u003ch2 style=\"margin-top:0\"\u003eWhat the files contain\u003c\/h2\u003e\n\n\u003cp\u003eApplicability and transitional assessment, meter identification and inspection intervals, batch formation and representative sample selection, assignment and receipt inspection for accredited inspection bodies, as well as non-conformity, removal from service, and archive logs. Excel links the meter register, inspection plan, inspection reports, and documentation requirements of Section 19.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2\u003eWho is the package intended for?\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eTarget audience:\u003c\/strong\u003e municipal water and sewerage authorities, water and sewerage companies, and their inspection\/operations managers who need to follow up on water meters within the scope specified in STAFS 2026:2 Section 1. The organization should have a designated metrological\/legal manager and hire a competent accredited inspection body for prescribed inspection.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eNot suitable for\u003c\/strong\u003e a private homeowner wishing to dispute their water bill, internal sub-meters that fall outside the scope of the regulation, heat energy meters according to STAFS 2026:1, or anyone who needs an actual accredited inspection certificate. The product must not be described as certified inspection software.\u003c\/p\u003e\n\n\u003ch2\u003eAll customer files – exact contents\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"border-collapse:collapse;width:100%;min-width:650px\"\u003e\n\n\u003cthead\u003e\u003ctr style=\"background:#163F5A;color:white\"\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eTemplate\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eWhat you document\u003c\/th\u003e\n\n\u003cth style=\"padding:10px;text-align:left\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d9e7ee\"\u003e01. Applicability assessment \u0026amp; regulation selection\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d9e7ee\"\u003eAuthority, residential building, use according to the planning and building act, STAFS 2007:2 transition, and extension decisions.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d9e7ee\"\u003eDOCX\/PDF · SV\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d9e7ee\"\u003e02. Meter register \u0026amp; inspection intervals\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d9e7ee\"\u003eSerial number, meter point, type certificate, network, latest inspection, seal, and archive trail.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d9e7ee\"\u003eDOCX\/PDF · SV\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d9e7ee\"\u003e03. Batch formation \u0026amp; sample selection\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d9e7ee\"\u003eTwo-year period, type certificate, nominal flow, production network, representative sample, and report link.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d9e7ee\"\u003eDOCX\/PDF · SV\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d9e7ee\"\u003e04. Ordering accredited inspection\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d9e7ee\"\u003eAssignment to Type A\/B\/C bodies, report receipt, sample points, and remedial action decisions.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d9e7ee\"\u003eDOCX\/PDF · SV\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d9e7ee\"\u003e05. Non-conformity, removal from service \u0026amp; archive\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d9e7ee\"\u003eBroken seal, incorrect reading, failed batch, removal decision, responsibility, and evidence.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d9e7ee\"\u003eDOCX\/PDF · SV\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d9e7ee\"\u003e06. Swedish user guide\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d9e7ee\"\u003eEight work steps and legal\/metrological inspection points, plus Excel instructions.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d9e7ee\"\u003eDOCX\/PDF · SV\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d9e7ee\"\u003e07. English User Guide\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d9e7ee\"\u003eEnglish instructions for the Swedish administrative documents and workbook.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px;border-bottom:1px solid #d9e7ee\"\u003eDOCX\/PDF · EN\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd style=\"padding:10px\"\u003e08. Excel – water meter register\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px\"\u003eNine worksheets with planning indicators, batch sizes, inspection reports, non-conformities, and sources.\u003c\/td\u003e\n\n\u003ctd style=\"padding:10px\"\u003eXLSX · SV\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\u003ch2\u003eExcel register with nine tabs\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eRead me · Overview · Meter register · Inspection plan · Batches · Sample selection · Inspection reports · Non-conformities · Sources.\u003c\/strong\u003e The workbook contains an overview with indicators, source references to the regulation's annex, a blank customer register, and input fields for type certificate, flow range, meter point, and accredited inspection body. The inspection year formula takes into account the ninth calendar year after commissioning and the fourth calendar year after the last documented inspection when STAFS 2026:2 is selected and the meter is registered in operation.\u003c\/p\u003e\n\n\u003cp\u003eThe annex's \u003cstrong\u003esample sizes and maximum number of failed meters\u003c\/strong\u003e are reproduced as planning references. Example: a batch of 501–1,200 meters has 50 meters in the sample according to the annex's sampling plan and at most one failed meter for a passed batch. This does \u003cstrong\u003enot\u003c\/strong\u003e mean that Excel can approve the batch – representativeness, testing, measurement uncertainty, and decisions require an accredited inspection body. Only the inspection body's signed report is actual evidence of inspection.\u003c\/p\u003e\n\n\u003ch2\u003eThree concrete use cases\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eInventory before 2027:\u003c\/strong\u003e The water and sewerage authority reviews which meters fall under Section 1 and whether transitional provisions or earlier extension decisions affect the planning.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003ePlanning a meter batch:\u003c\/strong\u003e an inspection manager groups meters by type certificate, nominal flow, production network, and commissioning period, and sends a traceable assignment to the inspection body.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eBroken seal or failed batch:\u003c\/strong\u003e the operations manager registers the non-conformity, archives the actual inspection report, and documents the decision for inspection or removal from service. No automatic approval status is created.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eRegulations and deadlines – current as of November 18, 2026\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eSTAFS 2026:2, Sections 1 and 3:\u003c\/strong\u003e cover the water and sewerage authority's water meters to determine water consumption according to the act on public water services in buildings with one or more residences. The regulation applies from \u003cstrong\u003eMay 1, 2026\u003c\/strong\u003e.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eSection 15:\u003c\/strong\u003e a meter that is to remain in service must be inspected no later than the ninth calendar year after commissioning and thereafter no later than every four calendar years. Inspection can also be triggered by an audit, broken metrological seal, or suspicion of changed metrological properties.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eSections 12 and 16–18:\u003c\/strong\u003e statistical inspection presupposes correct batch formation and a representative sample according to the annex. A failed batch should generally be removed from service within one year, but reliably delimited faulty meters may mean that the others do not have to be removed from service.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eSection 19:\u003c\/strong\u003e the specified meter data must be available during operation and for three years thereafter. \u003cstrong\u003eSection 20:\u003c\/strong\u003e prescribed inspection is performed by an inspection body accredited for the purpose of Type A, B, or C.\u003c\/p\u003e\n\n\u003cp\u003e\u003cstrong\u003eTransition:\u003c\/strong\u003e STAFS 2007:2 may continue to apply until \u003cstrong\u003eApril 30, 2027\u003c\/strong\u003e according to the transitional provisions. Previously announced decisions on extended exemption periods may continue to apply according to their content. Always see the current wording of the regulation and let the organization's responsible person assess which regulation should be used.\u003c\/p\u003e\n\n\u003cp\u003e\u003ca href=\"https:\/\/regelverk.swedac.se\/foreskrifter\/swedac\/stafs-2026-2.html\"\u003eSwedac regulation STAFS 2026:2 (official primary source)\u003c\/a\u003e · \u003ca href=\"https:\/\/www.svensktvatten.se\/om-oss\/nyheter-och-press\/nyheter\/nya-regler-for-vattenmatare-1-maj-026\/\"\u003eSvenskt Vatten's summary\u003c\/a\u003e · \u003ca href=\"https:\/\/www.riksdagen.se\/sv\/dokument-och-lagar\/dokument\/svensk-forfattningssamling\/lag-2006412-om-allmanna-vattentjanster_sfs-2006-412\/\"\u003eAct (2006:412) on public water services\u003c\/a\u003e\u003c\/p\u003e\n\n\u003ch2\u003eDifference from Mallbutiken's other water and sewerage templates\u003c\/h2\u003e\n\n\u003cp\u003eThis is an internal compliance and documentation product for water and sewerage authorities. A private customer wishing to dispute a high water bill should instead see \u003ca href=\"\/en\/products\/felaktig-va-faktura-vattenrakning-matarkontroll-och-avgiftsprovning-word-pdf-excel\"\u003eIncorrect water and sewerage bill\u003c\/a\u003e. For regular consumption and cost monitoring, there is \u003ca href=\"\/en\/products\/vattenforbrukning-va-kostnadsuppfoljning-2026-2027-excel-word-pdf\"\u003eWater consumption \u0026amp; water and sewerage cost monitoring\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently asked questions\u003c\/h2\u003e\n\n\u003ch3\u003eWho needs the template for STAFS 2026:2?\u003c\/h3\u003e\n\n\u003cp\u003ePrimarily a water and sewerage authority documenting meters for water consumption in residential buildings within the scope of the regulation. Not all water meters are automatically covered.\u003c\/p\u003e\n\n\u003ch3\u003eMust all water meters be inspected every nine years?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Section 15 of the regulation specifies the first inspection no later than the ninth calendar year after commissioning and thereafter no later than every four calendar years for meters that are to remain in service. Transitional choices, earlier decisions, and event-based inspections must also be assessed.\u003c\/p\u003e\n\n\u003ch3\u003eCan Excel determine if a meter batch is approved?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It only shows conditional planning signals and sample references. Actual approval requires correct selection and inspection, as well as a documented report from an accredited inspection body.\u003c\/p\u003e\n\n\u003ch3\u003eHow long should meter documentation be kept?\u003c\/h3\u003e\n\n\u003cp\u003eFor the data specified in Section 19, availability during operation and for three years thereafter is required. Additional specific archiving or data protection requirements may apply and should be assessed separately.\u003c\/p\u003e\n\n\u003ch3\u003eAre the PDF files interactively fillable?\u003c\/h3\u003e\n\n\u003cp\u003eNo. They are searchable and printable reference versions. Use the corresponding Word files for editing and Excel for registration.\u003c\/p\u003e\n\n\u003ch3\u003eIs the product legally or metrologically certified?\u003c\/h3\u003e\n\n\u003cp\u003eNo. This is a generic work template that has undergone AI-assisted checking against public legal sources on November 18, 2026. No external lawyer or accredited inspection body has approved the product, and it does not replace individual regulatory compliance assessment.\u003c\/p\u003e\n\n\u003ch2\u003eVersion, delivery, and limitation\u003c\/h2\u003e\n\n\u003cp\u003e\u003cstrong\u003eVersion 1.0 · November 18, 2026 · Jurisdiction Sweden.\u003c\/strong\u003e The package is delivered as a digital ZIP.  No independent legal review, certification, or authority review has been performed.\u003c\/p\u003e\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":56693894021462,"sku":"MB-STAFS2026-2-VA-261118-V1","price":8.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/01_Huvudbild_STAFS2026_2_1600.png?v=1795032777","url":"https:\/\/mallbutiken.se\/en\/products\/stafs-2026-2-vattenmatare-va-kontrollintervall-partiprovning","provider":"Mallbutiken","version":"1.0","type":"link"}