{"product_id":"systeminspektion-varme-kyla-70-290-kw-2027","title":"System Inspection 2027 – Heating, Ventilation \u0026 Cooling, Performance Data and Control Registers | Word\/PDF\/Excel","description":"\u003cp\u003ePrepare the inspection of a building's heating, ventilation, and air conditioning system with a cohesive working basis for the property owner. The amended rules in Section 10 of the Swedish Energy Declaration Act (2006:985) specify the total nominal capacity and two inspection intervals. The template package helps you inventory the building, compile source-verified capacities, investigate the basis for exemptions, order an inspection, and follow up on the expert's recommendations. It does not replace the certified expert's inspection report.\u003c\/p\u003e\n\u003cdiv style=\"border:1px solid #b7ccde;background:#f2f7fb;padding:16px;margin:16px 0;\"\u003e\n\n\u003ch2\u003ePackage Contents\u003c\/h2\u003e\n\n\u003cp\u003eDigital ZIP, version 1.0, with five Swedish working templates, a Swedish user guide and an English user guide in seven editable Word documents and seven corresponding searchable PDF files, plus a Swedish Excel workbook. 15 customer files in total.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\u003cdiv style=\"border:1px solid #b7ccde;background:#f2f7fb;padding:16px;margin:16px 0;\"\u003e\n\n\u003ch2\u003eWhat the Files Contain\u003c\/h2\u003e\n\n\u003cp\u003eBuilding inventory, nominal capacity, basis for exemptions, ordering and report verification, and action follow-up. Excel has nine tabs and seven filterable work registers with 40 prepared rows each.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\u003ch2\u003eWho Is the Template Package For?\u003c\/h2\u003e\u003cp\u003eFor property owners, housing cooperatives, property managers, and operations managers who need to prepare the documentation for a mandatory system inspection in Sweden. Check the building's actual system boundaries, applicable exemptions, and confirmed inspection deadlines. The package is not a technical sizing tool, an energy performance certificate (EPC) template, or a self-prepared energy declaration.\u003c\/p\u003e\n\u003ch2\u003eDocument List\u003c\/h2\u003e\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable style=\"width:100%;border-collapse:collapse\"\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth scope=\"col\"\u003eDocument\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eFormat and Language\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eUse\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e01 Building Inventory and Responsibility\u003c\/td\u003e\n\n\u003ctd\u003eDOCX\/PDF, Swedish\u003c\/td\u003e\n\n\u003ctd\u003eBuilding, owner, generators, system boundary, and documentation\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e02 Nominal Capacity and Intervals\u003c\/td\u003e\n\n\u003ctd\u003eDOCX\/PDF, Swedish\u003c\/td\u003e\n\n\u003ctd\u003eCapacity in kW, sources, delimitation, interval indicator, and confirmed deadline\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e03 Basis for Exemption Assessment\u003c\/td\u003e\n\n\u003ctd\u003eDOCX\/PDF, Swedish\u003c\/td\u003e\n\n\u003ctd\u003eGrounds for exemption, evidence of functionality, and expert assessment\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e04 Ordering and Report Verification\u003c\/td\u003e\n\n\u003ctd\u003eDOCX\/PDF, Swedish\u003c\/td\u003e\n\n\u003ctd\u003eCertified energy expert, documentation, report, and transmission\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e05 Action Plan and Follow-up\u003c\/td\u003e\n\n\u003ctd\u003eDOCX\/PDF, Swedish\u003c\/td\u003e\n\n\u003ctd\u003eRecommendations, responsibility, cost basis, and verification\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e06 Swedish User Guide\u003c\/td\u003e\n\n\u003ctd\u003eDOCX\/PDF, Swedish\u003c\/td\u003e\n\n\u003ctd\u003eWorkflow, legal sources, and fictitious example\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e07 English User Guide\u003c\/td\u003e\n\n\u003ctd\u003eDOCX\/PDF, English\u003c\/td\u003e\n\n\u003ctd\u003eEnglish guidance for the Swedish working templates\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003e08 System Inspection Register\u003c\/td\u003e\n\n\u003ctd\u003eXLSX, Swedish\u003c\/td\u003e\n\n\u003ctd\u003eNine tabs for capacity, evidence, orders, reports, and actions\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\u003ch2\u003eWorkflow Before the Inspection\u003c\/h2\u003e\u003col\u003e\n\n\u003cli\u003eIdentify each building, owner, system, and supporting documentation.\u003c\/li\u003e\n\n\u003cli\u003eRecord the relevant nominal capacity of the heating and cooling generators per building and check for double counting.\u003c\/li\u003e\n\n\u003cli\u003eCollect documentation for any exemptions and have an expert assess the scope.\u003c\/li\u003e\n\n\u003cli\u003eOrder an inspection from an independent certified expert. Record the confirmed deadline, report reference, and electronic transmission.\u003c\/li\u003e\n\n\u003cli\u003eDocument recommended actions, responsibility, schedule, and follow-up.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\u003ch2\u003eAmended Rules from 2026 – 70 and 290 kW\u003c\/h2\u003e\u003cp\u003eOn July 1, 2026, Sections 10 and 12 of the Swedish Energy Declaration Act (2006:985) were amended by SFS 2026:744. The starting point is the total nominal capacity of the heating and cooling generators in the building. Over 290 kW requires an interval of at least three years. Over 70 kW up to and including 290 kW requires an interval of at least five years. Exactly 70 kW does not exceed the limit. Applicable exemptions and the actual inspection deadline must be investigated separately. An interval is not the same as a calculated final day for the next inspection.\u003c\/p\u003e\n\u003ch2\u003eCapacity Documentation per Building\u003c\/h2\u003e\u003cp\u003eCollect nameplates, product data sheets, and other relevant documentation regarding representative operation. According to Boverket's guidance, capacity for domestic hot water production or business processes is not included. For a shared district heating plant, each building must be assessed separately. Check with the energy expert which capacity is relevant and avoid counting the same generator twice. A compilation of recorded values is not a technical verification of actual capacity.\u003c\/p\u003e\n\u003ch2\u003eExemptions and Evidence of Functionality\u003c\/h2\u003e\u003cp\u003eSection 8b of the Swedish Energy Declaration Ordinance (2006:1592) regulates exemptions, including energy performance agreements with equivalent capacity, qualified building automation, and certain residential systems. For local buildings, the relevant functional requirements in Boverket's regulations must be checked. For residential buildings, the conditions include continuous electronic monitoring, effective regulation, and the capacity to respond to external signals and adapt energy use. The latter condition applies from October 1, 2026, according to Boverket's guidance. An earlier exemption must therefore be assessed against the current requirements if necessary. Record the actual expert assessment, scope, and evidence; Excel does not grant any exemption.\u003c\/p\u003e\n\u003ch2\u003eOrdering, Report, and Follow-up\u003c\/h2\u003e\u003cp\u003eAccording to Section 12, an independent expert shall perform the inspection, prepare an inspection report, and transmit it electronically to Boverket. The certification requirement follows Section 10 of the ordinance. The report's information according to Section 8c includes, among other things, efficiency and sizing, more efficient temperature settings with safe operation, opportunities to reduce fossil energy use, recommendations, and discovered safety issues. The templates help the owner order the work and follow up on the results. Follow the instructions of the responsible expert regarding safety issues.\u003c\/p\u003e\n\u003ch2\u003eExcel – Capacity Reconciliation and Control Register\u003c\/h2\u003e\u003cp\u003eNine tabs: Overview, Buildings, Generators, Exemptions, Orders, Reports, Evidence, Actions, and Sources. The workbook contains 368 formula cells, seven filterable tables with 40 prepared rows each, status selections, and administrative control signals. It flags, among other things, duplicate IDs, missing generator data, incorrectly linked evidence, and passed confirmed deadlines. The capacity calculation assumes that the inventory is marked as complete and that the recorded generator entries have complete documentation. Manually check that all generators are actually included.\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eFictitious example:\u003c\/strong\u003e A building with 180 kW of relevant heating capacity and 120 kW of cooling capacity has a total capacity of 300 kW and an indicative three-year interval before exemptions. At 290 kW, a five-year interval is displayed. If a generator has a duplicate ID or missing evidence, the summation is stopped. The register does not establish a legal exemption, technical performance, or actual inspection deadline.\u003c\/p\u003e\n\u003ch2\u003eFormat, Language, and Related Templates\u003c\/h2\u003e\u003cp\u003eWord is editable, PDF is searchable, and Excel is macro-free. The working templates and Excel are in Swedish; the English guide describes their use. Excel does not have preset print areas; select the area manually. For separate follow-up of individual measurement and billing, see \u003ca href=\"https:\/\/mallbutiken.se\/products\/imd-2027-fjarravlasning-matarregister-boendeinformation\"\u003eIMD 2027 – Remote Reading, Meter Registers, and Billing Information\u003c\/a\u003e.\u003c\/p\u003e\n\u003ch2\u003eFrequently Asked Questions\u003c\/h2\u003e\u003ch3\u003eWhen do the amended rules apply?\u003c\/h3\u003e\u003cp\u003eThe amendment by SFS 2026:744 applies from July 1, 2026. Also check the current regulations and exemption rules.\u003c\/p\u003e\u003ch3\u003eWhen is an inspection required?\u003c\/h3\u003e\u003cp\u003eThe starting point in Section 10 is that the total nominal capacity exceeds 70 kW. Exemptions are assessed separately.\u003c\/p\u003e\u003ch3\u003eHow often should the inspection be performed?\u003c\/h3\u003e\u003cp\u003eAt least every three years over 290 kW and at least every five years over 70 up to and including 290 kW, when the inspection requirement applies.\u003c\/p\u003e\u003ch3\u003eIs domestic hot water included in the capacity?\u003c\/h3\u003e\u003cp\u003eAccording to Boverket's guidance, capacity for domestic hot water and business processes should not be included. Check the relevant heating and cooling capacity with the expert.\u003c\/p\u003e\u003ch3\u003eHow are multiple buildings with a shared district heating plant handled?\u003c\/h3\u003e\u003cp\u003eHeating systems are calculated per building. Document the capacity documentation for each building.\u003c\/p\u003e\u003ch3\u003eIs building automation sufficient for an exemption?\u003c\/h3\u003e\u003cp\u003eNo, not merely the presence of automation. The applicable functional requirements and the scope of the system must be supported.\u003c\/p\u003e\u003ch3\u003eWhat is new for residential buildings from October 2026?\u003c\/h3\u003e\u003cp\u003eBoverket states that the capacity to respond to external signals and adapt energy use is a new condition from October 1, 2026. All conditions in Section 8b, paragraph 1, point 3, must be assessed.\u003c\/p\u003e\u003ch3\u003eWho performs the mandatory inspection?\u003c\/h3\u003e\u003cp\u003eAn independent expert with relevant certification. The expert prepares and transmits the inspection report electronically to Boverket.\u003c\/p\u003e\u003ch3\u003eDoes the package replace an EPC or an official inspection report?\u003c\/h3\u003e\u003cp\u003eNo. It is the property owner's administrative working basis for ordering and follow-up, not an EPC, energy declaration, or the expert's report.\u003c\/p\u003e\u003ch3\u003eDoes Excel calculate the legally binding inspection deadline?\u003c\/h3\u003e\u003cp\u003eNo. The register shows an indicative interval based on a recorded and complete capacity inventory before exemption assessment. The actual deadline is recorded after confirmation.\u003c\/p\u003e\n\u003ch2\u003eLegal Sources and Agency Information\u003c\/h2\u003e\u003cp\u003e\u003ca href=\"https:\/\/www.riksdagen.se\/sv\/dokument-och-lagar\/dokument\/svensk-forfattningssamling\/lag-2006985-om-energideklaration-for-byggnader_sfs-2006-985\/\"\u003eSwedish Energy Declaration Act (2006:985)\u003c\/a\u003e, Sections 10 and 12 as amended by SFS 2026:744; \u003ca href=\"https:\/\/www.riksdagen.se\/sv\/dokument-och-lagar\/dokument\/svensk-forfattningssamling\/forordning-20061592-om-energideklaration-for_sfs-2006-1592\/\"\u003eSwedish Energy Declaration Ordinance (2006:1592)\u003c\/a\u003e, Sections 8b–c and 10, amended by SFS 2026:869; \u003ca href=\"https:\/\/www.boverket.se\/sv\/energideklaration\/for-energiexperter\/inspektion-av-uppvarmnings--och-luftkonditioneringssystem\/\"\u003eBoverket's Inspection Guidance\u003c\/a\u003e, last reviewed October 1, 2026, including references to BFS 2007:4, Section 3b, and BFS 2026:9, Chapter 4, Section 2. AI-assisted legal source check on November 26, 2026. No independent legal or energy-technical expert review. Check current regulations and hire a certified expert for the mandatory inspection.\u003c\/p\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":56855058022742,"sku":"MB-INS-2027","price":79.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/systeminspektion-2027-huvudbild.png?v=1795696926","url":"https:\/\/mallbutiken.se\/en\/products\/systeminspektion-varme-kyla-70-290-kw-2027","provider":"Mallbutiken","version":"1.0","type":"link"}