{"product_id":"underentreprenorsavtal-subcontractor-agreement-2026-2027-word-pdf-english-svensk-ratt","title":"Subcontractor Agreement Template Package 2026\/2027 – Word\/PDF + English | Swedish Law","description":"\n\u003ch2\u003eSubcontractor Agreement Template Package 2026\/2027 – Word\/PDF + English | Swedish Law\u003c\/h2\u003e\n\u003cp\u003eThis is a complete and professional \u003cstrong\u003esubcontractor agreement for construction, civil engineering, installation, and other contracting work between companies\u003c\/strong\u003e. The package is designed for prime, general, or design-build contractors who are hiring a subcontractor and need a clear written agreement regarding scope, schedule, price, extra work (ÄTA), work environment, quality, insurance, liability, documentation, and termination.\u003c\/p\u003e\n\u003cp\u003eThe template package is \u003cstrong\u003elegally reviewed against current Swedish law and relevant authority information as of October 4, 2026\u003c\/strong\u003e, and prepared for practical use during \u003cstrong\u003e2026\/2027\u003c\/strong\u003e. It contains a Swedish Subcontractor Agreement, a complete English-language \u003cstrong\u003eSubcontractor Agreement\u003c\/strong\u003e under Swedish law, and a separate detailed user guide.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eDelivery:\u003c\/strong\u003e 3 documents in both Word (DOCX) and PDF – a total of \u003cstrong\u003e6 files, 37 A4 pages, and 12 appendices\/schedules\u003c\/strong\u003e. Digital download. No physical product will be sent.\u003c\/p\u003e\n\n\u003ch3\u003eWhat is included\u003c\/h3\u003e\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eSubcontractor Agreement 2026\/2027 – Swedish version\u003c\/strong\u003e, 17 pages with 25 contract sections and 12 appendices.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eSubcontractor Agreement 2026\/2027 – English \/ Swedish law\u003c\/strong\u003e, 16 pages with corresponding structure and 12 schedules.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDetailed user guide\u003c\/strong\u003e, 4 pages with step-by-step instructions, control points, and a final checklist.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch3\u003eWhen is a subcontractor agreement appropriate?\u003c\/h3\u003e\n\u003cp\u003eThe template is intended for B2B subcontracts where one contractor hires another company to perform a specific part of a construction, civil engineering, installation, or contracting assignment. Examples:\u003c\/p\u003e\n\u003cul\u003e\n\n\u003cli\u003eelectrical, HVAC, and ventilation contracts,\u003c\/li\u003e\n\n\u003cli\u003egroundwork and civil engineering,\u003c\/li\u003e\n\n\u003cli\u003econcrete, structural work, assembly, and building services,\u003c\/li\u003e\n\n\u003cli\u003epainting, flooring, roofing, facade, and other specialist work,\u003c\/li\u003e\n\n\u003cli\u003einstallation and commissioning of technical equipment,\u003c\/li\u003e\n\n\u003cli\u003esubcontracting with or without design responsibility,\u003c\/li\u003e\n\n\u003cli\u003eprojects with multiple contractor tiers.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch3\u003eStandalone agreement – not a copy of AB-U 07 or ABT-U 07\u003c\/h3\u003e\n\u003cp\u003eThe subcontractor agreement is an \u003cstrong\u003eindependent, standalone contractual document\u003c\/strong\u003e. It does not reproduce AB-U 07, ABT-U 07, AB 04, or ABT 06.\u003c\/p\u003e\n\u003cp\u003eAB-U 07 and ABT-U 07 remain established standard provisions for subcontracts in the construction sector in 2026. If the parties wish to use any of these, the standard document must be incorporated separately as a contract document and explicitly stated in Appendix 2.\u003c\/p\u003e\n\u003cp\u003eThe template therefore includes a clear contract hierarchy where the parties can choose to:\u003c\/p\u003e\n\u003cul\u003e\n\n\u003cli\u003euse the agreement as a completely standalone document, or\u003c\/li\u003e\n\n\u003cli\u003esupplement the agreement with separately incorporated AB-U 07, ABT-U 07, or other standard provisions.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\u003cp\u003eThis reduces the risk of vague wording that simply states that \"AB applies\" without specifying which document, which version, or how conflicting terms should be handled.\u003c\/p\u003e\n\n\u003ch3\u003eExecution subcontract or design\/functional responsibility\u003c\/h3\u003e\n\u003cp\u003eAppendix 2 is used to clearly select the type of responsibility the Subcontractor actually has. The parties can mark if the assignment is:\u003c\/p\u003e\n\u003cul\u003e\n\n\u003cli\u003ea pure execution subcontract where the Client is responsible for the design, or\u003c\/li\u003e\n\n\u003cli\u003ea subcontract where the Subcontractor also has explicit design or functional responsibility.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\u003cp\u003eThis is a central risk issue. The template therefore states that design responsibility shall not be considered to transfer to the Subcontractor unless it is explicitly stated in the contract documents.\u003c\/p\u003e\n\n\u003ch3\u003e25 contract sections\u003c\/h3\u003e\n\u003cp\u003eThe main Swedish agreement covers, among other things:\u003c\/p\u003e\n\u003cul\u003e\n\n\u003cli\u003eparties and purpose,\u003c\/li\u003e\n\n\u003cli\u003edefinitions and contract documents,\u003c\/li\u003e\n\n\u003cli\u003eform of contract and design responsibility,\u003c\/li\u003e\n\n\u003cli\u003eorganization and sub-subcontractors,\u003c\/li\u003e\n\n\u003cli\u003eschedule, coordination, and access,\u003c\/li\u003e\n\n\u003cli\u003ework environment and construction site,\u003c\/li\u003e\n\n\u003cli\u003epersonnel, labor law, and contractor liability for wages,\u003c\/li\u003e\n\n\u003cli\u003eF-tax, VAT registration, and reverse charge VAT,\u003c\/li\u003e\n\n\u003cli\u003ematerial, products, environment, and waste,\u003c\/li\u003e\n\n\u003cli\u003equality, self-inspection, and documentation,\u003c\/li\u003e\n\n\u003cli\u003ecompensation and payment,\u003c\/li\u003e\n\n\u003cli\u003eextra work (ÄTA) and change orders,\u003c\/li\u003e\n\n\u003cli\u003edelay and obstacles,\u003c\/li\u003e\n\n\u003cli\u003einspection, acceptance, defects, and remediation,\u003c\/li\u003e\n\n\u003cli\u003eliability and insurance,\u003c\/li\u003e\n\n\u003cli\u003esecurity,\u003c\/li\u003e\n\n\u003cli\u003econfidentiality and trade secrets,\u003c\/li\u003e\n\n\u003cli\u003eGDPR and information security,\u003c\/li\u003e\n\n\u003cli\u003eintellectual property and documentation,\u003c\/li\u003e\n\n\u003cli\u003eagreement term, cancellation, and termination,\u003c\/li\u003e\n\n\u003cli\u003eforce majeure,\u003c\/li\u003e\n\n\u003cli\u003ecompliance, sanctions, and improper benefits,\u003c\/li\u003e\n\n\u003cli\u003enotices, assignment, and amendments,\u003c\/li\u003e\n\n\u003cli\u003eSwedish law and dispute resolution,\u003c\/li\u003e\n\n\u003cli\u003esigning.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch3\u003e12 practical appendices\u003c\/h3\u003e\n\u003col\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eParties, organization, and authorization\u003c\/strong\u003e – contact persons and who is authorized to order extra work (ÄTA).\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eScope, form of contract, and contract documents\u003c\/strong\u003e – scope, design responsibility, drawings, and standard terms.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eSchedule, milestones, and liquidated damages\u003c\/strong\u003e – start, interim milestones, completion, and any liquidated damages.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003ePrice, payment, and ÄTA pricing\u003c\/strong\u003e – fixed price, cost-plus, hourly rates, markups, and payment plan.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eChange orders\u003c\/strong\u003e – separate log for changes, price, schedule impact, and approval.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eInspection, acceptance, and warranty\u003c\/strong\u003e – control points, inspection, warranty period, and defect reporting.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDocumentation, design, and IP\u003c\/strong\u003e – as-built documents, self-inspection, testing, BIM\/drawings, and licenses.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eLiability, insurance, and security\u003c\/strong\u003e – liability caps, carve-outs, insurance, and securities.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eWork environment, environment, and compliance\u003c\/strong\u003e – work environment plan, Bas-U, work preparations, waste, ID06, F-tax, and subcontractor control.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eGDPR and information security\u003c\/strong\u003e – roles, data processing agreement (PUB), systems, incidents, and deletion.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eCancellation, termination, and handover\u003c\/strong\u003e – notice period for remediation, termination, and winding down.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eNotices, assignment, and dispute\u003c\/strong\u003e – notice, assignment, and forum.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch3\u003eWork environment – adapted to regulations effective in 2026\u003c\/h3\u003e\n\u003cp\u003eThe Swedish Work Environment Authority's new regulatory structure has been in effect since January 1, 2025. \u003cstrong\u003eAFS 2023:3 on design and construction work environment coordination\u003c\/strong\u003e explicitly covers contractors and subcontractors across multiple tiers.\u003c\/p\u003e\n\u003cp\u003eThe template therefore does not treat the work environment as a general standard sentence, but includes specific rules regarding:\u003c\/p\u003e\n\u003cul\u003e\n\n\u003cli\u003ethe Subcontractor's responsibility as an employer,\u003c\/li\u003e\n\n\u003cli\u003ework preparations and risk information,\u003c\/li\u003e\n\n\u003cli\u003ework environment plan,\u003c\/li\u003e\n\n\u003cli\u003ecoordination with Bas-U,\u003c\/li\u003e\n\n\u003cli\u003ethe project's shared work environment efforts,\u003c\/li\u003e\n\n\u003cli\u003ecompliance by sub-subcontractors.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\u003cp\u003eThe agreement does not attempt to contract away responsibilities that follow directly from work environment legislation.\u003c\/p\u003e\n\n\u003ch3\u003eContractor liability for wage claims\u003c\/h3\u003e\n\u003cp\u003eFor construction and civil engineering activities in Sweden, the \u003cstrong\u003eAct (2018:1472) on contractor liability for wage claims\u003c\/strong\u003e applies. This may mean that a contractor who has hired a subcontractor can, in certain situations, become liable for unpaid wage claims of the subcontractor's employees.\u003c\/p\u003e\n\u003cp\u003eThe agreement therefore contains requirements that the Subcontractor:\u003c\/p\u003e\n\u003cul\u003e\n\n\u003cli\u003efulfills its employer and wage payment obligations,\u003c\/li\u003e\n\n\u003cli\u003eprovides relevant information when reasonably necessary,\u003c\/li\u003e\n\n\u003cli\u003eimmediately notifies of wage claims or disputes that may affect the contracting chain,\u003c\/li\u003e\n\n\u003cli\u003eforwards relevant requirements to approved sub-subcontractors.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch3\u003eReverse charge VAT for construction services\u003c\/h3\u003e\n\u003cp\u003eThe Swedish Tax Agency's rules regarding \u003cstrong\u003ereverse charge VAT for construction services\u003c\/strong\u003e may be applicable between subcontractors and between a subcontractor and a general\/prime contractor.\u003c\/p\u003e\n\u003cp\u003eThe template therefore does not hard-code standard Swedish VAT on all invoices. Instead, before invoicing, the parties must assess:\u003c\/p\u003e\n\u003cul\u003e\n\n\u003cli\u003ewhether the current performance is a construction service covered by the rules,\u003c\/li\u003e\n\n\u003cli\u003ewhether the buyer is a trader covered by the rules,\u003c\/li\u003e\n\n\u003cli\u003ehow the invoice should therefore be structured.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch3\u003eF-tax and registration control\u003c\/h3\u003e\n \u003cp\u003eThe Subcontractor shall maintain the tax and business registrations required for its operations and notify the Client if a significant registration is changed or revoked. Appendix 9 can be used for the project's control of F-tax and VAT.\u003c\/p\u003e\n\n\u003ch3\u003eÄTA – clear ordering and documentation process\u003c\/h3\u003e\n\u003cp\u003eChanges and additional work are a common source of construction disputes. The template therefore includes a structured process:\u003c\/p\u003e\n\u003cul\u003e\n\n\u003cli\u003eAppendix 1 specifies exactly who is authorized to order changes.\u003c\/li\u003e\n\n\u003cli\u003eBefore starting, the Subcontractor must describe the change and its impact on price, time, work environment, and quality whenever possible.\u003c\/li\u003e\n\n\u003cli\u003eAppendix 5 serves as a separate change order log.\u003c\/li\u003e\n\n\u003cli\u003eEmergency work required to avert immediate injury or property damage can be handled specifically but must be documented immediately.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch3\u003ePrice – fixed price, cost-plus, or combination\u003c\/h3\u003e\n\u003cp\u003eAppendix 4 can be used for:\u003c\/p\u003e\n\u003cul\u003e\n\n\u003cli\u003efixed contract sum,\u003c\/li\u003e\n\n\u003cli\u003ecost-plus (löpande räkning),\u003c\/li\u003e\n\n\u003cli\u003ecombined compensation,\u003c\/li\u003e\n\n\u003cli\u003ehourly rates for skilled workers,\u003c\/li\u003e\n\n\u003cli\u003emanagement costs,\u003c\/li\u003e\n\n\u003cli\u003ematerial markups,\u003c\/li\u003e\n\n\u003cli\u003epayment plan and payment terms.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\u003cp\u003eÄTA pricing can therefore be determined in advance instead of being discussed only after extra work has already been performed.\u003c\/p\u003e\n\n\u003ch3\u003eSchedule, obstacles, and liquidated damages\u003c\/h3\u003e\n\u003cp\u003eAppendix 3 contains start date, interim milestones, and completion. Liquidated damages apply only when the parties actually fill in a liquidated damages clause. In addition, the Subcontractor must notify of any obstacles or risk of delay in writing without delay.\u003c\/p\u003e\n\n\u003ch3\u003eInspection, acceptance, and warranty\u003c\/h3\u003e\n\u003cp\u003eAppendix 6 makes it possible to adapt the inspection and acceptance procedure to the project. It specifies, for example:\u003c\/p\u003e\n\u003cul\u003e\n\n\u003cli\u003econtrol points,\u003c\/li\u003e\n\n\u003cli\u003eself-inspection,\u003c\/li\u003e\n\n\u003cli\u003einspection format,\u003c\/li\u003e\n\n\u003cli\u003ewarranty period,\u003c\/li\u003e\n\n\u003cli\u003erecipient of defect reports,\u003c\/li\u003e\n\n\u003cli\u003eresponse time for critical defects.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\u003cp\u003eIf the project uses AB-U 07\/ABT-U 07 or another standard procedure, the inspection and warranty clauses must be coordinated with the separately incorporated standard.\u003c\/p\u003e\n\n\u003ch3\u003eDocumentation is part of the contract work\u003c\/h3\u003e\n\u003cp\u003eThe template treats as-built documents, self-inspections, and test reports as actual deliverables – not as voluntary administrative additions. Appendix 7 can be used to specify:\u003c\/p\u003e\n\u003cul\u003e\n\n\u003cli\u003eas-built documents,\u003c\/li\u003e\n\n\u003cli\u003eBIM and drawings,\u003c\/li\u003e\n\n\u003cli\u003etest reports,\u003c\/li\u003e\n\n\u003cli\u003emanuals, certificates, and product documentation,\u003c\/li\u003e\n\n\u003cli\u003eformat and delivery date,\u003c\/li\u003e\n\n\u003cli\u003erights\/licenses to the material.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch3\u003eLiability, insurance, and security\u003c\/h3\u003e\n\u003cp\u003eAppendix 8 contains selectable fields for liability caps, carve-outs from liability caps, liability insurance, other insurance, and any performance and warranty bonds.\u003c\/p\u003e\n\u003cp\u003eThe template avoids automatically inserting a high standard amount. A reasonable liability cap and reasonable security must be assessed in relation to the contract sum, type of work, risk, and insurance coverage.\u003c\/p\u003e\n\n\u003ch3\u003eSub-subcontractors\u003c\/h3\u003e\n\u003cp\u003eThe Subcontractor may not outsource a significant part of the work to the next tier without the Client's written approval. Approval does not release the Subcontractor from liability.\u003c\/p\u003e\n\u003cp\u003eRelevant requirements regarding work environment, confidentiality, insurance, taxes, documentation, and compliance must also be passed on to approved sub-subcontractors.\u003c\/p\u003e\n\n\u003ch3\u003eGDPR and information security\u003c\/h3\u003e\n\u003cp\u003eIf personal data is processed in the project, each party is responsible for its processing according to GDPR. If the Subcontractor processes personal data solely on behalf of the Client, a separate Data Processing Agreement usually needs to be entered into in accordance with Article 28 GDPR.\u003c\/p\u003e\n\u003cp\u003eAppendix 10 contains control fields for role distribution, system access, incident notification periods, as well as storage and deletion.\u003c\/p\u003e\n\n\u003ch3\u003eCancellation, termination, and rescission\u003c\/h3\u003e\n\u003cp\u003eAppendix 11 makes it possible to document what applies in the event of:\u003c\/p\u003e\n\u003cul\u003e\n\n\u003cli\u003ecancellation without breach of contract,\u003c\/li\u003e\n\n\u003cli\u003ematerial breach of contract,\u003c\/li\u003e\n\n\u003cli\u003enotice period for remediation,\u003c\/li\u003e\n\n\u003cli\u003eserious work environment or safety deficiency,\u003c\/li\u003e\n\n\u003cli\u003einsolvency or other defined termination situations,\u003c\/li\u003e\n\n\u003cli\u003ehandover of material and documentation after termination.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch3\u003eEnglish Subcontractor Agreement under Swedish law\u003c\/h3\u003e\n\u003cp\u003eThe English version contains the same basic structure and 12 schedules and is intended for projects where the client, subcontractor, corporate function, or advisor works in English but where Swedish substantive law is to be applied.\u003c\/p\u003e\n\u003cp\u003eThe English version is therefore an \u003cstrong\u003eEnglish-language agreement under Swedish law\u003c\/strong\u003e and not a British or American standard agreement.\u003c\/p\u003e\n\n\u003ch3\u003eDetailed user guide included\u003c\/h3\u003e\n\u003cp\u003eThe guide shows step-by-step how the agreement is filled out and specifically reviews:\u003c\/p\u003e\n\u003cul\u003e\n\n\u003cli\u003eselection of contract form,\u003c\/li\u003e\n\n\u003cli\u003eorder of precedence for contract documents,\u003c\/li\u003e\n\n\u003cli\u003eAB-U 07\/ABT-U 07 as separate standard documents,\u003c\/li\u003e\n\n\u003cli\u003etime, price, and ÄTA,\u003c\/li\u003e\n\n\u003cli\u003ework environment 2026 and Bas-U,\u003c\/li\u003e\n\n\u003cli\u003econtractor liability for wage claims,\u003c\/li\u003e\n\n\u003cli\u003ereverse charge VAT for construction,\u003c\/li\u003e\n\n\u003cli\u003einspection, warranty, and documentation,\u003c\/li\u003e\n\n\u003cli\u003eliability and insurance,\u003c\/li\u003e\n\n\u003cli\u003etermination and cancellation,\u003c\/li\u003e\n\n\u003cli\u003efinal checklist before signing.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch3\u003eReviewed for 2026\/2027\u003c\/h3\u003e\n\u003cp\u003eThe legal review is dated \u003cstrong\u003eOctober 4, 2026\u003c\/strong\u003e. The package has been checked against, among other things:\u003c\/p\u003e\n\u003cul\u003e\n\n\u003cli\u003ethe Contracts Act (1915:218),\u003c\/li\u003e\n\n\u003cli\u003ethe Work Environment Act (1977:1160),\u003c\/li\u003e\n\n\u003cli\u003ethe Work Environment Authority's AFS 2023:3 on design and construction work environment coordination, consolidated version current for 2026,\u003c\/li\u003e\n\n\u003cli\u003ethe Act (2018:1472) on contractor liability for wage claims,\u003c\/li\u003e\n\n\u003cli\u003ethe Swedish Tax Agency's rules on reverse charge VAT for construction services,\u003c\/li\u003e\n\n\u003cli\u003ethe General Data Protection Regulation (EU) 2016\/679 (GDPR),\u003c\/li\u003e\n\n\u003cli\u003ethe Trade Secrets Act (2018:558).\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\u003cp\u003eAB-U 07 and ABT-U 07 are industry standards that can be incorporated separately but are \u003cstrong\u003enot included and not reproduced\u003c\/strong\u003e in the package.\u003c\/p\u003e\n\n\u003ch3\u003eFormat and delivery\u003c\/h3\u003e\n\u003cp\u003e\u003cstrong\u003e3 documents • 6 files • 37 pages • 12 appendices\/schedules\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eWord (DOCX)\u003c\/strong\u003e – fully editable.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003ePDF\u003c\/strong\u003e – for reference, printing, and layout control.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eSwedish + English main agreements\u003c\/strong\u003e.\u003c\/li\u003e\n\n\u003cli\u003e\n\n\u003cstrong\u003eDigital delivery\u003c\/strong\u003e – no physical product is sent.\u003c\/li\u003e\n\n\n\u003c\/ul\u003e\n\n\u003ch3\u003eImportant\u003c\/h3\u003e\n\u003cp\u003eThe template package is a professional general contractual basis and does not replace individual legal advice. Large or technically complex construction projects, design-build subcontracts, extensive design responsibility, publicly procured projects, posted workers, collective bargaining issues, advanced security, insolvency risks, or ongoing construction disputes should be assessed separately by a qualified advisor.\u003c\/p\u003e\n","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":55594916282710,"sku":"UNDERENTREPRENAD-2026-2027","price":249.0,"currency_code":"SEK","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/underentreprenorsavtal-2026-2027-hero.png?v=1791086213","url":"https:\/\/mallbutiken.se\/en\/products\/underentreprenorsavtal-subcontractor-agreement-2026-2027-word-pdf-english-svensk-ratt","provider":"Mallbutiken","version":"1.0","type":"link"}