{"product_id":"undertaksmontage-kma-montagekontroll-2027","title":"Soffit installation 2027 – KMA plan, work preparation, installation inspection, fire and acoustic requirements, and document handover | Word\/PDF\/Excel","description":"\u003csection lang=\"sv\"\u003e\u003ch2\u003eKMA for ceiling installation – from project start to document handover\u003c\/h2\u003e\n\n\u003cp\u003eDo you need a KMA plan, work preparation, and self-monitoring for ceiling installation? This template package for Swedish ceiling contractors combines quality, environment, and occupational health and safety in a coherent workflow: from project start and material receipt to installation inspection, non-conformance management, and document handover. You get eight Swedish work templates in Word and PDF, two user guides, and a macro-free Excel register – a total of 21 customer files.\u003c\/p\u003e\n\n\u003cp\u003eThe package is suitable for site managers, installers, project managers, and KMA managers who need to track the project's actual requirements for materials, installation, fire safety, acoustics, and installations. Use one workbook per project and link control points to the respective room, requirement, product batch, and evidence.\u003c\/p\u003e\n\n\u003cp\u003eThe materials are administrative work templates. They are not design calculations, design documents, fire classifications, acoustic assessments, official certificates, or certifications. They do not contain universal dimensions, installation tolerances, or technical approvals.\u003c\/p\u003e\n\n\u003cdiv style=\"border:2px solid #16838a;background:#edf7f7;padding:18px 20px;border-radius:12px;margin:19px 0\"\u003e\n\n\u003ch3\u003ePackage contents\u003c\/h3\u003e\n\n\u003cp\u003eEight Swedish work templates, a Swedish user guide, a separate English User Guide, and a Swedish macro-free Excel register with ten tabs. Ten editable Word files, ten searchable PDF files, and one XLSX file – a total of 21 customer files in a digital ZIP.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003cdiv style=\"border:2px solid #183e58;background:#f3f7fa;padding:18px 20px;border-radius:12px;margin:19px 0\"\u003e\n\n\u003ch3\u003eWhat the files contain\u003c\/h3\u003e\n\n\u003cp\u003eProject plan, work preparation, receipt inspection, installation inspection, functional requirements, non-conformance and ÄTA, environmental journal, and document handover. Common reference IDs make it possible to manually link the same project requirements to rooms, product batches, control points, and evidence.\u003c\/p\u003e\n\n\n\u003c\/div\u003e\n\n\u003ch2\u003eDocument for document\u003c\/h2\u003e\n\n\u003cdiv style=\"overflow-x:auto\"\u003e\u003ctable\u003e\n\n\u003cthead\u003e\u003ctr\u003e\n\n\u003cth scope=\"col\"\u003eDocument\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eUse\u003c\/th\u003e\n\n\u003cth scope=\"col\"\u003eFormat\u003c\/th\u003e\n\n\n\u003c\/tr\u003e\u003c\/thead\u003e\n\n\u003ctbody\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eProject plan and requirements overview\u003c\/td\u003e\n\n\u003ctd\u003eProject boundaries, regulations, drawing revisions, responsibilities, and control planning\u003c\/td\u003e\n\n\u003ctd\u003eSV · Word\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eWork preparation and risk control\u003c\/td\u003e\n\n\u003ctd\u003eRisk assessments, work method, protection, coordination, and documented clearance\u003c\/td\u003e\n\n\u003ctd\u003eSV · Word\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eMaterial and receipt inspection\u003c\/td\u003e\n\n\u003ctd\u003eProduct, batch, system basis, delivery non-conformance, and material hold\u003c\/td\u003e\n\n\u003ctd\u003eSV · Word\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eInstallation inspection per room and control point\u003c\/td\u003e\n\n\u003ctd\u003eInspections before installation, before covering, and after installation\u003c\/td\u003e\n\n\u003ctd\u003eSV · Word\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eFire, acoustic, and functional requirements\u003c\/td\u003e\n\n\u003ctd\u003eThe project's actual requirements, evidence, interfaces, and need for official decisions\u003c\/td\u003e\n\n\u003ctd\u003eSV · Word\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eNon-conformance management and ÄTA\u003c\/td\u003e\n\n\u003ctd\u003eFindings, corrective action notices, re-inspection, and separate contract control\u003c\/td\u003e\n\n\u003ctd\u003eSV · Word\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eEnvironmental and waste journal\u003c\/td\u003e\n\n\u003ctd\u003eSorting, quantities, units, recipients, and documentation\u003c\/td\u003e\n\n\u003ctd\u003eSV · Word\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eDocument handover\u003c\/td\u003e\n\n\u003ctd\u003eControl basis, drawings, non-conformances, recipients, and receipt\u003c\/td\u003e\n\n\u003ctd\u003eSV · Word\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eSwedish user guide\u003c\/td\u003e\n\n\u003ctd\u003eWorkflow, examples, boundaries, and sources\u003c\/td\u003e\n\n\u003ctd\u003eSV · Word\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eEnglish User Guide\u003c\/td\u003e\n\n\u003ctd\u003eEnglish guidance for the Swedish work templates\u003c\/td\u003e\n\n\u003ctd\u003eEN · Word\/PDF\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\u003ctr\u003e\n\n\u003ctd\u003eKMA register\u003c\/td\u003e\n\n\u003ctd\u003eTen tabs for registers, control signals, and compilation.\u003c\/td\u003e\n\n\u003ctd\u003eSV · Excel\u003c\/td\u003e\n\n\n\u003c\/tr\u003e\n\n\n\u003c\/tbody\u003e\n\n\n\u003c\/table\u003e\u003c\/div\u003e\n\n\u003ch2\u003eHow the package is used\u003c\/h2\u003e\n\n\u003col\u003e\n\n\u003cli\u003eEstablish the scope of the contract, applicable documents, current drawing revisions, and allocation of responsibilities. State which set of regulations the project is subject to.\u003c\/li\u003e\n\n\u003cli\u003eDocument actual risks, work methods, and measures. Submit risk assessments to Bas-U and document actual clearance where required. An internal start notice does not replace Bas-U's clearance or the municipality's start notice.\u003c\/li\u003e\n\n\u003cli\u003eCheck received materials against the correct system and project-specific requirements. If product or system basis is unclear, the responsible person must investigate the issue before use.\u003c\/li\u003e\n\n\u003cli\u003ePlan control points before installation, before covering, and after installation. State the actual control criterion, source, method, inspector, and result.\u003c\/li\u003e\n\n\u003cli\u003eFollow up fire, acoustic, and other functional requirements against design documents and documented system solutions. Request an official decision in case of non-conformance or change; the template cannot verify a fire or acoustic class.\u003c\/li\u003e\n\n\u003cli\u003eRecord non-conformances, actual measures, and re-inspections. Separate technical correction from contract issues regarding compensation or time changes.\u003c\/li\u003e\n\n\u003cli\u003eDocument waste with the actual fraction, quantity, unit, and recipient. Check sorting obligations and any special requirements for hazardous waste separately.\u003c\/li\u003e\n\n\u003cli\u003eCompile handover documents and open questions. Document the actual recipient and receipt; a receipt does not automatically mean the contract is approved.\u003c\/li\u003e\n\n\n\u003c\/ol\u003e\n\n\u003ch2\u003eExcel – ten tabs\u003c\/h2\u003e\n\n\u003cp\u003eOverview, Project, Requirements, Materials, Risk and Start, Inspections, Non-conformances, Waste, Handover, and Read Me. The eight work registers each have 100 prepared rows. The overview compiles registered IDs, open or incomplete entries, and administrative controls. The workbook uses 827 formula cells. It is delivered without test entries.\u003c\/p\u003e\n\n\u003cp\u003eWAIT means that the status is open or that a non-conformance exists. INCOMPLETE means that control fields are missing, the status is invalid, or that a waste quantity is not a valid non-negative number. ADMIN CONTROL means that the mandatory administrative fields and an evidence reference are filled in for the status Verified or Not Applicable. The signal does not verify the content of the evidence, the accuracy of the reference ID, technical safety, or legal validity. When expanding the registers, formulas, validations, and the overview must be expanded. Store actual evidence separately.\u003c\/p\u003e\n\n\u003ch3\u003eFictitious example\u003c\/h3\u003e\n\n\u003cp\u003eA delivered ceiling section is registered as M1 in the material register. System basis is missing and the status is Open. The control signal becomes WAIT. When the responsible person has performed the actual inspection, registered relevant data, and documented the evidence reference as well as the status Verified, Excel shows ADMIN CONTROL. The signal does not mean that the ceiling's fire class or acoustic performance has been established by the workbook.\u003c\/p\u003e\n\n\u003ch2\u003eRegulations and limits of use\u003c\/h2\u003e\n\n\u003cp\u003eThe Swedish Work Environment Authority's AFS 2023:1, AFS 2023:3, and AFS 2023:13 are relevant for occupational health and safety work and the construction project's risk management. Which requirements apply depends on the contractor's role and actual work steps. Boverket's new building regulations came into effect on July 1, 2025, with a transitional period until June 30, 2026. Older regulations may still be relevant for projects where the transitional provisions allow this. Always check the current requirements and the documents of the responsible designer. For construction and demolition waste, applicable sorting, classification, and special documentation requirements must be assessed, among other things.\u003c\/p\u003e\n\n\u003ch2\u003eFrequently asked questions\u003c\/h2\u003e\n\n\u003ch3\u003eWhat should a self-monitoring for ceiling installation contain?\u003c\/h3\u003e\n\n\u003cp\u003eDocument which room and which control point is intended, the applicable project requirement, control method, inspector, date, result, and evidence reference. In case of non-conformance, record the measure and any re-inspection. The package's installation inspection and Excel register are intended for this work.\u003c\/p\u003e\n\n\u003ch3\u003eWhat is the difference between a KMA plan and work preparation for ceiling installation?\u003c\/h3\u003e\n\n\u003cp\u003eThe KMA plan compiles the project's requirements, roles, and control planning. The work preparation describes the concrete work method, risks, protective measures, and coordination before a work step. Both are included as separate documents in the package.\u003c\/p\u003e\n\n\u003ch3\u003eIs a control plan according to PBL included?\u003c\/h3\u003e\n\n\u003cp\u003eNo. The package supports the contractor's project-specific controls and documentation. Any control plan according to the Planning and Building Act must be handled separately based on the construction case.\u003c\/p\u003e\n\n\u003ch3\u003eIs the package a complete management system for certification?\u003c\/h3\u003e\n\n\u003cp\u003eNo. It is project-specific administrative work material, not a certified quality, environmental, or occupational health and safety management system.\u003c\/p\u003e\n\n\u003ch3\u003eCan the installation inspection be used as a fire certificate?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Check the actual design, system documentation, and execution. The template records criteria and results but does not establish a fire class.\u003c\/p\u003e\n\n\u003ch3\u003eDoes the work preparation give the right to start the work?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Risk management, actual coordination, and required clearances must be performed and documented by the responsible parties.\u003c\/p\u003e\n\n\u003ch3\u003eAre general tolerances for ceiling installation included?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Criteria and dimensions are obtained from current project documents, the manufacturer's or system supplier's instructions, and agreed requirements. The template contains no universal limit values of its own.\u003c\/p\u003e\n\n\u003ch3\u003eCan I use Excel for multiple projects?\u003c\/h3\u003e\n\n\u003cp\u003eThe workbook is intended to be used per project. The registers contain prepared ID fields but no automatic relationship tests or document archives.\u003c\/p\u003e\n\n\u003ch3\u003eAre all documents in English?\u003c\/h3\u003e\n\n\u003cp\u003eNo. Eight Swedish work templates and one Swedish user guide are included, together with a separate English user guide for the Swedish documents.\u003c\/p\u003e\n\n\u003cp\u003eFor broader contracting work, there is also the \u003ca href=\"\/en\/products\/kma-projektparm-bygg-entreprenad\"\u003eKMA project folder for construction and contracting\u003c\/a\u003e.\u003c\/p\u003e\n\n\u003ch2\u003eLegal sources and version\u003c\/h2\u003e\n\n\u003cp\u003eVersion 1.0 – November 25, 2026. AI-assisted source control; no external legal or technical expert review. \u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/afs-20231\/\"\u003eAFS 2023:1\u003c\/a\u003e, \u003ca href=\"https:\/\/www.av.se\/afs-20233\/\"\u003eAFS 2023:3\u003c\/a\u003e, \u003ca href=\"https:\/\/www.av.se\/arbetsmiljoarbete-och-inspektioner\/publikationer\/foreskrifter\/afs-202313\/\"\u003eAFS 2023:13\u003c\/a\u003e, \u003ca href=\"https:\/\/www.boverket.se\/sv\/PBL-kunskapsbanken\/regler-om-byggande\/nya-byggregler\/\"\u003eBoverket's new building regulations\u003c\/a\u003e, and \u003ca href=\"https:\/\/www.naturvardsverket.se\/vagledning-och-stod\/avfall\/bygg--och-rivningsavfall\/\"\u003ethe Swedish Environmental Protection Agency's guidance on construction and demolition waste\u003c\/a\u003e. Check current regulations and project requirements before use.\u003c\/p\u003e\n\n\u003cp\u003eOne-time digital download as a ZIP. The PDF files are intended for reading and printing, Word and Excel for editing in compatible programs. No physical delivery.\u003c\/p\u003e\u003c\/section\u003e","brand":"Svenska Dokumentmallar","offers":[{"title":"Default Title","offer_id":56843891573078,"sku":"MB-UNDERTAK-KMA-2027-V1","price":94.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0827\/2373\/3846\/files\/01-undertak-kma-huvudbild.png?v=1795639138","url":"https:\/\/mallbutiken.se\/en\/products\/undertaksmontage-kma-montagekontroll-2027","provider":"Mallbutiken","version":"1.0","type":"link"}