Skip to product information
1 of 3

Svenska Dokumentmallar

Shared dock – Operating agreement, slip allocation, maintenance and Excel | Word/PDF/Excel

Shared dock – Operating agreement, slip allocation, maintenance and Excel | Word/PDF/Excel

File format
DOCX, PDF, XLSX
Document language
Five Swedish work templates Swedish user guide and English user guide
Number of files
7

Digital download. No physical product is shipped.

Regular price 49 SEK
Regular price Sale price 49 SEK
Sale Sold out
Taxes included.
View full details

About this template

Operating Agreement for a Shared Pier – Boat Moorings, Maintenance, and Cost Allocation

Do two or more authorized parties have an existing shared pier but lack a practical, joint arrangement for its use, boat moorings, servicing, and actual operating costs? This comprehensive pier operating and cost agreement helps the parties document their cooperation, verify the legal basis, allocate costs, and monitor maintenance—without confusing a private agreement with an easement or a government decision.

The document templates are intended for property owners, co-owners, and others who already have a verified right to use an existing pier. They are not intended for new construction, a shoreline protection exemption, or a complete legal land survey document.

01. Package Contents

15 downloadable files: 7 editable Word (.docx) files, 7 corresponding searchable PDF (.pdf) files, and 1 Excel workbook (.xlsx) with nine tabs. Five Swedish working documents, a Swedish user guide, and an English User Guide. The main templates are in Swedish; only the user guide is also available in English.

Version: 1.0 (2026) · Jurisdiction: Sweden · Delivery: digital ZIP file via Shopify Digital Products after the file has been attached.

02. What the Files Contain—File by File

Each Word document has a corresponding searchable PDF. The table describes the actual files provided.

No. Document and File Name Content and Use Format
01 Operating and Usage Agreement
01_Operating_Agreement_Shared_Pier.docx
01_Operating_Agreement_Shared_Pier.pdf
Parties, existing rights, boat moorings, care, cost allocations, decisions, and signatures. DOCX + PDF
02 Pier Inventory and Rights Verification
02_Pier_Inventory_Rights_Verification.docx
02_Pier_Inventory_Rights_Verification.pdf
Map, ownership, land and water rights, any easements, GA decisions, and permit documents. DOCX + PDF
03 Boat Mooring and Cost Agreement
03_Boat_Mooring_and_Cost_Allocation.docx
03_Boat_Mooring_and_Cost_Allocation.pdf
Mooring list, shares, budget, and terms for allocation, with signatures. DOCX + PDF
04 Pier Inspection and Non-Conformance Log
04_Pier_Inspection_Non-Conformance_Log.docx
04_Pier_Inspection_Non-Conformance_Log.pdf
Actual observations, photo references, non-conformance management, and technical follow-up. DOCX + PDF
05 Operating Decisions and Maintenance Plan
05_Operating_Decisions_Maintenance_Plan.docx
05_Operating_Decisions_Maintenance_Plan.pdf
Authorized decisions, servicing, winter plan, suppliers, and final check. DOCX + PDF
06 Swedish User Guide
06_User_Guide_SV.docx
06_User_Guide_SV.pdf
Practical use, alternatives, risk cases, formal requirements, and official legal sources. DOCX + PDF
07 English User Guide
07_English_User_Guide.docx
07_English_User_Guide.pdf
English guidance on using the Swedish templates and their legal scope. DOCX + PDF
08 Excel: Pier, Operations, and Cost Register
08_Pier_Operations_Boat_Mooring_Cost_Register.xlsx
Nine tabs with cost allocations, boat moorings, deficiencies, decisions, and compliance status. XLSX

The Excel Tool—Nine Useful Tabs

Start, Parties, Piers, Boat Moorings, Costs, Maintenance, Non-Conformances, Decisions, and Read Me. Excel shows the number of parties, agreed percentages, number of moorings, calculated cost allocations, and non-conformance status. The allocation formulas can distribute, for example, SEK 3,000 according to agreed written shares of 50/30/20—but do not create a payment obligation, property rights, the right to a boat mooring, or an authorized government decision.

How to Use the Document Package

  1. First, check who owns the pier, the land, and the affected water area. Locate any easements, usage rights, and construction decisions; complete the rights annex.
  2. Document which individuals are actually authorized to use the pier. If necessary, terminate the agreement if consent or the right of access is missing.
  3. Complete the operating agreement with safety procedures, a contact person, decision-making authority, and valid usage terms.
  4. Specify boat moorings, agreed cost allocations, and the budget in Annex 03. Check that the shares add up to 100% when a percentage model is used.
  5. Document actual inspections, non-conformances, completed maintenance, and decision-making basis in Files 04–05 and the Excel register.
  6. Review all annexes, valid authority, dates, and signatures before use.

Legal Requirements and Formal Requirements

Existing shared facility: Piers may be part of a shared facility under the Swedish Construction Act (1973:1149). It is established through a land survey. If a registered facility exists, the relevant construction decisions, share ratios, and management rules apply. This private operating agreement does not change such a legal arrangement.

Land and water rights: The agreement is not designed as a new registrable easement agreement and does not automatically grant the right to enter someone else's land, construct a pier, or use a boat mooring on someone else's property. Such rights must be verified and, where applicable, arranged separately.

Shoreline protection and water activities: The Swedish Environmental Protection Agency's guidance states that constructing new piers within a shoreline protection area usually requires an exemption; maintenance of existing piers may be assessed differently depending on the specific measure. New construction or expansion of a pier is often a water activity that must be reported or, in some cases, undergo a permit review. This package does not provide an exemption or the right to rebuild.

Signatures and advice: Private operating terms should be documented and signed by all authorized contracting parties. In cases of uncertain property rights, disputes, co-owner management, changes to GA shares, extensive renovations, or government review, a qualified lawyer or other relevant expert should assess the situation. Not all questions can be resolved with a general template.

Frequently Asked Questions

Does this cooperation agreement create an easement or a shared facility?

No. It is an administrative and civil law document package for a cooperation that presupposes an existing legal right of use. Property rights and shared facilities must be handled separately in accordance with the applicable rules.

Can we change share ratios established by a land survey decision using Excel?

No. Excel provides a calculation model for agreed operating costs between authorized parties. It cannot change established GA share ratios or replace applicable formal and registration requirements.

Can we use the template to build a completely new pier?

No. This package is for the operation and maintenance of an existing facility. New construction and certain modification measures require separate legal and environmental review.

Are the PDF files interactive forms?

No. They are searchable, readable, and printable. Use the Word versions to edit and customize the terms.

Does the package include a boat mooring list and cost calculation?

Yes, in both the accompanying Word annexes and the Excel tool. Only accurate, actually agreed-upon information should be used in the final documents.

Related Document Templates and Guidance

If a separate property right needs to be investigated, see Easement Agreement—General Template. For the individual allocation of a boat mooring, see Boat Mooring Rental Agreement, which is a different type of document. Additional support is available on the Template Store FAQ page.

Official Legal Sources and Legal Source Review

Version 1.0 · Actual AI-assisted source check and document review: October 27, 2026. This is not an externally lawyer-reviewed, government-approved, or technically certified document. Check the relevant legal situation and valid rights before use.