FAT & SAT Test Protocol 2026/2027 – Acceptance Testing, Deviations and Excel | Word/PDF
FAT & SAT Test Protocol 2026/2027 – Acceptance Testing, Deviations and Excel | Word/PDF
- File format
- DOCX, PDF, XLSX
- Document language
- Swedish work templates and Swedish guide + English User Guide
- Number of files
- 8
Digital download. No physical product is shipped.
Couldn't load pickup availability
About this template
FAT & SAT – test protocols and acceptance testing for equipment and systems
Document factory acceptance testing (FAT) and site acceptance testing (SAT) with traceability from requirements specification to measured results, deviations, retesting, and handover. The template package includes editable working documents in Word, searchable PDF versions, and an Excel register for test cases, results, outstanding items, and responsibilities.
01. Package contents
15 digital files in a ZIP: 7 Word (DOCX), 7 PDF, and 1 Excel (XLSX) file with nine tabs. Five Swedish working templates, one Swedish user guide, and one English reference guide.
02. What the files contain
Testing strategy and test plan, factory protocol, site protocol, deviation and outstanding items report, acceptance certificate and handover, and guides. Excel provides a traceable test case list and Dashboard, with separate registers for FAT, SAT, deviations, actions, decisions, and documentation.
File by file
| Document | Format | Content |
|---|---|---|
| 01 FAT/SAT test plan and testing strategy | DOCX + PDF | Project, requirements, test criteria, witnesses, environment, and decision authority |
| 02 FAT test protocol | DOCX + PDF | Factory testing, measured values, evidence, status, and deviations |
| 03 SAT test protocol | DOCX + PDF | Site testing of installation and function with FAT references |
| 04 Deviation and outstanding items report | DOCX + PDF | Errors, risks, actions, retesting, and remaining outstanding items |
| 05 Acceptance certificate and handover | DOCX + PDF | Test overview, reservations, evidence, and authorized signatures |
| 06 User Guide – Swedish | DOCX + PDF | Workflow, responsibilities, test status, and legal limitations |
| 07 User Guide – English | DOCX + PDF | English reference guide and instructions for the Swedish templates |
| 08 Test Register and Dashboard | XLSX | 9 tabs: Dashboard, Test Cases, FAT, SAT, Deviations, Actions, Decisions, Documentation, and Read Me |
How to use the FAT and SAT templates
- Identify the relevant equipment, requirements specification, and contract version.
- Establish measurable acceptance criteria before testing.
- Perform FAT and document the actual measured value, tester, and any deviations.
- Perform SAT on site, checking the current installation, environment, and open FAT items.
- Record deviations, corrections, retesting, and remaining outstanding items in Excel.
- Document the agreed acceptance procedure and authorized signatures separately from the technical test status.
Technical and contractual limitations
These are independently developed administrative templates, not a copy of a licensed standard and not a technical certification. IEC 62381:2024 covers FAT, SAT, and SIT for automation systems in the process industry. Requirements, safety testing, and acceptance must be adapted to the specific project's contract, equipment, and regulations. A completed or signed test protocol does not automatically imply CE compliance, permission to commission, or transfer of contractual risk.
Sources and version information
- IEC 62381:2024 – FAT, SAT, and SIT
- ISA – acceptance testing from factory to plant
- Siemens – technical guidance for FAT and SAT
Frequently Asked Questions
What is the difference between FAT and SAT?
FAT normally takes place at the supplier's facility before delivery or installation. SAT is performed on site in the installed environment. The exact arrangement is governed by the equipment, contract, and test plan.
Can I use the templates for machines and automation systems?
Yes, as administrative documentation support once the technically responsible parties have established the test criteria. Special requirements for machine safety, functional safety, CE, and regulations must be checked separately.
Does Excel calculate passed and failed tests?
Yes. The Dashboard summarizes registered test IDs and status, as well as open deviations and overdue internal actions. The calculations do not constitute a legal acceptance assessment.
Does the certificate replace a purchase agreement?
No. The legal effect of acceptance and any handover depends on the terms of the agreement and the actual approval of the authorized party.
Are all the templates in English?
No. Five working templates are in Swedish. A separate English user guide is included as a reference.
How is the package delivered?
Digital ZIP with 15 files, after the product has been activated and the delivery file linked to Shopify Digital Products.
Version: 1.0 · October 31, 2026. Jurisdiction: Sweden. Method review: internal source control, no external technical or legal review. See frequently asked questions.