-
Wood dust in woodworking 2026/2027 – Risk assessment, extraction, measurement basis & CMR register | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishWood dust in woodworking 2026/2027 – Risk assessment, extraction, measurement basis & CMR register | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishRegular price 79 SEKRegular priceSale price 79 SEK -
Diesel exhaust in workshops & depots 2026/2027 – Risk assessment, extraction & exposure register | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishDiesel exhaust in workshops & depots 2026/2027 – Risk assessment, extraction & exposure register | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishRegular price 79 SEKRegular priceSale price 79 SEK -
Integration test for weighing systems with PLC/HMI – signal matrix, weight test & Excel | Word/PDF
Word · PDF · ExcelMain document language: SwedishIntegration test for weighing systems with PLC/HMI – signal matrix, weight test & Excel | Word/PDF
Word · PDF · ExcelMain document language: SwedishRegular price 249 SEKRegular priceSale price 249 SEK -
AI vision system – incorrect OK sorting, part jams and safe restart | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishAI vision system – incorrect OK sorting, part jams and safe restart | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishRegular price 79 SEKRegular priceSale price 79 SEK -
Control panel in production cell – push-button station, functional test and safety boundary definition | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishControl panel in production cell – push-button station, functional test and safety boundary definition | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishRegular price 79 SEKRegular priceSale price 79 SEK -
AI vision system in production cell – model change, pilot series and release decision | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishAI vision system in production cell – model change, pilot series and release decision | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishRegular price 79 SEKRegular priceSale price 79 SEK -
In-process weighing in production cell – measurement protocol, tolerance deviation and release documentation | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishIn-process weighing in production cell – measurement protocol, tolerance deviation and release documentation | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishRegular price 79 SEKRegular priceSale price 79 SEK -
Machine OTA Update 2027 – Security Firmware, Rollback Test, and Change Decision | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishMachine OTA Update 2027 – Security Firmware, Rollback Test, and Change Decision | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishRegular price 399 SEKRegular priceSale price 399 SEK -
PLC/HMI – backup, recovery test and restart decision | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishPLC/HMI – backup, recovery test and restart decision | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishRegular price 79 SEKRegular priceSale price 79 SEK -
Machinery Regulation 2027 – importer & distributor: CE and documentation check | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishMachinery Regulation 2027 – importer & distributor: CE and documentation check | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishRegular price 79 SEKRegular priceSale price 79 SEK -
3D-printed spare parts 2027 – CAD file, safety testing and product liability | Word/PDF/Excel
Word · PDF · ExcelMain document language: Swedish3D-printed spare parts 2027 – CAD file, safety testing and product liability | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishRegular price 79 SEKRegular priceSale price 79 SEK -
IED 2.0 environmental management system 2027 – Article 14a, BAT objectives, chemical inventory and audit evidence | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishIED 2.0 environmental management system 2027 – Article 14a, BAT objectives, chemical inventory and audit evidence | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishRegular price 79 SEKRegular priceSale price 79 SEK -
Strategic Raw Materials 2026/2027 – supplier mapping, supply risk and action plan | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishStrategic Raw Materials 2026/2027 – supplier mapping, supply risk and action plan | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishRegular price 79 SEKRegular priceSale price 79 SEK -
Waste for disposal 2026/2027 – Article 11, recyclability assessment and PIC evidence | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishWaste for disposal 2026/2027 – Article 11, recyclability assessment and PIC evidence | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishRegular price 79 SEKRegular priceSale price 79 SEK -
EED 2027 – energy assessment 10/85 TJ, three-year calculation and action plan | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishEED 2027 – energy assessment 10/85 TJ, three-year calculation and action plan | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishRegular price 79 SEKRegular priceSale price 79 SEK -
Safety PLC 2027 – program change, version evidence and restart test | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishSafety PLC 2027 – program change, version evidence and restart test | Word/PDF/Excel
Word · PDF · ExcelMain document language: SwedishRegular price 79 SEKRegular priceSale price 79 SEK
About Production & Industry – Templates
Which manufacturing or industrial template do you need? Choose by the actual task: production orders, material demand, OEE, measurement quality, failure investigation, maintenance, PLC/HMI changes or regulatory compliance. Documents support decisions, but do not provide CE approval or replace testing, workplace safety or official reporting.
Choose by your production task
Orders, capacity, materials and costing
Plan production orders and capacity, calculate MRP material needs, compare costing and orders, and distinguish a supplier agreement from a goods receipt. Plan is not actual delivery.
- Produktionsplanering & Kapacitetskalkyl 2026/2027 – Produktionsorder, Veckoplan & Excel
- Materialbehovsplanering & Inköpsplanering MRP Light 2026/2027 – Excel, Word & PDF
- Produktionskostnad & Maskintimkostnad 2026/2027 – Artikelkalkyl, Pris & Excel
- Inköpsorder & Leveransbevakning 2026/2027 – Beställningsorder, Restorder & Excel
- Leveransavtal & Leveransplan B2B 2026/2027 – Order, Leveranskvittens & Excel
- Godsmottagningsprotokoll & Leveranskontroll 2026/2027 – Excel, Word & PDF
Shift handover, OEE, setup time and material flow
Measure real OEE performance, report shift issues, study SMED changeover and 5S, use Kanban for replenishment and a spare-parts register for machine-linked critical stock.
- OEE & TAK – Maskineffektivitet 2026/2027
- Skiftöverlämning & Produktionsdagbok 2026/2027 – Skiftrapport, Risker, Åtgärder & Excel
- SMED & Ställtidsanalys 2026/2027 – Intern/extern ställtid, ställinstruktion & Excel
- 5S-revision & Arbetsplatsstandard 2026/2027 – Checklista, Poängkort & Åtgärdsregister
- Kanban & Tvåbingesystem 2026/2027 – Påfyllnadskort, Lagerflöde & Excel
- CNC Verktygsregister & Verktygslivslängd 2026/2027 – Skärverktyg, Bytejournal & Kostnader
- Reservdelsregister & Kritiska Reservdelar 2026/2027 – Lagerstyrning, Min/Max & Inköpsförslag
Measurement systems and product-quality release
Calibration checks the instrument; MSA examines the measurement process, FAI checks an initial product, and SPC examines process variation. Weight and AI-vision testing require real evidence and manual release decisions.
- Kalibreringsregister & Mätdonskontroll 2026/2027 – Excel, Word & PDF
- Mätsystemanalys MSA & Gage R&R 2026/2027 – 60 mätningar, upprepbarhet & reproducerbarhet
- Förstastyckskontroll & FAI 2026/2027 – Måttprotokoll, Ritningskrav & Frisläppningsregister
- SPC & Processduglighet 2026/2027 – Styrdiagram I–MR, Cp/Cpk & Åtgärdsregister
- Kontrollvägning i produktionscell – mätprotokoll, toleransavvikelse och frisläppningsunderlag
- AI-visionsystem – felaktig OK-sortering, partispärr och säker återstart
- AI-visionsystem i produktionscell – modellbyte, provserie och frisläppningsbeslut
8D, FMEA, root cause and unplanned machine stops
Use 8D for identified defects, FMEA for possible failures, and downtime reports for actual machine stoppages. An RPN number is not a safety certification.
- 8D-rapport & Rotorsaksanalys 2026/2027 – 5 Varför, Åtgärdsregister & Excel
- FMEA – Feleffektanalys 2026/2027
- Driftstoppsrapport & Maskinhaveri 2026/2027 – Riskkontroll, åtgärdslogg och Excel
Preventive maintenance and equipment records
Keep machine maintenance distinct from warranties, vehicles, lift tables, fire equipment and ventilation. A log does not replace any legally required inspection.
- Maskinregister & Förebyggande Underhåll 2026/2027 – Excel, Word & PDF
- Garantiregister & Garantibevakning 2026/2027 – Excel, Word & PDF
- Fordonsregister & Serviceplanering 2026/2027 – Excel, Word & PDF
- Lyftbord & Saxlyftbord – Kontrolljournal, Service & Åtgärdsregister
- Inomhusbrandpost & Slangvinda – Kontrolljournal, Service & Åtgärdsregister
- Ventilation & Inomhusklimat 2026/2027 – Driftjournal, Mätprotokoll & OVK-bevakning
Automation, PLC/HMI, machine safety and FAT/SAT
A scale-to-PLC/HMI test, new button panel, backup, firmware change, Safety PLC, integrated line and FAT/SAT are different tasks. Creating an integrated machine may create manufacturer and CE responsibilities.
- Integrationsprov för vågsystem mot PLC/HMI – signalmatris, viktprov & Excel
- Manöverpanel i produktionscell – tryckknappsstation, funktionsprov och säkerhetsgränsdragning
- PLC/HMI – backup, återläsningsprov och återstartsbeslut
- Maskinens OTA-uppdatering 2027 – säkerhetsfirmware, återställningsprov och ändringsbeslut
- Säkerhets-PLC 2027 – programändring, versionsbevis och återstartsprov
- Sammansatt produktionscell 2027 – integratörens gränssnitt, CE-underlag & säkerhetsprovning
- FAT & SAT Testprotokoll 2026/2027 – Acceptansprovning, avvikelser och Excel
- 3D-printade reservdelar 2027 – CAD-fil, säkerhetsprovning och produktansvar
- Maskinförordningen 2027 – importör & distributör: CE- och dokumentkontroll
Occupational health, exposure and environmental records
Forklift operators require documented knowledge and written permission. Diesel exhaust needs actual exposure controls; environmental and hazardous-waste records must reflect reality. Authority submissions are separate.
- Trucktillstånd & Riskbedömning Trucktrafik 2026/2027 – Lager, Trafikplan & Excel
- Dieselavgaser i verkstad & depå 2026/2027 – Riskbedömning, utsug & exponeringsregister
- Trädamm i snickeri 2026/2027 – Riskbedömning, utsug, mätunderlag & CMR-register – Woodworking: record real wood-dust risks, extraction measures, exposure evidence and applicable CMR duties; templates cannot replace actual controls.
- Miljöaspektregister & Miljöriskbedömning 2026/2027 – Excel, Word & PDF
- Farligt avfall – Avfallsjournal & Transportdokument 2026/2027
Industry regulations, raw materials, energy and permits
IED and CRMA apply only to particular operators. Check when cross-border waste provisions apply and whether new Swedish EED implementing rules are in force. A permit register does not issue a permit.
- IED 2.0 miljöledningssystem 2027 – artikel 14a, BAT-mål, kemikalieinventering och revisionsbevis
- Strategiska råmaterial 2026/2027 – leverantörskartläggning, försörjningsrisk och åtgärdsplan
- Avfall för bortskaffande 2026/2027 – artikel 11, återvinningsprövning och PIC-bevis
- EED 2027 – energikartläggning 10/85 TJ, treårsberäkning och handlingsplan
- Tillståndsregister & Myndighetsbevakning 2026/2027 – Excel, Word & PDF
Legal scope and future rules
EU Machinery Regulation 2023/1230 applies from 20 January 2027. Swedish machinery and workplace-risk responsibilities already exist. The proposed Swedish energy-audit law remained under consultation with a response deadline of 15 January 2027. Hazardous-waste reports must be submitted separately to the Swedish Environmental Protection Agency.
FAQ
Does OEE show machine safety?
No. It measures operational performance, not protective functions.
Are MRP, FMEA and 8D the same?
No. They plan materials, anticipate failure modes and investigate actual problems.
Does a PLC backup authorise restart?
No. Testing and safety approval are separate.
Does vision AI for product inspection control machine safety?
No. These products address quality inspection.
Is the proposed EED 2027 law already enacted in Sweden?
Not merely because an EU directive exists. Verify national implementation.
Are downloaded files automatically in the storefront language?
No. Check each product's actual file language and format.
Official sources and further reading
Choose a template
Compare contents and intended use.
Read the product details
Check what is included and which formats you receive.
Adapt your document
Fill in your details and follow the instructions.