Skip to product information
1 of 3

Svenska Dokumentmallar

First Article Inspection & FAI 2026/2027 – Measurement Reports, Drawing Requirements & Release Register | Word/PDF/Excel

First Article Inspection & FAI 2026/2027 – Measurement Reports, Drawing Requirements & Release Register | Word/PDF/Excel

File format
DOCX, PDF, XLSX
Document language
5 Swedish main templates + Swedish guide + English User Guide
Number of files
8

Digital download. No physical product is shipped.

Regular price 79 SEK
Regular price Sale price 79 SEK
Sale Sold out
Taxes included.
View full details

About this template

First Article Inspection & FAI 2026/2027 – measurement logs, drawing requirements, and Excel registry

Do you need to verify a first manufactured article against drawings and customer requirements before continuing production? This package for First Article Inspection (FAI) helps manufacturers, CNC workshops, subcontractors, and quality departments to plan inspections, document actual measurement results, link materials and manufacturing processes to the correct article revision, and make a separate, traceable release decision.

A total of 15 files: 7 Word, 7 searchable A4 PDFs, and one Excel tool with nine tabs. Five Swedish main templates, one Swedish user guide, and an English User Guide. Editable documents, no subscription or physical shipping.

Technical source and methodology review: October 14, 2026.

The templates are an independent, voluntary documentation aid. SAE AS9102C is a separate, protected industry standard for FAI in aerospace; original forms and the full standard text are not included. The package is not claimed to satisfy AS9102C, ISO certification requirements, or any specific customer contract without supplementary review. 2027 is a version designation.

01. Package Contents

  • 7 editable Word files (DOCX): five Swedish main documents, Swedish user guide, and English User Guide.
  • 7 corresponding searchable PDF files: A4 for printing, reading, and archiving.
  • 1 Excel workbook (XLSX): nine tabs with measurement comparisons, registry relationships, and documented decisions.

15 delivery files in total. Language: Swedish main templates with Swedish and English guides; not fully bilingual. Version: 1.0 – 2026/2027. Delivery: digital ZIP file without physical shipping.

02. What the files contain

No Document Content and area of use Format
01 Inspection plan and start-up protocol Inspection identity, reason, drawing revision, scope, resources, and documented start decision. DOCX + PDF
02 Drawing requirements and measurement log Characteristic ID, nominal value, LSL/USL, measuring method, actual observation, evidence, and separate review. DOCX + PDF
03 Material and process verification Material certificates, batch/traceability, machine, CNC program revision, tools, process, and verification. DOCX + PDF
04 Non-conformance and re-inspection Locking/hold, actual deviation, root cause analysis, documented waiver, action, and re-inspection. DOCX + PDF
05 Final report and release decision Documentation, open points, decision authority, actual signature, limitations, and follow-up. DOCX + PDF
06 Swedish User Guide Step-by-step workflow, registry connection, tolerance limits, evidence, and sources. DOCX + PDF
07 English User Guide English explanation of the Swedish main templates and the Excel tool (main templates are not translated). DOCX + PDF
08 Excel – FAI inspection registry Nine tabs for inspection identities, requirements, measurement results, process, non-conformances, actions, and manual decisions. XLSX

The Excel tool – nine useful tabs

The workbook contains Overview, Articles, Requirements Registry, Measurement Results, Process, Non-conformances, Actions, Decisions, and Read me. Registry-based key figures show the number of first article inspections, drawing requirements, recorded measurements, preliminary limit deviations, open non-conformances, and manually recorded decisions.

  • Drawing and requirement connection: unique requirement IDs and inspection IDs with clear reference to the current drawing revision.
  • Preliminary measurement comparison: formulas for actual values against specified lower and/or upper limits. Empty limits are not interpreted as zero. Deviating units and missing requirement IDs are signaled.
  • Traceable process: batch, material certificates, machine, CNC program version, tools, and evidence references are recorded.
  • Actions and decisions: separation between reported performance, impact analysis, and an actual manual release decision. No algorithm performs automatic approval.

How to conduct a First Article Inspection

  1. Create an inspection ID and enter the article, drawing number, revision, work order, sample, and the reason for the inspection.
  2. Inventory the customer's actual drawing requirements and any special inspection requirements. Register each requirement with a unique reference and correct units.
  3. Check measuring method, current status of measuring equipment, material certificates, and actual machine/program configuration.
  4. Register actual measurement values with measurement ID, sample number, requirement ID, method, and evidence in Excel and the measurement log.
  5. Investigate numerical deviations, missing documentation, uncertain measurements, and any customer waivers individually.
  6. Have an authorized person perform a final, documented assessment with signature, date, scope of the decision, and any conditions.

Legal and quality engineering requirements

First Article Inspection is not a general Swedish government form. If a contract stipulates requirements for, e.g., SAE AS9102C (2023), PPAP, or customer-specific FAI formats, the original requirements and applicable documentation order must be used. SAE describes AS9102C as supplementary to customer requirements and applicable regulations; the protected standard text must not be replaced by a general proprietary template.

SIS's public guidance on ISO 9001:2015 highlights the importance of documentation for measurement resources, identification, change review, release, and non-conformances. The product is not ISO-certified, and an Excel calculation does not constitute an independent conformity assessment or delivery approval.

Important limitation: Excel does not automatically convert units of measurement and does not automatically review measurement uncertainty, drawing interpretation, sampling, special processes, or customer acceptance criteria. The customer must ensure the correct requirements, competence, and actual decision-making authority.

Related products and further information

When measurement series need to be monitored over time, SPC & Process Capability with Control Charts in Excel can complement the first article inspection. For the traceability of measuring equipment, there is Calibration Registry & Gauge Control. With Quality Plan & Inspection Program, the inspection can be integrated into a larger quality system. For root cause investigation, the 8D Report & Root Cause Analysis is relevant.

See also the guide on supplier agreements, quality, and delivery responsibility when first article inspection is to be included in a supplier relationship, or browse Production & Industry – Templates.

Frequently Asked Questions

What is FAI?

First Article Inspection is a documented verification of a first or representative article against specified requirements, often for a new article, drawing change, or process change. The scope is determined by customer requirements and the chosen method.

Is this an official AS9102C form?

No. The package was developed independently. It contains neither SAE's official forms nor licensed standard text and cannot be marketed as verified AS9102C-compliant.

Does Excel provide automatic approval?

No. Numerical comparisons only provide preliminary indicators. Decisions, measurement uncertainty, customer requirements, and any waivers must be assessed and documented by an authorized person.

Can I use it for CNC manufacturing?

Yes, as a general registration aid for article revisions, measurement results, machine/program traceability, non-conformances, and release documentation. Customer-specific requirements must be supplemented.

Are all documents in English?

No. The five main templates are in Swedish. The English User Guide describes how to use them together with the Excel tool.

Sources and version information

Source review October 14, 2026: SIS – guidance for documented information according to ISO 9001:2015 and SAE International – AS9102C, public scope description. Edition: 1.0, 2026/2027; version years do not indicate established future rights. File package: forstastyckskontroll-fai-2027.zip.