Skip to product information
1 of 3

Svenska Dokumentmallar

F-gas in heat pump sales – proof of installation, certificate check & 5-year register | Word/PDF/Excel

F-gas in heat pump sales – proof of installation, certificate check & 5-year register | Word/PDF/Excel

File format
DOCX, PDF, XLSX
Document language
Five Swedish workbooks and a Swedish user guide as well as a separate English User Guide; Excel in Swedish; main workbooks not in English
Number of files
7

Digital download. No physical product is shipped.

Regular price 79 SEK
Regular price Sale price 79 SEK
Sale Sold out
Taxes included.
View full details

About this template

Do you sell heat pumps, air conditioners, or other pre-filled F-gas equipment directly to end users? This Swedish document package helps the seller assess whether the EU F-gas Regulation requires proof of installation before sale, request supporting documentation from the customer and certified company, document certificate verification, and retain information on actual sales. Important: the rules do not automatically apply to all heat pump equipment – the product's gas, pre-filling, hermetic design, and the buyer's role must be checked.

Quick facts for the purchasing decision

For: retailers, wholesalers, refrigeration/HVAC companies, and online retailers with applicable pre-filled F-gas equipment. Legal: Regulation (EU) 2024/573, Articles 11.7 and 7.4; Swedish business process. Contents: 5 Swedish work templates, a Swedish user guide, a separate English User Guide, all in DOCX and searchable, printable PDF, plus 1 Excel register (XLSX): 15 customer files. DOCX/XLSX are editable; PDFs lack interactive form fields. The delivery format after subsequent manual publication is a digital ZIP.

01 – Package contents

Five different Swedish work documents for applicability assessment, customer request, installer confirmation, actual certificate verification, and decision/five-year register. A Swedish guide and a separate English guide. Seven independent documents × Word/PDF = 14 files, plus one Excel tool = 15 files. The English guide does not make the main templates English-language.

02 – What the files contain

Equipment classification and end-user test; letter requesting actual proof of installation before sale; voluntary written confirmation from the installation company; control log for company certificates, scope of certification, and source usage; separate seller decision and register of sold equipment and the intended certified installation company. Excel shows administrative cases and open deviations, but does not automatically check any certificates or certify regulatory compliance.

Who should choose the template – and who should not?

Situation A: A webshop receives an inquiry about a split heat pump pre-filled with relevant F-gas and assessed as non-hermetically sealed. It needs proof of a certified installation company before the sale is completed. Situation B: A wholesaler sells relevant equipment directly to a business that is itself an end user and needs to perform the corresponding check and maintain its register.

Not the right product: if you need a leak repair log, operational service, electrical installation documentation, refrigerant inventory for operators, or a certificate of actual installation. A correctly verified hermetically sealed product not covered by Article 11.7 does not require the special proof of installation under this specific provision; other safety and environmental requirements may still apply. A business customer is not automatically exempt from the end-user rule.

File by file – exactly what the customer can work with

Document / file Function Language / format
01 Applicability assessment Model, gas type, pre-filling, hermetic status, end user, manual assessment SV · DOCX + PDF
02 Request for proof of installation Customer letter before completed sale and internal response log SV · DOCX + PDF
03 Installer confirmation Voluntary supporting documentation with company, certificate number, installation, and signature SV · DOCX + PDF
04 Certificate verification Verification source, validity, company identity, scope of business, and decision SV · DOCX + PDF
05 Sales decision & five-year log Internal assessment before sale and register of actually sold equipment SV · DOCX + PDF
06 Swedish user guide Workflow, legal boundaries, and completion checklist SV · DOCX + PDF
07 English User Guide Explains use of Swedish templates, not an English version of the legal documents EN · DOCX + PDF
08 Sales register Nine tabs, status selection, sources, and eight formula-based summaries SV · XLSX

The Excel register – what it actually does

The workbook's nine tabs are Products, Orders, Installers, Proof, Checks, Deviations, Sales, Overview, and Read me & sources. The registers have data validation for relevant status selections, ID fields for traceability, and separate fields for actual sales. The overview counts, for example, pending proof, paused check decisions, unverified certificates, and registered sales with eight tested COUNTIF/COUNTA formulas. If a customer still lacks proof, the case can remain as a request/pending; an internal status of "Proceed" is not an actually completed sale. No customer examples or macros are included in the delivery file. Microsoft Excel or another compatible program is required for XLSX; specific alternative program versions have not been tested.

How the package is used

  1. Identify the exact equipment model, F-gas type, and whether the product is pre-filled and non-hermetically sealed.
  2. Assess the end-user role; even a business can be an end user.
  3. If Article 11.7 applies: request actual proof of installation before the sale is completed.
  4. Check the company's certification and relevant installation activities with the actual issuer, e.g., INCERT for relevant Swedish certificates.
  5. Document a separate decision; in case of uncertainty, supplement or refrain until the assessment is sufficient.
  6. After the actual sale: register the sold equipment and the certified installation company, protect the archive, and retain the information for at least five years according to Article 7.4.

Legal prerequisites and limitations

EU Regulation (EU) 2024/573, Article 11.7 applies to non-hermetically sealed equipment, filled with the F-gases listed in Annex I or Section 1 of Annex II, when sold to end users. In that case, proof of installation by a company certified according to Article 10 is required. Article 7.4 requires registers of sold equipment and relevant certified installation companies for at least five years.

The Swedish Chemicals Agency states that the Regulation does not prescribe a single specific proof form; an actual installation agreement or written confirmation from a certified company may be relevant, and the seller should check the certificate number. The Swedish Environmental Protection Agency explains, among other things, the distinction from hermetically sealed equipment. INCERT offers search/verification of relevant Swedish certificates. None of this means that the authority or certification body has approved Mallbutiken's documents.

The sufficiency of proof, correct scope of certification, special circumstances, contractual situation, and any other applicable Swedish or EU law must be checked at every actual transaction. The material is not a technical installation instruction, not a certificate, and not individual legal advice.

Compare with related templates

F-gas leakage, repair, and post-check is another workflow that handles leaks/service, not the requirement for proof of installation before sale. The heat pump service log follows operation and maintenance. This package focuses instead on the seller's advance check and five-year register.

Frequently asked questions

Must all heat pumps be sold with proof of installation?

No. First, the equipment's gas, pre-filling, hermetic status, and end-user situation must be assessed against Article 11.7.

Is the buyer's promise to hire an installer sufficient?

Not necessarily. The supporting documentation must show that the installation is to be carried out by a certified company. Verification of the company's certification and actual connection to the equipment is required.

Is a personal certificate always sufficient?

No. Check the certified installation company and applicable certification requirement, not just whether an individual technician has a personal certificate.

How long should the seller retain the register?

At least five years according to Article 7.4 for the sold equipment and the certified installation company to which the provision refers. Handle personal data simultaneously in accordance with GDPR.

Are the PDFs fillable, and are there English work templates?

PDF is searchable/printable but not interactively fillable. The five work templates are Swedish; English is available as a separate user guide.

Does Excel automatically check valid certificates?

No. Excel registers information and calculates administrative summaries. The actual certificate verification is carried out separately with the relevant issuer.

Source version and review status

Version 1.0, November 14, 2026. AI-assisted legal source review and internal document/formula/file check have been carried out for this version. No independent external legal review, authority review, or certification has been carried out. Future digital delivery will be as a ZIP after the DRAFT product has been manually activated and the file linked to the correct variant. Supplier: Svenska Dokumentmallar · Mallbutiken.se.