Skip to product information
1 of 3

Svenska Dokumentmallar

Tender Evaluation & Scoring Matrix 2026/2027 – Excel, Word & PDF

Tender Evaluation & Scoring Matrix 2026/2027 – Excel, Word & PDF

File format
DOCX, PDF, XLSX
Document language
Swedish + English working reference
Number of files
9

Digital download. No physical product is shipped.

Regular price $8.00 USD
Regular price Sale price $8.00 USD
Sale Sold out
Taxes included.
View full details

About this template

Bid Evaluation & Scoring Matrix 2026/2027 is an editable template package for structured supplier assessment and bid evaluation. Compare up to 20 bids in Excel with separate checks for formalities, mandatory requirements, and qualification; calculate preliminary price and quality scores; document the assessment; and compile a manual basis for decision-making. The package also includes evaluation protocols, a criteria appendix, a detailed Swedish user guide, and an English working reference.

What is included in the package

Delivery file Content Format
Bid Evaluation & scoring matrix Seven tabs: Overview, Settings, Bids, Assessment Log, Decision, Instructions, and a separate fictional Example. Excel (XLSX)
Evaluation protocol Examination of mandatory requirements, model, bids, scores, assessment documentation, statement of reasons, and approval. Word (DOCX) + PDF
Criteria appendix & scoring scale Working appendix to establish criteria, relative weights, scoring anchors, and formulas before bids are submitted. Word (DOCX) + PDF
Detailed user guide Step-by-step instructions, calculation examples, risks, documentation requirements, quality assurance, and sources. Word (DOCX) + PDF
Bid Evaluation Workflow English working reference for Swedish procurement and purchasing conditions. Word (DOCX) + PDF

Total of nine files: 4 Word, 4 searchable A4 PDF documents, and 1 Excel workbook. Everything is delivered digitally in a ZIP file.

Excel scoring matrix with clear control

  • 20 bid slots: register bidders, price excl. VAT, evaluator, justification, and document reference.
  • Mandatory examination: separate fields for formalities, "shall" requirements, and qualification, with Yes/No/Not reviewed.
  • Control lock: scores are only calculated once requirement assessment, price, and all quality scores are fully registered.
  • Scoring formulas: an example weighting with 35% price, 30% quality, 20% execution, and 15% service.
  • Dashboard: preliminary ranking, number of registered/approved/rejected bids, price, and scores.
  • Assessment log: basis for documented assessment reasons and verification against actual bids.
  • Manual decision sheet: management of responsibility, conflicts of interest, tied scores, statement of reasons, and archive reference.
  • Fictional examples: separate demonstration sheet that is not included in the actual bid list.

How does the calculation model work?

The pre-filled example model provides a total of up to 100 points. Price points are calculated as the lowest price among complete and qualified bids divided by the current bid's price, multiplied by the price weight. Quality parts are assessed with scores of 0–5 and multiplied by their weights. A bid with an incomplete or rejected examination will not be scored.

How to use the bid evaluation template

  1. First, determine if the purchase is a private procurement or covered by the Public Procurement Act (LOU/LUF) or other regulations.
  2. Establish and document the basis for evaluation, criteria, scoring scale, weights, price model, and any tie-breaking rules before bids are received.
  3. Register each bid and check formalities, mandatory requirements, supplier qualification, and any grounds for exclusion according to applicable rules.
  4. Only score bids that are permitted to be evaluated; document the reasons for each score and refer to relevant appendices.
  5. Review the dashboard, formula results, any tied scores, conflict of interest issues, and decision basis.
  6. Draft and sign the decision according to the organization's routines and procurement regulations, including any notification/standstill period and archiving.

Public procurement, LOU, and weighting

When applying the Public Procurement Act (2016:1145), LOU, fundamental principles such as equal treatment and transparency apply. The Swedish National Agency for Public Procurement describes three grounds for choosing the most economically advantageous tender in directive-governed procurement: price, cost, or the best price-quality ratio. Requirements regarding how award criteria and weighting must be specified depend on the procurement procedure. A generic Excel model cannot replace procurement documents, qualification assessment, or individual legal control.

The Swedish Competition Authority highlights the importance of documentation regarding bids, reasons for assessment, supplier selection, and decisions. Therefore, a separate evaluation protocol and an assessment log are included. The documents are general administrative templates, not an authority-approved procurement system or a guarantee that a certain procedure is lawful.

Who is the template package suitable for?

For example, purchasers, procurement officers, municipal operations with relevant powers, consulting firms, property companies, housing cooperatives, companies, and non-profit organizations that want to compare quotes or bids more systematically. Private corporate purchases may require a different model and assessment than public procurement.

Frequently asked questions

Is the scoring matrix ready to be used in an LOU procurement?

Not without review and customization. The pre-filled model is a calculation example. Criteria, weighting, and the price model must correspond exactly to the procurement documents and be compatible with applicable regulations.

How many bids can be accommodated?

The Excel workbook has 20 prepared bid slots as well as a separate assessment log.

Can one change the criteria weights oneself?

Yes. The weights in Excel are editable and checked to ensure the sum equals 100%. In public procurement, customization must not entail unauthorized changes to an already established evaluation model.

Are bids that do not meet the "shall" requirements excluded?

The workbook automatically blocks scoring for items not marked as approved in the three examination fields. However, the requirement and qualification assessment itself is always manual.

Is it possible to assess based solely on lowest price?

That requires a separate, pre-established model. The provided example model combines price and quality. You should not assume it automatically supports all award bases.

Does Excel designate the winning supplier?

No. It shows a preliminary ranking. Legal control, decisions, tied-score situations, and documentation must be handled manually.

Which languages are included?

Excel and the three Swedish document templates have Swedish main fields. A separate English working reference for organizations with Swedish procurement conditions is included.

Legal basis and official sources

Delivery: Digital ZIP with editable Excel workbook, Word files, and searchable PDF. No physical item is sent. Also see our templates for purchasing and supplier management and corporate agreements.

  • 5 stars: 6 (60%)
  • 4 stars: 2 (20%)
  • 3 stars: 2 (20%)
  • 2 stars: 0 (0%)
  • 1 star: 0 (0%)
N
Nils Lindberg
Smidig utgångspunkt

Vi ville kunna prata igenom Anbudsutvärdering & Poängmatris 2026/2027 med samma underlag framför oss, och det fungerade bra. Inget onödigt krångel i upplägget, vilket jag uppskattar. Excel-delen gjorde det enklare att arbeta systematiskt vidare. Resultatet blev precis den start jag behövde.

D
David Svensson
Bra grundmaterial

Ett användbart underlag för Anbudsutvärdering & Poängmatris 2026/2027, särskilt när man behöver komma igång utan lång förberedelse. Språket var överlag rakt och lätt att förstå. Lite eget arbete krävdes, men helhetsintrycket är positivt.

A
Anders Andersson
Plantilla muy útil

Utilicé la plantilla «Anbudsutvärdering & Poängmatris 2026/2027» para preparar un primer borrador. Los apartados están organizados de forma sencilla. Me resultó una ayuda muy práctica.

K
Karl Rydberg
Okej som utgångspunkt

Den här mallen för Anbudsutvärdering & Poängmatris 2026/2027 gav mig en bra känsla för hur dokumentet kunde byggas upp. Jag kunde lägga min tid på innehållet snarare än på formateringen. Att kunna redigera Word-filen var en tydlig fördel. Det fungerade som startpunkt, men krävde mer anpassning än jag först räknade med.

S
Stefan Hedlund
A useful starting point

We needed a clear outline for "Anbudsutvärdering & Poängmatris 2026/2027" and this gave us something practical to work with. The document gave us a more consistent basis for discussion. Worth having as a starting point.

T
Thomas Söderberg
Kohtuullinen aloituspohja

Malli ”Anbudsutvärdering & Poängmatris 2026/2027” auttoi kokoamaan asiat yhteen paikkaan. Jouduin täydentämään joitakin kohtia itse. Käyttökelpoinen, mutta vaatii muokkausta.

P
Peter Danielsson
Bonne base de travail

Pour «Anbudsutvärdering & Poängmatris 2026/2027», je cherchais surtout une structure facile à adapter. J'ai modifié quelques passages pour mon cas. Très satisfait de cet outil pratique.

L
Lars Dahlberg
Nöjd med upplägget

Vi behövde ta fram ett underlag för Anbudsutvärdering & Poängmatris 2026/2027, och det sparade en hel del förarbete. Efter en genomläsning kunde vi göra de ändringar som behövdes. Excel-delen gjorde det enklare att arbeta systematiskt vidare. Det hjälpte mig särskilt att få ordning på vårt eget material. Lite eget arbete krävdes, men helhetsintrycket är positivt.

S
Samuel Wallin
Godt utgangspunkt

Jeg brukte malen for «Anbudsutvärdering & Poängmatris 2026/2027» som et utgangspunkt. Oppsettet gjorde det lettere å se hva som måtte fylles inn. Alt i alt veldig fornøyd.

R
Robert Holmqvist
Bra arbetsmaterial

Framför allt ville jag slippa börja med ett tomt dokument för Anbudsutvärdering & Poängmatris 2026/2027. Det gav en tydligare bild av vad som behövde kontrolleras innan vi var klara. Excel-delen gjorde det enklare att arbeta systematiskt vidare. Det hjälpte mig särskilt att få ordning på vårt eget material. Resultatet blev precis den start jag behövde.