Work Preparation Construction & Civil Engineering 2026/2027 – AFS 2023:3/13 Word/PDF
Work Preparation Construction & Civil Engineering 2026/2027 – AFS 2023:3/13 Word/PDF
- File format
- DOCX, PDF
- Document language
- Swedish
- Number of files
- 5
Digital download. No physical product is shipped.
Couldn't load pickup availability
About this template
Work Preparation for Construction & Civil Engineering 2026/2027 – AFS 2023:3 / AFS 2023:13
This is a complete template package for work preparation in construction and civil engineering work. The package helps contractors, site management, and the Bas-U (Work Environment Coordinator for the construction phase) to plan a specific work task step by step, identify work environment risks, determine protective measures, coordinate work with other parties, and document reviews and clearance for start.
The template package was legally reviewed on October 4, 2026, and is based on the current structure of the Swedish Work Environment Authority's regulations, primarily AFS 2023:3 regarding design and construction work environment coordination, AFS 2023:13 regarding risks in certain types of work, and AFS 2023:1 regarding systematic work environment management.
Digital delivery: a ZIP file. Previous product lists indicated 5 documents in Word/PDF (10 internal format files, 10 pages per format series), but the ZIP contents have not been independently inventoried.
This is included in the package
Verified download item: a ZIP file, Arbetsberedning_Bygg_Anlaggning_2026_2027_Mallpaket.zip.
The older product list indicates 5 document types, each in Word and PDF (a total of 10 internal format files, 10 pages per format series). The archive's internal files have not been independently inventoried.
One ZIP download is verified – not 10 separate download links.
What the files contain
Work Preparation: method, prerequisites, equipment, risks, and protective measures for an individual work task. Task Risk Register: assessment and follow-up. Clearance for Start: inspection and review before starting. Deviation and Guide: changed prerequisites and lessons learned.
A work preparation complements the employer's systematic work environment management and the construction project's work environment plan. Real risks and routines for the Bas-U must be assessed on-site.
Documents according to the table of contents
- Work Preparation for Construction & Civil Engineering 2026/2027 – 4 pages.
- Task Risk Register – 2 pages.
- Clearance for Start & Review – 1 page.
- Deviation & Follow-up – 1 page.
- Detailed User Guide – 2 pages.
- All five documents in both Word and PDF.
What is work preparation?
AFS 2023:3 defines work preparation as detailed planning of how an individual work task is to be carried out, including the management of work environment risks.
Work preparation is therefore more concrete than an overall work environment plan. It focuses on a specific task: how the work should be performed, in what order, with what equipment, what risks exist, what protective measures must be in place, and how the work should be coordinated with others.
When is work preparation particularly relevant?
The package is particularly useful:
- before high-risk work tasks,
- when several contractors are working simultaneously or consecutively,
- when the work method is unusual or technically complex,
- when the Bas-U needs planned measures before granting clearance for start,
- for work with special risks according to the work environment plan,
- when work conditions change during the construction phase,
- as an understandable instruction before an individual work task.
Work preparation and the Bas-U
AFS 2023:3 states that the Bas-U must participate in the construction phase planning and manage it so that common work environment aspects are considered. Ongoing planning also includes detailed planning in the form of work preparations.
Before a contractor may begin their work for the first time, the Bas-U must, among other things, have received information about:
- work with special risks,
- risks that the contractor's work may cause to others on the construction site,
- the contractor's own risks that can be handled through coordination.
The Bas-U must ensure that risks are addressed or that planned measures are in place before work starts. A planned work preparation can be such a measure.
Work preparation as a safe instruction
AFS 2023:13 requires the employer to provide employees with sufficient instructions on how construction and civil engineering work is to be performed safely. The general recommendations indicate work preparation as a possible way to provide instructions before an individual work task where work environment risks are managed.
The template is therefore built to function both as a planning basis and as support during the practical review before starting.
Project and task information
The main template includes fields for, among other things:
- project and workplace,
- developer/client,
- contractor and employer,
- Bas-U and contact person,
- work task and work area,
- planned start and end time,
- responsible supervisor,
- participating professional groups and subcontractors.
Prerequisites before start
Before the actual method is planned, the template helps the site management verify that the necessary prerequisites are in place, for example:
- drawings and documents,
- work environment plan,
- APD plan and logistics,
- permits and inspections,
- materials and equipment,
- competence and qualifications,
- coordination with other contractors,
- weather and external conditions,
- emergency and rescue routes.
Describe the work method step by step
The workflow is documented in its own table where each step is linked to equipment/aids and the person responsible. This makes it easier to then perform a risk assessment of the actual method instead of using an overly general risk list.
Risk assessment of the work task
The main template has a built-in risk register with fields for:
- risk or dangerous situation,
- who may be affected,
- probability,
- consequence,
- risk value,
- preventive measure,
- residual risk.
For more extensive tasks, a separate Task Risk Register is included with ten risk rows and a separate assessment of residual risk after measures.
Written risk assessment according to AFS 2023:1
According to AFS 2023:1, the employer must regularly investigate work environment conditions and assess the risks of ill health and accidents. The risk assessment must always be documented in writing, and it must be clear what the risks are and whether they are serious.
The work preparation can therefore be used as a project-specific part of the employer's systematic work environment management, but it does not replace the company's other SAM (Systematic Work Environment Management) procedures.
Control of common construction and civil engineering risks
The template includes a quick checklist of risk areas that often need to be assessed, including:
- falling to a lower level,
- excavation and collapse,
- heavy building elements,
- demolition,
- passing traffic,
- electricity and wiring,
- lifting and cranes,
- machinery and work equipment,
- quartz and dust,
- chemical risk sources,
- asbestos and other hazardous materials,
- fire and hot work,
- noise and vibration,
- ergonomics,
- lone working,
- simultaneous work,
- temporary structures,
- weather and temperature,
- confined spaces.
Work with special risks and the work environment plan
AFS 2023:3 specifies particular work environment risks that require measures to be described in the work environment plan. When the same risk occurs during several work tasks and different measures are required, it must be clear which measure applies to each respective task.
When work preparations are planned for such tasks, the work environment plan should indicate how affected parties can take part in the work preparations. The package therefore contains special fields for AMP reference and where the work preparation is stored.
Equipment, inspection, and competence
A separate section in the main template documents, among other things:
- machinery and work equipment,
- inspection, control, and testing,
- lifting gear and lifting plans,
- personal protective equipment (PPE),
- fall protection and anchor points,
- barriers and protective devices,
- competence, training, and certificates,
- person with special competence when required by regulation.
Coordination of simultaneous work
The package has a specific coordination section where the contractor documents:
- what other work is ongoing simultaneously,
- risks that their own work causes to others,
- risks that other work causes to their own staff,
- need for time or area separation,
- shared protection and barriers,
- communication channel to the Bas-U and other parties.
Emergency preparedness
The work preparation contains fields for alarm numbers, first aid, defibrillators, rescue/evacuation route, assembly point, and a special rescue plan when the work task requires it.
Clearance for Start & Review
The separate one-page protocol can be used as a practical final step before work begins. It checks, among other things, that:
- work preparation has been carried out,
- risk assessment is complete,
- work environment plan has been checked,
- special risks have been reported to the Bas-U,
- coordination risks have been managed,
- equipment and protection have been checked,
- qualifications have been verified,
- emergency preparedness has been reviewed.
Document that the information is understood
AFS 2023:13 requires that information and instructions be available and understandable to the employees for whom they are intended. The employer must also ensure that the employees have understood the information.
The startup protocol therefore includes signature fields where those involved can document the review.
Stop work when conditions change
Work preparation should not be treated as a static document. If the work method, equipment, staffing, materials, simultaneous work, weather, or other conditions change, the risk assessment needs to be reconsidered.
The package therefore includes a separate Deviation & Follow-up section where changes, new risk assessments, immediate actions, and decisions about continued work are documented.
Immediate and serious danger
If the work task involves immediate and serious danger to life or health, work must not start, or it must be interrupted/changed until the work environment risk has been addressed. The main template therefore contains a clear stop box at the startup decision.
Feedback of experience
The deviation/follow-up form also contains fields for:
- what worked well,
- what should be done differently next time,
- who followed up,
- whether the lesson learned should be incorporated into routines, the work environment plan, or future work preparations.
Detailed user guide included
The guide explains step by step:
- when work preparation should be used,
- how real conditions are mapped,
- how the work method is described,
- how each step is risk-assessed,
- how special risks are linked to the work environment plan,
- how coordination with the Bas-U is carried out,
- how understandable information and reviews are documented,
- when work should be stopped,
- how the work preparation is updated during changes,
- a complete recommended workflow from planning to feedback of experience.
Legally reviewed for 2026/2027
The package was reviewed on October 4, 2026, based on:
- AFS 2023:3 Design and construction work environment coordination – fundamental obligations.
- AFS 2023:13 Risks in certain types of work, especially Chapter 5 on construction and civil engineering work.
- AFS 2023:1 Systematic work environment management.
- The Work Environment Act (1977:1160) and other risk regulations where applicable.
Format and delivery
Verified delivery: a ZIP file. The product list indicates 10 internal Word/PDF files, but the archive has not been checked separately.
- 5 documents.
- 10 files total.
- Word (DOCX) + PDF.
- 10 A4 pages per format series.
- Digital product – no physical goods are shipped.
Guides and related risk areas
Read the guide on work preparation in construction, the guide on work environment plans, the guide on subcontracting agreements and liability.
Common questions
How are the various documents delivered?
A ZIP file is verified as the download object. The table of contents indicates 5 document types in Word/PDF (a total of 10 internal format files), but the archive's internal file list has not been inventoried separately.
Is work preparation the same thing as a work environment plan?
No. The work environment plan is the project's overall document when such is required. The work preparation is detailed planning of an individual work task.
Must work preparation always be done?
The regulations use work preparation as a concrete planning and instruction tool. The need is determined by the work task's risks, complexity, and project organization, as well as any requirements from the client/Bas-U.
Can the template be used by a subcontractor?
Yes. It is specifically designed for contractors' and subcontractors' work tasks on the construction site.
Is risk assessment included?
Yes. Both a risk section in the main template and a separate task risk register are included.
Is clearance for start included?
Yes. A separate clearance for start and review protocol is included.
Does the template replace SAM?
No. The employer still has responsibility for their systematic work environment management according to AFS 2023:1.
Important
The template is a professional general work environment basis. It must be adapted to the actual work task, the project's work environment plan, the Bas-U's coordination, client requirements, collective agreements, and the risk regulations that apply to the work.