Skip to product information
1 of 3

Svenska Dokumentmallar

Septic systems for holiday homes – municipal notification, site assessment and installation inspection | Word/PDF/Excel

Septic systems for holiday homes – municipal notification, site assessment and installation inspection | Word/PDF/Excel

File format
DOCX, PDF, XLSX
Document language
Five Swedish main templates Swedish user guide and separate English User Guide; Swedish Excel register
Number of files
7

Digital download. No physical product is shipped.

Regular price 79 SEK
Regular price Sale price 79 SEK
Sale Sold out
Taxes included.
View full details

About this template

Are you installing a BDT system for bath, dishwashing, and laundry water at your holiday home? This Swedish template package helps you identify the correct municipal review process, compile the site plan and protection data, request documentation from the contractor, and document the installation and commissioning. It is specifically designed for those who have or plan a separate BDT solution without a toilet.

Important before purchase: A new BDT system is normally subject to notification under Section 13 of the Ordinance (1998:899), but the municipality may have prescribed a permit requirement. Connecting a toilet changes the legal assessment. No template provides a permit, determines technical protection distances, or replaces the municipality's official notification form.

Quick facts: 7 editable Word files (DOCX), 7 corresponding searchable and printable PDFs, and one Excel workbook (XLSX) with nine tabs. Total of 15 customer files in a digital ZIP. Five Swedish operational forms, one Swedish user guide, and one English User Guide; Excel is in Swedish. PDFs lack interactive form fields. Version 1.0, November 21, 2026.

01 · Package Contents

Five work templates: (1) property and toilet/BDT check, (2) supplementary documentation for the municipality, (3) site and water source documentation, (4) contracting and installation protocol, and (5) commissioning, deviations, and follow-up. In addition, a Swedish guide, English User Guide, and Excel workbook with nine tabs. Each text document is available in editable DOCX and searchable A4 PDF formats. There are seven different text documents in two formats—not fourteen different legal forms.

02 · What the Files Contain

Fields for the actual property designation, the holiday home's use, BDT water flows without a toilet, local permit rules, the municipality's original diary number, site plan, own and neighbors' water sources, technical test pit reports, as-built drawings, photos before backfilling, the contractor's work, operating instructions, and separate post-inspections. Excel highlights missing documentation without determining whether the soil or treatment technology is approved.

Which Holiday Homes Is the Package Suitable For?

Scenario A – simple summer cottage without a toilet: The cottage has water for washing dishes and handwashing. The package helps you compile usage, actual load, soil data, and the municipality's local notification or permit requirements. A small amount of water does not automatically grant an exemption.

Scenario B – a shower is to be installed: An older BDT system exists, but a new shower may change the water volume. You will receive separate control questions about previous decisions, change notifications, and the contractor's technical documentation.

Scenario C – toilet connected to a sealed tank and BDT separately: The two solutions may need to be assessed separately. The package does not treat a toilet connection as a BDT notification and does not provide a general permit for toilet sewage.

Not intended for public or large-scale commercial sewage, treatment plants, professional sizing, official technical decisions, toilet installations, or a ready-made permit guarantee. A separate product is available for the ongoing maintenance of existing sludge separators.

Exact Customer Files and Formats

Document Function Language Format
01 – Project and Legal Track The holiday home's actual water installations, toilet/BDT delineation, local rules, and municipal decisions Swedish DOCX + searchable PDF
02 – Documentation for the Municipality Supplementary attachment to the municipality's form/e-service with site plan, technology, original reports, and answers Swedish DOCX + searchable PDF
03 – Site and Water Sources Documentation for expert assessment of soil, test pits, groundwater, wells, and surroundings Swedish DOCX + searchable PDF
04 – Contracting and Installation Order, terms, as-built drawing, photo before backfilling, and actual work certificate Swedish DOCX + searchable PDF
05 – Commissioning and Follow-up Instruction certificate, actual inspection decisions, operation, deviations, and changed usage conditions Swedish DOCX + searchable PDF
06 – Swedish User Guide Step-by-step, three scenarios, frequently asked questions, and official legal sources Swedish DOCX + searchable PDF
07 – English User Guide Instructions in English for completing the Swedish templates English DOCX + searchable PDF
08 – BDT Project Register Project, Site, Attachments, Municipality, Installation, Operation, Costs, Overview, and Read Me Swedish XLSX, nine tabs

Excel – Nine Tabs and 21 Tested Control Cases

Excel contains 463 formula cells, filterable registers, validated status fields, and an overview of open original questions. The formulas can, among other things, flag TOILET – OTHER ASSESSMENT, LOCAL ASSESSMENT UNCLEAR, SITE DOCUMENTATION MISSING, COMPLETED – POST-INSPECTION REMAINING, and duplicate cost IDs. All 21 synthetic functional tests passed; the customer workbook is free of test cases.

Calculation example: 4 units at 25 SEK each equals 100 SEK in an administrative cost basis. Refunds and already paid amounts are recorded separately. The calculation does not determine subsidies, deductions, damages, permits, or whether a system is correctly sized.

How to Work with the Templates

  1. Determine the BDT scope. Report actual bath, dishwashing, and laundry water, and whether a toilet exists, is planned, or is kept completely separate.
  2. Check local rules. Read the municipality's instructions and any local regulations or water protection provisions. Fill in the actual review track, not what you hope applies.
  3. Examine the site. Request a site plan and expert soil/groundwater documentation. Own and neighbors' water sources must be identified using actual data.
  4. Compile and submit municipal documentation. Use the municipality's official e-service or form. Working document 02 is a supplement, not a replacement for the authority's form.
  5. Assess when the work can legally start. A submitted document is not a permit. The starting conditions for notification and permit cases differ. Check the original decision and environmental requirements.
  6. Order professional installation. Ensure the contractor takes an as-built drawing and photos before backfilling and saves the product's actual instructions.
  7. Monitor operation. Archive any municipal conditions and document actual deviations, service, and changed loads.

Legal Regulations and Authority Guidance

Section 13 of the Ordinance (1998:899) on environmentally hazardous activities and health protection: installing a toilet sewage system generally requires a permit. Another system, such as a BDT system without a toilet, normally requires notification to the municipality. In certain areas, the municipality may prescribe a permit instead. Read the Ordinance on the Riksdag website.

Section 14 of the same Ordinance: a change that substantially alters the volume or composition of sewage may trigger a notification requirement. The Swedish Environmental Protection Agency also explains that changing treatment technology or moving the installation site in relevant situations is equivalent to installing a new system. The difference between notification, local permit, and actual maintenance must be determined individually. See the authority's review guidance.

The Environmental Code (1998:808), especially Chapter 2 and Chapter 9, Section 7: precautionary measures and treatment must be assessed with regard to the site's environmental and health risks. The Environmental Code on the Riksdag website. The Swedish Environmental Protection Agency's HVMFS 2016:17 contains general advice; it is not a binding universal treatment formula for every BDT system.

Site conditions: The authority's guidance describes, among other things, the site plan, soil investigation, water sources, test pits, groundwater, protection distances, and review. See the review of documentation and the guidance on test pits. The template does not set its own general meter figures or sizing values.

Difference from Other Mallbutiken Templates

Sludge separators & individual sewage systems apply to ongoing emptying, self-monitoring, and service. Own well before buying a house applies to the water source and the buyer's inspection. This new BDT package is instead for preparation, municipal review, site documentation, and initial installation of a separate bath, dishwashing, and laundry sewage system.

Frequently Asked Questions

Do I need a permit for a BDT system at the holiday home?

Normally, notification under Section 13 of the Ordinance (1998:899) is required if a toilet is not to be connected, but local regulations may require a permit. The municipality's actual conditions determine the requirement.

Can I start digging immediately after submitting the notification?

A notification is not a permit. Permit-required measures have specific starting conditions; a different procedure applies in pure notification cases. Even then, environmental requirements, the municipality's instructions, and actual documentation must be followed. Check your case before starting work.

Is a BDT filter automatically approved for all summer cottages?

No. The technical solution and treatment are assessed against actual load, soil, groundwater, and local protection requirements. Product documentation does not replace a site assessment.

What happens if I install a shower or washing machine later?

If the volume or composition of the sewage changes substantially, Section 14 may become relevant. Document the change and ask the municipality.

Can Excel select the size of the infiltration system or calculate a minimum protection distance?

No. The register keeps track of original evidence, status, and costs—it is not a technical calculation module.

Are all documents in English or are the PDF files digitally fillable?

Five main Swedish templates, a Swedish guide, and a Swedish Excel workbook are included. The English User Guide provides instructions in English. The PDF files are searchable and printable but lack interactive form fields.

Product Quality and Review Status

Version 1.0, November 21, 2026. Official Swedish legal sources and Swedish Environmental Protection Agency guidance have been reviewed with AI assistance. Seven Word documents and seven searchable PDFs have been rendered and visually reviewed (14 pages). Excel has nine sheets and 463 formula cells, as well as 21 approved scenario tests; test data has been cleared from the customer file. The ZIP file is integrity-checked and verified in Google Drive. No independent lawyer, environmental inspector, sewage engineer, or authority has approved the product. External client testing in installed Microsoft Office has not been carried out. The product is in Shopify DRAFT without channel publication; Digital Products file linking has not been performed.