Svenska Dokumentmallar
Construction Diary 2026/2027 – Swedish + English | Word/PDF/Excel & Dashboard
Construction Diary 2026/2027 – Swedish + English | Word/PDF/Excel & Dashboard
- File format
- DOCX, PDF, XLSX
- Document language
- Swedish
- Number of files
- 5
Digital download. No physical product is shipped.
Couldn't load pickup availability
About this template
Construction Daily Log 2026/2027 is a professional document package for construction and civil engineering companies, contractors, subcontractors, site supervisors, and project managers who need to document what actually happens in a project on a day-to-day basis. The package includes editable Word templates, ready-to-use PDF versions, and an Excel register with a dashboard for ongoing tracking.
The document package has been legally and practically reviewed based on Swedish conditions for 2026/2027. It distinguishes between legal requirements, contractual requirements, and practical project best practices.
About the document template
- What is included in the package
- What is a construction daily log used for?
- What can be documented?
- Excel register and dashboard
- Contractual and legal background
- How to use the template
- Frequently asked questions
What is included in the package
| File | Content |
|---|---|
| Byggdagbok svenska | Word (DOCX) + PDF, 4 pages |
| Construction Site Daily Log English | Word (DOCX) + PDF, adapted to Swedish construction conditions |
| Användarguide svenska | Word (DOCX) + PDF with step-by-step instructions and common mistakes |
| User Guide English | Word (DOCX) + PDF |
| Byggdagbokregister | Excel (XLSX) with daily log, events, ÄTA (variation order) register, data validation, and dashboard |
What is a construction daily log used for?
The construction daily log creates ongoing and traceable documentation of the project's actual progress. It can be valuable for internal project management, communication with the client, invoicing documentation, tracking of obstacles and disruptions, variation orders (ÄTA), inspections, and subsequent evidence.
This template is designed for practical use: fill it in on the same day the work is performed, refer to photos and documentation with clear IDs, and link events to separate variation orders (ÄTA), non-conformance, or inspection documents when needed.
What can be documented?
- Project, workplace, client, contractor, and log responsible,
- Date, day number, weather, temperature, and actual weather impact,
- Workforce, professional groups, hours, machinery, and resources,
- Started, ongoing, and completed work,
- Progress, quantities, and work areas,
- Deliveries, materials, and receiving inspections,
- Non-conformances, obstacles, waiting times, and disruptions,
- Variation order (ÄTA) work, changes, and notifications with references,
- Instructions and decisions from the client, representative, or project management,
- Self-inspections, measurement protocols, and other evidence,
- Photo and attachment references,
- Daily summary and signature.
Excel register and dashboard
The Excel file provides a cohesive project overview and is intended for projects where you want to track multiple workdays without flipping through separate daily sheets.
- Daily log: up to 500 days with date, resources, hours, work, obstacles, and variation orders (ÄTA).
- Event register: obstacles, disruptions, non-conformances, instructions, and decisions with responsible party, deadline, and status.
- ÄTA register: changes, additions, deletions, cost and time impact, and notification.
- Dashboard: shows the number of logged days, staff hours, days with obstacles, days with variation orders (ÄTA), and open events.
- Data validation: dropdown fields for day status, event type, and status.
- Follow-up: delayed open events are marked automatically.
Contractual and legal background 2026/2027
AB 04 and ABT 06 are standard contracts, not laws. They become binding once incorporated into the construction contract. Svensk Byggtjänst describes that AB 04 includes requirements for the contractor to keep a log of circumstances of importance to the contract and continuously inform the client of its content.
The planned successors, AB 25 and ABPU 25, are not yet released, according to current information from Svensk Byggtjänst on October 7, 2026. The BKK estimates that new contracts will arrive during 2027. The template, therefore, does not state AB 25/ABPU 25 as the applicable standard contract.
Always check contracts, administrative provisions, AMA AF references, changes, additions, and the client's project routines. A log entry should not automatically be assumed to replace a special written notice or variation order (ÄTA) notification if the contract requires a certain form or deadline.
How to use the template
- Fill in project details and check which contract and administrative provisions apply.
- Duplicate the daily sheets for each workday.
- Record weather and resources when they are relevant to the project's progress.
- Describe concretely what has been performed and where.
- Log obstacles and disruptions as soon as they arise.
- Create separate variation order (ÄTA) or event IDs when needed and refer to them from the log.
- Number photos, measurements, self-inspections, and other attachments.
- Save the final version of the day with version history.
- Share the log according to the project's contract and communication routines.
Who is this template for?
The template is suitable for construction companies, ground and civil engineering contractors, installation companies, subcontractors, real estate companies with internal projects, project managers, site managers, supervisors, and consultants who need a clear and consistent daily project journal.
Frequently asked questions
Is a construction daily log a legal requirement?
Not as a general, standalone statutory document in all construction projects. However, the requirement may stem from construction contracts, standard agreements, and the project's administrative provisions. Check your specific project.
Is a construction daily log the same as an electronic staff register (personalliggare)?
No. The electronic staff register regulates which individuals are active on the construction site and is subject to special tax rules. The construction daily log documents the project's events, work, obstacles, resources, and changes.
Can I use the log as a variation order (ÄTA) form?
The log can document and refer to a variation order (ÄTA) event, but it does not automatically replace separate variation order documentation or contractually required notification.
Can the template be used in accordance with AB 04 and ABT 06?
Yes, as practical documentation support when the contracts are used, but the template does not reproduce the copyright-protected full text of the standard contracts and must be adapted to the project's contract documents.
Is an English version included?
Yes. The package includes an English translation adapted to Swedish conditions. The English version is a practical aid and does not change which law or contract applies.
What format do I receive?
Word (DOCX), PDF, and Excel (XLSX). The files are intended for computer, tablet, and standard office software.
Legal and industry sources
- Svensk Byggtjänst – Byggdagbok 30 dagar
- Svensk Byggtjänst – AB 04
- Svensk Byggtjänst – current status of AB 25 and ABPU 25
- Swedish Tax Agency – Electronic staff register in the construction industry
Disclaimer: The template is a general documentation aid and does not replace project-specific legal, technical, or tax advice.
Related guides: Construction Diary 2026 – what should be documented in a site diary? · Construction & Contracting 2026 – documentation, extra work (ÄTA), self-inspection, and work environment.
