Charging Infrastructure 2027/2033 – Local Buildings, Capacity Calculation, Investment Decisions & Evidence of Compliance | Word/PDF/Excel
Charging Infrastructure 2027/2033 – Local Buildings, Capacity Calculation, Investment Decisions & Evidence of Compliance | Word/PDF/Excel
- File format
- DOCX, PDF, XLSX
- Document language
- Five Swedish work templates Swedish guide English User Guide and Swedish Excel register.
- Number of files
- 7
Digital download. No physical product is shipped.
Couldn't load pickup availability
About this template
Do you need to plan charging infrastructure for an existing non-residential building ahead of 2027 or 2033? This template package helps property owners and managers distinguish the 2025 basic requirement from the forthcoming requirements for indoor parking, compare alternative investments, and collect genuine evidence of compliance.
Scope: Administrative work support for existing non-residential buildings under BFS 2026:4. No technical dimensioning, electrical installation instructions, certification, or guarantee of regulatory compliance. New construction, conversion, bicycle parking, and fire protection are assessed separately.
Package contents
15 digital customer files: 7 editable Word documents, 7 searchable and printable PDF versions, and 1 Swedish Excel register with nine tabs. Five Swedish work templates, a Swedish user guide, and an English User Guide.
What the files contain
Building assessment, inventory, capacity selection, investment decision and ordering, and evidence of compliance. The Excel file compares preliminary targets and gaps for charging points and cabling infrastructure, as well as cable locations for the relevant public authorities. 100 pre-populated rows per register. The options should not be summed as a single requirement.
Documents and formats
| Document | Format | Language |
|---|---|---|
| Building assessment 2025–2033 | DOCX/PDF | Swedish |
| Inventory of locations and equipment | DOCX/PDF | Swedish |
| Capacity selection and calculation basis | DOCX/PDF | Swedish |
| Investment decision and ordering | DOCX/PDF | Swedish |
| Evidence of compliance and phased follow-up | DOCX/PDF | Swedish |
| Swedish user guide | DOCX/PDF | Swedish |
| English User Guide | DOCX/PDF | English |
| Charging infrastructure register – nine tabs | XLSX | Swedish |
Frequently asked questions
Which existing non-residential buildings are affected in 2027?
Extended retrospective requirements apply from 1 January 2027 for buildings within the scope of the regulations that have more than 20 indoor parking spaces. The requirement entails alternative measures: cabling infrastructure for at least half of the spaces or at least one charging point for every ten spaces. The 2025 basic requirement is assessed separately.
Is the upward rounding in the calculation a binding minimum number?
No. Boverket describes several possible interpretations of the number of charging points. The Excel file uses a cautious planning principle with upward rounding. Have an expert verify the selected solution and its relationship to the basic requirement.
What additional requirements apply in 2033?
For non-residential buildings owned or used by public authorities that have more than 20 indoor spaces, requirements apply for pre-installed cabling for at least half of the spaces. Relevant existing charging spaces may be counted without double counting.
Can the Excel file approve the installation?
No. The register is a planning and follow-up tool. Original technical reports and expert assessments are required. Compare quotes on the same basis and with the same VAT treatment.
Legal basis and sources
BFS 2026:4, Chapter 1 and Chapter 4, Sections 2–5, and the requirements referred to in Chapter 2 of Boverket – retrospective requirements for non-residential buildings; general provisions; Planning and Building Ordinance (2011:338), Chapter 3, Section 20 b. AI-assisted source check on 25 November 2026. No external legal or technical review. Digital download in ZIP.