Svenska Dokumentmallar
Garbage compactors, waste compactors & refuse conveyance systems 2026/2027 – Operating logs, maintenance & inspection tracking | Word/PDF/Excel
Garbage compactors, waste compactors & refuse conveyance systems 2026/2027 – Operating logs, maintenance & inspection tracking | Word/PDF/Excel
- File format
- DOCX, PDF, XLSX
- Document language
- Five Swedish work templates Swedish quick start guide English User Guide and Swedish Excel register
- Number of files
- 5
Digital download. No physical product is shipped.
Couldn't load pickup availability
About this template
Operation log for motor-driven waste equipment under BFS 2025:11. For property owners, housing cooperatives and facility managers with permanently installed vacuum waste systems, stationary waste compactors, waste screws or waste lifts. Collect actual inspection, care, maintenance, usage intensity, downtime, changes and inspection records per object.
For motor-driven waste equipment covered by the Boverket regulations. The package does not replace the manufacturer's instructions, professional service, technical assessment, prescribed inspection or other workplace and machinery requirements.
Package contents
Five Swedish work templates, Swedish start guide and English User Guide: 7 editable DOCX and 7 searchable PDF. A Swedish XLSX register with seven tabs. Total 15 files in a digital ZIP, version 1.0.
What the files contain
Equipment card, inspection log, operating intensity and downtime, change and incident follow-up, inspection monitoring and restart records. Excel links each entry to an object ID and displays administrative control flags.
Document list
| Document | Use | Format |
|---|---|---|
| 01 Equipment card and applicability | Location, type, responsibility, classification and instructions. | DOCX/PDF, SV |
| 02 Inspection, care and maintenance | Date, performer, scope of action, evidence and follow-up. | DOCX/PDF, SV |
| 03 Operating intensity and downtime | Period, quantity, unit, source, cause of stoppage and actual status. | DOCX/PDF, SV |
| 04 Change and incident follow-up | Change, accident, incident or error; protective measures, revision control and evidence. | DOCX/PDF, SV |
| 05 Inspection monitoring and restart | Basis for inspection, actual report, remarks and documented decision. | DOCX/PDF, SV |
| 06 Start guide | Workflow, legal scope and three fictional scenarios. | DOCX/PDF, SV |
| 07 English User Guide | English guidance for the Swedish templates. | DOCX/PDF, EN |
| 08 Register | Five work registers, start tab and overview. | XLSX, SV |
What do the regulations say?
BFS 2025:11 came into force on December 1, 2025. According to Chapter 1, Sections 25–27, the owner or other responsible party is responsible for professional care and record-keeping. The log covers actions taken, usage intensity, downtime with cause, accidents and incidents, as well as relevant control data. It must be available for inspection and supervision. For actions, the date, scope and performer are recorded; for changes, any revision inspection and applicable minor deviations are also documented.
Chapter 7, Section 1 applies to protection against unauthorized activation. According to Chapter 7, Section 2, other motor-driven waste equipment than waste lifts are exempt from initial, recurring and revision inspection under the regulation. Waste lifts have a two-year recurring interval according to Chapter 2, Section 11. The initial inspection may be covered by a special exemption in Chapter 1, Section 20. Follow the actual decision of the control authority. Inspection exemptions do not mean exemptions from record-keeping or other safety requirements. See Boverket's guidance.
Excel – seven tabs
Start, Overview, Object, Log, Operation, Controls and Cases. Five work registers with 50 prepared rows each. The overview shows seven administrative counts: number of objects, log entries, operation entries, control entries, open cases, closed without evidence and other flags. Formulas highlight, among other things, duplicates, unknown object references and incomplete data. Operating volume must not be negative. The register does not calculate statutory time limits, assess safety or sum up different operating units. Fill in actual data and check the documents behind the references.
How the templates are used
- Assign each piece of equipment a unique object ID and verify the classification.
- Record actually performed inspection, care and maintenance.
- Document operating intensity, source and any stoppages.
- Follow changes, incidents and deviations with actual protective measures.
- Record prescribed inspection or verified exemption and other controls. Follow actual conditions before restart.
Fictional example
A-01 is a stationary compactor. Log entry J-01 documents inspection, D-01 records 25 cycles from a meter and K-01 refers to the inspection exemption in Chapter 7, Section 2. In the event of downtime, F-01 and the actual lock are recorded. If the case is marked closed without evidence, Excel displays a documentation flag. The fact that the flag disappears when the evidence reference is filled in does not mean that the equipment has been approved.
Frequently asked questions
Does a vacuum waste system need an operation log?
Yes, for a motor-driven waste equipment covered by the regulations, the record-keeping requirement applies even if it is exempt from inspection.
How often is a waste lift inspected?
Recurring inspection every two years according to Chapter 2, Section 11. Verify the next date and other requirements with the control record.
Is the log an inspection report?
No. It collects actual reports and references and does not replace accredited inspection.
Can I use Excel as operating approval?
No. It shows administrative counts and control flags, not actual safety.
Are technical service instructions included?
No. Follow the manufacturer's documentation and hire competent service personnel.
What programs are needed?
Word-compatible word processor, PDF reader and XLSX-compatible spreadsheet program. DOCX has been tested in LibreOffice Writer and XLSX with a spreadsheet engine. PDF is searchable and printable, not interactively fillable.
Version 1.0, AI-assisted legal source check November 26, 2026. No independent legal or technical review. Digital download, no physical product.
