About this template
New forest road – document package for planning, landowners, consultation and construction budget
Do you need to prepare for a new forest road together with other property owners or a contractor? The package brings together working documents to describe the project, check land access, prepare documentation for contacting authorities, request quotes, plan construction costs and document the final inspection.
For forest owners, landowners and road maintainers who want to create a coherent project file from the initial investigation to handover. The documents help you to keep the preliminary study, agreement, authority decision, technical design, start of construction and completion separate. They do not replace decisions or permits from the competent authority.
01. Package contents
20 files in a digital ZIP: 9 editable Word (.docx) files, 9 corresponding searchable PDF (.pdf) files, 1 Excel workbook (.xlsx) with eleven tabs and 1 TXT quick start guide. Included are seven separate Swedish working documents, a Swedish user guide and an English user guide. The working templates are in Swedish; the English guide is not an English version of the agreement. Version 1.0, 22 November 2026. Swedish law.
02. What the files contain
Before construction starts: project start, agreement in principle, road corridor/map attachment, check of authority cases and technical design brief. Implementation and completion: contractor request, conditional start decision, construction control log, deficiency list and final receipt. Excel tool: preliminary budget, recorded actual costs, proposed financing shares, quote comparison, consultation register and deficiencies. Excel does not establish legally binding share figures.
Documents and file formats in the package
| No. | Document | Use | Format |
|---|---|---|---|
| 01 | Project start and decision basis | Preliminary study, alternatives and mandate – not start of construction. | DOCX + PDF |
| 02 | Agreement in principle between landowners | Coordinate investigation, access for site inspection and preliminary conditions. | DOCX + PDF |
| 03 | Road corridor and review inventory | Map basis, consultation questions, watercourses, natural values and authority status. | DOCX + PDF |
| 04 | Technical design brief | Basis for expert and measured quantities. | DOCX + PDF |
| 05 | Contractor request | Comparable scope, quote prices, risks and exceptions. | DOCX + PDF |
| 06 | Conditional start of construction decision and construction log | Manual start conditions, self-inspections, deviations and STOP decisions. | DOCX + PDF |
| 07 | Final inspection and handover | Deficiency list, check against agreement, cost reconciliation and receipt. | DOCX + PDF |
| 08 | Swedish user guide | Step-by-step, legal limits, completion checklist and sources. | DOCX + PDF |
| 09 | English user guide | English user instructions for the Swedish working templates. | DOCX + PDF |
| 10 | Excel: project calculation and register | 11 tabs with budget, financing proposal, authority log and construction control. | XLSX |
| 11 | Read me | TXT quick start to the file package. | TXT |
How to use the template package
- Start with land and rights check. Identify property owners, any easements or joint facilities and the competent applicant.
- Investigate alternative road routes. Document purpose, map, natural values, water crossings and other affected interests.
- Check consultation and permits. Investigate which authority is competent and what documents, confirmations and decisions are actually required.
- Ask an expert to design. Use the brief to order correct dimensions, technical requirements and quantity basis.
- Request and compare quotes. Use comparable scope and enter quantity and unit price in Excel.
- Document the start decision. Use the internal start guide only when the necessary reviews, rights and technical checks are complete.
- Follow up and complete. Document inspections, costs, deficiencies and those responsible for corrections before project receipt.
Excel – budget and financing proposal
The workbook contains START, PROJECT, PROPERTIES, ROAD CORRIDORS, CALCULATION, FINANCING, CONSULTATION, QUOTES, CONSTRUCTION CONTROL, DEFICIENCIES and READ ME. The project budget calculates quantity × unit price and compares it with manually recorded actual costs. The financing sheet calculates a simple, preliminary allocation of the budget according to the parties' own entered percentages. The total percentage is mathematically checked against 100%.
Important: Such a calculation does not change the share figures in a joint facility, create any right to use someone else's land or constitute an authority-approved investment allocation. No legal deadlines or construction start permits are calculated automatically.
Legally and technically important
Forest management and consultation. For a new forest road, you need to check whether the clearing for the road must be reported and whether a consultation under Chapter 12, Section 6 of the Swedish Environmental Code is required. Assess the nature, scope and affected land of the measure using the Swedish Forest Agency's guidance and the rules on consultation. A submitted report is not in itself sufficient evidence that all necessary permits and rights exist.
Road embankments and water crossings. Work in water may require its own review under the Swedish Environmental Code. See the County Administrative Board's guidance on water activities.
Property law and allocation. An agreement in principle does not replace an easement, a construction decision or competent formal handling of share figures. See the Swedish Land Survey's information on joint facilities. The design basis and the preliminary calculation do not replace road engineering dimensioning or expert construction control.
Frequently asked questions
Is this a permit to build a forest road?
No. The documents are working documents for planning and follow-up. Competence, affected properties and necessary authority reviews must be checked separately before physical measures.
Can I change the share figures for the road's construction costs in Excel?
No. Excel only makes mathematical proposals based on manual percentages; legally valid share figures and decision order need to be handled according to existing regulations and applicable law.
Is a finished technical drawing or an official map included?
No. The map, design and quantity fields are bases for attaching and reviewing actual site data. Technical drawings and dimensioning are prepared by an expert when needed.
Are the PDF files fillable?
The PDF versions are searchable read-only and print copies. Edit the documents in Word and use Excel for recording and calculation; interactive PDF forms are not promised.
What is included in English?
A separate English user guide. The seven working documents and the Swedish guide are in Swedish.
Is the template package approved by a lawyer or authority?
No. The material is based on AI-assisted source control and technical file tests as of 22 November 2026. It is not externally reviewed by a lawyer or approved by an authority.
Scope compared to other templates
For ongoing logging and graveling on an existing road, there is a separate package Gravel road maintenance single road. The new construction package is instead for preparations and implementation control for a new road project.