Svenska Dokumentmallar
Consultation Notice 12:6 – Natural Values, Map Appendices & Start Control | Word/PDF/Excel
Consultation Notice 12:6 – Natural Values, Map Appendices & Start Control | Word/PDF/Excel
- File format
- DOCX, PDF, XLSX
- Document language
- Five Swedish work templates Swedish guide English User Guide and Swedish Excel register
- Number of files
- 7
Digital download. No physical product is shipped.
Couldn't load pickup availability
About this template
Are you planning a land measure that could significantly change the natural environment? Prepare a consultation notification in accordance with Chapter 12, Section 6 of the Swedish Environmental Code using structured work templates for applicability, map appendices, natural values, start control, and follow-up. For property owners, earthmoving contractors, clients, and developers.
This is a documentation aid for land and construction measures, not an official notification, permit, or natural value inventory. Forestry and special energy procedures are assessed separately.
Package Contents
15 customer files: five Swedish work templates, a Swedish user guide and a separate English User Guide in editable DOCX and searchable PDF formats, plus a Swedish Excel register with nine tabs.
What the Files Contain
Review path, notification basis, natural value objects, map appendices, protective measures, actual authority decisions, and work follow-up.
When is the Package Suitable?
For example, for a planned access road in sensitive nature or earthworks that are not already subject to other permit or notification requirements under the Swedish Environmental Code. Assess each measure and site; other exemptions, rights, and permits may be required.
File by File
| Document | Function | Format |
|---|---|---|
| 01 Applicability Assessment | Scope of the measure, significant change, alternative review paths, and responsible authority. | DOCX/PDF · SV |
| 02 Consultation Notification | Written work basis, property, affected rights holders, map, and measure description. | DOCX/PDF · SV |
| 03 Natural Values and Map Appendices | Inventory, object ID, map, alternative solutions, and protective measures. | DOCX/PDF · SV |
| 04 Start Control | Completeness of notification, waiting period, actual authority decisions, and parallel requirements. | DOCX/PDF · SV |
| 05 Non-Conformance Log and Final Report | Actual inspections, non-conformances, changed measures, and restoration. | DOCX/PDF · SV |
| 06 Swedish User Guide | Workflow, examples, and sources. | DOCX/PDF · SV |
| 07 English User Guide | English guidance for the Swedish work templates. | DOCX/PDF · EN |
| 08 Consultation Register | Overview, Checkpoints, Notifications, Natural Values, Maps, Decisions, Non-Conformances, Final Report, and Read Me. | XLSX · SV |
Excel – Internal Follow-up
The overview calculates five fixed work steps. A step marked Complete corresponds to 20 percent. Six register tables have 30 prepared rows each. Record actual dates, basis, decisions, and responsible parties. No automatic legal deadlines or start authorizations are calculated.
Workflow
- Assess the measure's impact, review path, and competent supervisory authority.
- Collect maps, affected rights holders, natural value basis, alternatives, and protective measures.
- Prepare the notification and submit it via the authority's current channel.
- Check formal requirements, waiting period, actual decisions, any prohibitions, and other legal requirements before starting.
- Document implementation, non-conformances, and restoration. Reconsider changes before continuing work.
Legal Prerequisites
The Swedish Environmental Code (1998:808), Chapter 12, Section 6 applies to operations and measures that risk a significant change to the natural environment and are not subject to other permit or notification requirements under the Code. The supervisory authority may require precautionary measures or prohibit the measure. The six-week rule is not an automatic approval. Also check the general rules of consideration in Chapter 2 and other applicable reviews.
According to Section 8 of the Ordinance (1998:904), the notification must be in writing and contain a map and measure description, as well as other prescribed information. See the Swedish Environmental Protection Agency's guidance and the County Administrative Board's e-service. If necessary, expert investigations and other reviews are required. The notification basis does not replace the e-service.
Frequently Asked Questions
When do I need to consult?
Assess the risk of a significant change to the natural environment as well as other permit and notification requirements. Also check special regulations.
Can the work start after six weeks?
Check that the notification has been made in accordance with the formal requirements, that the waiting period has been met or other express permission exists, and that decisions, prohibitions, and other requirements do not prevent starting.
Is a completed map included?
No. The templates help you document your own map, inventory, and appendices.
Does consultation replace an exemption from biotop protection?
No. Investigate other applicable requirements separately before the measure begins.
Is Complete in Excel a permit?
No, it is an internal status marker.
Are the PDF files fillable?
No. They are searchable read-only and print versions. The Word files are editable.
Related Documents
See also Land Use Permit for Tree Felling and Remediation of Contaminated Land when these separate reviews are relevant.
Format and Version
Digital ZIP download. 7 DOCX, 7 PDF, and 1 XLSX. Compatible document and spreadsheet programs as well as PDF readers are required. Version 1.0. AI-assisted source control November 25, 2026; no external legal or ecological review or guarantee of permit.
