Skip to product information
1 of 3

Svenska Dokumentmallar

Shoreline protection 2026/2027 – small lake, stream, exemption and plot | Word/PDF/Excel

Shoreline protection 2026/2027 – small lake, stream, exemption and plot | Word/PDF/Excel

File format
DOCX, PDF, XLSX
Document language
Five Swedish working documents and a Swedish user guide as DOCX/PDF as well as an English User Guide as DOCX/PDF. Swedish Excel register with nine tabs. The working templates are not translated into English.
Number of files
7

Digital download. No physical product is shipped.

Regular price 79 SEK
Regular price Sale price 79 SEK
Sale Sold out
Taxes included.
View full details

About this template

Shoreline protection 2026/2027 – small lake, stream, exemption and set-back is a digital document package for landowners, private individuals and small businesses that need to check the scope of shoreline protection and, when necessary, prepare a basis for an application for shoreline protection exemption. The package helps you distinguish between checking whether shoreline protection applies and an actual application for exemption. It does not perform any automatic legal review and is not an official form.

Quick facts: 5 Swedish working templates + Swedish user guide + English User Guide, all as editable DOCX and searchable PDF, as well as an XLSX register with nine tabs. Total 7 Word + 7 PDF + 1 Excel = 15 customer files in a digital ZIP. All PDFs are searchable and printable but not interactively fillable. The Swedish working templates are not included as full English translations.

Package contents

Shoreline protection check for a small lake or stream, exemption application, evidence matrix for special reasons, set-back and free passage attachment, and letter for agency inquiries and supplementation. Also Swedish and English user guides and a nine-tab Excel register. Each text document is delivered in both Word and PDF.

What the files contain

Fields for property designation, water category, lake area in hectares, waterway width in meters, measurement source and date, local county administrative board decisions, requested measure, applicable special reason, site plan, proposed set-back, free passage, natural values, attachments, and agency contacts. Excel has nine tabs, 707 administrative formula cells, and seven register tables. The formulas indicate control needs but never determine legal protection status or exemption.

Who can benefit from this?

Examples: (1) a property owner wants to check shoreline protection at a 0.8-hectare lake; (2) a landowner plans a measure at a narrow waterway and needs to verify local decisions; (3) a homeowner needs to document special reasons, set-back, and free passage for a planned building or facility near the shore. Small-scale businesses can also document factual information before review. Not suitable as a finished site plan, evidence of actual water area, natural value assessment, building permit, water activity permit, or legally binding preliminary decision.

New shoreline protection rules from July 1, 2025

According to Chapter 7, Section 13 a of the Environmental Code, the general shoreline protection normally does not apply to lakes whose water area at normal mean water level is at most one hectare. According to Section 13 b, the same applies to waterway sections that are at most two meters wide. Section 13 c covers lakes and waterways created after June 30, 1975. Important: the county administrative board may in some cases specifically decide on shoreline protection for small bodies of water, and other environmental or building rules may apply. A measurement below the limit does not automatically mean that every measure is permitted. Everything requires correct measurement data, decision, and planning status.

When is an exemption needed?

If shoreline protection applies, you must check the prohibitions in Chapter 7, Section 15. The municipality normally reviews exemptions according to Section 18 c, while the county administrative board is responsible for certain types of measures and areas according to Section 18 b. Only the special reasons specified in Sections 18 e–18 g can form the basis for an exemption. Examples may include already occupied land, a well-isolated area, a facility that must be located by the water, special permanent acquisition activity with limited impact in certain sparsely populated areas, or a LIS area. Each reason must be assessed against actual and legal conditions; it is not enough that the measure is desirable.

Set-back and public free passage

A set-back is not automatically the same as a property. For an exemption, the relevant decision must show how much land can be occupied, normally with a clear marking on a map. According to Section 18 i, an area for free passage and natural values must normally be left between the measure and the shoreline. Exceptions are possible when such use is impossible with regard to the function. Leaving free passage is not in itself a special reason for exemption. The template provides factual fields for a map, natural impact, and attachments but does not draw a legally approved set-back for you.

Exact contents – file by file

File What it does Language Format
01 Shoreline protection check for a small lake or stream Factual check of water area, width, construction history, area protection, and special decisions Swedish DOCX/PDF
02 Application for shoreline protection exemption Claim, property, measure, correct agency, special reason, and site plan Swedish DOCX/PDF
03 Special reasons – evidence matrix Legal grounds in Chapter 7, Sections 18 e–g, and factual chain of evidence Swedish DOCX/PDF
04 Set-back, free passage, and natural values Map, previous home peace zone, proposed set-back, and environmental basis Swedish DOCX/PDF
05 Request for decision and supplementation Factual issues regarding special protection decisions and supplementation of an ongoing application Swedish DOCX/PDF
06 Swedish user guide Legal rules, three scenarios, workflow, and limitations Swedish DOCX/PDF
07 English User Guide English instructions for the Swedish working forms English DOCX/PDF
08 Excel register Nine tabs with administrative status formulas and attachment references Swedish XLSX

How to use the document package

  1. Open document 01 and check the water category, normal mean water level, measured area/width, any historical construction documents, and the county administrative board's decision.
  2. If the protection status is unclear, use document 05 to request relevant sources and decisions from the correct agency. The inquiry does not automatically result in a binding exemption.
  3. If an exemption is needed, draft the claim in document 02 and state a genuine legal basis in document 03 with a chain of evidence.
  4. Mark the measure, proposed set-back, free passage, and actual environmental conditions on a map using document 04. Supplement with professional expertise as needed.
  5. Record the case ID, decision, measurement sources, special reasons, and attachment ID in Excel. The legal applicability must always be checked separately.
  6. Also check the Planning and Building Act, water activity, area protection, and other possible permits. Do not appeal an agency decision without reading the appeal instructions.

The nine tabs of the Excel register

Cases, Water, Protection Decision, Special Reasons, Set-back, Natural Values, Attachments, Overview, and Read Me. The formulas may provide prompts such as “Check special decision 13 a” for a registered small lake or “Investigate protection status” for a larger waterway. No personal data or fictitious test cases are included in the customer file. No site sketches or actual natural measurements are generated automatically.

Frequently asked questions

Are all lakes under one hectare free from all permits?

No. The general shoreline protection normally does not apply according to Section 13 a, but a special decision on shoreline protection may exist. Building permits, water activity, and other area protection must be assessed separately.

How wide can the waterway be?

The limit in Section 13 b refers to waterway sections that are at most two meters wide at normal mean water level. Actual measurement data and local decisions are decisive.

Is it always the municipality that reviews?

No. The municipality is normally the exemption authority, but the county administrative board reviews special categories and areas according to Section 18 b. Check who is the correct recipient.

Does an existing property or private pier automatically grant an exemption?

No. A special reason must be legally applicable and proven. Previous buildings and facilities do not result in an automatically positive decision.

Is there a fixed statutory width for free passage?

Not as a universal figure for every location. The suitability of the passage is assessed with regard to the actual conditions of the location and the purposes of shoreline protection.

How long does an exemption last?

According to Section 18 k, it expires if the measure has not been started within two years or completed within five years from the day the decision became legally binding. Individual conditions and review must be checked.

Legal sources, legal transparency, and limitations

AI-assisted legal source review November 18, 2026. No external lawyer, natural value expert, or agency has approved this product. The document templates do not automatically grant exemption, agency approval, Google ranking, or AI exposure.