Svenska Dokumentmallar
System Inspection 2027 – Heating, Ventilation & Cooling, Performance Data and Control Registers | Word/PDF/Excel
System Inspection 2027 – Heating, Ventilation & Cooling, Performance Data and Control Registers | Word/PDF/Excel
- File format
- DOCX, PDF, XLSX
- Document language
- Five Swedish work templates Swedish guide English guide and Swedish Excel register
- Number of files
- 7
Digital download. No physical product is shipped.
Couldn't load pickup availability
About this template
Prepare the inspection of a building's heating, ventilation, and air conditioning system with a cohesive working basis for the property owner. The amended rules in Section 10 of the Swedish Energy Declaration Act (2006:985) specify the total nominal capacity and two inspection intervals. The template package helps you inventory the building, compile source-verified capacities, investigate the basis for exemptions, order an inspection, and follow up on the expert's recommendations. It does not replace the certified expert's inspection report.
Package Contents
Digital ZIP, version 1.0, with five Swedish working templates, a Swedish user guide and an English user guide in seven editable Word documents and seven corresponding searchable PDF files, plus a Swedish Excel workbook. 15 customer files in total.
What the Files Contain
Building inventory, nominal capacity, basis for exemptions, ordering and report verification, and action follow-up. Excel has nine tabs and seven filterable work registers with 40 prepared rows each.
Who Is the Template Package For?
For property owners, housing cooperatives, property managers, and operations managers who need to prepare the documentation for a mandatory system inspection in Sweden. Check the building's actual system boundaries, applicable exemptions, and confirmed inspection deadlines. The package is not a technical sizing tool, an energy performance certificate (EPC) template, or a self-prepared energy declaration.
Document List
| Document | Format and Language | Use |
|---|---|---|
| 01 Building Inventory and Responsibility | DOCX/PDF, Swedish | Building, owner, generators, system boundary, and documentation |
| 02 Nominal Capacity and Intervals | DOCX/PDF, Swedish | Capacity in kW, sources, delimitation, interval indicator, and confirmed deadline |
| 03 Basis for Exemption Assessment | DOCX/PDF, Swedish | Grounds for exemption, evidence of functionality, and expert assessment |
| 04 Ordering and Report Verification | DOCX/PDF, Swedish | Certified energy expert, documentation, report, and transmission |
| 05 Action Plan and Follow-up | DOCX/PDF, Swedish | Recommendations, responsibility, cost basis, and verification |
| 06 Swedish User Guide | DOCX/PDF, Swedish | Workflow, legal sources, and fictitious example |
| 07 English User Guide | DOCX/PDF, English | English guidance for the Swedish working templates |
| 08 System Inspection Register | XLSX, Swedish | Nine tabs for capacity, evidence, orders, reports, and actions |
Workflow Before the Inspection
- Identify each building, owner, system, and supporting documentation.
- Record the relevant nominal capacity of the heating and cooling generators per building and check for double counting.
- Collect documentation for any exemptions and have an expert assess the scope.
- Order an inspection from an independent certified expert. Record the confirmed deadline, report reference, and electronic transmission.
- Document recommended actions, responsibility, schedule, and follow-up.
Amended Rules from 2026 – 70 and 290 kW
On July 1, 2026, Sections 10 and 12 of the Swedish Energy Declaration Act (2006:985) were amended by SFS 2026:744. The starting point is the total nominal capacity of the heating and cooling generators in the building. Over 290 kW requires an interval of at least three years. Over 70 kW up to and including 290 kW requires an interval of at least five years. Exactly 70 kW does not exceed the limit. Applicable exemptions and the actual inspection deadline must be investigated separately. An interval is not the same as a calculated final day for the next inspection.
Capacity Documentation per Building
Collect nameplates, product data sheets, and other relevant documentation regarding representative operation. According to Boverket's guidance, capacity for domestic hot water production or business processes is not included. For a shared district heating plant, each building must be assessed separately. Check with the energy expert which capacity is relevant and avoid counting the same generator twice. A compilation of recorded values is not a technical verification of actual capacity.
Exemptions and Evidence of Functionality
Section 8b of the Swedish Energy Declaration Ordinance (2006:1592) regulates exemptions, including energy performance agreements with equivalent capacity, qualified building automation, and certain residential systems. For local buildings, the relevant functional requirements in Boverket's regulations must be checked. For residential buildings, the conditions include continuous electronic monitoring, effective regulation, and the capacity to respond to external signals and adapt energy use. The latter condition applies from October 1, 2026, according to Boverket's guidance. An earlier exemption must therefore be assessed against the current requirements if necessary. Record the actual expert assessment, scope, and evidence; Excel does not grant any exemption.
Ordering, Report, and Follow-up
According to Section 12, an independent expert shall perform the inspection, prepare an inspection report, and transmit it electronically to Boverket. The certification requirement follows Section 10 of the ordinance. The report's information according to Section 8c includes, among other things, efficiency and sizing, more efficient temperature settings with safe operation, opportunities to reduce fossil energy use, recommendations, and discovered safety issues. The templates help the owner order the work and follow up on the results. Follow the instructions of the responsible expert regarding safety issues.
Excel – Capacity Reconciliation and Control Register
Nine tabs: Overview, Buildings, Generators, Exemptions, Orders, Reports, Evidence, Actions, and Sources. The workbook contains 368 formula cells, seven filterable tables with 40 prepared rows each, status selections, and administrative control signals. It flags, among other things, duplicate IDs, missing generator data, incorrectly linked evidence, and passed confirmed deadlines. The capacity calculation assumes that the inventory is marked as complete and that the recorded generator entries have complete documentation. Manually check that all generators are actually included.
Fictitious example: A building with 180 kW of relevant heating capacity and 120 kW of cooling capacity has a total capacity of 300 kW and an indicative three-year interval before exemptions. At 290 kW, a five-year interval is displayed. If a generator has a duplicate ID or missing evidence, the summation is stopped. The register does not establish a legal exemption, technical performance, or actual inspection deadline.
Format, Language, and Related Templates
Word is editable, PDF is searchable, and Excel is macro-free. The working templates and Excel are in Swedish; the English guide describes their use. Excel does not have preset print areas; select the area manually. For separate follow-up of individual measurement and billing, see IMD 2027 – Remote Reading, Meter Registers, and Billing Information.
Frequently Asked Questions
When do the amended rules apply?
The amendment by SFS 2026:744 applies from July 1, 2026. Also check the current regulations and exemption rules.
When is an inspection required?
The starting point in Section 10 is that the total nominal capacity exceeds 70 kW. Exemptions are assessed separately.
How often should the inspection be performed?
At least every three years over 290 kW and at least every five years over 70 up to and including 290 kW, when the inspection requirement applies.
Is domestic hot water included in the capacity?
According to Boverket's guidance, capacity for domestic hot water and business processes should not be included. Check the relevant heating and cooling capacity with the expert.
How are multiple buildings with a shared district heating plant handled?
Heating systems are calculated per building. Document the capacity documentation for each building.
Is building automation sufficient for an exemption?
No, not merely the presence of automation. The applicable functional requirements and the scope of the system must be supported.
What is new for residential buildings from October 2026?
Boverket states that the capacity to respond to external signals and adapt energy use is a new condition from October 1, 2026. All conditions in Section 8b, paragraph 1, point 3, must be assessed.
Who performs the mandatory inspection?
An independent expert with relevant certification. The expert prepares and transmits the inspection report electronically to Boverket.
Does the package replace an EPC or an official inspection report?
No. It is the property owner's administrative working basis for ordering and follow-up, not an EPC, energy declaration, or the expert's report.
Does Excel calculate the legally binding inspection deadline?
No. The register shows an indicative interval based on a recorded and complete capacity inventory before exemption assessment. The actual deadline is recorded after confirmation.
Legal Sources and Agency Information
Swedish Energy Declaration Act (2006:985), Sections 10 and 12 as amended by SFS 2026:744; Swedish Energy Declaration Ordinance (2006:1592), Sections 8b–c and 10, amended by SFS 2026:869; Boverket's Inspection Guidance, last reviewed October 1, 2026, including references to BFS 2007:4, Section 3b, and BFS 2026:9, Chapter 4, Section 2. AI-assisted legal source check on November 26, 2026. No independent legal or energy-technical expert review. Check current regulations and hire a certified expert for the mandatory inspection.
