Svenska Dokumentmallar
TSD Telematics 2027 – Railway Data Requirements, Implementation Plan, Sub-Objective Register & ERA Reporting | Word/PDF/Excel
TSD Telematics 2027 – Railway Data Requirements, Implementation Plan, Sub-Objective Register & ERA Reporting | Word/PDF/Excel
- File format
- DOCX, PDF, XLSX
- Document language
- Five Swedish workbooks Swedish guide English User Guide and Swedish Excel register.
- Number of files
- 7
Digital download. No physical product is shipped.
Couldn't load pickup availability
About this template
Are you preparing for the implementation of the EU's new TSD Telematics as an infrastructure manager? This template package brings together application inventory, network-specific data requirements, implementation plans, transition testing, and actual reporting evidence into a coherent workflow.
For infrastructure managers and their project, IT, and regulatory compliance officers. Internal working aid; does not replace ERA's official template, web application, technical testing, or operational approval.
Package contents
15 files: 7 editable Word documents, 7 searchable PDF versions, and 1 Excel workbook with nine tabs. Five Swedish working templates, Swedish user guide, and English User Guide.
What the files contain
Role and application inventory, network-specific data requirements, implementation plan, transition documentation, and reporting evidence. Excel contains source-based sub-deadlines, manually verified deadlines, status flags, and registers with 100 pre-filled rows per register.
Documents and formats
| Document | Format | Language |
|---|---|---|
| Role and application inventory | DOCX/PDF | Swedish |
| Network-specific data requirements | DOCX/PDF | Swedish |
| Implementation plan and coordination | DOCX/PDF | Swedish |
| Transition testing – TAP/TAF | DOCX/PDF | Swedish |
| ERA report and self-assessment evidence | DOCX/PDF | Swedish |
| Swedish user guide | DOCX/PDF | Swedish |
| English User Guide | DOCX/PDF | English |
| TSD register with nine worksheets | XLSX | Swedish |
Frequently asked questions
When should the infrastructure manager report network-specific data requirements?
According to Article 11, the relevant information and justification must be shared with ERA by 2 December 2026 at the latest. Use ERA's official template. This package is complementary internal support.
When is the first implementation report due?
For infrastructure managers, the deadline is 2 September 2027 according to Article 17 for capacity management, train setting, and traffic management. Reporting continues until evidence under Article 18 has been submitted. Other roles have different deadlines.
Can older TAP or TAF projects automatically receive an extension?
No. Assess the conditions in Article 16.5 separately. A possible extension under Articles 16.2 and 16.3 is not a general exception. The Swedish Transport Agency specifies 1 February 2027 as the Swedish deadline for documentation on well-advanced projects.
Does Excel perform an official self-assessment?
No. The workbook tracks verified deadlines and evidence references. Use ERA's actual tool under Article 18 for technical self-assessment and retain the documentation in an authorized system.
Sources and legal basis
Implementing Regulation (EU) 2026/253, Articles 11, 16–18, and Annex G; Swedish Transport Agency – deadlines and reporting; ERA – deadlines and compliance. AI-assisted source check 25 November 2026. No external legal or technical review. Digital download in ZIP.
