Euro 7 tyre abrasion 2028–2036 – C1 C2 C3 and stock deadlines
Euro 7 Regulation 2024/1257 covers more than vehicle tailpipe emissions. It also addresses tyre abrasion for C1, C2 and C3 classes, but there is no universal date when all old tyres become illegal. Articles 11(4–6) distinguish new type approvals, first placing non-compliant tyres on the Union market, and a limited period for further supply of units already legally placed on the market. The phase-in runs through 2028–2036, not a general sales ban in 2026.
Euro 7 Regulation 2024/1257 covers more than vehicle tailpipe emissions. It also addresses tyre abrasion for C1, C2 and C3 classes, but there is no universal date when all old tyres become illegal. Articles 11(4–6) distinguish new type approvals, first placing non-compliant tyres on the Union market, and a limited period for further supply of units already legally placed on the market. The phase-in runs through 2028–2036, not a general sales ban in 2026.
Checked against EU regulation and Commission report on 17 November 2026. General information, not an official tyre test, type approval or individual stock ruling.
| Tyre class | New types | Stop first placing non-compliant types | Last special date for further supply |
|---|---|---|---|
| C1 | 1 July 2028 | 1 July 2030 | 30 June 2032 |
| C2 | 1 April 2030 | 1 April 2032 | 31 March 2034 |
| C3 | 1 April 2032 | 1 April 2034 | 31 March 2036 |
Scope and the ice-grip exception
The regulation includes C1 passenger-car, C2 light-commercial and C3 heavy-vehicle tyre classes, with a specific exclusion for formally defined ice-grip tyres. A general winter tyre, snow pictogram or studded marketing claim alone does not establish the exception. Check the actual UN Regulation 117 classification and the tyre type evidence before claiming exemption.
Three distinct dates, not one deadline
The first date restricts new type approvals for non-compliant models. The second prohibits the first placing of non-compliant tyres on the market. The third permits further making available of eligible non-compliant units already legally placed on the Union market, subject to Article 11 conditions. A late stock sell-through date is not permission to import new non-compliant stock after the earlier placing cut-off. Use the class-by-class schedule above.
What first placing on the market means
Placing on the market is the first making available of an individual product in the Union; later transfer in an existing distribution chain is a different event. Keep invoices, importer evidence, supply-chain records and model/batch identifiers that support the legally relevant date. A catalogue listing or factory manufacturing date alone cannot prove an individual unit was already placed on the EU market.
Manufacturer, importer and dealer roles
Manufacturers and type-approval applicants must obtain competent approval using applicable technical test methods and conformity-of-production evidence. Importers, wholesalers and dealers should check whether the particular model, type, stock and date may be supplied. Never claim that a spreadsheet is an EU authority certificate, a valid laboratory test, or a substitute for manufacturer documentation.
Technical tests still developing in 2026
The European Commission's 24 June 2026 report describes ongoing UNECE tyre abrasion methods: both a road convoy and an indoor drum approach for C1, with C2 work expected later in 2027 and C3 later still. UN Regulation 117 as published in 2025/1453 includes additional C1 tyre abrasion reporting from January 2027 for new approvals. Distinguish a published testing requirement from an invented threshold for C2 or C3.
Production conformity and individual batch evidence
A valid type-approval reference, test report with scope and tyre type, production conformity arrangement and official source are different pieces of evidence. Verify issuer, version, dates and applicability. Track whether a given stock batch was placed on the market before the relevant class cut-off; retain supplier proof. Do not convert a retailer's internal checklist into a purported government approval.
Euro 7 versus the EU energy label and EPREL
The tyre energy-label Regulation 2020/740 has applied since May 2021 and concerns rolling resistance, wet grip and external rolling noise shown to purchasers. Euro 7 abrasion approval requirements operate separately. A high energy class or EPREL record does not establish Euro 7 abrasion compliance. Map both regimes independently for the same product.
Two warehouse scenarios
A non-compliant C1 tyre unit demonstrably first placed on the EU market before 1 July 2030 may remain eligible for further supply until 30 June 2032. The same tyre type newly imported from outside the EU for first placement after 1 July 2030 does not become permitted merely because the stock sell-through date is later. Confirm exact facts and any other relevant restrictions before a decision.
Practical checklist and FAQ
Confirm C1/C2/C3 and any proven ice-grip exception, record all three dates, type and supplier role, approval/test/CoP sources, first EU placement and individual stock batches. Recheck future delegated technical rules and preserve review records. Are all tyres banned in 2026? No. Can all remaining tyres sell until 2036? No. Does EPREL certify abrasion? No. Does this template issue official approval? No.
Related guides
EU law and sources
Explore the topic
Business guides – contracts, HR, AI & complianceEU tyre labels 2026 – EPREL, price display and online sales
A tyre shop sells C1, C2 and C3 tyres online. Regulation (EU) 2020/740 requires the correct tyre label close to the price and access to the product...
Business guides – contracts, HR, AI & complianceEU compliance for businesses 2026/2027 – guide to new EU regulations
Pillar guide to EU compliance 2026/2027: PPWR, ESPR/DPP, battery passport, CBAM, EUDR, greenwashing, Data Act, NIS2, and how companies can build a ...

