Where the Swedish staff-register rules apply, the project owner must notify the site, provide equipment and ensure access to consolidated records. An independently responsible contractor can assume all relevant duties in writing.

When does the requirement apply?

Assess total estimated labour and material costs at the construction site, excluding VAT. The threshold is above four price base amounts: SEK 236,800 in 2026 and SEK 238,400 in 2027. A natural person building outside business activity is exempt from the owner's duties.

Example: a company's 2027 project costs an estimated SEK 230,000 plus SEK 12,000 in extra work, totalling SEK 242,000. Notify the site and start the register as soon as the excess can be anticipated, not when the final invoice arrives.

Who is responsible?

SituationResponsibility
No transferOwner notifies the site, provides equipment and ensures access to consolidated records.
Independent general contractorMay take over all relevant duties in writing; notifies in its own name.
Separate contractsOwner retains its duties; each contractor retains its own duties where applicable.

Checklist before starting and closing

  1. Document costs, site scope and responsible legal or natural person.
  2. Check transfer conditions. Do not transfer notification alone; assess occupational safety separately.
  3. Keep confirmation of required notification before actual construction starts. Test access to consolidated records.
  4. Notify changes to mandatory details or closure within two weeks. Secure continued access.

New requirements in 2027

SFS 2026:1904 enters into force on 1 January 2027. From 1 July 2027 electronic staff registers must support electronic transfer to the Swedish Tax Agency. Transfer is required on request during an inspection or to check reporting obligations, not as general continuous automatic reporting. Transfer does not apply to data predating 1 July 2027. In construction, identify the employer when a person working has an employer other than the business operator.

Ask the supplier to demonstrate transfer and employer fields. Retain test dates, results, issues and retests. Check current technical regulations before deployment.

Frequently asked questions

Can notification alone be transferred?

No, all relevant duties must be transferred.

Is an ID06 card, diary or Excel enough?

Not alone. The electronic register must meet applicable requirements.

Who notifies after a valid transfer?

The contractor assuming the duties, using its own organisation number.

Sources and scope

AI-assisted editorial source check, 25 November 2026. General Swedish legal information, not individual tax advice.