Skip to product information
1 of 3

Svenska Dokumentmallar

BAS-P to BAS-U – handover protocol, risk appendix and document receipt | Word/PDF/Excel

BAS-P to BAS-U – handover protocol, risk appendix and document receipt | Word/PDF/Excel

File format
DOCX, PDF, XLSX
Document language
5 operational Swedish DOCX/PDF templates Swedish user guide DOCX/PDF separate English User Guide DOCX/PDF; Swedish Excel workbook. No English-language operational full version.
Number of files
7

Digital download. No physical product is shipped.

Regular price 79 SEK
Regular price Sale price 79 SEK
Sale Sold out
Taxes included.
View full details

About this template

Document the handover from BAS-P to BAS-U before construction begins – without mixing up received files with verified safety measures. A dedicated work aid for clients, construction health and safety coordinators, and project managers when risks, preventive measures, the occupational health and safety plan (when required), and other project information are explained and handed over. The product does not contain the project-specific occupational health and safety plan itself and does not replace a safety assessment or workplace inspection.

Quick facts: Swedish occupational health and safety law, AFS 2023:3 • five Swedish work templates + Swedish guide + English User Guide • 7 editable DOCX and 7 searchable PDFs plus 1 Swedish Excel workbook with 9 tabs • 15 customer files in total in a digital ZIP.

Package contents

7 independent documents: handover protocol, risk appendix, document receipt, open questions/actions, ongoing design/change notification, Swedish user guide, and separate English instruction guide. Each document in Word (DOCX) and a matching searchable PDF. Plus an Excel workbook with 9 tabs. 7 + 7 + 1 = 15 customer files – the formatted copies are not new legal documents.

What the files contain

Project name and designated coordinators, document versions and receipt confirmation, identified remaining occupational health and safety risks, explained protective measures and rejected solutions, open points with responsible parties, change notifications during ongoing design, and administrative overviews in Excel. The files distinguish between received, checked, and actually verified.

Who should choose the template – and when is it not suitable?

Situation 1: A construction project is about to start, BAS-P has completed the design and is handing over the occupational health and safety plan and risk documentation to BAS-U. The client needs a traceable handover protocol. Situation 2: A drawing or work method is changed after the initial meeting and new risk information needs to be transferred, assessed, and potentially incorporated into the occupational health and safety plan.

Choose a different document: If you need to create the occupational health and safety plan itself, see Occupational Health and Safety Plan – Construction and Civil Engineering. This package is not a government form, the project's complete occupational health and safety plan, a formalized BAS appointment, a risk guarantee, or permission to start hazardous work.

File by file – what do you get?

Document Specific function Language Format
Handover protocol Project participants, actually handed over occupational health and safety plan, risk review, open questions, and separate receipts. Swedish Editable DOCX; corresponding PDF searchable/printable but not interactive
Risk transfer and protective measures Risk card with preventive measures, remaining risks, source references, and manual follow-up. Swedish Editable DOCX; corresponding PDF searchable/printable but not interactive
Document receipt and version control Action register with the correct version, receipt, check, and missing information. Swedish Editable DOCX; corresponding PDF searchable/printable but not interactive
Open questions and action decisions Non-conformance form with responsible party, requirement before work step, and traceable verification. Swedish Editable DOCX; corresponding PDF searchable/printable but not interactive
Ongoing design and change notification Notification when new/changed drawings, method choices, or risks arise after the handover. Swedish Editable DOCX; corresponding PDF searchable/printable but not interactive
Swedish user guide Preparation, legal scope, correct meeting, signing, and control checklist. Swedish Editable DOCX; corresponding PDF searchable/printable but not interactive
English User Guide Instructions for the Swedish work templates – not a full English version. English Editable DOCX; corresponding PDF searchable/printable but not interactive
Excel – handover register Nine tabs: Read Me, Overview, Project, Documents, Risk Transfer, Open Questions, Ongoing Design, Handovers, Sources. Swedish XLSX – editable workbook

The Excel tool in practice

The Swedish register has nine tabs: Read Me, Overview, Project, Documents, Risk Transfer, Open Questions, Ongoing Design, Handovers, and Sources. You can enter actual project IDs, document versions, risk cards, completed actions, and receipt dates. The overview formulas count, among other things, registered projects, received documents, manually checked documents, risks, and open questions.

Tested status logic: When a document is marked as received but not checked, only the receipt is counted. When the actual check status is later changed, the correct summary is updated. The customer file summaries start at zero. Excel does not calculate legal deadlines, decide whether construction can start, or assess whether legal requirements have been met.

How the handover works

  1. Establish the project, client, actually appointed BAS-P/BAS-U, and planned first construction day.
  2. Check whether a written occupational health and safety plan is required under AFS 2023:3, Chapter 11, Section 2.
  3. Collect current risk assessments, AMP versions, and other design documentation.
  4. Hold a structured conversation explaining risks and preventive choices.
  5. Document gaps, responsible parties, decisions, and which actions need to be checked before the work in question begins.
  6. Record receipt separately from actual assessment and verification.
  7. Determine the flow for new information during ongoing design and archive the latest versions.

Legal requirements under AFS 2023:3

The client: according to Chapter 2, Sections 23–24, the client must ensure that the handover takes place before the first construction/civil engineering work, even if the coordinator changes, and clarify the transfer of additional design work.

BAS-P: Chapter 3, Sections 18–19 regulate the handover of the occupational health and safety plan and other risk-related information, as well as continued provision of information while design work continues after the handover.

BAS-U: Chapter 4, Section 26 regulates receipt, while Chapter 4, Section 29 deals with updating the occupational health and safety plan in the event of significant changes.

Structured handover: Chapter 11, Section 15 requires that previous preventive work, identified risks, and prescribed measures are explained, not just that a file is sent. According to Chapter 11, Section 2, not all construction projects require a project-specific written occupational health and safety plan; this must be assessed separately. The Swedish Work Environment Authority describes the client's responsibilities and an appropriate meeting structure.

Comparison: handover protocol or occupational health and safety plan?

An occupational health and safety plan is the plan to prevent risks in the construction project when the requirements are met. This handover package is a separate documentation flow showing how people, risk explanations, and documents are actually passed between BAS-P and BAS-U, and how open questions are kept visible.

Frequently asked questions

Must BAS-P hand over to BAS-U before construction begins?

Yes, in an applicable construction or civil engineering project, the handover of the occupational health and safety plan and other occupational health and safety work must take place before the first work begins. See AFS 2023:3, Chapter 2, Section 23, and Chapter 3, Section 18. How the plan should look depends on whether the requirement under Chapter 11, Section 2 applies.

Is it enough to email an occupational health and safety plan?

No, an email alone is not sufficient documentation to show that the structured risk review referred to in Chapter 11, Section 15 has been carried out. Risks, previous preventive work, and decisions should be explained in a documented conversation.

What happens if design work continues after the handover?

BAS-P must pass on relevant new/changed design information, and BAS-U must assess how occupational health and safety work and the plan are affected. The document for ongoing design provides a traceable notification flow.

Can Excel indicate that construction has been approved to start?

No. The register contains only administrative fields and formulas. Received files, confirmations, and registered checkpoints are not the same as a safe working environment or permission to start.

Can the PDF files be filled out digitally?

The PDF versions are searchable and printable, not interactive forms. Edit the DOCX templates in compatible software and export the final version yourself.

Are all the documents in English?

No. The five operational documents and Excel are in Swedish. A separate English User Guide provides instructions on how to use the Swedish files.

Are the documents approved by lawyers?

No. The actual files have undergone internal AI-assisted legal source checking and technical testing. No independent professional legal review or government approval is promised.

Related controlled resources

Occupational Health and Safety Plan for Construction and Civil Engineering and the existing guide on occupational health and safety plans in construction projects.

Sources, version, and transparency

Document version 1.0 – November 17, 2026. Internal AI-assisted legal source check November 17, 2026. Primary source: The Swedish Work Environment Authority's AFS 2023:3. The documents provide structure and evidence support, not automated compliance or advice on a specific high-risk project.