Skip to product information
1 of 3

Svenska Dokumentmallar

Safe Excavation 2026/2027 – Work preparation, competent person, excavation permit & inspection register | Word/PDF/Excel

Safe Excavation 2026/2027 – Work preparation, competent person, excavation permit & inspection register | Word/PDF/Excel

File format
DOCX, PDF, XLSX
Document language
Five Swedish work templates Swedish guide English guide and Swedish Excel register
Number of files
7

Digital download. No physical product is shipped.

Regular price $8.00 USD
Regular price Sale price $8.00 USD
Sale Sold out
Taxes included.
View full details

About this template

Prepare and follow up on occupational health and safety work during excavation with a comprehensive template package for earthmoving contractors, water and sewage companies, and construction businesses. Document actual ground conditions, expert information, the competent person, work preparation, inspections, work stoppages, and inspection records.

Package Contents

15 customer files: five Swedish work templates and two user guides (Swedish and English) in editable Word format and corresponding searchable PDF format, plus an Excel register with six tabs. Digital download as a ZIP file, version 1.0.

What the Files Contain

Pre-start requirements, work preparation, excavation inspections, work stoppages and documented restarts, and inspection records. The Excel file collects administrative references, non-conformities, corrective action deadlines, and stoppages.

Why Is the Package Needed in 2026/2027?

The Swedish Work Environment Authority's targeted inspections of excavation work are ongoing from June 2026 to September 2027. The inspections focus on collapse risks and also cover traffic, electricity, occupational health and safety plans, machinery inspections, and emergency preparedness. The regulations apply regardless of the inspections. Information from the Swedish Work Environment Authority about the inspections.

Document List

Document Format Language Function
01 Requirements Word/PDF SV Ground conditions, utilities, hazardous materials, competence, and evidence.
02 Work Preparation Word/PDF SV Technical information, coordination, protection, and briefing.
03 Excavation Inspection Word/PDF SV Rounds, changed conditions, and non-conformities.
04 Work Stoppage and Restart Word/PDF SV Investigation, verification references, and manual decision.
05 Inspection Record Word/PDF SV List of evidence, deficiencies, and follow-up.
06 User Guide Word/PDF SV Workflow, legal sources, and scope.
07 User Guide Word/PDF EN English guidance for Swedish work templates.
08 Excavation Register Excel SV Six tabs and 50 pre-formatted rows per register.

When Is a Competent Person Required?

AFS 2023:13, Chapter 5, Section 87, requires that excavation work be led by a competent person when investigations show that hazardous substances, materials, installations, or utilities are present in the ground, or when shoring or a slope angle as required by Section 90 is necessary. Investigate according to Section 89 before starting and document the necessary protection. Competence and technical assessments must be verified in practice; the template does not automatically designate an authorized person.

Ground Stability, Shoring, and Loads

According to Sections 88–92, ground work must be planned based on actual geotechnical conditions and loads. Shoring is used if the risk of a collapse causing injury or an accident is not assessed as non-existent; a slope angle may be an alternative. An expert assesses the method and safety distances. Materials and traffic must not create risks through overloading, for example, and fall risks must be managed. The package does not contain general safe depths, angles, or distances and does not replace design calculations.

Inspections and Work Stoppages

Follow the site-specific risk assessment and the expert's inspection instructions, even when ground conditions, water, weather, or loads change. If there is danger, work must be stopped and those affected must follow the site's safety and emergency procedures. Document the investigation, new inspection, risk assessment, and actual decision. Special rules apply to safety representative stoppages and government decisions; no Excel status can override them.

Excel – Six Tabs

Overview, Excavation, Inspections, Actions, Stoppages, and Sources. Four registers with 50 pre-formatted rows each and 206 formula cells. Duplicate IDs, missing evidence, deviating inspection statuses, and overdue actions are flagged. "Information registered" only means that certain administrative fields are filled in, not that the risks are acceptable. A registered decision is a reference to a separate actual decision.

Practical Example

An inspector records a non-conformity during ongoing excavation work. The inspection row is flagged for investigation, and an action with a passed stated deadline is flagged as overdue. The stoppage is followed up in a separate tab. The person responsible must assess the actual conditions and document any new decision before work resumes. The example is fictional.

How to Use the Package

  1. Collect and verify the site's technical information and investigations.
  2. Carry out work preparation together with those affected and coordinate with Bas-U where relevant.
  3. Document inspections and relevant changes.
  4. Investigate non-conformities and follow stoppage and emergency procedures.
  5. Collect traceable information for self-monitoring and potential inspections.

Format and Limitations

Word files can be edited in a compatible word processor, PDF is for reading and printing, and Excel requires compatible spreadsheet software. The work templates and Excel file are in Swedish; an English guide is included. This is administrative support for professional operations, not geotechnical design, a complete occupational health and safety plan, a technical inspection, or a safety approval.

Frequently Asked Questions

Is there a safe standard angle for all excavation?

No. The method and design must be assessed based on the ground and loads.

Is a competent person always required?

Section 87 specifies particular situations where this is required. Other requirements for risk assessment and safety apply regardless.

Is the inspection a new law?

No, it is a targeted inspection effort under existing occupational health and safety regulations.

Is Excel a start inspection that approves the work?

No. It monitors documentation and non-conformities.

What inspection frequency should be used?

Base it on the actual risk assessment, the expert's instructions, and changed conditions. No general frequency is specified in the package.

Can a registered decision reference override a safety representative stoppage?

No. Follow the specific legal and factual requirements for lifting the stoppage.

Does the package replace the occupational health and safety plan?

No. It complements the occupational health and safety plan and site-specific information. See also the occupational health and safety plan for construction and civil engineering.

Legal Sources

AFS 2023:13, Chapter 5, Sections 87–92, AFS 2023:10 on risks in the working environment, and AFS 2023:3 on design and construction site occupational health and safety coordination. AI-assisted legal source check November 26, 2026; no independent legal or geotechnical review.