Skip to product information
1 of 3

Svenska Dokumentmallar

Scaffolding Handover 2026/2027 – Installation Inspection, Documentation & Excel | Word/PDF

Scaffolding Handover 2026/2027 – Installation Inspection, Documentation & Excel | Word/PDF

File format
DOCX, PDF, XLSX
Document language
Five Swedish working documents Swedish User Guide and English User Guide
Number of files
7

Digital download. No physical product is shipped.

Regular price 79 SEK
Regular price Sale price 79 SEK
Sale Sold out
Taxes included.
View full details

About this template

Scaffold Handover 2026/2027 is a document package for scaffold contractors, construction companies, and employers who need to document assembly inspection, handover documentation, receiver inspection, non-conformities, and ongoing inspections for construction scaffolds in Sweden.

Note: The templates are administrative and legally limited documentation aids, not design calculations, official certificates, completed inspections, or permission to use a scaffold. Actual inspection and risk assessment must be carried out by responsible persons with appropriate competence.

Package Contents

15 customer files in a digital ZIP: 7 editable Word (DOCX) files, 7 corresponding searchable and printable PDFs, and 1 Excel workbook (XLSX) with nine tabs. Five main templates and a Swedish guide are in Swedish. A separate English User Guide for the Swedish files is included. The PDFs do not contain interactive form fields.

What the Files Contain

Assembly inspection, document handover in accordance with AFS 2023:11, the receiver's own inspections, non-conformity and exclusion logs, and registers for ongoing follow-up. The Excel workbook links scaffold ID, responsible parties, verified inspection data, actual document references, and open deficiencies. It provides only administrative statuses, not safety approval.

File by File: What Do I Get?

Document Function Language and Format
01 Assembly Inspection Form for actual inspection after erection in accordance with Chapter 8, Sections 32–33. SV · Word/PDF
02 Handover Protocol Document list for plans, design documentation, inspection documentation, and relevant instructions in accordance with Section 34. SV · Word/PDF
03 Receiver Inspection The user employer's risk assessment and inspection basis before use. SV · Word/PDF
04 Non-conformities and Exclusions Document actual deficiencies, protective measures, and re-inspection. SV · Word/PDF
05 Ongoing Inspection Log Inspections during use and after specific risk events. SV · Word/PDF
06 User Guide Workflow, allocation of responsibilities, legal sources, and practical scenarios. SV · Word/PDF
07 English User Guide English instructions for the Swedish working templates. EN · Word/PDF
08 Excel Register Nine tabs for assembly inspections, documentation, receivers, deficiencies, and follow-up. SV · XLSX

Who Uses the Templates?

Scaffold erectors, construction contractors, and employers who receive and use a construction scaffold. The regulations distinguish between inspection after assembly and the employer's own inspection before and during use. For weather protection, special designs, and multiple employers at a construction site, additional documentation and specific procedures may be required. This package does not produce a design calculation or an actual technical scaffold plan.

What Documentation Must Be Handed Over?

AFS 2023:11, Chapter 8, Section 34, covers, among other things, the plan for erection, use, and dismantling, design documentation, documented inspection, and specific instructions for applicable weather protection and prefabricated scaffolds. The user employer also needs to verify access to the documentation in accordance with Section 36. At construction sites with multiple employers, there are specific requirements regarding Bas-U. See the Swedish Work Environment Authority regulations.

Excel with Nine Tabs

START, SITE, ASSEMBLY INSPECTION, HANDOVER, DOCUMENTS, USER INSPECTION, DEFICIENCIES, FOLLOW-UP, and SOURCES. If the eight administrative handover inspections are marked as verified and no non-conformity has the status “Open” or “In Progress,” BASE – MANUAL FINAL REVIEW is displayed. For incomplete inspections or open non-conformities, STOP/INVESTIGATE is displayed. The status never constitutes a right to use a scaffold.

How the Document Package Is Used

  1. Identify the scaffold, site, scaffold erector, and user employer.
  2. Collect the actual plan, design documentation, and evidence of competence where required.
  3. Document the actual inspection after assembly.
  4. Record which documents have actually been handed over and to whom.
  5. Perform the user's separate risk assessment and inspection before use.
  6. Follow up on open deficiencies, exclusions, changes, and ongoing inspections.
  7. Archive signed originals and the current version of all supporting documentation.

Legal Limitations

In accordance with AFS 2023:11, Chapter 8, Sections 32–33, the employer responsible for erection must inspect and document the completed scaffold. In accordance with Sections 35–37, the employer who uses the scaffold has their own risk assessment and inspection obligations. A scaffold with a deficiency that is significant for the working environment must not be used until the deficiency has been addressed. Requirements for competence and documentation are also found in Section 24 and Annex 6. The legal and technical content of the documentation must be checked against the actual scaffold.

Frequently Asked Questions

Is the product an approved scaffold certificate?

No. It helps document work and inspections that are actually carried out. The files do not certify the actual safety of a scaffold.

Is it enough if the scaffold erector has signed?

No. The user's employer needs to perform their own inspections before and during use in accordance with applicable regulations.

What do we do if a deficiency remains?

A deficiency that is significant for the working environment prevents use until it has been addressed. Describe the deficiency, the protective measure, and the actual re-inspection.

Does it include design and technical construction?

No. The package provides space for references to technical documentation, but does not produce it.

Can Excel approve the scaffold for use?

No. Excel only displays administrative supporting information for manual final review or STOP/INVESTIGATE.

What is editable?

The Word files and Excel workbook can be edited. The PDF files are searchable and printable without interactive fields.

Legal Sources and Version

Version 1.0, internal source review November 22, 2026. AFS 2023:11, especially Chapter 8, Sections 5, 24–25, and 32–37; the Swedish Work Environment Authority guidance on scaffolds with a free sample form for plans; AFS 2023:3 for construction site working environment coordination. No external legal or scaffold expert review has been verified.

Supplementary documentation: Fall Risk and Work at Height covers a broader fall risk assessment; this package covers scaffold handover and inspection logs.