F-gas 2027: which split air-to-water heat pumps face the GWP 150 ban?
Guide to the January 2027 F-gas market ban for small split air-to-water heat pumps, including GWP thresholds, stock evidence and safety exceptions.
Importers, distributors and installers of heat pumps need to separate the type of equipment, rated capacity, refrigerant and first placing on the EU market. From 1 January 2027, an EU F-gas restriction applies to certain split air-to-water systems rated up to and including 12 kW that contain or rely on fluorinated greenhouse gases with a GWP of 150 or more. This is a placing-on-the-market rule, not a general ban on continuing to operate all existing heat pumps.
What changes under the F-gas rules on 1 January 2027?
The legal basis is Regulation (EU) 2024/573, Article 11(1) and Annex IV point 9(b). The relevant first placing on the market of split air-to-water systems with rated capacity no more than 12 kW and F-gases with GWP 150 or above is restricted unless required for safety at the operating site. Other provisions can also apply. A checklist never creates a legal authorisation to sell or install a product.
Decision matrix: equipment, capacity and GWP
Up to and including 12 kW includes exactly 12.0 kW. 'GWP 150 or more' includes precisely 150. Check verifiable manufacturer specifications, gas identity and the relevant GWP definition in the Regulation. A model number or catalogue label is not enough. The European Commission lists R-32 with GWP 675. Do not treat a split system as a monoblock system, and do not apply the separate 2029 split air-to-air deadline to split air-to-water equipment.
| Situation | How to assess it |
|---|---|
| Split air-to-water, 12.0 kW, GWP 675 | Point 9(b) matters from 2027; verify first EU placement and any valid exception |
| Split air-to-water, up to 12 kW, GWP 149 | The GWP trigger in point 9(b) is not met; still review other applicable requirements |
| Split air-to-air, up to 12 kW, GWP 150+ | A separate date, 1 January 2029, appears in point 9(c) |
| Split air-to-water, 12.1 kW | Outside the 12 kW scope of point 9(b); assess other Annex IV categories and dates |
| Lawfully placed in the EU before 2027 | Further supply from 1 January 2028 requires proof of earlier lawful placement |
| Claimed site safety exception | Needs a site-specific documented safety assessment, not a blanket statement |
First EU market placement and 2028 stock evidence
Placing on the market generally concerns the first supply of an item on the Union market, including relevant import events. Equipment lawfully placed on the market before the 2027 ban must be distinguished from equipment first introduced after it. Article 11(1) permits subsequent availability of certain earlier lawful stock, but from 1 January 2028, one year after that Annex date, evidence of the lawful earlier placement is required. Keep transaction documents, EU entry data, exact model, serial numbers and the supplier chain. Merely showing a 2026 production date or purchase order is not conclusive.
When does the safety exception apply?
The exception in point 9(b) is linked to safety requirements at the actual operating site. General arguments about cost, convenience or stock shortages do not automatically qualify. Record the site, applicable safety rules, evaluated alternatives and a qualified technical assessment. Do not copy a GWP 750 exception from another equipment category without checking the exact legislative provision.
Six checks before ordering or supplying a model
- Confirm that the equipment is actually a split air-to-water system and record its exact model and rated capacity.
- Obtain manufacturer evidence for refrigerant identity, mix, legally relevant GWP and equipment classification.
- Establish when the particular unit was first lawfully placed on the EU market.
- For claimed old stock, collect an auditable chain of invoices, deliveries and EU market evidence.
- For claimed safety exceptions, obtain site-specific requirements, options reviewed and competent signed technical evidence.
- Escalate unclear products for manual review and keep an internal hold until an authorised person reaches a documented decision.
Three real-world importer and distributor cases
Case A: A 12.0 kW split air-to-water model using R-32 is first introduced on the EU market in February 2027. Since its GWP exceeds 150, Annex IV point 9(b) needs to be applied. Without a valid exception, it cannot be newly placed on the market.
Case B: A specific unit was lawfully first placed on the EU market in November 2026 and supplied again in February 2028. Under Article 11(1), documented proof of that lawful pre-ban placement is required for further supply.
Case C: An installer claims that an alternative refrigerant cannot meet local safety rules. The company must examine actual site requirements and competent technical evidence; a generic sales statement does not itself establish the exception.
Frequently asked questions
Does the 12 kW threshold include exactly 12.0 kW?
Yes. Point 9(b) covers rated capacity up to and including 12 kW.
Will all existing heat pumps become illegal to operate?
No. This point deals with placing certain new equipment on the market; separate servicing and use requirements may still apply.
Can pre-2027 EU stock be supplied in 2028?
Potentially, if it was lawfully placed on the EU market before the ban and the supplier can provide the required evidence.
Does an Excel register certify compliance?
No. It organises evidence and decisions, but does not grant a legal exception, CE mark or installation permission.
Different heat-pump technology: This F-gas guide covers air-to-water equipment and product rules. Ground-source heat pumps require separate checks of municipal notification or permits, borehole positions and neighbouring wells. See the guide to geothermal boreholes in Sweden.
Restrictions on placing new heat-pump models on the EU market are not the same as operators' ongoing obligations. See our guide to F-gas operator changes, leak checks and register handover. It covers operating existing equipment separately from rules on new products.
Official sources and legal limits
- Regulation (EU) 2024/573 – Article 11 and Annex IV
- European Commission – equipment categories and deadlines
- Naturvårdsverket – fluorinated greenhouse gases
Sources reviewed 17 November 2026: Regulation (EU) 2024/573 Article 11 and Annex IV points 9(b)–(c), plus European Commission equipment guidance. Explains EU rules as applied in Sweden, not an individual product conformity approval.
Explore the topic
Business guides – contracts, HR, AI & complianceGeothermal borehole in Sweden 2026 – permits and neighbour distances
Ground-source heat pumps in Sweden: municipal notification, SGU distance guidance, neighbouring wells, water protection and the drilling report.
Business guides – contracts, HR, AI & complianceF-gas when an operator changes in Sweden – handover, leak checks and records
When a shop, property or business changes the operator of refrigeration, air-conditioning or heat-pump equipment, handing over the keys is not enou...