Skip to product information
1 of 3

Svenska Dokumentmallar

Wetland Creation 2026/2027 – Application, Readiness & Management Register | Word/PDF/Excel

Wetland Creation 2026/2027 – Application, Readiness & Management Register | Word/PDF/Excel

File format
DOCX, PDF, XLSX
Document language
Five Swedish work templates and a Swedish guide English User Guide; Excel in Swedish
Number of files
7

Digital download. No physical product is shipped.

Regular price 79 SEK
Regular price Sale price 79 SEK
Sale Sold out
Taxes included.
View full details

About this template

Creating a wetland – notification, land use, and management plan

Are you planning to create a wetland on your land to promote biodiversity, reduce nutrient runoff, or retain water in the landscape? This specialized template package helps you gather project details, investigate land use and drainage companies, prepare environmental documentation, and record decisions and long-term management.

15 customer files: 7 editable Word documents (DOCX), 7 corresponding searchable PDF files, and 1 Excel workbook (XLSX) with nine tabs. Five Swedish working templates, a Swedish user guide, and a separate English User Guide. One-time digital purchase in ZIP format, with no physical shipping. The PDF files are read-only versions and not interactive forms. Compatible document and spreadsheet software are required.

Five hectares is not a permit.

Creating a wetland with a water area of no more than five hectares is subject to a numerical criterion for notification. Assess the entire project, land use, existing water installations, environmental impacts, and other requirements separately. Restoration and rewetting may be subject to different assessment rules. The template package does not replace expert design, the official notification to the authority, or a permit.

01. Package contents

Five Swedish working templates: project card and assessment pathway, land use and drainage control, environmental and drawing documentation, notification file and start control, and management plan and monitoring log. Also included are Swedish and English user guides and a Swedish Excel workbook. Seven unique text documents in two formats plus a spreadsheet – 15 files in total.

02. What the files contain – file by file

Fields for case ID, operator, total water area, maps, rights, drainage companies, environmental impacts, authority decisions, actual management, and evidence. Each Swedish working template has two framed information boxes and two pages with control and input fields.

Document and file name Function Language Format
Project card and assessment pathway
01_Project Card.docx / .pdf
Define the new installation, water area, purpose, and assessment requirements. Swedish DOCX + PDF
Land use and drainage control
02_Land Use and Drainage.docx / .pdf
Collect evidence of rights, drainage records, affected properties, and documentation for reassessment. Swedish DOCX + PDF
Environmental and drawing documentation
03_Environmental and Drawing Documentation.docx / .pdf
Coordinate expert maps, hydrological documentation, impacts, and protective measures. Swedish DOCX + PDF
Notification file and start control
04_Notification and Start Control.docx / .pdf
Follow appendices, notification, environmental impact decision, other requirements, and verified start rule. Swedish DOCX + PDF
Management plan and monitoring log
05_Management and Monitoring.docx / .pdf
Document implementation, maintenance, support conditions, costs, and actual evidence. Swedish DOCX + PDF
Swedish user guide
06_User Guide SV.docx / .pdf
Workflow, legal boundaries, examples, and legal sources. Swedish DOCX + PDF
English User Guide
07_English User Guide.docx / .pdf
English instructions for the Swedish working templates. English DOCX + PDF
Wetland – project and management register
08_Wetland Register.xlsx
Nine tabs for area, rights, environment, decisions, management, and evidence. Swedish XLSX

Who is the package for?

For farmers, property owners, conservation organizations, and project managers preparing a new, smaller wetland in Sweden. Use it to keep tasks organized before contacting an advisor, expert, county administrative board, or other competent authority. The package does not calculate hydrology, size dam embankments or cut-offs, or replace reassessment by a drainage company, special permit applications, or subsidy applications.

Excel – nine tabs and 809 administrative formulas

Overview, Cases, Area, Land Use, Environment, Decisions, Management, Evidence, and Sources. Seven registers with 100 pre-formatted rows each. Record a unique case ID and the entire water area in square meters. Excel converts this to hectares and checks the numerical criterion for new installations. You can track rights documentation, authority decisions, management entries, and evidence. Duplicate IDs and incomplete or invalid data are flagged. The overview includes nine control key figures.

Hypothetical example: 50,000 m² equals 5 hectares and falls within the numerical criterion. 50,001 m² falls outside. If restoration or rewetting is recorded, a different assessment pathway is indicated instead. If no decision is recorded that significant environmental impact cannot be assumed, STOP appears in the decision register. A status of MANUAL ASSESSMENT is never a green light. If there are more than 100 rows, formulas and ranges need to be expanded.

How to use the template package

  1. Define the entire project, water area, purpose, and other planned water measures.
  2. Investigate land use, property rights, drainage companies, and any reassessment using actual records.
  3. Collect expert maps, drawings, hydrological documentation, environmental impacts, and protective measures.
  4. Submit any notification through the relevant authority channel. Document the environmental impact decision, final processing, legal effect, and other requirements.
  5. Monitor actual construction, management, maintenance, evidence, and any support conditions. Check changes before they are implemented.

Legal requirements

According to Section 19, paragraph 1 of the Ordinance (1998:1388) on Water Activities, creating a wetland where the water area does not exceed five hectares is subject to the notification provision. A permit is generally required under Chapter 11, Section 9 of the Environmental Code. Exceptions under Section 12 must be assessed individually. A larger new installation or other measures requires a separate assessment. Land use under Chapter 2 of the Act (1998:812) and existing drainage companies must be investigated. Consent does not replace reassessment or other necessary decisions.

From 1 August 2025, the supervisory authority must decide on significant environmental impact under Section 22 a. If there is significant environmental impact, the notifier must be ordered to apply for a permit under Section 22 d. Check decisions on whether significant environmental impact cannot be assumed under Section 22 e, the eight-week rule in Chapter 11, Section 9 b of the Environmental Code, any individual start decision under Section 22 f, continued processing, and other requirements. A submitted notification is not a permit.

The owner of a water installation is responsible for maintenance under Chapter 11, Section 17 of the Environmental Code. Support decisions may include special management and conservation conditions. Check the actual form of support and the decisions; Excel does not calculate support rights or binding deadlines.

Ordinance on Water Activities · Environmental Code · Act with Special Provisions on Water Activities · Swedish Environmental Protection Agency – Wetland Rules · County Administrative Board e-service · Swedish Board of Agriculture – Management.

Related templates

For special assessment of water abstraction: Water abstraction for irrigation. For coastal protection issues: Coastal protection – small lake, stream, and dispensation. For separate management of drainage water: Drainage water at excavation sites.

Frequently asked questions

Do I need to notify the authority about a new wetland?

A new wetland with a water area of no more than five hectares is subject to the stated notification criterion. Assess the entire project and any other requirements separately.

Can I create exactly five hectares?

Five hectares is subject to the numerical criterion, but this does not permit the work to be carried out.

Can I use the template for rewetting drained land?

You can use parts of the working documentation, but restoration and rewetting may be subject to different assessment requirements. The package is limited to new installations.

Is consent from a drainage company sufficient?

No. Also check the land use record, existing decisions, affected rights, and any need for reassessment or a permit.

Does Excel calculate whether I can start the work or receive support?

No. Excel checks administrative data and the area criterion. Actual authority decisions, legal effect, and support conditions must be verified manually.

Are English working templates included?

No. The five working templates and the Excel register are in Swedish. A separate English user guide is included.

Version 1.0 · Swedish law · Source control November 24, 2026. AI-assisted legal source control; no external legal or engineering review. Publisher: Svenska Dokumentmallar.