Svenska Dokumentmallar
Dredging and dredged material 2026/2027 – Application, sediment sample & control register | Word/PDF/Excel
Dredging and dredged material 2026/2027 – Application, sediment sample & control register | Word/PDF/Excel
- File format
- DOCX, PDF, XLSX
- Document language
- Five Swedish work templates and a Swedish guide English User Guide; Excel in Swedish
- Number of files
- 7
Digital download. No physical product is shipped.
Couldn't load pickup availability
About this template
Dredging and dredged material – notification, sediment sampling and waste management
Are you planning to dredge at a pier, in a small boat harbour, a lake or a watercourse? This specialised template package helps you structure information about the planned water activity, sediment sampling, handling of dredged material, regulatory decisions and the actual follow-up. For boat clubs, small boat harbours, property owners and contractors.
15 customer files: 7 editable Word documents (DOCX), 7 corresponding searchable PDF files and 1 Excel workbook (XLSX) with nine tabs. Five Swedish work templates, Swedish user guide and separate English User Guide. Digital one-time purchase in ZIP, without physical shipping. The PDF files are read-only and printable versions, not interactive forms. Requires compatible document and spreadsheet software.
A notification of dredging does not automatically mean that waste may be deposited, recycled, dewatered or dumped. Ownership, sampling data, protected areas and the authority's decision must be checked separately. The template package is an administrative aid, not an official authority form or a technical design.
01. Package contents
Five Swedish work templates: assessment path and project definition, sediment sample and analysis data, waste management plan and reception, notification data and environmental effects, and start control, operation and final report. Also Swedish and English user guides and an Excel workbook in Swedish. Seven unique text documents in two formats plus a spreadsheet tool – 15 files in total.
02. What the files contain – file by file
Fields for case ID, operator, actual affected seabed area, maps, sample ID, analysis results and units, classification data, waste batches, wet weights, transport receipts, regulatory decisions and completed controls. Each Swedish work template has two framed information boxes and two pages with control and input fields.
| Document and file name | Function | Language | Format |
|---|---|---|---|
|
Assessment path and project definition 01_Provningsvag.docx / .pdf |
Document water category, total seabed area, ownership and other assessments. | Swedish | DOCX + PDF |
|
Sediment sample and analysis data 02_Sedimentprov.docx / .pdf |
Collect sampling plan, sample ID, analysis unit, laboratory report and expert assessment. | Swedish | DOCX + PDF |
|
Waste management plan and reception 03_Masshanteringsplan.docx / .pdf |
Document classification, planned wet weight, handling path, carrier and reception receipt. | Swedish | DOCX + PDF |
|
Notification data and environmental effects 04_Anmalningsunderlag.docx / .pdf |
Collect drawings, environmental effects, protective measures, consultation, appendices and reception receipt. | Swedish | DOCX + PDF |
|
Start control, operation and final report 05_Startkontroll_slutrapport.docx / .pdf |
Check decision and other requirements; follow conditions, deviations, actual waste deliveries and completion. | Swedish | DOCX + PDF |
|
Swedish user guide 06_Anvandarguide_SV.docx / .pdf |
Workflow, definitions, Excel examples and legal sources. | Swedish | DOCX + PDF |
|
English User Guide 07_English_User_Guide.docx / .pdf |
English instructions for the Swedish work templates. | English | DOCX + PDF |
|
Dredging – Excel register 08_Muddring_register.xlsx |
Nine tabs with area criteria, sample register, wet weight reconciliation and decision control. | Swedish | XLSX |
Who is the package for?
For an operator preparing a smaller dredging project who needs a coherent documentation chain from assessment path to documented completion. Use for example during a planned dredging in a lake or at a small boat harbour, when expert sampling and map data need to be collected. The package is not intended to replace specific permit applications, dumping exemptions, land dewatering assessments, professional sediment investigations or technical design. For larger or more complex activities, an individual assessment is required.
Excel – nine tabs and 1,210 administrative formulas
Overview, Cases, Area, Samples, Waste, Transport, Decisions, Control and Sources. Seven register tables with 100 pre-filled rows per table. Register a unique case ID, total affected seabed area, waste batches and unique load IDs. Excel calculates a rough volume estimate based on area and average depth, checks the numerical area criterion and compares documented planned wet weight with delivered wet weight from registered transport receipts. Duplicate IDs, negative quantities and missing mandatory information are flagged. For more than 100 rows, formulas, validations and summation ranges need to be extended.
Fictitious example: 500 m² in a watercourse is within the numerical criterion while 501 m² is outside. 3,000 m² in another water area is within the criterion while 3,001 m² is outside. A documented plan of 120 tonnes and a documented delivery of 100 tonnes gives a difference of 20 tonnes. This is not evidence of an actual remaining quantity. The register does not check concentrations against limit values, classify waste or determine whether any activity may commence.
How to use the template package
- Document the full scope of the activity, water category, seabed area, ownership and other assessments.
- Prepare an expert sampling plan, laboratory reports and assessment of sediment and waste.
- Investigate planned waste management, approved receiver, transport and any separate regulatory requirements.
- Collect actual maps, drawings, environmental effects and appendices. Use the relevant authority's current e-service or instructions and save receipts.
- Check regulatory decisions, legal effect, start rule and other requirements. Follow conditions, deviations, actual waste deliveries and completion.
Legal prerequisites
For dredging, the notification provision in Section 4–5 of the ordinance (1998:1388) covers a maximum of 500 m² of affected seabed area in watercourses and a maximum of 3,000 m² in other water areas. Check the entire activity, permit requirements, exemptions, ownership and other protections. The area must not be treated as a general permission to dredge. According to Section 20, the notification must contain sufficient information, drawings, maps and technical descriptions as well as prescribed environmental data.
From 1 August 2025, the supervisory authority shall decide on significant environmental impact according to Section 22 a. In the event of significant environmental impact, the notifier shall be required to apply for a permit according to Section 22 d. According to Section 22 e, a notifiable water activity may commence at the earliest after a decision that significant environmental impact cannot be assumed. Also check the eight-week rule according to Chapter 11, Section 9 b of the Environmental Code, any special start decision, continued processing according to Section 23 and other requirements.
Chapter 29, Sections 18–19 of the Environmental Assessment Ordinance (2013:251) apply a special deposition case for non-hazardous dredged material on land along the small sounds, canals or waterways where the material was dredged. Permit requirement B applies if the quantity exceeds 1,000 tonnes or the pollution risk is not only minor; otherwise, notification requirement C applies for this special case. It is not a general limit for all waste management. Check wet weight, classification, location, risk and actual handling path separately. Waste may not be dumped in water as a general rule according to Chapter 15 of the Environmental Code. Dumping application is not included.
Environmental Code · Ordinance on Water Activities · Environmental Assessment Ordinance · Swedish Maritime and Water Authority · County Administrative Board e-service.
Related templates
For separate shoreline protection assessment: Shoreline protection – small lake, stream and exemption. For operation of an existing shared pier: Shared pier. For water sampling and purification log at boat washing: Wash pad in leisure boat harbour.
Frequently asked questions
Do I need to notify a dredging project?
Often notification or permit is required. Check the entire affected seabed area, activity type, ownership and any other assessments. Exemptions must be assessed individually.
Are 500 or 3,000 m² an allowed maximum area?
No. They are numerical criteria for the current notification provision, not a right to carry out the work.
Can I start when the notification has been submitted for eight weeks?
Not automatically. Check the authority's environmental impact decision, continued processing, applicable start rule and other requirements.
Can Excel classify the dredged material?
No. Document expert assessment, actual sample results and handling path. Excel checks administrative data.
Is the application for dumping exemption included?
No. Dumping in water is not included in the package workflow and requires separate legal assessment.
Are English work templates included?
No. The five work templates and the Excel register are in Swedish. A separate English user guide is included.
Version 1.0 · Swedish law · Source control November 24, 2026. AI-assisted legal source control; no external lawyer or engineer review. Publisher: Svenska Dokumentmallar.
