Skip to product information
1 of 3

Svenska Dokumentmallar

System Inspection 2027 – Power Output Test 70/290 kW, Simplified Inspection & Expert Report | Word/PDF/Excel

System Inspection 2027 – Power Output Test 70/290 kW, Simplified Inspection & Expert Report | Word/PDF/Excel

File format
DOCX, PDF, XLSX
Document language
Five Swedish work templates Swedish user guide English User Guide and Swedish Excel register
Number of files
7

Digital download. No physical product is shipped.

Regular price 79 SEK
Regular price Sale price 79 SEK
Sale Sold out
Taxes included.
View full details

About this template

Do you, as a property owner, need to inventory heating, ventilation, and cooling systems under the revised energy performance rules? This Swedish template package helps you document the total nominal capacity, assess grounds for exemptions and simplified inspection, commission an independent certified energy expert, and follow up on the actual inspection report.

Quick facts: 15 digital files in a ZIP: 7 editable Word documents (DOCX), 7 searchable A4 PDFs, and an Excel register with nine tabs. Five Swedish work templates, a Swedish user guide, and a separate English User Guide. The PDFs are intended for reading and printing, not as interactive forms. Version 1.0.

Package contents

Capacity assessment, exemption assessment, simplified inspection, expert commissioning, and report follow-up. Two user guides and a Swedish Excel register. The seven documents are provided in Word and corresponding PDF formats.

What the files contain

Fields for building ID, generators, nominal kW, verified reduction, original evidence, exemption assessment, six conditions for simplified inspection, certificate check, commissioning, report reference, and actions. Excel summarizes verified capacity items and displays administrative control flags. No formula determines legal obligation or technical safety.

Who is the package for?

Property owners, housing cooperatives, property managers, and operations managers who need to prepare documentation for the inspection of buildings' technical systems. In the case of a shared central, reversible heat pump, or process use, expert capacity delimitation is required. The product is not an official inspection report, energy declaration, OVK report, technical testing instruction, or substitute for a certified energy expert.

All files in the package

Document Work step Format
01 Capacity assessment Building boundary, heating and cooling generators, verified nominal capacity Word/PDF
02 Exemption assessment Energy performance agreement, control system, monitoring, and evidence of function Word/PDF
03 Simplified inspection Six conditions with reference to actual evidence Word/PDF
04 Expert commissioning Request for quotation, scope, certificate, independence, and appendices Word/PDF
05 Report and follow-up Receipt check, register evidence, safety issues, and actions Word/PDF
06 Swedish user guide Workflow, legal sources, and practical examples Word/PDF
07 English User Guide English instructions for the Swedish main templates Word/PDF
08 System inspection register Nine tabs for capacity, exemptions, simplification, expert, report, and actions Excel

Capacity limits and inspection intervals

According to Section 10 of the Act (2006:985) as amended from 1 July 2026, the total nominal capacity is the sum of the nominal capacities of the heating and cooling generators. Over 70 but no more than 290 kW: inspection at least every five years. Over 290 kW: at least every three years. Exactly 70 kW does not pass the capacity limit; exactly 290 kW is in the five-year group. Exemptions and the actual next inspection date must be checked separately. BED 4 c § allows reduction for use not intended for thermal comfort. A district heating plant is counted as a heating generator. Do not count fan power or kWh as nominal generator capacity.

Simplified inspection from 1 October 2026

According to BED 4 e § as amended by BFS 2026:10, all six conditions must be met for inspection without a site visit: unchanged generators and energy requirements; completed and valid mandatory ventilation inspection; previously reported proposed actions; no significant increase in energy use; the latest site visit no more than ten years ago; deficiencies from the latest full inspection remedied. The expert assesses the conditions. Simplification does not exempt from inspection and report transmission.

Excel – nine tabs

START, Dashboard, Buildings, Generators, Exemptions, Simplified, Expert, Report, and Actions. 100 prepared rows per register. Capacity items are checked against unique IDs, numerical values, and evidence references. The sum provides a numerical group; incomplete inventory or lack of source is flagged. The deadline is entered manually after expert review. Six documented Yeses lead to status for expert assessment, not automatic approval. Example: 40 kW heating and 35 kW cooling give 75 kW before verified reduction. Test data is not included in the customer file.

Workflow

  1. Delimit the building and collect actual capacity evidence.
  2. Summarize relevant generators without double counting and assess exemptions with evidence.
  3. Check the simplification conditions, if applicable.
  4. Commission a certified independent energy expert and determine the actual inspection date.
  5. Check the delivered report and electronic transmission to Boverket.
  6. Follow up on recommendations, any safety issues, and the verified next deadline.

Frequently asked questions

Is a previous energy declaration or OVK sufficient?

No, not automatically. Check the actual inspection report and valid interval. OVK is a separate inspection system.

Can I use the template without an energy expert?

Yes for preparatory administration; the formal inspection, report, and transmission must be handled by an independent certified expert.

Is property automation always an exemption?

No. For local buildings, the applicable functional requirements according to BED 3 b § and BFS 2026:9 must be met. The residential exemption requires a special functional assessment.

Are the PDF files fillable on screen?

The PDF is searchable and printable. Edit the Word and Excel files in compatible programs.

Are the work templates in English?

No. Five work templates and Excel are in Swedish; English User Guide is a separate English guide.

Legal sources and version

Act (2006:985), Sections 10 and 12; Ordinance (2006:1592), Sections 8 b–c and 10; BED, BFS 2026:10; Boverket guidance. AI-assisted source check 25 November 2026; no independent legal or technical specialist review. Check current regulations and the building's actual conditions before use.

Related: simplified update of energy declaration and property automation.